Widining & Strengthing of Biswan Laharpur Hargao NH-727 Ke KM 17 Nayamupur Safipur Kasmanda Road
Widining & Strengthing of Biswan Laharpur Hargao NH-727 Ke KM 17 Nayamupur Safipur Kasmanda Road
Widining & Strengthing of Biswan Laharpur Hargao NH-727 Ke KM 17 Nayamupur Safipur Kasmanda Road
Length 2,500.00
Say Rs Lacs -
Carriageway 3.00
SOLING -
E/W -
CC
HP- No. 1000 2.00
HP- No. 350 -
V.G-10 40,592.00
EMULSION SS-2 51,034.00
01.08.2024
Mate 370.00
Labour Skilled 350.00
Labour Semi Skilled 335.00
Labour UnSkilled 325.00
Mason 1st 480.00
Mason 2nd 450.00
Bhisti 380.00
Water 50.00
Water Tanker 6Kl 370.00
Capacity
VG_10
SS_2
RS_1
Cement PPC 325.00
Bricks 7.50
Pipe 600 dia 1,700.00
Collor 600 dia 375.00
Pipe 1000 dia 3,800.00
Collor 1000 dia 800.00
Distance Querry upto 1,823.00
200
onward 200 6.50
781032094.xlsx
Basic Rates
Date:- 01.08.2024
Analysis for Bitumen
a) Bitumen emulsion SS-2
Basic rate at Panipat Refinery 51034.00 per MT
b) Cement (OPC)
Market rate 335.00 per beg or 6700.00 per Mt
Analysis for Steel
H.Y.S.D. Bar 68000.00 per Mt
JE AE EE
P.D., PWD P.D., PWD P.D., PWD
Sitapur Sitapur Sitapur
PWD WORK
1 Report (a) Proper references have been quoted and attached to the estimate with copies
(b) In case of revised estimate the amount of excess has been given itemwise in the
comparative statement with detailed reasons.
(b) Each design has been prepared as per standard practive and C.E.'s instructions.
4 Analysis of Rates : (a) The rates for non scheduled items have been based on prevailing market rates
and rates for schedule items are as per approved one.
(b) The rates for non scheduled items have been based on prevailing market rates
and rates for schedule items are as per approved one.
5 Datails of Measurements : Each page has been signed by Junior Engineer, The signature of A.E., E.E. exist in
the end of each set.
6 Bill of Quantity : Each page bears signature of Junior Engineer, Assistant Engineer, Executive Engineer and
Superintending at the end of the each set.
7 Summary of Estimated Cost : These have been signed by Junior Engineer, Assistant Engineer, Executive
Engineer and Superintending Engineer.
8 Plans : This has been signed by Junior Engineer, Assistant Engineer, Executive Engineer and Superintending
engineer.
9 General : (I) Name and designations, should exist below all signaturs and correction intialed.
(ii) Each page of design, analysis of rates, details of measurements, bill of quantities
and summary of estimated cost should be certified checked and corrected by
Divisional and Circle Office computers with the signature and seal.
(iii) The Signature of Local Head of department should exist on report, specifications,
summary of estimated cost and plans.
1 Title Page
2 Index
3 Report
4 References
5 Specification
6 Design
7 R.M.R.
8 Analysis of Rate
9 Detail of Measurement
10 Bill of Quantity
12 Map / Drawinds
SPECIFICATION
A.E E.E
PD, PWD, PD, PWD,
Sitapur Sitapur
ekxksZ ds lkekU; ejEer ds lkFk
uohuhdj.k@fo'ks"k ejEer@ lqn`<+hdj.k gsrq
izLrkfor ekxZ@iqfy;k ds dk;ksZ gsrq psd
fyLV
Widining & strengthing of Biswan Laharpur Hargao
1 ekxZ dk uke & NH-727 ke km 17 Nayamupur safipur kasmanda
Road
2 ekxZ dk ;wfud dksM & 240710
3 ekxZ dh Js.kh & xzkeh.k ekxZ
4 ekxZ dk LokfeRo & yksd fuekZ.k foHkkx
5 ekxZ dh dqy yEckbZ 2-40 & izLrkfor yEc 0.250 Km.
6 lEcfU/kr fo/kku lHkk dk uk & egksyh
7 lEcfU/kr yksdlHkk dk uke & /kkSjgjk
8 izLrkod dk uke ¼;fn dksb & ek0 Jh 'k'kkad f=osnh
¼ek0 tuizfrfuf/k vFkok vU & ek0 fo/kk;d
ekxZ ds {kfrxzLr yEckbZ
9 ekxZ ds foxr uohuhdj.k dk& 10/2017
10 ekxZ dh vkSlr ØLV & 20-00 lseh0
11 ekxZ dh pkSM+kbZ ¼ehVj& #NAME?
