Perhitungan Kebutuhan Listrik Enchem

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

PROYEK : PABRIK ENCHEM

PERIHAL : PERHITUNGAN KEBUTUHAN DAYA LISTRIK


PEKERJAAN : INSTALASI ELEKTRIKAL
REV. / TANGGAL : NOVEMBER 2023
DIBUAT : PT. MITRA CIPTA PRANATA

Daya Daya Daya Daya Emergency


Luas Demand Faktor
No. Uraian Unit Tersambung Kebutuhan
(m²) Factor hunian
Va/m² Va/unit (VA) (VA) % (VA)

1 PRODUCTION
A LANTAI 1
- LOADING DOCK 178 10.0 1,780 0.8 1,424 100% 1,424
- PRODUCTION AREA 988 50.0 49,400 0.8 39,520 100% 39,520

B LANTAI 2
- PRODUCTION AREA 442 50.0 22,100 0.8 17,680 100% 17,680

C LANTAI 3
- DRY ROOM 149 50.0 7,450 0.8 5,960 100% 5,960
- PERALATAN DRY ROOM 1 24,000 24,000 0.8 19,200 100% 19,200
- PERALATAN DRY ROOM (FUTURE) 1 24,000 24,000 0.8 19,200 100% 19,200
- HOIST MOVING AREA 300 50.0 15,000 0.8 12,000 100% 12,000

D PERALATAN/MESIN
- Discharge Pump 4 6,875 27,500 0.8 22,000 100% 22,000
- LST Agitator 2 27,500 55,000 0.8 44,000 100% 44,000
- LST Agitator (FUTURE) 1 27,500 27,500 0.8 22,000 100% 22,000
- LST Pump 2 9,375 18,750 0.8 15,000 100% 15,000
- LST Pump (FUTURE) 1 9,375 9,375 0.8 7,500 100% 7,500
- FT Agitator 2 27,500 55,000 0.8 44,000 100% 44,000
- FT Agitator (FUTURE) 1 27,500 27,500 0.8 22,000 100% 22,000
- Formulation Pump 2 9,375 18,750 0.8 15,000 100% 15,000
- Formulation Pump (FUTURE) 2 9,375 18,750 0.8 15,000 100% 15,000
- Activated Carbon Tower 1 18,750 18,750 0.8 15,000 100% 15,000
- CIP Pump 1 13,750 13,750 0.8 11,000 100% 11,000
- Product loading Pump 4 9,375 37,500 0.8 30,000 100% 30,000
- Product loading Pump (FUTURE) 4 9,375 37,500 0.8 30,000 100% 30,000
- Electric Insulation 1 12,500 12,500 0.8 10,000 100% 10,000
- Electric Insulation (FUTURE) 1 12,500 12,500 0.8 10,000 100% 10,000
- Process Control Panel 1 6,250 6,250 0.8 5,000 100% 5,000
- Process Control Panel (FUTURE) 1 6,250 6,250 0.8 5,000 100% 5,000
- Field Instruments 100 63 6,250 0.8 5,000 100% 5,000
- Field Instruments (FUTURE) 20 63 1,250 0.8 1,000 100% 1,000
- Electric Heat Insulation 1 6,250 6,250 0.8 5,000 100% 5,000

2 RAW MATERIAL BUILDING


A LANTAI 1
- LOADING DOCK 198 10.0 1,980 0.8 1,584 100% 1,584
- BOILER ROOM 17 50.0 850 0.8 680 100% 680 CEK RUANGAN
- HOT ROOM 38 50.0 1,900 0.8 1,520 100% 1,520
- ELECTRIC BOILER 1 ### 4,806,250 0.8 3,845,000 100% 3,845,000 PASTIIN KW RIS
- RAW MATERIAL STORAGE 1,113 20.0 22,260 0.8 17,808 100% 17,808
- COLD ROOM 124 50.0 6,200 0.8 4,960 100% 4,960
- PERALATAN COLD ROOM 1 18,750 18,750 0.8 15,000 100% 15,000
- SPEED DOOR 1 10,600 10,600 0.8 8,480 100% 8,480

