EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
EDMS 02-102-1
This revision contains option items that must be selected by EDC before bidding.
EDMS 19-400 for HRC Fuses shall be attached if applicable.
EDMS 17-400 for MV CTs shall be attached if applicable.
EDMS 17-401 for MV VTs shall be attached if applicable.
EDMS 20-305 for Indirect Smart Meters shall be attached if applicable.
Page 1 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
CONTENTS
2 REFERENCE 7
3 APPLICABLE STANDARDS 7
4 GENERAL REQUIREMENTS 9
4.1 GENERAL 9
4.9 INTERLOCKS 17
4.11 ENCLOSURE 18
4.15 GIS 25
4.16 AIS 26
Page 2 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
9 TRAINING 30
11 WARRANTEE 30
12 GUARANTEE TABLES 30
13 MARKING 31
14 SUBMITALS 32
15 OPTION LIST 33
- GURANTEE TABLE 35
- APPENDIX 43
Page 3 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
GLOSSARY:
EEHC: Egyptian Electricity Holding Company.
EDMS: Egyptian Distribution Material Specifications.
MV: Medium Voltage.
RMU: Ring Main Unit.
GIS: Gas Insulated System.
AIS: Air Insulated System.
A.C.: Alternating Current.
D.C.: Direct Current.
IEC: International Electrotechnical Commission.
NO: Normal Open.
NC: Normal Close.
VDS: Voltage Detecting Systems.
VPIS: Voltage Presence Indicator
EMS: Energy Management System.
DMS: Distribution Management System.
DA: Distribution Automation.
SA: Substation Automation.
RTU: Remote Terminal Unit.
ADMS: Advanced Distribution Management System.
SCADA: Supervisory Control and Data Acquisition.
C.T.: Current Transformer.
V.T.: Voltage Transformer.
SF6: Sulfur Hexafluoride
IP: Ingress Protection.
IK: Degree of Protection against Mechanical Impact.
Page 4 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Page 5 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
1. SCOPE
This specification specifies the minimum technical requirements for design, supply, engineering,
manufacturing, testing, inspection, packing, and performance of indoor/outdoor gas-insulated (AIS/GIS)
ring main unit (RMU) intended to be used in a 12 kV medium-voltage system. The RMU shall be
motorized and ready to be controlled remotely by using integrated automation solution via the SCADA in
the future. All required modifications and retrofit must be deployed on the site.
2. REFERENCE
The RMU equipment should comply with IEC listed hereafter. In no way does this specification supersede
the relevant codes except when the requirements herein are more stringent. All cases of conflicts should be
immediately brought to the tenderer's attention.
3. APPLICABLE STANDARDS
Unless otherwise specified, the RMU should comply with the latest edition of IEC publications:
3.1. IEC 62271-1 Common Specification for alternating current switchgear and control gear
3.2. IEC 62271-200 AC metal-enclosed switchgear and control gear for rated
voltage above 1 kV and up to and including 52 kV.
3.3. IEC 62271-100 High-voltage alternating-current circuit breakers
3.4. IEC 62271-102 Alternating current disconnectors (isolators) and earthing
switch.
3.5. IEC 62271-103 Switches for rated voltages above 1 kV up to and including 52 kV
3.6. IEC 62271-105 Alternating current switch-fuse combinations for rated voltages above 1
kV up to and including 52 kV.
3.7. IEC 62271- 206 Voltage presence indicating systems for rated voltages above 1 kV and
up to and including 52 kV
3.8. IEC 61243-5 Live working - Voltage detectors - Part 5: Voltage detecting systems
(VDS)
3.9. IEC 61958 High-voltage prefabricated switchgear and control gear assemblies -
Page 6 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Page 7 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
4. General Requirements :
4.1. General
The Ring Main Unit should have different configurations that consisting of a combination of various
modules to meet the electricity distribution company requirements. Some of these modules are listed below
and not limited to:
Note: [X], [Y1 or Y2], and [M1 or M2] should be defined according to ….EDC requirements.
: The RMU may be extendable as option according to….EDC requirements).
Page 8 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Page 9 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
The RMU should withstand the internal arc test, as a mandatory type test, which is intended to verify
the effectiveness of the design in protecting persons in case of an internal arc (IAC).
