T&C Plan FA&FF

Uploaded by

karim.khalifa232
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

Project Title Project No.

Arar Land port Fire Fighting & Fire Alarm Works 21SACG00001
‫اسم المشروع‬ ‫رقم المشروع‬
Client Contract No.
ZATCA
‫المالك‬ ‫رقم العقد‬
Consultant Prototype
IMAR
‫الستشاري‬ ‫النموذج‬
Contractor Site No.
Redwater Project Engineering Company
‫المقاول‬ ‫رقم الموقع‬
To
IMAR
‫إلى‬
Attention
DOCUMENT SUBMITTAL ‫عناية‬
Mr. Mohammed Sid Ahmed

FORM From
‫من‬
Redwater Project Engineering Company

‫نموذج تقديم مستندات‬ Submittal Number


‫رقم التقديم‬
21SACG00001-001-200-YAA000-1F0-MP-000001
Submission Date
____
30 /____
04 /20_____
24
‫تاريخ التقديم‬

Discipline ‫التخصص‬ □ Civil/Str. ‫إنشائي‬/‫مدني‬ □ Architectural ‫معماري‬ □ Electrical ‫كهرباء‬ □ Mechanical ‫ميكانيكا‬
Testing and Commissioning Plan (Fire alarm and Firefighting Work) for Admin area
Document Description
‫وصف المستند‬

Document Type ‫نوع المستند‬ T&C Plan BOQ Reference Number


‫رقم المرجع لجداول الكميات‬
Area of Application Specification Reference
‫مجال تطبيق المستند‬ ‫رقم المرجع للمواصفات‬
No. of Copies ‫عدد النسخ‬ Submitted for ‫تم التقديم لغرض‬ ✔Approval ‫االعتماد‬
□ □ Information ‫للمعلومية‬
Enclosure ‫المرفقات‬
By completing this form, the Contractor certifies that submitted document is complies with contract specification & conditions
‫ يقر المقاول أن المستندات المقدمة تتوافق مع مواصفات و شروط العقد‬، ‫من خالل استكمال تعبئة هذا النموذج‬
Contractor ‫المقاول‬ Name ‫االسم‬ Signature ‫التوقيع‬
Red Water Project Engineering Company
Contractor’s PD/PM Name ‫االسم‬ Signature ‫التوقيع‬
)‫مدير المشروع (المقاول‬ Mohammed Gesraha

For Consultant’s Use Only ‫لستخدام الستشاري فقط‬


Received By
Name: --------------------------------------------------------------------------- :‫اإلسم‬ Received Date _____ /_____ /20______ ‫تاريخ االستالم‬
‫تم استالمه من قبل‬

Consultant’s
Comments
‫مالحظات‬
‫الستشاري‬ □ Approved □ Approved with Comments □ Revise and Resubmit □ Rejected □ Received for Information
‫موافقة‬ ‫موافقة مع مالحظات‬ ‫مراجعة وإعادة تقديم‬ ‫مرفوض‬ ‫نسخة منقحة للمعلومية‬
Approved by Consultant’s Discipline Engineer Approved by Project Manager
‫يعتمد من مهندس القسم لالستشاري‬ ‫يعتمد من مدير المشروع لالستشاري‬

Name: ----------------------------------------------------------------------------- ‫االسم‬ Eng'r. Moahmmed Sid Ahmed


Name: --------------------------------------------------------------------------- ‫االسم‬
Signature ‫التوقيع‬ Signature ‫التوقيع‬
Date: ____ /____ /20_____ :‫التاريخ‬ Date: ____ /____ /20_____ :‫التاريخ‬

Distribution Copy to ‫نسخة إلى‬ □ Contractor ‫المقاول‬ □ ZATCA EPMO Representative ‫ممثل إدارة المشاريع بالجمارك السعودية‬

Note: These documents have been reviewed for general conformity with Contract terms & ‫ هذه‬.‫تمت مراجعة هذه المستندات للتوافق العام مع شروط وأحكام العقد والمواصفات وجداول الكميات‬ :‫مالحظة‬
conditions, the specifications and bill of quantities. Such review doesn’t relieve the ‫المراجعة ال تعفي المقاول من مسؤولياته التعاقدية بموجب شروط العقد وال تعتبر موافقة على أي‬
Contractor of his responsibilities under the terms of the Contract and shall not be deemed
as approval for any further compensation or permission to carry out additional works. .‫تعويض إضافي أو إذن لتنفيذ أعمال إضافية‬