12 izLrkfor dk;Z ¼la{ksi esa & ysofyax dks 0.250 Km.
uohuhdj.k & 1.500 Km.
lh0lh0 jksM 0.250 Km.
;w0Mªsu@ds0lh0 Ms0.160 Km.
b.Vj ykWfdax VkbYl X
ekxZ ij {kfrxzLr iqfy;k dk fooj.k
13 iqfy;k dk izdkj &vkj0lh0lh0@gz;we ikbi X
14 iqfy;k la0 & X
15 iqfy;k dh pkSM+kbZ ¼eh0& X
16 iqfy;k dh Liku ¼eh0 esa½& X
17 izLrkfor dk;Z ¼la{ksi esa & foLrkj@ iquZfuekZ.kX
vizksp jksM------------X
ckbZikl----------------- X
18 ekxZ fdlh vU; ;kstuk esa iz& ugha
19 ekxZ ij foxr rhu o"kksZ esa djk;s x;s dk;Z ,oa O;;
20 izLrkfor dk;Z dh ykxr & 27.16 Lacs
21 ctV dksM &
Month & Year of Traffic Volume From to Design Period 10 Traffic Growth 6
Motorised Traffic Non Motorised Traffic
Agricultural Tractors Animal Drawn
Trucks Buses
Trallers Vechicle
Cars
Jeep Light Laden Unladen Overladen
Motorised
Vans Comm Cycl Cycle
Days two
Three ercial es Rickhwa Num
Wheelers L U OL L U OL SWC
Wheeler Vehicle Tyred
s SA TaA SA TaA SA TaA
Certified that the cartage from the shortest possible route where the overall rates are cheapest has bee adopeted.
Quantity Amount
Reference to Rate (Rs.)
Sr No MORD Description Unit (Rs.)
Specification For Small Small Project
Project
WMM Stblz
4.9 406 Wet Mix Macadam (RAP with 3.5% emulsion & 1% cement)
Providing, laying, spreading and compacting graded stone aggregate to
wet mix macadam specification including premixing the material with
water at OMC in mechanical mixer (Pug Mill), carriage of mixed material
by tipper to site, laying in uniform layers in sub-base/base course on a
well prepared sub-base and compacting with smooth wheel roller of 80
to 100kN weight to achieve the desired density including lighting,
barricading and maintenance of diversion, etc as per Tables 400.11 &
400.12 and Technical Specification Clause 406. (RAP with 3.5%
emulsion & 1% cement)
1 2 3 4 5 6 7
(1) WBM Grading II
d) Add Royalty
63 mm to 45 mm @ 0.91 cum per 10 sqm cum 435.60 160.00 69,696.00
JE AE EE
PD, PWD, PD, PWD, PD, PWD,
Sitapur Sitapur Sitapur
###
Analysis of Rate
Widining & strengthing of Biswan Laharpur Hargao NH-727 ke km 17 Nayamupur safipur kasmanda Road
S. Ref. To Description Unit Quantity Rate Amount
No. Rs.
Specifi
cation
1 2 3 4 5 6 7
(1) WBM Grading III
Say- 5,507.21
JE AE EE
PD, PWD, PD, PWD, PD, PWD,
Sitapur Sitapur Sitapur
ANALYSIS OF RATES & CONVEYANCE CHARGES
Widining & strengthing of Biswan Laharpur Hargao NH-
727 ke km 17 Nayamupur safipur kasmanda Road
Cost of Bitumen VG-10 from Refinery to Site
Sl.N Amount
Item
o. (in Rs.)
Total 41,929.60
Say [per M.T.] Rs. 41,929.60
Note- Above bitumen and emulsion rates are based on basic rates 01.08.2024
2 Cartage from Refinary to Site Distance 364 KM. 1.90 ./Km. 691.60
3 Less Loading 0.00
Total 51,725.60
Say [per M.T.] Rs. 51,725.60
Note- Above bitumen and emulsion rates are based on basic rates 01.08.2024
1 2 3 4 5 6 7
5.2 503 Tack Coat
Unit = Sqm.
