(R02) FS (1BR) MUR BOQ General Works (15.07.2024) Without Preliminaries

Download as pdf or txt
Download as pdf or txt
You are on page 1of 41

PROPOSED FOUR SEASONS RESORT

MOCK-UP ROOM - 1 BED ROOM VILLA


Pongwe, Zanzibar, Tanzania

Bills of Quantities
General Works
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS :Pongwe, Zanzibar, Tanzania Section A : Preliminaries
BILL NO : Grand Summary

AMOUNT
ITEM DESCRIPTION QUANTITY
AED

GENERAL SUMMARY

Bill No. 2 - 1BR-MUR-WORK B2/S 1 -

Bill No. 3 - METAL & WOOD WORK B3/S 1 -

Bill No. 4 - INTERIOR FITTINGS B4/S 1 -

Total Carried to Letter of Tender AED -

G/S
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section B: Sitework

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION B: SITEWORK

Site Clearance

Site clearance, remove vegetation, trees, topsoil and a cart


A to tip with the approval of the Engineer and appropriate 502.00 m2 -
authorities

Excavation

Excavation from existing ground level to bottom of


B foundation; all in accordance with the drawings and 403.00 m3 -
specification

Compaction
Compaction of excavated surface to receive foundation,
C ground beam, and slab on grade; all as per the drawings and 428.00 m2 -
specification-( Minimum of 95% M.D.D)

Filling
Filling in layers with approved material; all as per the
D 509.00 m3 -
drawings and specification

Disposal

Remove surplus unsuitable excavated material off-site with


E 92.00 m3 -
the approval of the Engineer and appropriate authorities

Soil Treatment
Anti-termite soil treatment to horizontal and vertical
surfaces; in accordance with the specifications

F Generally 884.00 m² -

Carried to Collection AED -

B2.1/1
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section B: Sitework

DESCRIPTION AMOUNT
ITEM
(AED)

SECTION B: SITEWORK (CONT'D)

COLLECTION

Page B2.1/1
-

Total Carried to Summary AED -

B2.1/2
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section C: Concrete Work

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION C: CONCRETE WORK


SUBSTRUCTURE

Plain Concrete
Mixing and Placing Blinding concrete, Grade C20/20 cubic
strength, design mix as per authority requirements and
structural drawings; all in accordance with the drawings and
specification
A Blinding for Column Footings & Ground Beam; 100 mm thick 37.00 m³ -

Reinforced Concrete
Reinforced poured in-situ concrete, Grade C40/20 cubic
strength, OPC with 66% to 80% GGBS, design mix as per
authority requirements and structural drawings; all in
accordance with the drawings and specifications

B Footings 42.00 m³ -

C Columns 9.00 m³ -
D Ground beams 29.00 m³ -
E Retaining Wall 35.00 m³ -
F Ground slabs; 150 mm thick 26.00 m³ -
G Pool 33.00 m³ -
REINFORCEMENT

Supply and installation of high-yield steel: FY 460, to conform


with standards BS 4449-2005 or ASTM Grade 75; to the
approval of the Consultant/Engineer; all in accordance with
the drawings and specifications

H Footings 3,445.00 kg -
J Columns 1,089.00 kg -
K Ground beams 2,741.00 kg -
L Retaining Wall 3,017.00 kg -
M Ground slabs; 150 mm thick 1,657.00 kg -
N Pool 3,664.00 kg -

Carried to Collection AED -

B2.2/1
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section C: Concrete Work

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)
SECTION C: CONCRETE WORK

SUBSTRUCTURE
Form work

Plain formwork; to the approval of the Consultant/Engineer;


all in accordance with the drawings and specifications

A Footings 86.00 m2 -
B Columns 82.00 m2 -
2
C Ground beams 209.00 m -
D Retaining Wall 148.00 m2 -
2
E Ground slabs; 150 mm thick 31.00 m -
F Pool 127.00 m2 -

Carried to Collection AED -

B2.2/2
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section C: Concrete Work

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)
SUPERSTRUCTURE
Reinforced Concrete
Reinforced poured in-situ concrete, Grade C40/20 cubic
strength, OPC with 66% to 80% GGBS, design mix as per
authority requirements and structural drawings; all in
accordance with the drawings and specifications
A Columns 9.00 m³ -
B Beams 8.00 m³ -
C Boundary Wall Coping Beam 4.00 m³ -
D Slab 150mm Thick 4.00 m³ -
REINFORCEMENT
Supply and installation of high-yield steel: FY 460, to conform
with standards BS 4449-2005 or ASTM Grade 75; to the
approval of the Consultant/Engineer; all in accordance with
the drawings and specifications
E Columns 992.00 kg -
F Beams 802.00 kg -
G Boundary Wall Coping Beam 428.00 Kg -
H Slab 150mm Thick 328.00 kg -
CONCRETE
Plain cement concrete of grade SRC C20 including all
necessary formwork complete as required
J Boundary Wall Decorative Openings 26.00 m³ -
Form work
Supplying & Fixing Plain formwork; to the approval of the
Consultant/Engineer; all in accordance with the drawings and
specifications
K Columns 54.00 m2 -
2
L Beams 34.00 m -
2
M Slab 32.00 m -
2
N Boundary Wall 35.00 m -
Sundries
Lintel beams, including reinforcement and shuttering; all in
accordance with the drawings and specification
P To Wall 58.00 Lm -
Supply, Fabricate & Fixing Pool Drain Access Panel Framed
with S/S Angle & Stainless Steel Angle Secured to Pool Wall
& Deck Floor all as per Specification and Drawings(Finishes
Paid Separately)
Q Pool Access Panel 3.00 Nos -