SAC-E01-EQ0-TP-000001_Rev 001 Page 1 of 1


Testing and Commissioning Plan

CLIENT NAME: ZAKAT, TAX AND CUSTOMS AUTHORITY (ZATCA )

Testing and Commissioning Plan


Firefighting and Fire alarm installation Work in Arar land
port
21SACG00001

Date 30/04/2024

Testing and Commissioning Plan


1
Testing and Commissioning Plan

Quality information

Prepared by Checked by Verified by Approved by

Eng. Anas Fadaaq Eng. Mohammed N/A Eng. Mahmoud Elwan


Ebrahim

Electrical Engineer

Revision History

Revision Revision date Details Issued By Position

#0

Testing and Commissioning Plan 2


Testing and Commissioning Plan

Table of Contents

1. Introduction .................................................................................................... 4

2. Project Details................................................................................................ 4

3. Project Scope ................................................................................................ 5

4. Testing and Commissioning Strategy Procedure ........................................... 5

5. List of Systems .............................................................................................. 7

6. Equipment List ................................................................................................ 7

7. Testing & Commissioning Schedule............................................................... 9

8. Details of systems………………………………..…………………………….......11

Testing and Commissioning Plan 3


Testing and Commissioning Plan

1. Introduction
Purpose
Testing & Commissioning Plan Guide outlines the required tools to manage and complete Testing
& Commissioning phase. This includes strategy, procedures, requirements and documentation
obligatory in order to test and commission various structures and components of projects within
SAC EPMO

Definition
Testing and Commissioning Plan (T&CP) is defined as the complete set of all required documents
to fulfill the planning, execution and commission all categories of systems within SAC EPMO
projects. Documents consist of Pre-requisite deliverables prior to testing equipment and systems.
And the required deliverables as testing takes place. T&CP also describes processes to provide
resolution for issues such as scheduling, roles and responsibilities, construction testing, pre-
commissioning testing, system stand-alone testing, integrated testing, doomsday testing and
approvals.

2. Project Details

Publishing Date: Project Number: 21SACG00001

Firefighting and Fire alarm


Arar Land Port installation Work in Arar land
Site Location Project Name:
K.S.A port

IMAR Engineering
Consultant: Consultant
AECOM PM:
MR.Mohammed Siraj

Consultant PM: MR.Mohamed SidAhmed

Contractor: Red Water Company.

Contract Start Date: 03/05/2023


Contractor PM: Eng. Mohammed Gesraha

Contract Finish Date: 02/11/2024

Testing and Commissioning Plan 4


Testing and Commissioning Plan

3. Project Scope
Arar Land port is a strategic land port at the Kingdom of Saudi Arabia Borders with Iraq.

This land port is projected by Zakat, Tax and Customs Authority (ZATCA) for development

The existing Arar LBC Fire Detection, Alarm and Firefighting Systems require upgrading and
improvement in keeping with Zakat, Tax and Customs Authority safety and security, and Civil Defense
requirements.

Undertake a Condition Report of the Arar Land Port and residential area fire life safety systems and
develop the fire strategy pertaining thereto

Develop a Fire Life Safety assessment with recommendations to rectify critical issues identified and
bring the site up to standard where so required under KSA requirements.

Refurbishment where required of the existing mechanical and electrical works inside and outside the
buildings to comply with the requirements of fire life safety

Documentation, installation and Testing and Commissioning new Fire detection, and life safety work to
buildings and areas of the land port area not currently having adequate Fire protection.

4. Testing and Commissioning Strategy Procedure


Testing and commissioning strategy shall be performed in five phases as shown below:

Method Operation and Testing &


Handover
Statement Functional Commissioning
Performance with Snag list

Testing & commissioning works for the systems shall be done as per the following
procedures, requirements, roles & responsibilities:

Phase Party
Description
# Contractor Supplier Consultant IMAR SAC EPMO End User
• Provide • Put remarks and • Verify consultant
Method • Communicate Start-Up recommendations recommendation
1 with all parties. Method of on Start-UP Method and grant approval --
Statement
Statement. of Statement. for the statement.