The internal arc class of the RMU shall be IAC AFL 16 kA for 1 Sec including the cable
compartment as mandatory. The ventilation should be provided with down/upward ventilation (as
optional according to...EDC requirements).
The gas tank should have a pressure relief.
A suitable base for RMU shall be provided (as optional according to …EDC requirements).
The RMU shall be designed such that the position of the different devices shall be visible to the
operator on the front of the switchboard and easy to operate & prevent access to all live parts during
operation without the use of the RMU special tools.
It is not the intent to specify herein complete details of design and construction. The offered
equipment shall conform to the relevant standards and be of high quality, sturdy, robust and of good
design and workmanship complete in all respects and capable to perform continuous and satisfactory
operations in the actual service conditions at site and shall have sufficiently long life in service as per
requirements.
Each module shall have a facility to carry out high voltage tests and current injection tests for the
cables terminated on them. Disconnection of cables for testing purposes is not accepted.
The RMU should have suitable support facilities to be lifted from the top and wooden pallet to be
lifted from bottom for safe transport.
Page 10 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
The earth switch contacts shall be designed to close into a fault and shall have the same short circuit
capacity as the main contacts.
Necessary auxiliary contacts for controlling, signaling& free contacts (2NO-2NC) at least in low
voltage compartment and all accessories needed for operation should be provided for each of the
switch disconnector and earth switch.
The operating handle shall be designed to prevent the opening of the switch-disconnector or the
earth switch after closing
Electrical endurance E2
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
The high rupture capacity (H.R.C) fuses shall be designed according to the latest revision
of EDMS 19-400.
The LBS shall have a 3-position „ON‟, „OFF‟, and „Earth‟ the main switch, and the earth
switch should have two independent manual operating mechanisms to prevent
simultaneous closing of the main switch and earth switch.
The manual switching operation shall be using an operating handle. Switching speed shall
be independent of the handle speed.
The switch fuse disconnector shall have the retrofitting capability on the site for the
operating mechanism and associated equipment.
The operating handle shall be designed to prevent the opening of the switch-disconnector
after closing.
The fuse holder frames should fit with an automatic opening device that functions even if
only a single fuse blows.
The fuse striker mechanism should trip the switch in case of any failure (The automatic
fuse contact shall be designed to open into a fault) and shall have visual and signal
indications.
Necessary auxiliary contacts for controlling, signaling& free contacts (2NO-2NC) at least
in low voltage compartment and all accessories needed for operation should be provided
for each of the switch-fuse disconnector and earth switch.
An indicator on the front side to present the charging spring status (Charged –
Discharged).
Rated Voltage 12 kV
Page 12 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Electrical endurance E2
Page 13 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
An indicator on the front side to present the charging spring status (Charged – Discharged).
Rated Voltage 12 kV
Electrical endurance E2
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
The current transformers should be interchangeable from lower ratio to higher ratio from the
secondary side of the current transformer only.
The current transformers ratio should by specified by .…EDC on every tender.
The winding of the current transformers should be made of copper.
Suitable current transformer shall be a part of RMU compartment along with its complete sizing
calculations.
Three single phase dry type (conventional/screened) voltage transformers according to EDMS17-
401.
The VT shall comply with IEC 61869.
The voltage transformer shall be (11000/√3/110/√3 V) 50 VA, CL0.5 Voltage factor 1.9 for 8 hrs. &
1.2 continuous feed from bus-bar or outgoing feeder.
Conventional voltage transformers should be protected by suitable H.R.C fuses on the Primary side.
No need for fuses in case of using screened VTs without life parts in the compartment.
VTs shall be protected by suitable MCBs on the secondary side. Suitable protection system shall be
provided to protect the voltage transformer against Ferro-resonance phenomena.
For conventional CTs and VTs, the leakage path should not be less than 2 cm/kV of the nominal
operating voltage.
Separate box of IP 42 for installing smart energy meter and its connections. The meter dimension
(L×W×D) is not less than (293×178×95) mm. Door-open signals for both meter box and CT
compartment shall be wired to the terminal block inside the meter box. The front door of the meter
box shall be transparent.
4.8.2. For auxiliary supply module [M2] in case of no low voltage feeding
Single /double pole dry type (conventional/screened) voltage transformers according to EDMS17-
401.
The voltage transformer shall be (11000/√3/suitable value), voltage factor 1.9 for 8 hrs. & 1.2
continuous feed from bus-bar.