Carried to Collection AED -

B2.2/3
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section C: Concrete Work

AMOUNT
ITEM DESCRIPTION
(AED)

SECTION C: CONCRETE WORK (CONT'D)

COLLECTION

Page B2.2/1
-
Page B2.2/2
-
Page B2.2/3
-

Total Carried to Summary AED -

B2.2/4
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section D: Masonry Work

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION D: MASONRY WORKS

EXTERNAL AND INTERNAL WALLS

Blockwork

Hollow blockwork; bedded and jointed in 1:3 cement: sand


mortar, net compressive strength of 7N/mm 2, including all
necessary fixings and accessories to complete the works, in
accordance with the drawings & specifications;

A 200/250 mm thick, Block Work 168.00 m² -


B Boundary Wall Block Work 89.00 m² -

C Dropoff Wall Block Work 16.00 m² -


D Solid Block Wall 28.00 m² -

Carried to Collection AED -

B2.3/1
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section D: Masonry Work

AMOUNT
ITEM DESCRIPTION
(AED)

SECTION D: MASONRY (CONT'D)

COLLECTION

Page B2.3/1
-

Total Carried to Summary AED -

B2.3/2
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section E: Metal work

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION E: METALWORK

Structural Steel work

Hand Rail
Supply ,Fabricating and Fixing 30mm x 10mm thick hot dip
galvanized steel bar Hand Rail in selected marine corrosion
resistance epoxy paint finish with 30mm x 6mm hot dip
galvanized steel plate to receive hardwood Fastened
Under-SIde all as per the drawings and Engineers
Instruction. (SC-03)
A To Cabana 11.00 Lm -

Pool Drain Steel Cover


Supplying, Fabricating & Fixing Pool Drain S/S grating as per
the Drawing & Specification
B To Pool Drain 12.00 Lm -
-

Carried to Collection AED -

B2.4/1
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS :Melia Zanzibar, Tanzania
BILL NO : 2 Section E: Metal work

AMOUNT
ITEM DESCRIPTION
(AED)

SECTION E: METAL WORK (CONT'D)

COLLECTION

Page B2.4/1
-

Total Carried to Summary AED -

B2.4/2
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section G: Thermal and Moisture Protection

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION G: THERMAL AND MOISTURE PROTECTION

SUBSTRUCTURE
Coverings and Linings
Supply and laying G-1000 polythene for substructure
accordance with drawings & specifications;
A To underside of footings 173.00 m² -
B To underside of slabs 248.00 m² -
C To underside of beams 44.00 m² -
D To Underside of Retaining Wall 44.00 m² -
E To Underside of Stepping Stone 40.00 m² -

Supply and installation of Emulsion Bitumen Waterproofing


(Polycot RBE-1000); including surface preparation,
protection screed, fittings, and all necessary fixing
accessories; to the approval of the Consultant/Engineer; all
in accordance with the drawings and specifications

F To footings 97.00 m² -
G To slabs 248.00 m² -
H To Ground beams 251.00 m² -
J To Retaining Wall 134.00 m² -

Carried to Collection AED -

B2.6/1
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section G: Thermal and Moisture Protection

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION G: THERMAL AND MOISTURE PROTECTION


(CONT'D)

Supply & Apply Internal Waterproofing Coating,


Polyflex(Acrylic Modified Cementitious Coating), Ceresit
Cm17 (Super Flexible High-Performance Polymer Modified
Cementitious Tile Adhesive), and Ceresit CE 47 (Epoxy Joint
Filler for Chemical Resistant Grouting)all in accordance with
the drawings and specifications
-
A To Pool Area 133.00 m²

SUPERSTUCTURE
Supply and apply Single Layer Waterproofing Membrane
with Protection Board / Waterproofing Membrane-Bituplus
AR 4000 (Anti-Rooting Waterproofing Membrane), Bitustick
R400 (Waterproofing Membrane & Protection Board), (Apply -
shower area 2000mm-other area continued 300mm to walls)
all necessary materials and accessories as per specifications
and drawings.

B For horizontal of wet areas 53.00 m² -

C For vertical surfaces of wet areas 66.00 m² -

Carried to Collection AED -

B2.6/2
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section G: Thermal and Moisture Protection

AMOUNT
ITEM DESCRIPTION
(AED)

SECTION G: THERMAL AND MOISTURE PROTECTION


(CONT'D)

COLLECTION

Page B2.6/1
-
Page B2.6/2
-

Total Carried to Summary AED -

B2.6/3
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section H: Doors & Windows

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)
SECTION H: DOORS AND WINDOWS
Installation of complete Powder Coated Aluminum, Wooden,
and glazing Door and Window works including all
accessories, fittings, hardware, architraves and ironmongery, Note
and signage, all as per the drawings, specifications, and to
the approval of the Engineer