Testing and Commissioning Plan 5


Testing and Commissioning Plan

Phase Party
Description
# Contractor Supplier Consultant IMAR SAC EPMO End User
• Review Start-Up • Provide • Advice for any • Advice for any
Method of ITP. needed modification needed
Statement. to comply with modification to
project comply with project
• QA/QC works. requirement. requirement.
Operation and • Communicate
with all parties.
Functional
Performance • QA/QC works. Attend and approve
2 Test (O&FPT) -- FPT works as it is --
Perform FPT --
being successfully
works until it will completed.
be successfully
completed &
approved.

• Communicate
with all parties.

• Perform
commissioning • Attend
works until it will Commissioning
be successfully • Attend & supervise works until it will
completed & Commissioning be successfully
Testing and approved.
3 -- works until it will be completed & --
Commissioning successfully approved.
• QA/QC works. completed &
approve. • Receives all
documents from
• Provide all related Consultant
documentations
to be verified by
consultant

• Coordinating & • To review, sign &


Communicating stamp all test reports
with all other as per testing at site.
parties. • Review consultant
• To ensure all test approved
• QA/QC works. forms and submittals of all
procedures are done test reports. Approve
4 Handover -- completely as per
• To submit all test and receive
method statement. • Approve and
reports for
consultant coordinate with
• To prepare all test end user to
approval. reports according to receive.
the tests done at site,
sign, stamp & submit
them to SAC EPMO.

Testing and Commissioning Plan 6


Testing and Commissioning Plan

5. List of Systems
Remarks
No. Category Description

01 Electrical Work 1. Fire Alarm System


2. Emergency light and Exit
sign System
02 Mechanical Work 1. Firefighting System

6. Equipment List
1.Fire Alarm Equipment List Admin Area

Sub-
# System Mnfr. Model Qty Drawing Ref. #
System
Fire Alarm -- Contex Plus XFP502/X/CON N/A
Control 18
Panel
Smoke -- Contex Plus 55000-685IMC N/A
266
Detector
Heat -- Contex Plus 55000-485IMC N/A
Electrical

19
Detector
Manual Call -- Contex Plus SA5900-908IMC N/A
54
point
-- Contex Plus CON451A/CX/SR N/A
Sounders CON433A/CX/D 80
R/65

2.Emergency light & Exit Sign list Admin Area

Testing and Commissioning Plan 7


Testing and Commissioning Plan

Sub-
Drawing
# System Syste Mnfr. Model Qty
Ref. #
m
Emergency Light -- Khanda LF-LED-500F 166 N/A
Electri

Exit Sign -- Hummer 3WYJ001D 112 N/A

2.Firefighting list Admin Area

Sub- Drawi
# System Syste Mnfr. Model Qty ng Ref.
m #
-- Union Pipe HDPE PIPE100, OD:200 N/A
HDPE Pipe 8 inch 90
Industry MM,SDR11,PN16,L:100M
-- Union Pipe HDPE PIPE100, OD:160 N/A
HDPE Pipe 6 inch 2800
Industry MM,SDR11,PN16,L:100M
-- Union Pipe HDPE PIPE100, OD:110 N/A
HDPE Pipe 4 inch 1100
Industry MM,SDR11,PN16,L:100M
-- Jazeera Steel ASTM A53 SCH.40, E.R.W N/A
black Steel Pipe 6 inch Black Steel Pipe WELDED 17
Mechanical

6MTR SIZE 6 INCH


-- Jazeera Steel ASTM A53 SCH.40, E.R.W N/A
black Steel Pipe 4 inch Black Steel Pipe WELDED 57
6MTR SIZE 4 INCH
-- Jazeera Steel ASTM A53 SCH.40, E.R.W N/A
black Steel Pipe 3 inch Black Steel Pipe WELDED 50
6MTR SIZE 3 INCH
-- Jazeera Steel ASTM A53 SCH.40, E.R.W N/A
black Steel Pipe 2.5 inch Black Steel Pipe WELDED 120
6MTR SIZE 2.5 INCH

