0% found this document useful (0 votes)
69 views10 pages

Sap PP T Codes

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views10 pages

Sap PP T Codes

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

SAP PP

Production Planning
01 02
Material Bill of
Master Material

SAP PP
Master Data
04
Routing
03 05
Work Centers Production
Version
01
Bill of Material

T-codes:
CS01: Create
CS02:
Change
CS03: Display
CS11/CS12/CS14: List
CS15: Where-used
list
02
WorkCenter
WorkCenter 02 WorkCenter 01
General Data
Default Values
Capacity Data:
Available Capacity
Scheduling Data:
Scheduling Basis
Wait & Remove time
Costing & HR
Data: Cost Center
Activity Types
Formulas
.
WorkCenter 03

WorkCenter 04
WorkCenter T-codes:
CR01: Create
CR02: Change
CR03: Display
CR05: List
CR15: Where-used
list

03
BOM:
Product Routing
WorkCenter
001 01 01
Operation Operation 02
001 004 003 003
002

002

003
WorkCenter 02
Operation 04 Operation 054 Operation 03
004 002 002 003 009 010 001 003

004

WorkCenter
03

WorkCenter 04
WorkCenter 05

T-codes:
CA01: Create
CA02:
Change
CA03: Display
CA85/CA85N: List
CA51:Task List

04
Production Version

Product001
Alternative Alternative Alternative
BOM 1 BOM 2 BOM 3

Routing Routing Routing


Group Counter1 Group Counter2 Group Counter3

Prod. version 1 Prod. version 2 Prod. version 3

The linkage between a product BOM and the process


Routing.

T-codes:
C223: Maintain
C252: List

05
SAP PP
Master Data

BOM
A bill of material is a complete, formally structured list of the components
that make up a product or assembly. The list comprises of the material
number of each component, together with the quantity and unit of
measure.

Work Center
Work center is an organization unit where manufacturing activities
are performed. In other words, Work Centers are the master data
which represent real machines, Production Lines, Assembly Work
Center, etc.

Routing
A routing is a description of which operations or list of activities has to
be carried out during the production and planning process.

Production Version
It determines which alternative BOM is used together with which routing
to produce a material or plan a material.There may be different production
versions based on the lot sizes and validity dates.

06
SAP PP
Production Process

01
Maintain Material
Data &
Create BOM 02
Create
Work Centers

03
Create
Routing &
Assign prod. 04
version Create
Production Order

05
Confirm
Operations 06
Good Reciept
Finished
Product
07
SAP PP
Production Order

A production order is used to


define:
1. The material to be produced
2.Plant location where
production has to be
done
3. Date and time of production
4. Quantity of goods required
5. Which components and
sequence of operations are to
be used
6.How the order costs are to
be settled
T-codes:
CO01:Create
Co02:Change
Co03: Display
CO15/CO11N:Confirmation
COOIS: Report
CO24:Missing Parts

08
The End

You might also like