The secondary voltage and burden of the voltage transformer should be design according to the
manufacture solution and the RMU configuration.
The rated continuous output power shall be design regarding to the consumption with safety factor
not less than 20%.
Conventional voltage transformers should be protected by suitable H.R.C fuses on the Primary side.
No need for fuses in case of using screened VTs without life parts in the compartment.
VTs shall be protected by suitable MCBs on the secondary side. Suitable protection system shall be
Page 15 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
4.8.3. For feeders and transformer Modules used for measuring [x] and [Y]
The current Sensors or Ring core CT
o Three single phase current sensor and ring core CT should be complying with IEC
IEC61869.
o The current transformers ratio should be according to rated normal current of each module.
o The winding of the current transformers should be made of copper.
o The current sensors/ Ring core CT shall has rated and insulation voltages of 0.72 kV/3 kV -
1min.
o The sensors for protection relay shall provide both measurement and power outputs with
class 5P20 for protection and class 1 for measurement. The power supply winding ensures
calibrated self-powering of the relay even for currents of just a few Amperes (for [Y1]
module).
o The current sensor/ Ring core CT should be designed to give a thermal protection to the
measuring and protection devices during heavy earth faults and should allow for cable fault
currents up to 25kA (r.m.s.) and should operate at cable sheath temperature up to 90ºC.
o Suitable current sensor shall be a part of RMU compartment along with its complete sizing
calculations.
o The current sensors/ Ring core CT should have current injection facility to perform the
primary current injection test (preferred).
Voltage Presence Indicator System (VPIS) or voltage detector system (VDS) should be integrated in
all functional modules.
o VPIS/VDS shall receive the signals through the capacitive sensor installed inside the
bushings of RMU which detect the cable side voltage.
o The indicator shall be flush-mountable.
o VPIS shall be according to standard IEC 62271- 206.
o VDS shall be according to standard IEC 61243- 5.
o VPIS/VDS shall have a low voltage hot phasing facility. The lamps / LCD shall be powered
by bushing-type capacitive dividers.
o VPIS/VDS shall detect the voltage presence /absence and be fitted with a 3 LED/LCD.
Page 16 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
o Internal wiring in cable boxes shall be protected with heat resistant tape/tube,
against flame temperatures of gas torch during the cable termination.
4.9. Interlocks
Interlocks between different components of the equipment are provided for reasons of
protection and for convenience of operation. Interlocks shall not be damaged by attempted incorrect
operations of any associated switching device.
The interlock shall be provided between electrical and manual operations.
A mechanical indicator should be provided to show the position of the switches to enable locking at
each position separately.
Manual closing blocking facility for an SF6 circuit breaker in AIS RMU.
Electrical closing or opening inhibition of LBS or CB in case of low sf6 gas.
Electrical closing inhibition of LBS or CB in case of cable door is open.
Arrangements for padlocking should be provided for:
o Each position of the switches enables locking at each position separately.
o Electrical Pushbuttons of closing and opening the switches.
o Mechanical pushbuttons for closing or opening the circuit breaker.
The switch should be provided with the inter-locks specified in IEC62271-200 but not limited to the
following:
o Operation of the „ON/OFF‟ mechanism of switch / CB shall be possible only if the earth
switch is in the „Earth OFF‟ position.
o Operation of the „ON / OFF‟ mechanism of the earth switch shall be possible only if the
mechanism of switch / CB is in the „OFF‟ position.
o The cable box cover cannot be opened unless the earth switch is in the “ON” position.
o LBS or CB cannot be moved “ON” position when the cable box cover is in the open position.
o Earth switch cannot be closed unless the cable is de-energized (as option according to …EDC
requirements)
o Fuse changing or accessing the fuse chamber cannot be done in any position other than the
“Earth” position.
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Page 18 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
key.
The enclosure shall be equipped with a base of iron beam with supports to withstand lifting it from
the bottom and suitable for the RMU weight. The iron beam shall be painted by two layers one for
iron erosion resistant and the 2nd is black.
Two large galvanized iron bolts (approved closing means) shall be installed, one on the top and the
other on the bottom of the left leaf for easy closing and opening the door.
The doors shall be equipped with two eye-bolts (iron hasp) as shown in the figure. In addition one
eye-bolt to be supported by locks.
