Wuwu
Wuwu
Wuwu
ANALYSIS
1
DOUBLY REINFORCED FOR BEAM 1
2
SLAB 1
3
4
5
6
SLAB 2
7
8
9
10
SLAB 3
11
12
13
14
SLAB 4
15
16
17
18
SLAB 5
19
20
21
22
BEAM LIVE LOAD
Floor Load = (5.751 + 5.729) 1.95.36 = 1.045 kn/m
Minimum Depth:
Minimum Depth of Non Prestressed Beams COLUMN INITIAL SIZING
Table 409.3.1.1
*expressions applicable for normal weight concrete and fy = 420 DESIGN CRITERIA
Mpa. for other cases, minimum h shall be modified in F’c = 20.7 MPa
accordance with sections 409.3.1.1 through 409.3.1.1.3 as Fy = 276 MPa
appropriate. Concrete unit weight = 23.544 kn/m3
Live Load = 1.92 kn/m2
b and d 0.3 ; bmin = 250 mm Slab thickness = 0.11m
Long span beam = 4m h = 200mm
d = 400 mm
Simply supported beam: 4 (0.4 + 420700)16= 0.25
Both ends continuous: 4 (0.4 + 420700)21 = 0.19048 MINIMUM DIMENSION bmin = 250mm
23
SECOND FLOOR
DEAD LOAD
Slab = 91.12 kN/m
Floor finish = 14.24 kN/m
Beam = 0.9288 kN/m STAIR
Wall = 7.0632 kN/m DESIGN CRITERIA
TOTAL = 113.34 kN/m F’c = 20.7 MPa
Fy = 276 MPa
LIVE LOAD Concrete unit weight = 23.544 kn/m3
Slab = 8.256 kN/m Live Load = 1.92 kn/m2
24
CALCULATION OF af
Slab side For beam For slab af
lb (mm4) ls (mm4)
Afm 6.51
DIRECTION L (m) af afL2 RATIO STATUS
25
ROOF
BEAMS DEAD LOAD (kN/m) CONCENTRATED LOAD (kN)
A-1-2 5.150
A-2-3 4.248
A-3-4 6.613
B-1-2 8.417
B-2-3 6.613
B-3-4 4.248
C-1-2 5.150
C-2-3 4.248
C-3-4 4.248
SECOND FLOOR
BEAMS DEAD LOAD (kN/m) CONCENTRATED LOAD (kN)
A-2-3 14.255
A-3-4 12.548
26
B-2-3 16.450 2.650
B-3-4 13.540
C-3-4 10.320
ROOF
BEAMS DEAD LOAD (kN/m) CONCENTRATED LOAD (kN)
1 -A -B 5.873
1-B-C 5.873
2-A-B 9.319
27
2 - B -C 9.319
3 - A -B 5.330
3 - B -C 5.105
4 - A- B 5.330
4-B-C 5.873
SECOND FLOOR
BEAMS DEAD LOAD (kN/m) CONCENTRATED LOAD (kN)
1 -A -B 8.112 4.46
1-B-C 10.471
2-A-B 5.969 3.8
2 - B -C 17.307
3 - A -B 9.967
3 - B -C 9.967
4-A-B 10.471
4-B-C 8.112
28
BEAMS LENGTH (m) WIDTH (m) DEPTH (m) VOLUME (m3) DEAD LOAD (kN/m)
LONGITUDINAL FRAMES
BEAMS LENGTH (m) WIDTH (m) DEPTH (m) VOLUME (m3) DEAD LOAD (kN/m)
29
2 - B -C 5 0.2 0.4 0.400 1.884
30
For dual system R = 8.5
For reinforced concrete moment resisting frames and eccentrically braced frames Ct = 0.0731
TRANSVERSE FRAMES (LIVE LOAD)
31
SECOND FLOOR
32
LONGITUDINAL FRAMES (LIVE LOAD)
ROOF: FLOOR LIVE LOAD = 1.9 kPa
CEILING LIVE LOAD = 0.5 kPA
Floor Load, Ceilings
BEAMS LENGTH (m) TRIBUTARY AREA (m2) SLAB THICKNESS (m) LIVE LOAD SLAB (kN/m) LIVE LOAD CEILING (kN/m)
33
SECOND FLOOR: FLOOR LIVE LOAD = 1.9 kPa
CEILING LIVE LOAD = 0.5 kPA
Floor Load, Ceilings
BEAMS LENGTH (m) TRIBUTARY AREA (m2) SLAB THICKNESS (m) LIVE LOAD SLAB (kN/m) LIVE LOAD CEILING (kN/m)
34
TABLE 208-5: Near-Source Factor, Na
A 1.5 1.2 1
B 1.3 1 1
C 1 1 1
D 1 1 1
A 1.5 1.2 1 1
B 1.3 1 1 1
C 1 1 1 1
35
D 1 1 1 1
Site Profile Type Seismic Zone, Z Site Profile Type Seismic Zone, Z
36
TOTAL WEIGHT PER FLOOR LEVEL
37
II. SECTION 208.5.2.1 COMPUTATION FOR THE DESIGN BASE SHEAR
The total design base shear in a given direction shall be determined from the following equation:
The total design base shear need not to exceed the following:
(208.9): V=(2.5)(Ca)(I)(R)(w) V=219 kN
The total design base shear shall not be less than the following:
(208.10): V= 0.11(Ca)(I)(W) V= 82.02 kN
In addition, for Seismic Zone 4, the total base shear shall not be less than the following:
(208.11) V=(20.8)(z)(Nv)(I)(R)(w) V= 63.80 kN
Vertical Distribution
Zone 4, Z = 0.4
Total
Dead load (W) = 1,130 kN
Cv = 0.64
I = 1
Time (T) = 0.29414 sec.
38
V = 444 kN
Ft < .25 V
9.14183477 < 111
39
Allowable Storey Drift, D
= 0.04h/R
h R D units
Since the Transverse Frames (Frames A-B) have 3 column each, and with Relative Rigidity of each column = 0.61, the Relative
Rigidity of the transverse frame shall be 3 x 0.61 = 1.884
Since the Longitudinal Frames (Frames 1-4) have 5 columns each, and with Relative Rigidity of each column = 0.61, the Relative
Rigidity of the transverse frame shall be 5 x 0.61 = 3.05
40
Transverse Coeff.
B 3 0.33 0 0 0 0 0.3333
total 9
Longitudinal
Total 9 224.25
41
42