Glass Partition & Glass Doors


Supply & Installation of Partitions in 10mm thick clear
tempered glass, stainless steel channels, Installation of Door
Mirodec: 10mm-RD-T20 10mm, Textured, Colorless(GL-
MUR-101), equipped with all necessary ironmongery in
accordance with the drawings & specifications provided by
the consultant.(D-03)
A To Bathroom 2.00 No -
ALUMINIUM DOORS & WINDOWS
Supply & Installation of Living/Bed Room Door
B 1.00 No. -
(2400x3800)mm - AD01
Supply & Installation of Bath Room Door (2400x1800)mm -
C 1.00 No. -
AD02
D Supply & Installation of Window (1900x900)mm - AW01 2.00 No. -
E Supply & Installation of Window (2300x1200)mm - AW02 1.00 No. -
Vertical Aluminum Screen Swing Door
Supply, Fabricating and Fixing Vertical Aluminum (40x100
F mm) (SC-01) Screen Swing Door all as per the drawings, 2.00 No. -
specifications, and to the approval of the Engineer (AD03)
Supply, Fabricating and Fixing Vertical Aluminum (40x100
G mm) Screen (SC-01) all as per the drawings, specifications, 1.00 m2 -
and to the approval of the Engineer

Carried to Collection AED -

B2.7/1
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section H: Doors & Windows

AMOUNT
ITEM DESCRIPTION
(AED)

SECTION H: DOORS AND WINDOWS

COLLECTION

Page B2.7/1
-

Total Carried to Summary AED -

B2.7/2
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section J: Finishes

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION J: FINISHES

INTERNAL FINISHES

Floor Finishes - Living/Bed Room


Full bonded cement and sand screed (1:4) 25mm thick Floor
Plaster; in accordance with the drawings & specifications to
the approval of the Engineer

A To Living/Bed Room 44.00 m² -


B To Bathroom 21.00 m² -

Supply & Laying of Jura Beige Marble Or Samaha (ST-


MUR-105) , all as per the drawings, specifications and to the
approval of Engineer

C To Bathroom 21.00 m² -

Supply & Laying of Omani Ivory Honed & Sealed Stone


Skirting (ST-MUR-101), , all as per the drawings,
specifications and to the approval of Engineer
D To skirtings 35.00 Lm -

Threshold
Supply & Laying of Omani Ivory Honed & Sealed Stone
Threshold (ST-MUR-102), width 250mm, Polished & Sealed
on all sides. To have Chamfered edge for safety all as per
the drawings, specifications and to the approval of Engineer

E To Living Area 4.00 Lm -


F From Bathroom to Shower Area 2.00 Lm -
G To bathroom Entrance 1.00 Lm -
H To Bathroom Shower area 2.00 Lm -

Carried to Collection AED -

B2.8/1
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section J: Finishes

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION J: FINISHES

INTERNAL FINISHES

Wall Finishes - Living / Bedroom/ Walk-in Closet


Cement and sand plaster (1:3) 25mm thick all as per the
drawings, specifications and to the approval of Engineer

A To Living / Bedroom / Walk-in Closet 191.00 m² -


B To Bathroom 80.00 m² -
C To MEP Room - (AC & Heat Pump) 19.00 m² -
Supplying & Applying Wall Paint ; (PT-MUR-101) Matt finish,
all as per the drawings, specifications and to the approval of
Engineer
D To Living / Bedroom / Walk-in Closet 191.00 m² -
E To Bathroom 80.00 m² -
F To MEP Room - (AC & Heat Pump) 19.00 m² -
Supply & Laying of Kens; CT-620 Bespoke 3D Artisan
Tile,(TL-MUR-102) all as per the drawings, specifications,
and to the approval of the Engineer
G To Bathroom 10.00 m² -

Supply & Apply Wall Paint 3 coats, Finish with Selected


Textured Weather Shield Emulsion Paint including Primer,
Suitable for Coastal Marine Environment, (WF-06) as shown
in the Drawings and in accordance with the Specifications

H To MEP Room - (DB & Pool Equipment) 19.00 m² -

Supply & Laying of Random : Base Décor Tirreno Livorno


Bianco Porcelain Tile, (TL-MUR-103) all as per the
drawings, specifications and to the approval of Engineer
J To Bathroom Wall 36.00 m² -

Carried to Collection AED -

B2.8/2
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section J: Finishes

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION J: FINISHES (CONT'D)

INTERNAL FINISHES (CONT'D)

Ceiling Finishes

Supply & Fixing of Plaster Board Ceiling (CL-01)all as per


the drawings, and specifications and to the approval of the Note
Engineer

A To Walk-in Closet 8.00 m2 -

B To Entrance 3.00 m2 -

Supply & Fixing of Moisture Resistant Plaster Board Ceiling


(CL-02)all as per the drawings, and specifications and to the
approval of the Engineer
C To Bathroom 19.00 m2 -

Supply & Apply Ceiling Paint (PT-MUR-102), Fenomastic


Note
Myhome Rich Matt Finish, all as per the drawings,
specifications and to the approval of Engineer

D To Walk-in Closet 8.00 m2 -


2
E To Entrance 3.00 m -

Supply & Apply Ceiling Paint (PT-MUR-103) and Fenomastic


Hygiene Emulsion, all as per the drawings, and
specifications, and to the approval of the Engineer

