350
125
mm Openning.
A =
0.35
0.125
P =
0.35
0.125
2
0.0438 m
R =
A/P
0.073 m
S =
1
650
0.002
= 0.600
Q =
=
1
0.015
0.044
0.02
>
3
0.018 m /s
0.073
2/3
0.002
1/2
(o.k)
i) Try
A =
100
3.14
mm dia. Pipe.
x
P = 2 x 3.14 x
R =
A/P
0.100
0.050
0.008
m2
= 0.314 m
0.025 m
Q = A1 V1 = A2 V2
V =
0.016
0.008
2.038
m/s
2
2
4/3
Sf = V n / R
= 2.038 2 x
= 0.128
0.015
V12
2g
0.5 V22
2g
hL =
1.5
x 2.038
=
=
0.318 +
0.394 m
0.025
Sf.
4/3
2 x 9.81
+ 0.128
0.077
<
0.6 m
(o.k)
0.6
0.60
0.00
0.60
m
m
m
3. Spillway.
Qspillway
=
=
=
Q10
Q2
0.018 - 0.016
3
0.002 m /s
Qspillway
B
Hp
=
=
0.3 m
0.075 m
C sp
1.38
1.38
0.3
3
0.009 m /s
>
0.075
1.5
0.002 m3/s
(o.k)
Design data
Location of Site
(Figure 13.3)
120 mm
0.026 Ha
Design ARI
year
Fc * L
A 1/10 * S 1/5
Where,
tcs = the time of concentration (minute)
Fc = a conversion factor,
2
58.50 when area is in km
or
0.015 km
5.02
1%
Minutes
It
2
3
= a +b In(tc) + c(In (tc)) + d (In (tc))
Where,
R
30
60
Fd =
Location
ARI(year)
Alor Star
5.6790
-0.0276
-0.0993
0.0033
b ln (tc)
1.85
I (mm/hr) Pd (mm)
c (ln(tc))2 d (ln(tc))3
5.6790
-0.0939
-1.1487
5.6790
-0.1130
-1.6646
(Value interpolated from Table 13.3)
0.1298
0.2265
96.183
62.045
48.091
62.045
P30 -FD(P60-P30)
Intensity of rainfall
(for tcs =
5.02
min)
P tcs =
22.28
mm
(for tcs =
5.02
min)
266.24
mm/hr
2
I tcs = 266.24 mm/hr
Therefore,
From Design Chart 14.4 (Vol.5, pg 14-25), for rural area, C =
(Medium Soil -Open Crop = Categrory B)
5.54
360
=
=
0.015
15.38
m3/s
L/s
tcs
0.800
2
(B) Post -Development Runoff From Tyipical Plot For Semi-D (Area = 260 m )
Location of Site
Design ARI
10
year
0.026 Ha
Drain Length, Ld
10.67
24.38
Land Slope, S
0.2
0.75
m/s
0.24
min
Design ARI
10
year
Time of Concentration, tc
to + td
6.44
min
It
2
3
= a +b In(tc) + c(In (tc)) + d (In (tc))
Where,
It = the average rainfall intensity (mm/hr) for ARI and duration t
Location ARI(year)
Alor Star
30
60
10
5.6422
0.1575
-0.1329
0.0056
b ln (tc)
5.6422
5.6422
0.5357
0.6449
I (mm/hr) Pd (mm)
c (ln(tc))2 d (ln(tc))3
-1.5374
-2.2279
Fd =
1.64
(Value interpolated from Table 13.3)
= P30 -FD(P60-P30)
From Equation 13-3, Pd
0.2203
0.3844
129.130
85.075
64.565
85.075
Rainfall depth
(for tc =
Intensity of rainfall
Therefore,
10
I tc =
6.44
(for tc =
288.28
6.44
min)
10
P tc =
30.93
min)
10
288.28 mm/hr
tc
mm
mm/hr
6.45
360
3
= 0.0179 m /s
=
17.91 L/s
Determination of Permissible Site Discharge, PSD
(a2 -4 b)
a2
Qa
tc
88.17079
) (0.333 tc
Qp
Qa
b = 4 Qa Qp
=
1101.729
Where,
tc = Post-development time of concentration (S)
tcs = Pre-development time of concentration (S)
386.23
301.22
15.0717 L/S
d=
0.214
PSD
Qd
PSD2
Qd
Table for Post Development Peak Discharge for Design Storm (10 year ARI) Storage
15.38
17.91
Storm
Rainfall
Duration, Intensity, I
Impervious Area
td
(mm/hr)
(Minutes)
C
A (Ha)
0.00
282.08
0.900
0.018
1.29
291.08
0.900
0.018
2.57
292.08
0.900
0.018
3.86
277.60
0.900
0.018
5.15
261.91
0.900
0.018
6.44
247.35
0.900
0.018
7.72
234.29
0.900
0.018
9.01
222.65
0.895
0.018
10.30
212.24
0.890
0.018
11.59
202.91
0.883
0.018
12.87
194.48
0.882
0.018
14.16
186.84
0.880
0.018
15.45
179.88
0.880
0.018
16.74
173.50
0.790
0.018
18.02
167.63
0.780
0.018
Table for Site Storage Inflow
Storm
Duration,
Qd (L/S) PSD (L/S)
td
(Minutes)
0.00
1.29
2.57
3.86
5.15
6.44
7.72
9.01
10.30
11.59
12.87
14.16
15.45
16.74
18.02
17.364
18.031
17.897
16.811
15.702
14.701
13.818
12.993
12.231
11.564
11.023
10.498
10.029
8.846
8.426
15.072
15.072
15.072
15.072
15.072
15.072
15.072
15.072
15.072
15.072
15.072
15.072
15.072
15.072
15.072
Pervious Area
C
0.741
0.759
0.728
0.695
0.667
0.643
0.622
0.605
0.583
0.570
0.558
0.540
0.520
0.510
0.500
A (Ha)
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
SSR (m3)
7.934
8.128
8.090
7.761
7.378
6.982
6.585
6.166
5.729
5.298
4.912
4.498
4.091
2.875
2.361
2.800
2.696
2.716
2.892
3.096
3.307
3.518
3.741
3.975
4.204
4.410
4.630
4.847
5.495
5.769
0.000
0.557
1.095
1.427
1.616
1.704
1.722
1.668
1.562
1.433
1.315
1.164
1.011
0.478
0.321
CA
Qd (L/S)
0.022
0.022
0.022
0.022
0.022
0.021
0.021
0.021
0.021
0.021
0.020
0.020
0.020
0.018
0.018
17.364
18.031
17.897
16.811
15.702
14.701
13.818
12.993
12.231
11.564
11.023
10.498
10.029
8.846
8.426
1.722
m3
7.72
minutes
Percentage added to the volume to compansate for the construction inaccuracy and
inevitable loss in storage due to build up of vegetation growth over time =
10%
Therefore, the required SSR
1.894
m3
3.16
m2