Taking output = 3500 Sqm.
a) Labour
Mate day 0.08 370.00 29.60
Mazdoor (skilled) day 2.00 350.00 700.00
729.60
b) Machinery Price Escalation @ 85%
1 2 3 4 5 6 7
5.9 508 Premix
VG_10 Providing laying & rolling of open graded premix
carpet of 20 mm thickness composed of 13.2mm
to 5.6 mm aggregates either using penetration
grade bitumen or emulsion to required line ,grade
and level to serve as wearing course on a
previously prepared base including mixing in a
suitable plant ,laying and rolling with a three wheel
80-100 KN static roller capacity finished to
required level and grades to be followed by seal
coat .
By Manual Means
Bitumen (VG-10)
Unit = Sqm.
Taking output = 100 Sqm.
a) Labour
Mate day 0.22 370.00 81.40
Mazdoor (Semi-skilled) day 1.20 335.00 402.00
Mazdoor (Unskilled) day 4.20 325.00 1,365.00
1,848.40
b) Machinery Price Escalation @ 85%
Total- 20,380.01
Rate Per Sqm./ 100 203.80
1 2 3 4 5 6 7
5.1 510 Seal Coat
Total- 7,318.81
Rate Per Sqm./ 100 73.19
Unit=cum
Taking output=1 cum
a) Labour
Mate day 0.08 370.00 29.60
Mason day 0.10 480.00 48.00
Mazdoor day 1.63 325.00 529.75
Bhisti day 0.27 380.00 102.60
709.95
b) Material
40 mm aggregate cum 0.576 2990.00 1722.24
20 mm aggregate cum 0.288 3214.50 925.78
10 mm aggregate cum 0.096 3160.00 303.36
Coarse sand cum 0.48 2861.80 1373.66
Cement t 0.25 6500.00 1625.00
5950.04
c) Machinery
Concrete mixer 0.4/0.28 cum hour 0.40 277.50 111.00
Formwork @ 4% on cost of material, labour
6770.99 4% 270.84
and machinery (a+b+c)
Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement Mortar 1:4 (As per sub analysis) cum 0.14 5782.19 809.51
809.51
b) Labour
Mate day 0.06 370.00 22.20
Mason day 0.60 480.00 288.00
Mazdoor day 0.60 325.00 195.00
Bhisti day 0.30 380.00 114.00
619.20
Contractor's profit including overhead @ 13.50% 1428.71 192.88
c) Add Royalty
Sand at Site day 0.147 150.00 22.05
Total [A+B+C]- 1621.59 1643.64
Rate per Sqm/ 10 164.36
Rate / Cum Rs. 164.30
Unit = 1 cum
Taking output =1 cum
a) Materials
Cement MT 0.38 6500.00 2470.00
Sand at Site Cum 1.05 2861.80 3004.89
5474.89
b) Labour
Mate day 0.04 370.00 14.80
Mazdoor day 0.90 325.00 292.50
307.30
5782.19
Rate / Cum Rs. 5782.19
M-20
Unit = cum
a) Material
Cement t 0.35 6500.00 2275.00
Coarse sand cum 0.45 2861.80 1287.81
10 mm aggregate cum 0.54 3160.00 1706.40
6.7 mm aggregate cum 0.36 2890.00 1040.40
6309.61
b) Labour
Mate day 0.08 370.00 29.60
Mason (Ist class) day 0.12 480.00 57.60
Mazdoor (unskilled) day 1.73 325.00 562.25
Bhisti day 0.27 380.00 102.60
752.05
c) Machinery
Concrete mixer 0.40/0.28 cum capacity hour 0.40 277.50 111.00
111.00
d) Add for formwork @ 4% of (a+b+c) 7172.66 0% 0.00
Unit = 10 Sqm
Taking output = 10 Sqm.