F To Bathroom 20.00 m2 -

Carried to Collection AED -

B2.8/3
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section J: Finishes

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION J: FINISHES (CONT'D)

EXTERNAL FINISHES
Floor finishes
Full bonded cement and sand screed (1:3) 25mm thick Floor
Plaster; in accordance with the drawings & specifications to Note
the approval of the Engineer
A To received Verandah floor finishes 31.00 m² -
B To received Pool Deck floor finishes 29.00 m² -
C To received Cabana floor finishes 28.00 m² -
D To received Drop-off Wall floor finishes 8.00 m² -
E To received Ground Beam floor finishes 35.00 m² -
F To received Porch & Outdoor Shower floor finishes 15.00 m² -
G To received Stepping Stones floor finishes 79.00 m² -

Full bonded cement and sand screed (1:3) 50mm thick Floor
Plaster; in accordance with the drawings & specifications to
the approval of the Engineer

H To Pool Base/Pool Drain Base 35.00 m² -

Supply & Laying of 300 x 600 mm Homogeneous Tiles, Lad


in Pattern Over Heavy Duty Bonding Adhesive Cement
Mortar - (FF-02)
J Verandah, Pool Deck & Cabana 76.00 m² -
Supply & Laying of Granite Stone Slab in Flamed & Brushed
Finish, 20mm thick, unless otherwise stated in Drawings -
(FF-01)
K To Porch / Outdoor Shower Area 15.00 m² -
L To Stepping Stone / Steps 79.00 m² -
M To Drop-off Area 8.00 m² -
N To Ground Beam 35.00 m² -

Carried to Collection AED -

B2.8/4
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section J: Finishes

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION J: FINISHES (CONT'D)

EXTERNAL FINISHES
Floor finishes
Supply & Laying of 10mm Thick 100 x 100 mm Sukabumi
Stone Tiles for Pool Floor (FF-03)
A To Pool Floor Finish 27.00 m² -

Supply & Laying of Granite stone capping in honed


finish with rounded edge profile, unless otherwise stated in
Drawings - (FF-06)
B To Pool Infinity Edge 4.00 m² -
Supply & Laying of Profiled Step Nosing in Granite Stone
Slab in Flamed & Brushed Finish, 20mm thick, unless
otherwise stated in Drawings - (FF-01)
C To Pool Steps 7.00 Lm -

Supply & Fix 5mm Thick Stainless Steel Inlay all as per the
drawings, specifications and to the approval of the Engineer
D To Verandah, Cabana 55.00 Lm -

Carried to Collection AED -

B2.8/5
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section J: Finishes

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION J: FINISHES (CONT'D)


EXTERNAL FINISHES
Wall finishes
Lime plaster Rough Finish(1:1:3) 25mm thick all as per the
Note
drawings, specifications and to the approval of Engineer

A To External Walls 147.00 m² -


B To MEP Room 20.00 m² -
C To Boundary Wall 159.00 m² -
D To Dropoff Wall 91.00 m² -
E To Columns 13.00 m² -
F To Pool Side Wall 57.00 m² -
G To Retaining Wall 55.00 m² -

Full bonded cement and sand screed (1:3) 50mm thick Floor
Plaster; in accordance with the drawings & specifications to
the approval of the Engineer

H To Pool Base/Pool Drain Base 49.00 m² -

Supply & Apply External Wall Paint 3 coats, Finish with


Selected Weather Shield Emulsion Paint including Primer,
Suitable for Coastal Marine Environment, (WF-02) as shown
in the Drawings and in accordance with the Specifications

J To External Walls 147.00 m² -


K To MEP Room 20.00 m² -
L To Boundary Wall 159.00 m² -
M To Dropoff Wall 91.00 m² -
N To Retaining Wall 55.00 m² -

Natural Stone-Like Decorative Coating Over Cement & Sand


(1:3) 25mm thick Plaster Including Primer (WF-03) as shown
in the Drawings and in accordance with the Specifications

P To Column -Verandah & Cabana 13.00 m² -


Q To Column & Wall - Dropoff Area 17.00 m² -
R To Boundary Wall 31.00 m² -

Carried to Collection AED -

B2.8/6
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section J: Finishes

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION J: FINISHES (CONT'D)


EXTERNAL FINISHES
Wall finishes

Supply & Apply Selected Epoxy Coating all as per the


drawings, specifications, and to the approval of the Engineer

To Pool Overflow Drain 56.00 m² -


-
-

Supply & Laying of Kens; CT-620 Bespoke 3D Artisan Tile,


Sage Green Gloss, Mixed 3 Patterns.Porcelain Stoneware
3d suitable for outdoor, Bespoke 60X200mm x 12mm Max Note
Thickness, all as per the drawings, specifications, and to the
approval of the Engineer (TL-MUR-102)

B To Outdoor Shower Area 3.00 m² -

Supply & Laying of 10mm Thick 100 x 100 mm Sukabumi


Stone Tiles for Pool Wall Finish (FF-03)