The means for non-closing the external doors during maintenance is by mean of a rectangular
section attached to the body of the panel with a screw at one end and with a hole on the other end
that is fixed with a stent welded to the outer door when it is opened.
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
o Support enough NO/NC output contacts operated with fault condition for covering all required
signals in case of separate module.
o Protection of enclose IP40 or above.
FPI shall have a latched output when the current exceeds the threshold value for overcurrent and the
earth fault.
The reset to the healthy condition should include: (Fault current is cleared, adjustment time delay,
software, sense current due to the cable re-energize, and sense the voltage due to the cable re-
energize).
FPI shall have a time-tagged events
Easily replaced and maintained.
Compact size.
Withstand a temperature range of -30 up to +70°.
Not responsive to mechanical shocks.
Protected against sun, radiation, humidity and dust.
It should be provided with an indication for transient and permanent faults.
Measuring continuous current and voltage for each phase.
Phase to earth fault function:
o Indicator should support adjustable setting range (10-180 A) primary current with suitable
step.
o Indicator should support fast act time response at fault condition (0.06 Sec. or less).
Phase to phase fault function
o Indicator should support wide adjustable setting range (225-700) primary current with
suitable step.
o Indicator should support fast act time response at fault condition (0.06 Sec. or less).
4.13. Capacitor divider and phase comparator
Every load break switch or circuit breaker cell should be equipped with three capacitor dividers
connected to the voltage presence indicator system monitored by LEDs or LCD to indicate the
voltage presence on the cable.
There should be a facility to check the phases concordances with the use of external device. This
external device shall be provided with the RMU.
Page 20 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Page 21 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Page 23 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Insulation tests
o Dielectric tests: according to the (IEC 60255/5 &60225/5 or equivalent) tests voltage 2
KV 50 Hz, 60 sec.
o Impulse voltage test according to the (IEC 60255/5 & 60225/5 or equivalent) Tests
voltage 5 kV, unipolar impulses, waveform 1.2/50μs.
o Insulation resistance measurements according to the IEC60255/5.
High frequency interference withstands:
o According to class III of IEC 60225
Over load
o Current circuit temporary 25 kA primary for 1.0 sec.
Mechanical tests
o Vibration test (sinusoidal) according to the IEC 60255.
o Shock and bump test according to the IEC 60255.
4.14.7. Measurement
Display primary current values (IR-IS-IT-IN).
Transient disturbance Events.
4.14.8. Communications:
The relay should support local and remote communication, local communication with P.C or laptop
and suitable remote communication to be connected with the RTU.
Page 24 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Heater of 100-watt, 220v AC with a hygrostat and a M.C.B per each module in cable
compartement.
Additional 200 watt, 220v AC heater shall be installed in the bus bar compartment with its
associated MCB and hygrostat.
Protection degree IP3X.
The creepage distance of the resin insulator should be not less than 2 cm/KV.
Main Bus Bar:
o It should be insulated B.B system and made of high grade of electrolytic copper at least
630A for all RMU panel should not be less than 400 mm2.
o The temperature rise should be according to IEC 60271-103.
o All main bus bars should be insulated by red anti-track heat shrinkable tubes and the
connection points should be covered with a suitable insulated cover.
o The bus-bar compartments should be placed at the upper part of the switchboard and
fitted with using dielectric supports.
o The entire bus and structure should be constructed to withstand the short circuit effects
due to the rated short circuit current of 25 kA for 1 Sec at least.
o The Bus bar connections should be anti- oxide greased.
o Main B.B should be extendable and securely mechanically bonded to each unit.
Earth Bus Bar:
o An earth copper bar at the bottom of the switchboard extending the entire length of each
distribution panel should be provided with a cross section area to withstand the rated
short circuit current of the system the bus should be extendable and securely
mechanically bonded to each unit.