Testing and Commissioning Plan 8


Testing and Commissioning Plan

Sub- Drawi
# System Syste Mnfr. Model Qty ng Ref.
m #
-- Jazeera Steel ASTM A53 SCH.40, E.R.W N/A
black Steel Pipe 2 inch Black Steel Pipe WELDED 153
6MTR SIZE 2 INCH
-- Jazeera Steel ASTM A53 SCH.40, E.R.W N/A
black Steel Pipe 1.5 inch Black Steel Pipe WELDED 600
6MTR SIZE 1.5 INCH
-- Jazeera Steel ASTM A53 SCH.40, E.R.W N/A
black Steel Pipe 1 1/4
Black Steel Pipe WELDED 90
inch
6MTR SIZE 1 1/4 INCH
-- Jazeera Steel ASTM A53 SCH.40, E.R.W N/A
black Steel Pipe 1 inch Black Steel Pipe WELDED 400
6MTR SIZE 1 INCH
Sprinklers -- Lifeco LF310,LF311,LF,320&LF321 213 N/A

Fire Hydrant -- Lifeco 100 SFH 1200 20 N/A

Fire Hose Cabinet -- Safeco SF 30 28 N/A


Mechanical

Fire Hose Cabinet -- Safeco SF 9000 2 N/A


(Foam)
ZCV -- Lifeco 3299-300-FLF 2 N/A

Testing and Commissioning Plan 9


Testing and Commissioning Plan

7.Testing & Commissioning Schedule


* ELECTRICAL WORK

Building Name Start Date End Date

Life Safety 12/05/2024 12/05/2024

1. Saudi Post Electrical 12/05/2024 12/05/2024

Life Safety 12/05/2024 12/05/2024

2. Gaudiness and Awareness building Electrical 12/05/2024 12/05/2024

Life Safety 12/05/2024 12/05/2024


3. Civil Defense building Electrical 12/05/2024 12/05/2024

Life Safety 12/05/2024 12/05/2024


4. Car Workshop Electrical 12/05/2024 12/05/2024

Life Safety 12/05/2024 12/05/2024


5. Kennels building Electrical 12/05/2024 12/05/2024

6. Road Security building Life Safety 12/05/2024 12/05/2024

Electrical 12/05/2024 12/05/2024

7. Port Security Warehouse Life Safety 13/05/2024 13/05/2024

Electrical 13/05/2024 13/05/2024

8. Port Security Building 13/05/2024 13/05/2024


Life Safety

9. Intelligence building Life Safety 13/05/2024 13/05/2024

10. Technical Department building Life Safety 13/05/2024 13/05/2024

11. Legal Affair Building Life Safety 13/05/2024 13/05/2024

12. Investigation Building Life Safety 13/05/2024 13/05/2024

13. Drug Control Building Life Safety 13/05/2024 13/05/2024

14. Ambulance Building Life Safety 13/05/2024 13/05/2024

Electrical 13/05/2024 13/05/2024

Testing and Commissioning Plan 10


Testing and Commissioning Plan

Building Name Start Date End Date

15. Military Security building Life Safety 14/05/2024 14/05/2024

Electrical 14/05/2024 14/05/2024

16. Emara Building Life Safety 14/05/2024 14/05/2024

17. Emera Hospitality building Life Safety 14/05/2024 14/05/2024

Electrical 14/05/2024 14/05/2024

18. Emera Warehouse Life Safety 14/05/2024 14/05/2024

Electrical 14/05/2024 14/05/2024

19. Police Building Life Safety 14/05/2024 14/05/2024

Electrical 14/05/2024 14/05/2024

20. Police prison Building Life Safety 14/05/2024 14/05/2024

Electrical 14/05/2024 14/05/2024

21. Admin Mosque 01 Life Safety 15/05/2024 15/05/2024

Electrical 15/05/2024 15/05/2024

22. Admin Mosque 02 Life Safety 15/05/2024 15/05/2024

Electrical 15/05/2024 15/05/2024

23. Food Distribution Building Life Safety 15/05/2024 15/05/2024

Electrical 15/05/2024 15/05/2024

24. Haj and Omra Building Life Safety 15/05/2024 15/05/2024

Electrical 15/05/2024 15/05/2024

25. Ministry of Defense Building Life Safety 15/05/2024 15/05/2024

Electrical 15/05/2024 15/05/2024

26. Inspection and Supportment Building Life Safety 15/05/2024 15/05/2024

Electrical 15/05/2024 15/05/2024

Testing and Commissioning Plan 11


Testing and Commissioning Plan

* MECHANICLA WORK

Building Name Start Date End Date

12/05/2024 12/05/2024
Firefighting
1. Saudi Post

12/05/2024 12/05/2024
Firefighting
2. Civil Defense building
12/05/2024 12/05/2024
Firefighting
3. Car Workshop
12/05/2024 12/05/2024
Firefighting
4. Kennels building
5. Road Security building Firefighting 12/05/2024 12/05/2024