C To Pool 28.00 m² -

Carried to Collection AED -

B2.8/7
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section J: Finishes

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)
SECTION J: FINISHES (CONT'D)
EXTERNAL FINISHES
Wall finishes
Supply & Laying of Granite Stone Slab in Flamed & Brushed
Finish, 20mm thick all as per the drawings, specifications, Note
and to the approval of the Engineer (WF-04)
A To Pool Side Wall 63.00 m² -
Supply & Fixing of Extra over for Grooves in Plaster with
10mm wide x 10mm deep Continuous Aluminum channel all
as per the drawings, specifications, and to the approval of
the Engineer
B To Cabana & Verandah Column 1.00 Item Allow -
Supplying & Fixing 25 x 25 mm Powder Coated Aluminum
Drip Chennel all as per the drawings, specifications and to
the approval of the Engineer
C To Drop-off Wall & Column 1.00 Item Allow -
Ceiling Finishes
Cement Sand Plastering (1:3) with Selected Textured all as
per the drawings, specifications and to the approval of the
Engineer
D To MEP Room - (CF-03) 4.00 m² -

Supply & Applying Primer & Weather Shield Emulsion Pain


Finish Including Primer, Suitable for Coastal Marine
Environments all as per the drawings, specifications and to
the approval of the Engineer
E To MEP Room - CF-03) 4.00 m² -
Sundries
Supply & Laying 20-40 mm Dia Light Gray Natural Loose
Pebbles (FF-04)
F To Pool Drain 1.00 Item Allow -

Carried to Collection AED -

B2.8/8
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 Section J: Finishes

AMOUNT
ITEM DESCRIPTION
(AED)

SECTION J: FINISHES (CONT'D)

COLLECTION

Page B2.8/1
-
Page B2.8/2
-
Page B2.8/3
-
Page B2.8/4
-
Page B2.8/5
-
Page B2.8/6
-
Page B2.8/7
-
Page B2.8/8
-

Total Carried to Summary AED -

B2.8/9
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION Q: MECHANICAL INSTALLATIONS

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION Q: MECHANICAL INSTALLATIONS

SANITARY INSTALLATIONS

INTERNAL INSTALLATION

Sanitary Appliances
Sanitary fittings and appliances; including all necessary
waste fittings, traps, taps, faucets, plugs, chains, seats,
handle levers, fixings, sealants, plates, brackets, and
connections to water supply and waste pipework; as shown
in the Drawings and in accordance with Specifications

A Hansgrohe : 73350140 Tecturis S Single lever 2.00 Nos -


Hansgrohe ; Waste set non-closing for wash basins.Art. no.
B 2.00 Nos -
5010140 .
C Hansgrohe ; Design trap Flowstar S 2.00 Nos -
D Wash Basin complete with Waste 2.00 Nos -
E Towel Rail 3.00 Nos -
F Magnifying Mirror 2.00 Nos -
G Water Closet with soft closing seat cover 1.00 Nos -
H Concealed Cistern with dual flush system 1.00 Nos -
J Dual flush Plate 1.00 Nos -
K WC hand shower 1.00 Nos -
L Toilet Roll Holder 1.00 Nos -
M Spare Toilet Roll Holder 1.00 Nos -
N Bathtub with waste 1.00 Nos -
P Freestanding Bathtub Mixer 1.00 Nos -
Q Grab Bar 2.00 Nos -
R Shower Mixer 1.00 Nos -
S Shower Set with Hand & Head Shower 1.00 Nos -
T Robe Hook 2.00 Nos -
U Towel Rack 1.00 Nos -
V Floor Drain withh Cover 4.00 Nos -
W Linear Floor Drain for Shower 1.00 Nos -
X Trash Bin by OS&E 1.00 Nos -

Carried to Collection AED -

B2. 10/1
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION Q: MECHANICAL INSTALLATIONS

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION Q: MECHANICAL INSTALLATIONS

EXTERNAL INSTALLATION

Sanitary Fittings
Sanitary fittings and appliances; including all necessary
waste fittings, traps, taps, faucets, plugs, chains, seats,
handle levers, fixings, sealants, plates, brackets, and
Note
connections to water supply and waste pipework; as shown
in the Drawings and in accordance with Specifications

Outdoor Area
A Shower Head (Outdoor) 1.00 Nos -
B Shower Control 1.00 Nos -
C Towel Rac 1.00 Nos -
D Shower Drain 1.00 Nos -

Carried to Collection AED -

B2.10/2
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION Q: MECHANICAL INSTALLATIONS

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)
SECTION Q: MECHANICAL INSTALLATIONS
Drainage Works

Supply & installation of soil, waste, rainwater, condensate,


and vent piping complete with accessories,insulation,
Note
supports, and coatings as per drawings and specification

Supply & Installation of Underground Soil, Waste, Vent


A 1.00 Item -
Pipes and fittings as per design drawings and specification

Supply & Installation of ground Soil, Waste, and vent pipe


B with fittings and associated works as per design drawings 1.00 Item -
and specifications

supply & Installation of condensate drain pipe, and fittings


-
C with Insulation as per design drawings and specifications 1.00 Item

Supply & Installation of Floor Drains as per design drawings


D 1.00 Item -
and specifications in various sections

Supply & Installation of Shower Channel drains as per


E 1.00 Item -
MEP/ID design drawings and specifications

Supply & Installation of Floor Trap and Floor Cleanout Cover


-
F completed with associated works as per MEP/ID design 1.00 Item
drawings and specifications