o Copper earthing bar 125 mm2, each earthing switch should be connected to the earthing
bar through copper braid of 25mm2
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
SF6 indication (low gas and/or insufficient)for one tank or for each
cell in case of separate tanks
Per RMU
Energy tariff meter door open
CT tariff meter compartment door open
Phase to phase fault
Per [X] Earth fault
Cable door open
CB spring discharged for CB
Protection relay OC Trip
Per [Y1] Protection relay EF Trip
Protection relay Faulty (IRF)
Cable door open
Any fuse blown
Per [Y2] Fuse rack out for GIS if available
Cable door open
LBS ON/OFF
Per RMU CB ON/OFF
ES ON/OFF
Close command
For [X] & [Y]
Open command
All equipment shall be successfully type tested at EEHC approved laboratory in accordance to the
Page 27 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
DESCRIPTION OF TESTS: Pass(P) , Fail (F) , Un-completed (U) , Not available (NA)
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
clamp
2 Dielectric test MV and LV
The purpose of the test is to check the trip of the transformer breaker
in case of trip condition:
Phase fault
Earth fault
7. Training:
….EDC reserves its right to claim a priceless training of its representatives on the vendor‟s factory, site,
and lab.
The training should include and not limited to the following:
1. Installation.
2. Testing & Commissioning.
3. Troubleshooting.
4. Operating and Maintenance
Page 29 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
9. Warrantee
The supplier guarantees the RMU and RTU against all defects arising out of faulty design or
workmanship, or of defective material for period of (5) years from date of delivery.
Warranty period for gas tightness (seal pressure system) shall conform to the relevant IEC and the
contractor shall assume full responsibility for no gas leakage during the service life.
The good quality and manufacturing of the materials should be guaranteed.
Any parts which on account of poor quality of the materials, manufacturing defects or poor
assembly, should be replaced or repaired in the shortest time possible and free of charge.
10.Marking
10.1. The following data should be engraved or laser printed on an aluminum/stainless steel
nameplate riveted on the Ring main unit and Enclosure and located in a visible and legible
place when the switchboard is installed showing the following information:
Manufacturer‟s name
Type/Model
Serial Number and year of Manufacturing
Distribution company name
order number
indoor or outdoor application
Rated voltage and rated insulation level
Page 30 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Rated frequency
N1 no. LBS + N2 no. CB/F and the type (GIS/AIS)
Rated and duration of short-circuits current (KA/sec)
Making current KA
degree of protection
Gross Weight(KG)
IEC standards
IAC type and (KA/time).
10.2. The following data should be cleared per cell (Switch disconnector, Switch fuse
disconnector/CB) and located in a visible and legible place showing the following
information, Entries on the plate should be indelibly marked be etching or engraving:
Type/Model
Rated voltage and rated insulation level
IEC standards
Rated current (A) and Rated voltage (V).
Rated and duration of short-circuits current (KA/sec)
Making current KA
Electrical and mechanical endurance
Rated frequency
Serial Number and year of Manufacturing
11.SUBMITTALS
11.1. Vendor shall provide the following with the quotation:
Clause by clause compliance with the specification.
All necessary drawings including the scheme drawing of the RMU, dimensions, single
line diagram of (control circuit, tripping circuit, closing circuit, voltage supply circuit,
VT and CT connections, Alarms, communication……etc.)
Technical catalogues containing the technical data for all offered components of the
unit should be submitted.
Installation and maintenance instructions.
Copy of type test report.
A valid approved letter must be submitted from the Egyptian Electricity Holding
Company
A comprehensive list of manufacturer‟s recommended spare parts. The quantities
Page 31 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
offered should be adequate for the initial 5 years of operation. Firm price and delivery
period shall be quoted for each item and ….EDC has the right to request the spare part
list or not
11.2. Vendor shall provide the following after signing of purchase order:
Details of manufacturing and testing schedules
Routine test reports (including tightness test)
11.3. Vendor shall provide the following with delivering:
Operation (user) manual.
Handles, Master Keys, Locks….. for operation and locking.
External device to check the phases concordances.
Testing rods for HIPOT (High Potential) test.
Testing rods for current injection test.
Testing device for protection relay if existing of a dedicated testing device.
Page 32 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
12.OPTION LIST:
The following table should be filled/attached by …EDC during tendering.