a) Material
Cement mortar 1:3 (Rate as in item 11.5 I) Cum 0.03 6657.59 199.73
199.73
b) Labour
Mate day 0.04 370.00 14.80
Mason Ist class day 0.50 480.00 240.00
Mazdoor (unskilled) day 0.50 325.00 162.50
Bhisti day 0.20 380.00 76.00
493.30
c) Contractor's profit including overhead @ 13.50% 693.03 93.56
c) Add Royalty
Sand at Site day 0.004 150.00 0.66
Total [A+B+C]- 786.59
Rate per Sqm/ 10 78.66
Rate / Cum Rs. 78.60
Unit = metre
Taking output = 12.5 metre (5 pipes of 2.5 m each)
600 mm dia
a) Labour
Mate Day 0.108 370.00 39.96
Mason Day 0.300 480.00 144.00
Mazdoor Day 2.400 325.00 780.00
963.960
b) Material
Sand at site cum 0.040 2861.80 114.47
Cement at site tonne 0.030 6500.00 195.00
RCC pipe including collar at site mtr 12.500 2070.00 25875.00
Granular material for bedding cum 2.700 2880.00 7776.00
33960.470
c) Contractor's profit including overhead @ 13.50% 34924.43 4714.80
d) Add Royalty
Granular material for bedding cum 2.700 160.00 432.00
Total a+b+c+d]- 40071.23
Rate per Sqm/ 12.50 3205.70
Rate / Cum Rs. 3205.70
Unit = metre
Taking output = 12.5 metre (5 pipes of 2.5 m each)
1000 mm dia
a) Labour
Mate Day 0.180 370.00 66.60
Mason Day 0.500 480.00 240.00
Mazdoor Day 4.000 325.00 1300.00
1606.600
b) Material
Sand at site cum 0.070 2861.80 200.33
Cement at site tonne 0.050 6500.00 325.00
RCC pipe including collar at site mtr 12.500 4615.30 57691.25
Granular material for bedding cum 4.500 2910.00 13095.00
71311.580
c) Contractor's profit including overhead @ 13.50% 72918.18 9843.95
d) Add Royalty
Granular material for bedding cum 4.500 160.00 720.00
Total a+b+c+d]- 83482.13
Rate per Sqm/ 12.50 6678.57
Rate / Cum Rs. 6678.50
Unit = metre
Taking output = 12.5 metre (5 pipes of 2.5 m each)
350 mm dia
a) Labour
Mate Day 0.108 370.00 39.96
Mason Day 0.300 480.00 144.00
Mazdoor Day 2.400 325.00 780.00
963.960
b) Material
Sand at site cum 0.040 2861.80 114.47
Cement at site tonne 0.030 6500.00 195.00
RCC pipe including collar at site mtr 12.500 1157.70 14471.25
Granular material for bedding cum 2.700 2910.00 7857.00
22637.720
c) Contractor's profit including overhead @ 13.50% 23601.68 3186.23
d) Add Royalty
Granular material for bedding cum 2.700 160.00 432.00
Total a+b+c+d]- 27219.91
Rate per Sqm/ 12.50 2177.59
Rate / Cum Rs. 2177.50
Unit = t
a) Material
HYSD bars including 5% for labs and wastage t 1.05 68000.00 71400.00
Binding wire Kg. 8.00 65.00 520.00
@ 1.20% and Weight of steel @ 7850 Kg./cum 0.0132 Qtls 8636.53 114.41
Total Rs. 2156.64
Say Rs. 2157.00
Per R.M.
0.025 m
0.30 m
0.050 m
0.075m
0.90 Mtr.
Unit = Cum
Taking output = 75 cum (172.50 t)
(100×3.75×0.200)
a) Labour
Mate day 7.00 370.00 2,590.00
Mason (Ist Class) day 5.00 480.00 2,400.00
Mason (IInd Class) day 5.00 450.00 2,250.00
Mazdoor (Skilled) day 6.00 350.00 2,100.00
Mazdoor (Semiskilled) day 6.00 335.00 2,010.00
Mazdoor (Unskilled) day 129.00 325.00 41,925.00
Surveyor day 2.00 0.00 -
Bhisti day 14.00 380.00 5,320.00
A) 58,595.00
b) Machinery
Concrete mixer 0.28 / 0.4 capacity (6 mixers) with hour 36.00 277.50 9,990.00
hour weigh batcher and suitable capacity calibrated
water tank
Needle vibrator hour 9.00 135.05 -
Screed Vibrator hour 9.00 0.00 -
Plate Vibrator hour 9.00 135.05 1,215.45
Concrete joint cutting machine for initial & final cuts hour 4.00 136.90 547.60
Unit = Cum
Taking output = 100 cum
a) Labour
Mate Day 0.04 370.00 14.80
Mazdoor Day 1 325.00 325.00
339.80
b) Machinery
Hydraulic Exacavator 0.9 cum bucket capacity
@ 60 cum hour 1.67 1,554.00 2595.18
Dozer D-50 for spreading @ 200 cum per hour hour 0.50 2,632.55 1316.28
Motor grader for grading @ 200 cum per hour hour 0.50 2,858.25 1429.13
Water tanker 6 kl capacity hour 2.00 370.00 740.00
Three wheel 80-100 kN Static Roller @ 80 cum hour 1.25 549.45 686.81
6767.40
c) Material
Water KL 12.00 50.00 600.00
Contractor's profit including overhead @ 13.50% 7707.20 1040.47
8747.67
Rate per Cum = 8747.67/ 100 87.48
Add Royalty Rs. 0.00
Rate / Cum Rs. 87.48
Unit = Cum
Taking output = 360 cum
a) Labour
Mate Day 0.08 370.00 29.60
Mazdoor Day 2.00 325.00 650.00
679.60
b) Machinery
Hydraulic Exacavator 0.9 cum bucket capacity
@ 60 cum hour 6.00 1,554.00 9324.00
Tipper 5.5 cum capacity, 4 trips per hour hour 16.00 -
0.00
9324.00
Contractor's profit including overhead @ 13.50% 10003.60 1350.49
11354.09
Rate per Cum = 11354.09/ 360 31.54
Add Royalty Rs. 0.00
Rate / Cum Rs. 31.54
Sl. Item Of Work Nos. Length Width Depth Quantity Rate Amount
NO.