Supply & Installation of Drainage Spout completed with


G associated works as per the Roof Plan design drawings and 1.00 Item
specifications

Carried to Collection AED -

B2.10/3
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION Q: MECHANICAL INSTALLATIONS

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION Q: MECHANICAL INSTALLATIONS

Water Supply Works


Supply & installation of Supply pumps complete with
accessories, Heat Pump, valves, strainers, controls,
electrical panels, and vibration isolators as per drawings and Note
specifications

A Allow for Cold Water System 1.00 Set -


B Allow for Hot Water System 1.00 Set -

Carried to Collection AED -

B2.10/4
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION Q: MECHANICAL INSTALLATIONS

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)
SECTION Q: MECHANICAL INSTALLATIONS
HVAC
A Supply and installation of complete HVAC works 1.00 Set
-

Supply & Installation of Dx Ducted Split FCU-1BR-01 with


Total capacity of 9.3Kw, complete with Electrical connection
B from nearest Isolator to Unit, including wiring between indoor 1.00 Set -
and outdoor units, drain connection to nearest CDP with final
T&C

Supply & Installation of Copper piping with Insulation


C between Indoor and Outdoor units as per design and 1.00 Set -
specifications

Supply & Installation of Inline extract Fan TE-1BR-01 as per


D 1.00 No -
design and specifications

Supply & Installation of GI Ducting for AC system with


E 1.00 Set -
associated work as Per design drawings and specifications

Supply & Installation of Duct Insulation and sound Liner for


F SA/RA system duct with associated work as Per design 1.00 Set -
drawings and specification
Supply & Installation of GI Ducting for Extract & Fresh Air
G system with associated work as Per design drawings and 1.00 Set -
specifications
Supply & Installation of Duct Insulation for EA/FA duct with
H 1.00 Set -
associated work as Per design drawings and specification

Supply & Installation of 1500x150mm SA/RA Grille for


J 2.00 Nos -
bedroom (To match AC & ID design )

Supply & Installation of SA/RA/EA/FA grilles and Louvers for


K 1.00 Set -
Dressing, Wash room and Toilet section,
Fire Protection
Supply, installation, Testing and Commissioning of the
complete Fire Protection System as Per the Drawings and
specification
L 5.0 Kg Co2 Type Fire Extinguisher 1.00 Set -
M 4.0 Kg DCP Type Fire Extinguisher 1.00 Set -

Carried to Collection AED -

B2.10/5
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION Q: MECHANICAL INSTALLATIONS

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)
SECTION Q: MECHANICAL INSTALLATIONS

Swimming Pool

Supply & installation of Commissioning of Swimming Pool


MEP system complete with Piping, accessories, Circulation
Note
Pump, Sand Filter, valves, strainers, controls, and electrical
panels, as per drawings and specifications

A Pool Circulation Pump 1.00 Nos -


B Pool Sand Filter 1.00 Nos -
C Chlorine Dosing Unit 1.00 Nos -
D Puddle Flange 5.00 Nos -
E Junction Box 1.00 Nos -
F Float Switch 1.00 Nos -
G 63 Dia Delivery Header 1.00 Nos -
H Pool Inlet 3.00 Nos -
J Vacuum Point 1.00 Nos -
K Antivortex Pool Main Drain 1.00 Nos -
L Channel Base Drain 2.00 Nos -
M Isolation Valve 1.00 Nos -
N Non-Return Valve 1.00 Nos -
P Solenoid Operated Valve 1.00 Nos -
Q Float Valve 1.00 Nos -
R 75 Dia Sunction header 28.70 Lm -
S 63 Dia Swimming Pool Main Drain Pipe 24.70 Lm -
T 50 Dia Vacuum Pipe 35.40 Lm -
U 50 Dia Inlet Pipe 30.60 Lm -
V 25 Dia Cool Water Pipe 23.60 Lm -

Carried to Collection AED -

B2.10/6
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION Q: MECHANICAL INSTALLATIONS

AMOUNT
ITEM DESCRIPTION
(AED)

SECTION Q: MECHANICAL INSTALLATIONS

COLLECTION

Page B2.10/1
-
Page B2.10/2
-
Page B2.10/3
-
Page B2.10/4
-
Page B2.10/5
-
Page B2.10/6
-

Total Carried to Summary AED -

B2.10/7
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION R: ELECTRICAL INSTALLATIONS

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION R: ELECTRICAL INSTALLATIONS


ELECTRICAL INSTALLATIONS
Low Voltage Distribution
Cable termination of DEWA supplied LV cable to LV panel,
A including termination glands, fittings, and all necessary 1 Item -
accessories in accordance with the Specifications
Distribution boards complete with all necessary accessories
B and required finishes, all in accordance with the drawings 1 Item -
and Specifications
Lighting control panel complete with all necessary
C accessories and required finishes, all in accordance with the 1 Item -
drawings and Specifications
Kilowatt-hour meter complete with all necessary accessories
D and required finishes, all in accordance with the drawings 1 Item -
and Specifications

LIGHTNING PROTECTION SYSTEM


Supply and install complete facility lightning protection
system; including but not limited to air termination network,
E 1 Item -
down conductors, ring conductors, etc., and containment
system