2 Outdoor RMU
12 [X], [Y1 or Y2], and [M1 or M2] should be defined according to ….EDC requirements:
NO. of [X]: , NO. of [Y…]: ,NO. of [M…]:
H.R.F capacity: ,C.T. Ratio:
Page 33 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
GUARANTEE TABLES
6 Color …….
Environmental conditions
1 Ambient temperature ……°C
Indoor RMU
1 RMU Type ……
2 RMU configuration ……
Page 34 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Page 35 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Page 36 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
4 Electrical endurance ……
CT
1 Product type ……
2 Highest voltage for equipment Um (R.M.S) ……KV
3 Rated primary service voltage ……KV
4 Rated frequency ……HZ
5 Rated primary current ……A
6 Rated secondary current ……A
7 Current continuous factor ……
8 Rated short time "thermal" withstand current (RMS) For 1 sec ……KA
(KA)
9 Accuracy class ……
Page 37 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
7 Voltage factor ……
8 Rated impulse withstand voltage for primary windings ……KV
9 Short duration withstand (r.m.s) voltage for primary windings ……KV
(1min) Rated power frequency short duration withstand for secondary
winding for 1 minute
10 Rated power frequency short duration withstand for secondary ……KV
winding for 1 minute
11 Accuracy class ……
4 It shall detect the voltage presence /absence and be fitted with a 3 Yes/no
LED/LCD.
Page 38 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Interlocks
1 Matching all requirements Yes/no
Enclosure Outdoor Use:
1 Thickness of sheet steel/IK protection ……mm
2 Thickness of electrostatic paints ……microns
3 Dimensions: Width *Depth *Height ……mm*……mm*……mm
4 IP protection ……
Fault passage Indicator (FPI)
1 Integrated/separate …….
2 Feeding source …….
3 IP …….
4 Matching all requirements Yes/no
Capacitor divider and phase comparator
1 Every load break switch or circuit breaker cell should be equipped Yes/no
with three capacitor dividers connected to the voltage presence
indicator system monitored by LEDs or LCD to indicate the
voltage presence on the cable.
2 There should be a facility to check the phases concordances with Yes/no
the use of external device. This external device shall be provided
with the RMU.
GIS
1 Model …….
2 IP protection for Cable Box and Mechanism …….
3 C.S.A of earthing bar …….
4 Interface type of Terminal bushings and size of bolt …….
5 Stages No. for the SF6 pressure indication for the tank …….
Page 39 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
2 IP protection …….
3 C.S.A of Bus bar …….
4 C.S.A of earthing bar …….
5 Creepadge distance …….cm/kV
6 Heater of 100-watt, 220v AC with a hygrostat and a M.C.B per Yes/no
each module.
7 Additional 200 watt, 220v AC heater shall be installed in the bus Yes/no
bar compartment with its associated MCB and hygrostat.
8 Rated short circuit current for 1 Sec
Protection Relay for [Y1] module
1 Maker 's name …….
2 Country of manufacture …….
3 Type and designation …….
4 Standard specification with which relay complies …….
5 Relays characteristics …….
6 Range of relay setting I……(A) / T.…..(Sec)
7 Current rating of relay coil …….A
8 Voltage rating of relay coil ……. V
9 Auxiliary supply rang …….DC (V)
10 Relay order number …….
11 Dual power supply Yes / No
Page 40 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Page 41 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
APPENDIX A
In case of the switch fuse disconnector has the same design of switch disconnector, Type
tests no. 5, 7 and 8 shall be only applied.
Page 42 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Switching devices forming part of the main circuit and earthing switches of
assemblies shall be tested to verify their rated making and breaking capacities
according to the relevant standards and under the proper conditions of installation
and use. That is, they shall be tested as normally installed in the assembly with all
associated components that may influence the performance, such as connections,
supports, provisions for venting. These tests are not necessary if making and
breaking tests have been performed on the switching devices installed in assemblie
with identical or more onerous conditions.
All switching devices not previously tested as mounted in the assembly, shall be operated 50
times C-O, mounted in the assembly. Test conditions and criteria to pass the test are identical
to the ones defined on each corresponding switching device standard for mechanical tests.
Page 43 of 44
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 02-102– 1
EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 26-10-2021
Where possible, the tests should be performed on a complete system. If this is not practical, the
test may be performed on parts, components or subassemblies.
The type test for [M] module shall be according to IEC 62271-200 and shall include tests
number
1. Rated Insulation level.
2. Measurement of the resistance of circuits
3. Rated contionus current and measurement of the resistance of circuits
4. Capability of the main and earthing circuits to be subjected to the rated peak and
rated Short-time withstand currents
5. IP protection code.
6. IK Protection degree
7. Tightness of gas – or liquid- filled compartments.
8. IAC classification
9. Electromagnetic compatibility (EMC).
Page 44 of 44