Rs
1 2 3 4 5 6 7 8 9 10
Mts. Mts. Mts. Unit Qty.
1 x 1 7.50 RM 7.50
1 Nos. RM 7.50 6673.60 50052.00
c Plain cement concrement 1:3:6 nominal mix in
foundation with crushed aggregate 40 mm
nominal size mechanically mixed,placed in
foundation and compected by vibration including
curing for 14 days.
1 x 2 3.10 0.90 0.15 Cum 0.84
1 Nos. Cum 0.84 8236.10 6918.32
d Brick masonry work in 1:3 cement mortar in
foundation complete excluding pointing and
plastering as per drawing and technical
speficiations clauses 600, 1202 & 1203
One Row
1 x 2 3.00 0.81 0.15 Cum. 0.73
1 x 2 3.00 0.69 0.30 Cum. 1.24
1 x 2 3.00 0.58 1.60 Cum. 5.57
1 x 2 3.00 0.46 0.60 Cum. 1.66
1 x 2 3.00 0.35 0.46 Cum. 0.97
Deduction 1 x 2 3.14 0.58 x 0.575 0.58 Cum. -1.21
1 Nos. Cum 8.95 7262.70 64974.00
e Pointing with cement mortar (1:3) on brickwork
in sub structure & super structure as per
drawing and technical specification clauses
613.3 , 1204 and 1208.4
J.E. A.E.
PD,PWD PD,PWD
Sitapur Sitapur
ANALYSIS OF RATE HUME PIPE CULVERT 350mm DIA
Sl. Item Of Work Nos. Length Width Depth Quantity Rate Amount
NO.
Rs
1 2 3 4 5 6 7 8 9 10
Mts. Mts. Mts. Unit Qty.
1 x 1 7.50 RM 7.50
1 Nos. RM 7.50 2174.60 16309.50
c Plain cement concrement 1:3:6 nominal mix in
foundation with crushed aggregate 40 mm
nominal size mechanically mixed,placed in
foundation and compected by vibration including
curing for 14 days.
1 x 2 1.00 0.80 0.10 Cum 0.16
1 Nos. Cum 0.16 8236.10 1317.78
d Brick masonry work in 1:3 cement mortar in
foundation complete excluding pointing and
plastering as per drawing and technical
speficiations clauses 600, 1202 & 1203
One Row
1 x 2 1.00 0.69 0.15 Cum. 0.21
1 x 2 1.00 0.58 0.60 Cum. 0.70
1 x 2 1.00 0.46 0.40 Cum. 0.37
1 x 2 1.00 0.35 0.35 Cum. 0.24
Deduction 1 x 2 3.14 0.20 x 0.200 0.58 Cum. -0.15
1 Nos. Cum 1.37 7262.70 9952.11
e Pointing with cement mortar (1:3) on brickwork
in sub structure & super structure as per
drawing and technical specification clauses
613.3 , 1204 and 1208.4
J.E. A.E.
PD,PWD PD,PWD
Sitapur Sitapur
DETAILS OF MEASUREMENT
Widining & strengthing of Biswan Laharpur Hargao NH-727 ke km 17 Nayamupur safipur
Sl. kasmanda Road Item Of Work Nos. Length Width Depth Quantity
NO.
1 2 3 4 5 6 7 8
Mts. Mts. Mts. Unit Qty.
Construction of Embankment with approved soil with
a lift upto 1.5 m laying in layers, breaking clods,
1 dressing to required lines, curves, grade and
sections, watering and compaction to meet
requirement of table 300.1 and 300.2
Extra Earthwork in chakroads
(2.50x(3.275+7.00)/2x(0.30+1.00)/2
1 x 2 2500.00 5.14 0.65 Cum 16696.88
16696.88
781032094.xlsx
Sl. Item Of Work Nos. Length Width Depth Quantity
NO.