Carried to Collection AED -

B2.11/1
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION R: ELECTRICAL INSTALLATIONS

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION R: ELECTRICAL INSTALLATIONS


ELECTRICAL INSTALLATIONS
Isolators complete with all necessary accessories and
required finishes, all in accordance with the drawings and
Specifications
Pool pump - 550W - 20A SPN Isolator 1.00 Nos -
Heat Pump - 1600W - 20A TPN Isolator 1.00 Nos -
DX-1BR-01 (Outdoor unit) - 3000W - 20A TPN isolator 1.00 Nos -
TEF-1BR-01 (Exhaust Fan) - 200W - Spur Outlet 1.00 Nos -
Specialist Lighting Installations
A Bespoke Pendant Light - LT-MUR-501 2.00 Nos -
B Reading Light - LT-MUR-502 2.00 Nos -
C Arteriors : Putney Floor Lamp - LT-MUR-503 1.00 Nos -
D Bespoke Wall Light - LT-MUR-504 4.00 Nos -
E Bespoke Pendant Light - LT-MUR-505 2.00 Nos -
Gloster : 100507 Ambeint Line Tall Glass Lanter - LT-MUR-
F 4.00 Nos -
506
G Bespoke Outdoor Wall Light - LT-MUR-507 1.00 Nos -
H Bespoke Outdoor Wall Light - LT-MUR-508 2.00 Nos -
J Recessed ceiling downlight with wide beam distribution(VL-1) 4.00 Nos -

K Recessed ceiling downlight with wide beam distribution(VL-2) 4.00 Nos -


L LED linear light with diffused beam (VL-3) 12.50 Lm -
M High density LED linear light with diffused beam (VL-4) 6.40 Lm -
Recessed ceiling downlight with wide beam distribution (VL-
N 2.00 Nos -
5)
Recessed ceiling downlight with wide beam distribution
P 1.00 Nos -
(VL-5a)
Recessed ceiling downlight with wide beam distribution (VL-
Q 2.00 Nos -
7)
R Surface monted downlight (VL-8) 5.00 Nos -
S High density LED linear light with diffused beam (VL-9) 1.00 Lm -
T High density LED linear light with diffused beam (VL-10) 1.10 Lm -
U High density LED linear light with diffused beam (VL-11) 3.60 Lm -
Recessed ceiling downlight with wide beam distribution
V 1.00 Nos -
(VL-13)
W 6W LED Floor Recessed Uplight (EX-1) 5.00 Nos -
X 15W LED Recessed Pool Light (EX-3) 3.00 Nos -
Y 5W/M LED Linear Stap Light (EX-4) 7.30 Lm -
Z 8W LED Spike Light (EX-5) 35.00 Nos -
A.a Pool LED Wall Light 6.00 Nos -
Carried to Collection AED -

B2.11/2
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION R: ELECTRICAL INSTALLATIONS
RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)
SECTION R: ELECTRICAL INSTALLATIONS
Low voltage cables
Supply and install of lighting switches; finishes to be as per
interior designer recommendation and client approval;
including back boxes, fixings, supports and all necessary
fitting accessories to complete installation; all in accordance
with the drawings and specifications (Cont'd)
A Entrance Panel Switch (TP-1) 1.00 Nos -
B Entrance Panel Switch (TP-2) 1.00 Nos -
C 4 Gang Entrance Panel Switch (TP-3) 1.00 Nos -
D 4 Gang Bedside Panel Switch (TP-4) 1.00 Nos -
E 4 Gang Bedside Panel Switch (TP-5) 1.00 Nos -
F Downlight Switch @ Corridor (TP-6) 1.00 Nos -
G 2 Gang Toilet Panel Switch (TP-7) 1.00 Nos -
H 2 Gang Toilet Panel Switch (TP-8) 1.00 Nos -
J Downlight Switch @ MEP Room (TP-9) 1.00 Nos -
K Downlight Switch @ MEP Room (TP-10) 1.00 Nos -
Supply and install cables, conduits, and trunking between
distribution boards, lighting fixtures switches, and the like; in
concealed work below suspended ceilings and surface
mounted above suspended ceilings; including hangers,
fixings, supports, and all necessary fitting accessories to
complete installation; all in accordance with the drawings and
specifications
L Lighting points 92.00 Nos -
M switches points 10.00 Nos -
Supply and install of wiring accessories and general power
outlets; finish to be as per interior designer recommendation
and client approval; including back boxes, all necessary
accessories, and connections, and all associated and
necessary works; all in accordance with the drawings and
specifications
N 13A Single Receptacle Socket Outlet 5.00 Nos -
P 13A Double Receptacle Socket Outlet 14.00 Nos -
Q 13A Double Receptacle Socket Outlet with USB Outlet 3.00 Nos -
R 13 A Unswitched Spur Outlet 6.00 Nos -
S Floor Box with 1 no Twin 13A S/Socket Outlet 2.00 Nos -
Switched Spur Outlet for AC Unit with Neon
T 1.00 Nos -
Indicator(Location & Rating According to A/C)
U Flex Outlet 4.00 Nos -
V Bell Chime 1.00 Nos -

Carried to Collection AED -

B2.11/3
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION R: ELECTRICAL INSTALLATIONS

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION R: ELECTRICAL INSTALLATIONS