3 OFFICE & UTILITY BUILDING


A LANTAI 1
- COMPRESSOR ROOM 314 50.0 15,700 0.8 12,560 100% 12,560
- PERALATAN COMPRESSOR ROOM 1 106,250 106,250 0.8 85,000 100% 85,000 CEK KW
- WOMAN'S LOCKER & TOILET 3 12 60.0 720 0.8 576 100% 576
- MAN'S LOCKER & TOILET 3 16 60.0 960 0.8 768 100% 768
- WOMAN'S SHOWER 7 10.0 70 0.8 56 100% 56
- MAN'S SHOWER 11 10.0 110 0.8 88 100% 88
- MAINTENACE SHOP 34 100.0 3,400 0.8 2,720 100% 2,720
- POWER STATION 69 60.0 4,140 0.8 3,312 100% 3,312
- TRAFO ROOM 45 60.0 2,700 0.8 2,160 100% 2,160
- SPRINKLER & PUMP ROOM 26 60.0 1,560 0.8 1,248 100% 1,248
- PASSAGE CORRIDOR 170 30.0 5,100 0.8 4,080 100% 4,080
- HALL 1 73 30.0 2,190 0.8 1,752 100% 1,752
- HALL 2 45 30.0 1,350 0.8 1,080 100% 1,080
- OPERATION CONTROL ROOM 73 100.0 7,300 0.8 5,840 100% 5,840
- PRODUCTION CONSUMABLES STORAGE 31 60.0 1,860 0.8 1,488 100% 1,488
- CONTROL PANEL ROOM 30 60.0 1,800 0.8 1,440 100% 1,440
- CAFETARIA 95 100.0 9,500 0.8 7,600 100% 7,600
- PRAY ROOM 12 60.0 720 0.8 576 100% 576
- WOMEN'S TOILET 1 14 30.0 420 0.8 336 100% 336
- MEN'S TOILET 1 13 30.0 390 0.8 312 100% 312
- DISABLE TOILET 5 30.0 150 0.8 120 100% 120
- LOBBY 30 100.0 3,000 0.8 2,400 100% 2,400
- VISITOR MEETING ROOM 28 100.0 2,800 0.8 2,240 100% 2,240
- MAIN OFFICE 1 210 100.0 21,000 0.8 16,800 100% 16,800
- MEETING ROOM 1 22 100.0 2,200 0.8 1,760 100% 1,760
- OFFICE ROOM 1 20 100.0 2,000 0.8 1,600 100% 1,600
- OFFICE ROOM 2 20 100.0 2,000 0.8 1,600 100% 1,600
- PANTRY 17 60.0 1,020 0.8 816 100% 816

B LANTAI 2
- TF OFFICE 50 100.0 5,000 0.8 4,000 100% 4,000
- MEETING ROOM 3 29 100.0 2,900 0.8 2,320 100% 2,320
- WAR ROOM 58 100.0 5,800 0.8 4,640 100% 4,640
- MAIN OFFICE 2 154 100.0 15,400 0.8 12,320 100% 12,320
- PANTRY 13 60.0 780 0.8 624 100% 624
- OFFICE ROOM 3 21 100.0 2,100 0.8 1,680 100% 1,680
- OFFICE ROOM 4 19 100.0 1,900 0.8 1,520 100% 1,520
- STORAGE/ARCHIVE ROOM 18 60.0 1,080 0.8 864 100% 864
- SERVER ROOM 16 100.0 1,600 0.8 1,280 100% 1,280
- MULTI ROOM 59 100.0 5,900 0.8 4,720 100% 4,720

780961174.xls/PABRIK ENCHEM 1/2


- KEEPING ROOM 18 100.0 1,800 0.8 1,440 100% 1,440
- ICP ROOM 25 100.0 2,500 0.8 2,000 100% 2,000
- ANALYSIS ROOM 93 200.0 18,600 0.8 14,880 100% 14,880
- HALL 3 69 30.0 2,070 0.8 1,656 100% 1,656
- HALL 4 42 30.0 1,260 0.8 1,008 100% 1,008
- MEETING ROOM 2 18 100.0 1,800 0.8 1,440 100% 1,440
- WOMEN'S TOILET 1 13 30.0 390 0.8 312 100% 312
- MEN'S TOILET 1 13 30.0 390 0.8 312 100% 312
- NURSERY ROOM 4 100.0 400 0.8 320 100% 320

4 GUARD HOUSE
- GUIDE HOUSE 31 100.0 3,100 0.8 2,480 100% 2,480
- TOILET 5 30.0 150 0.8 120 100% 120
- MEETING ROOM 8 100.0 800 0.8 640 100% 640

5 PERALATAN UTAMA M/E


- ELEKTRONIK 1 20,000 20,000 0.8 16,000 100% 16,000
- PENERANGAN LUAR & SPECIAL LIGHTING 1 10,000 10,000 0.8 8,000 100% 8,000
- SISTEM AIR BERSIH 1 15,000 15,000 0.8 12,000 100% 12,000
- SISTEM AIR KOTOR 1 15,000 15,000 0.8 12,000 100% 12,000

- CHILLER 1 400,000 400,000 0.8 320,000 100% 320,000


- ELEVATOR 1 5,750 5,750 0.8 4,600 100% 4,600
- FORTLIFT CHARGING 3 25,000 75,000 0.8 60,000 100% 60,000 CEK KW
- HOIST WAY 1 3,750 3,750 0.8 3,000 100% 3,000
- HOIST WAY (FUTURE) 1 3,750 3,750 0.8 3,000 100% 3,000

- POMPA JOCKEY 1 3,250 3,250 0.8 2,600 100% 2,600


- POMPA ELEKTRIK 1 172,500 172,500 - - 100% -

TOTAL 171 6,429,525 5,005,620 5,005,620

Cadangan 10% - 5,506,182

Faktor Keserempakan 1.2 - 4,588,485

Effeciensi Trafo 80% - 5,735,606

REKAPITULASI :
- Daya Tersambung = 6,430 kVA
- Daya Kebutuhan = 4,588 kVA
- Daya Emergency = 5,006 kVA
- Kapasitas Transformator = 2x3200 kVA
- Kapasitas Generator Set = 2x3000 kVA
- Sambungan PLN (TM) = 4,670 kVA, TM 20 Kv

780961174.xls/PABRIK ENCHEM 2/2