1 2 3 4 5 6 7 8
Mts. Mts. Mts. Unit Qty.
8 Providing laying & rolling of open graded premix carpet of
20 mm thickness composed of 13.2mm to 5.6 mm
aggregates either using penetration grade bitumen or
emulsion to required line ,grade and level to serve as
wearing course on a previously prepared base including
mixing in a suitable plant ,laying and rolling with a three
wheel 80-100 KN static roller capacity finished to required
level and grades to be followed by seal coat . (Mord
5.9Case-I(I))
AE
P.D., PWD P.D., PWD
Sitapur Sitapur
781032094.xlsx
BILL OF QUANTITY
Widining & strengthing of Biswan Laharpur Hargao NH-727 ke km 17 Nayamupur safipur kasmanda
Road
Sl.
Item Of Work Qty Unit Rate Amount
NO.
1 2 3 4 5 6
1 Construction of Embankment with approved soil with a lift upto 1.5 m laying in
layers, breaking clods, dressing to required lines, curves, grade and sections,
watering and compaction to meet requirement of table 300.1 and 300.2
Total- 18,754,363.18
A.E. E.E.
PD,PWD PD,PWD
Sitapur Sitapur
Validate Print Help
Percentage BoQ
Tender Inviting Authority: SE, Sitapur-Khiri Circle, Sitapur
Name of Work: Widining & strengthing of Biswan Laharpur Hargao NH-727 ke km 17 Nayamupur safipur kasmanda Road
Contract No: 653/E-Tender/352C/STP-LMP/2022-23 Dt. 13.02.2023
Bidder Name :
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are
allowed to enter the Bidder Name and Values only )
NUMBER # TEXT # NUMBER # TEXT # NUMBER NUMBER # TEXT #
TOTAL
Sl. TOTAL AMOUNT
Item Description Quantity Units Estimated Rate AMOUNT
No. In Words
With Taxes
1 2 3 4 5 6 7
1 Construction of embankment with approved material obtained from availble land as permitted 2600.00 Cum 85.00 221,000.00 #NAME?
and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with
all lifts and leads, spreading, grading to required slope and compacting to meet requirement of
Tables 300.1and 300.2 as per Technical Specification clause 301.5
2 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including 71.78 Cum 31.00 2,225.18 #NAME?
cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements
of lines, grades and cross sections, and transporting to the embankment location within all lifts
and lead upto 1000m to as per Technical Clause 301 (S.No. 3.6) of MORTH Specification.
3 Construction of granular sub-base by providing well graded material, spreading in uniform layers 71.78 Cum 4400.00 315,832.00 #NAME?
with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,
and compacting with smooth wheel roller to achieve the desired density, complete as per
Technical Specification Clause 401. GSB
4 Providing, Laying, spreading and compacting stone aggregates of 63-45 mm size to water bound 254.00 Cum 5250.00 1,333,500.00 #NAME?
macadam specification including spreading in uniform thickness , hand packing ,rolling with
Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and
brooming ,Stone screening,binding materials to fill up theinterstices of coarse
aggregate ,watering and compacting to the required density G-II
5 Providing, Laying, spreading and compacting stone aggregates of 53-22.4 mm size to water 262.00 Cum 5270.00 1,380,740.00 #NAME?
bound macadam specification including spreading in uniform thickness , hand packing ,rolling
with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and
brooming ,Stone screening to fill up the nterstices of coarse aggregate, watering and
compacting to the required density G-III (Mord 4.7(3)(A))
6 Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular 3262.50 Sqm 40.00 130,500.00 #NAME?
base including cleaning of road surface and spraying primer at the rate of 0.70kg/sqm using
mannual means.
7 Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.35 kg per 3262.50 Sqm 17.00 55,462.50 #NAME?
sqm on the prepared surface cleaned with hydraulic broom. (Mord 5.2(iii))
8 Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 3262.50 Sqm 195.00 636,187.50 #NAME?
13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required
line ,grade and level to serve as wearing course on a previously prepared base including mixing
in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished
to required level and grades to be followed by seal coat . (Mord 5.9Case-I(I))
9 Providing and laying seal coat 'C' Type sealing the voids in a bituminous surface laid to the 3262.50 Sqm 70.00 228,375.00 #NAME?
specified levels, grade and cross fall . (Mord 5.12 A. By Manual Case-III Type-C(I))
10 Brick edgeing on both sides of the road of first class brick 8 cm (3") wide and 12 cm. deep laid 0.87 Km. 96000.00 83,520.00 #NAME?
with mud mortar all including labour & supply ofbricks finished to the required template and in
proper aligment and also including dressing and ramming the excavated earth as directed by
Engineer in charge. SOR 765
11 Construction of Patri with approved material obtained from availble land as permitted and 525.00 Cum 85.00 44,625.00 #NAME?
approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts
and leads, spreading, grading to required slope and compacting to meet requirement of Tables
300.1and 300.2 as per Technical Specification clause 301.5 (Mord 3.14)
…………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………
………………………………………………………………………………………………….....................