ELECTRICAL INSTALLATIONS

Supply and install cables, conduits, and trunking between


distribution boards and power outlets and the like; including
junction box, pull box, fittings, hangers, fixings, supports and
all necessary fitting accessories to complete installation; all in
accordance with the drawings and specifications

A socket points 36.00 Nos -


IT & GRMS System
Wiring in approved cables, drawing into and including
conduit where required, complete with boxes, fittings, and
supporting brackets, all in accordance with the drawings and
Specifications
B Tel/data outlet points 7.00 Nos -
Equipment and devices complete as described, all in
accordance with the drawings and Specifications
Supply, Installation, Testing, and Commissioning of Guest
C 1.00 Item -
Room Management System (GRMS) Panel Board.
D Single RJ45 voice outlet 2.00 Nos -
E Single RJ45 data outlet 2.00 Nos -
F Single RJ45 data & voice outlet 1.00 Nos -
G Single RJ45 data outlet for GRMS control panel 1.00 Nos -
H Telephone with integrated alarm 1.00 Nos -
J External Wireless Access Point 2.00 Nos -
K Wireless Access Point 1.00 Nos -
L Directional R.145 Data & Voice Outlet Access Device 2.00 Nos -
Wiring in approved cables, drawing into and including
conduit where required, complete with boxes, fittings, and
supporting brackets, all in accordance with the drawings and
Specifications
Speaker points with humidity proof speaker & Volume /
M 1.00 Nos -
source control plate
CCTV System
Wiring in approved equipments,devices, cables, drawing into
and including conduit where required, complete with boxes,
fittings, and supporting brackets, all in accordance with the
drawings and Specifications
N Camera points with camera 7.00 Nos -

Carried to Collection AED -

B2.11/4
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION R: ELECTRICAL INSTALLATIONS

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

SECTION R: ELECTRICAL INSTALLATIONS


Fire Detection and Alarm System

Supply and install and maintain the Fire Alarm and detection
system including all necessary fittings,cables, wiring,
conduits, trunking, mounting accessories hardware, support
with standard, drawing, and specifications
A Fire Alarm Manual Call Point 1.00 Nos -
B Addressable Smoke Detector with Sounder Base 1.00 Nos -
C Addressable Smoke Detector with Sounder Base 1.00 Nos -
D Addressable Fire Alarm Multi Sensor 1.00 Nos -
E Addressable Fire Alarm Sounder Strobe W/P 1.00 Nos -
2W LED Recessed Type Emergency Light with 3hrs Battery
F 1.00 Nos -
Pack IP-20

Guest Room Door Lock System


Wiring in approved cables, drawing into and including
conduit where required, complete with boxes, fittings, and
supporting brackets (main cable trunking measured
separately), all in accordance with the drawings and
Specifications
H Access control points 8.00 Nos -

Equipment and devices complete as described, all in


accordance with the drawings and Specifications

J Single Door - Door Contact 4.00 Nos -


K Double Door - Door Contact 1.00 Nos -
L Online Door Locking System 1.00 Nos -
M Card Reader 1.00 Nos -
N Electric Mortise Lock 1.00 Nos -

Accessories

P 5.1 Virtual Surround Sound Bar 1.00 Nos -


Q 65" LED Smart TV 1.00 Nos -

Carried to Collection AED -

B2.11/5
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 SECTION R: ELECTRICAL INSTALLATIONS

AMOUNT
ITEM DESCRIPTION
(AED)

SECTION R: ELECTRICAL INSTALLATIONS

COLLECTION

Page B2.11/1 -
Page B2.11/2 -
Page B2.11/3 -
Page B2.11/4 -
Page B2.11/5 -

Total Carried to Summary AED -

B2.11/6
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 ANY OTHER ITEMS

RATE AMOUNT
ITEM DESCRIPTION QUANTITY UNIT
(AED) (AED)

ANY OTHER ITEMS

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with


quantities and rates not previously included to complete
the build-up of lumpsum tender price for this section of
the works. Should the tenderer fail to insert any items
here, it will be deemed that his lumpsum price for the
the tender includes all items and no subsequent claim for
any
additional items will be entertained.

Carried to Collection AED -

B2.12/1
Bills of Quantities
PROJECT : PROPOSED FOUR SEASONS RESORT
ADDRESS : Pongwe, Zanzibar, Tanzania
BILL NO : 2 BILL SUMMARY

AMOUNT
ITEM DESCRIPTION
(AED)

Bill No. 2 - PROPOSED FOUR SEASONS RESORT

BILL SUMMARY

A SECTION B: SITEWORK B2 1/2 -

B SECTION C: CONCRETE WORK B2 2/4 -

C SECTION D: MASONRY WORK B2.3/2 -

D SECTION E: METALWORK B2.4/2 -

E SECTION G: THERMAL AND MOISTURE PROTECTION B2.6/3 -

F SECTION H: DOORS AND WINDOWS WORK B2.7/2 -

G SECTION J: FINISHES WORK B2.8/7 -

H SECTION Q: MECHANICAL INSTALLATIONS B2.10/7 -

J SECTION R: ELECTRICAL INSTALLATIONS B2.11/5 -

K ANY OTHER ITEMS B2.12/1 -

Total Carried to General Summary AED -

B2/S