Letak STP Gedung A PPKM2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

SALURAN 80 X 100 x 120

BLOWER

CP

(by other)

-40 -40

STP 10 M3

STP 10 M3

STP 10 M3

STP 10 M3
Cap 5 m3
EQUALIZING TANK

INFLUENT

BAR SCREEN

-40

NK
NK NK
F
NK NK G
SISTIN
NG EK
GEDU
GEDUNG EKSISTING

-130

A
-40 -40
-60

TERAS GD A
-120 -40
-5-10

NK
-1780
-1780
-1710
-1710
H
-178
-74
-750
-750
I -740
-740 -750
-750 -171
JA21
21
-1780
-1780
-1710
-1710
NK

-5
TERAS GD C -50
-50
IN -10

OUT -150 E

E -130 BB
NK NK

NK

JANITOR

E -110

E -90
-5 810
NK NK

-30
TAMAN

-40 TAMAN
-20
-20
B
BLOWER

CP

STP 10 M3

STP 10 M3

STP 10 M3

STP 10 M3
A A

CP
BLOWER
BLOWER

EL. -0.40 EL. 0.40

STP 10 M3
STP 10 M3

EL. -2.96 EL. -2.96

You might also like