.........................................................................................................................................................
.........................................................................................................................................................
.........................................................................................................................................................
.........................................................................................................................................................
.........................................................................................................................................................
.........................................................................................................................................................
.........................................................................................................................................................
.........................................................................................................................................................
.........................................................................................................................................................
.........................................................................................................................................................
13 Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 48.00 Cum 130.00 6,240.00 #NAME?
including setting out, construction of shoring and bracing, removal of stumps and other
deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material. (Mord 3.5(iii))
14 Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm 9.60 Cum 8000.00 76,800.00 #NAME?
nominal size mechanically mixed,placed in foundation and compected by vibration including
curing for 14 days. (Mord 11.4 I (i))
15 Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and 22.08 Cum 7150.00 157,872.00 #NAME?
plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 (Mord 11.5 I)
16 Providing PCC M20 Architectural Coping on the top of wing wall, return wall etc. complete as per 3.04 Cum 8050.00 24,472.00 #NAME?
drawing and technical specification Clause 615
17 Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure /superstracutre as 96.00 Sqm 161.00 15,456.00 #NAME?
per technical specification clauses 613.4 & 1204 (Mord 12.3)
600 mm Hume Pipe Culvert
18 Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 20.72 Cum 130.00 2,693.60 #NAME?
including setting out, construction of shoring and bracing, removal of stumps and other
deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material.
19 Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm 1.68 Cum 8000.00 13,440.00 #NAME?
nominal size mechanically mixed,placed in foundation and compected by vibration including
curing for 14 days.
20 Laying reinforced cement concrement pipe for culverts on first class bedding of granular material 15.00 Rm 3100.00 46,500.00 #NAME?
in single row including fixing collar with cement motar 1:2 but excluding excavation,protection
works,back filling,concrete and masonary works in head walls and parapets
21 Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and 17.68 Cum 7150.00 126,412.00 #NAME?
plastering as per drawing and technical speficiations clauses 600, 1202 & 1203
22 Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing 24.44 Sqm 77.00 1,881.88 #NAME?
and technical specification clauses 613.3 , 1204 and 1208.4
23 Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure/superstracutre as 0.84 Sqm 161.00 135.24 #NAME?
per technical specification clauses 613.4 & 1204
Total in Figures 5,213,469.90 #NAME?
Quoted Rate in Figures Select 0.00 #NAME?
Quoted Rate in Words INR Zero Only
DETAILS OF MEARSUMENT
Length Km.
Widining & strengthing of Biswan Laharpur Hargao NH-727 ke km 17 Nayamupur safipur kasmand
Sl. Item Of Work Nos. Length Width Depth
NO.
1 2 3 4 5 6
Mts. Mts. Mts.
1 Construction of embankment with approved material
obtained from availble land as permitted and approved by
Engineer-in-Charge and as per Technical Specitaion Clause
301.3.4.1, with all lifts and leads, spreading, grading to
required slope and compacting to meet requirement of
Tables 300.1and 300.2 as per Technical Specification
clause 301.5
1 1500.00 3.75
Curve & Junction
Total
7 Providing and applying tack coat with VG_10 using bitumen
distributor at the rate of 0.35 kg per sqm on the prepared
surface cleaned with hydraulic broom. (Mord 5.2(iii))
1 1500.00 3.75
Curve & Junction
Total
8 Providing laying & rolling of open graded premix carpet of
20 mm thickness composed of 13.2mm to 5.6 mm
aggregates either using penetration grade bitumen or
emulsion to required line ,grade and level to serve as
wearing course on a previously prepared base including
mixing in a suitable plant ,laying and rolling with a three
wheel 80-100 KN static roller capacity finished to required
level and grades to be followed by seal coat . (Mord
5.9Case-I(I))
1 1500.00 3.75
Curve & Junction
Total
9 Providing and laying seal coat 'C' Type sealing the voids in
a bituminous surface laid to the specified levels, grade and
cross fall . (Mord 5.12 A. By Manual Case-III Type-C(I))
1 1500.00 3.75
Curve & Junction
Total
10 Brick edgeing on both sides of the road of first class brick 8
cm (3") wide and 12 cm. deep laid with mud mortar all
including labour & supply ofbricks finished to the required
template and in proper aligment and also including dressing
and ramming the excavated earth as directed by Engineer in
charge. SOR 765
1 1500.00
U-Type Drain
13 Earthwork in excavation for structures as per drawing and
technical specifications clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious materials and disposal upto a lead of 50
m, dressing of sides and bottom and backfilling in trenches
with excavated suitable material. (Mord 3.5(iii))
0 4 80.00 0.300
Total
2Nos. Total
1 7.50
2Nos. Total
21 Brick masonry work in 1:3 cement mortar in foundation
complete excluding pointing and plastering as per drawing
and technical speficiations clauses 600, 1202 & 1203
2Nos. Total
22 Pointing with cement mortar (1:3) on brick work in sub
structure & super structure as per drawing and technical
specification clauses 613.3 , 1204 and 1208.4
2 2.80 2.050
2 2.80 0.350
-6 0.58 0.350
2Nos. Total
23 Plastering with cement mortar (1:4) 15 mm thick on
brickwork in substructure/superstracutre as per technical
specification clauses 613.4 & 1204
4 0.35 0.30
2Nos. Total
J.E.