6. Port Security Warehouse Firefighting 13/05/2024 13/05/2024

7. Port Security Building 13/05/2024 13/05/2024


Firefighting

8. Intelligence building Firefighting 13/05/2024 13/05/2024

9. Technical Department building Firefighting 13/05/2024 13/05/2024

10. Legal Affair Building Firefighting 13/05/2024 13/05/2024

11. Investigation Building Firefighting 13/05/2024 13/05/2024

12. Drug Control Building Firefighting 13/05/2024 13/05/2024

13. Ambulance Building Firefighting 13/05/2024 13/05/2024

14. Military Security building Firefighting 14/05/2024 14/05/2024

15. Emara Building Firefighting 14/05/2024 14/05/2024

16. Emera Hospitality building Firefighting 14/05/2024 14/05/2024

17. Emera Warehouse Firefighting 14/05/2024 14/05/2024

18. Police Building Firefighting 14/05/2024 14/05/2024

19. Police prison Building Firefighting 14/05/2024 14/05/2024

20. Admin Mosque 01 Firefighting 15/05/2024 15/05/2024

21. Admin Mosque 02 Firefighting 15/05/2024 15/05/2024

Testing and Commissioning Plan 12


Testing and Commissioning Plan

Building Name Start Date End Date

22. Food Distribution Building Firefighting 15/05/2024 15/05/2024

23. Ministry of Defense Building Firefighting 15/05/2024 15/05/2024

24. Inspection and Supportment Building Firefighting 15/05/2024 15/05/2024

Testing and Commissioning Plan 13


Testing and Commissioning Plan

8.Detail system

Electrical work

*Emergency light and Exit sign work:

- Check installation of cables for proper laying termination and clipping


- Check cable connection to the Emergency light & Exit sign Devices
- Put the system into Operation as per manufactures recommendation
- Cut the electricity off to check the functionality
- Check operations of LED on the devises

* Fire Alarm System:

- Check installation of cables for proper laying termination and clipping


- Check cable connection to the FACP and battery
- Put the system into Operation as per manufactures recommendation
- Simulate fire Conditions by generating Smoke /heat to activate the detectors
- Check display for detector number
- Check operations of LED on the detector
- Check Sounder Functionality.

Testing and Commissioning Plan 14


Testing and Commissioning Plan

Mechanical work

• Fire Hose Cabinet


- Open the cabinet door that conceals the fire hose reel. The hose reel shall open
fully & easily in all
- Open the lock shield valve and allow the water to flow in to the hose reel
- Ensure that the hose can be withdrawn easily in any direction
- Ask one assistant to run across a room with the hose until it fully extends. Watch the
reel to ensure it
- Open the nozzles in the Jet mode ensure that the flow rate with the nozzle in the jet mode is
producing minimum jet length.
- Discharge the water in the open area if possible or inside the drum
- After full satisfaction close the nozzle immediately. Rewound the hose to its proper position on
the reel. Finally drain the water inside the hose.

• Fire Hydrant
- Hydrants are accessible.
-Hydrant outlets are slightly more than hand-tight
- There are no leaks in the top of the hydrant when hydrant valve is opened.
- There are no leaks in the gasket under the caps when hydrant valve is opened
- There are no cracks in the hydrant barrel
- Nozzle threads are not damaged

Testing and Commissioning Plan 15


Testing and Commissioning Plan

• Sprinkler system
-Check Sprinkler heads that are damaged or painted over must be
replaced.
- Check that sprinkler head and location match the type
indicated on the plans.
-Check any possibility of Leakage in the system after applying pressure.
- All piping and attached accessories subjected to system
working pressure shall be hydrostatically tested at 200 psi
and shall maintain that pressure without loss for 2 hours.

Testing and Commissioning Plan 16