CD-4,PWD
Sitapur
Length Km.- 1.580
ur kasmanda Road
Depth
Quantity
7 8
Unit Qty.
Cum 20.63
Cum 0.00
2.0% Cum 0.41
Cum 21.04
Cum 0.00
Cum 0.00
Cum 53.13
2.0% Cum 0.00
Cum. 53.13
Cum 421.88
10% Cum 12.38
2.0% Cum 8.44
Cum 442.70
Cum 421.88
Cum 18.00
2.0% Cum 8.44
Cum. 448.32
Depth
Quantity
7 8
Unit Qty.
Sqm 5625.00
2.0% Sqm 112.50
Sqm 5737.50
Sqm 5625.00
2.0% Sqm 112.50
Sqm 5737.50
Sqm 5625.00
2.0% Sqm 112.50
Sqm 5737.50
Sqm 5625.00
2.0% Sqm 112.50
Sqm. 5737.50
Km. 1.500
Km. 1.500
Cum 303.75
Cum 591.25
Cum 895.00
Depth
Quantity
7 8
Unit Qty.
Cum 36.00
Cum 36.00
Cum 48.00
Cum 48.00
Cum 9.60
Cum 9.60
Cum 22.08
Cum 22.08
Cum 1.84
Cum 1.20
Cum 3.04
Sqm 96.00
Sqm 96.00
Cum 6.70
Depth
Quantity
7 8
Unit Qty.
Cum 3.66
10.36
Cum 20.72
Cum 0.84
Cum 1.68
RM 7.50
RM 15.00
Cum 9.61
Cum -0.77
Cum 8.84
Cum 17.68
Sqm 11.48
Sqm 1.96
Sqm -1.22
Sqm 12.22
Sqm 24.44
Sqm 0.42
Sqm 0.84
No. 01
No. 01
A.E.
CD-4,PWD
Sitapur
ekxZ dk uke&बिसवां लहरपुर हरगांव मार्ग NH ७२७ के किमी १९ से न्यामूपुर होते हुए शरीफपुर कसमं
Crust Chart
Chainage L C R Ave
0.000 14.00 15.00 15.00 14.67
0.050 15.00 16.00 14.00 15.00
0.100 15.00 16.00 22.00 17.67
0.150 14.00 15.00 16.00 15.00
0.200 18.00 15.00 15.00 16.00
0.250 14.00 15.00 15.00 14.67
0.300 14.00 15.00 16.00 15.00
0.350 15.00 15.00 14.00 14.67
0.400 14.00 15.00 16.00 15.00
0.450 20.00 15.00 16.00 17.00
0.500 14.00 14.00 16.00 14.67
0.550 15.00 15.00 15.00 15.00
0.600 16.00 15.00 16.00 15.67
0.650 15.00 14.50 14.50 14.67
0.700 16.00 15.00 16.00 15.67
0.750 15.00 1.50 15.00 10.50
0.800 13.00 14.50 15.00 14.17
0.850 15.00 16.00 15.00 15.33
0.900 16.00 15.00 15.00 15.33
0.950 15.00 16.00 16.00 15.67
1.000 15.00 15.00 14.00 14.67
1.050 15.00 15.00 15.00 15.00
1.090 14.00 15.00 14.00 14.33
15.01