OW NER.

01 01 of 09
TB426 WA-345703 P 44000046421-1312042.03
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO. TYPICAL FOR 132/33KV TRANSFORMER FEEDERS
1. CT/VT DATA ARE SUBJECT TO THEIR SIZING CALCULATIONS

~
132KV, 3150A, 40KA (1 SEC), 3PH, 60 HZ, BUS-1A =AD11 APPROVAL BY SEC.
132/33KV TRAFO PROT.

TS
PANEL SET-1 2. WHEN BF STAGE-2 OF ANY BAY OPERATES, BAY UNIT WILL SEND

OF I
132KV BB WITH BF PROT. PANEL SYS.2 INTERTRIP TO CENTRAL UNIT WHICH WILL BE DISTRIBUTED TO
Q1
OTHER BAYS BY THE CENTRAL UNIT AS PER SYSTEM TOPOLOGY.
M 2000A 87B-2/CU
TC1 & TC2 FAULTY
40KA

CONSENT
49W-A 49W-A 63-A 63-A 87M 87CH
HV LV T HVCBX Q51 SPRING NOT CHARGED
FOC Q0 Q0
40KA
SF6 LOW 2ND STAGE
CURRENT LEGEND
BY PASS 33KV ABTS INITIATION
BB TRIP/
SWITCH 26-A/T OIL TEMPERATURE ALARM (MAIN TANK)

TTEN
Q52 POWER TRAFO. MECH. INTERTRIP 86BB 74
40KA 26/T OIL TEMPERATURE TRIP (MAIN TANK)
PROTN. TRIP & 2 86BB
TRANSFORMER MECHANICAL 49W-A/HV HV WINDING TEMP. ALARM
50/51G/SEF

THE W RI
PROTECTION ALARMS Q2 87B-2/BU11 49W-A/LV LV WINDING TEMP. ALARM
M 2000A 49W/HV HV WINDING TEMP. TRIP
40KA BFI FROM 86-1, 49W/LV LV WINDING TEMP. TRIP
50BF 62 94BF 74

~
74 86-2, 86-3, 86-4
132KV, 3150A, 40KA (1 SEC), 3PH, 60 HZ, BUS-2A 63-A/T BUCHHOLZ RELAY ALARM (MAIN TANK)
Q0 BF1 2 94BF
DC-1 & 33KV 94BB1 01
63/T BUCHHOLZ RELAY TRIP (MAIN TANK)
63/OLTC OIL FLOW RELAY TRIP (OLTC)

THOUT
63PR/T PRESSURE RELIEF DEVICE RELAY TRIP(MAIN TANK)
LCC(=AD11) 62 86BF 74

BLOCK
TCS-1 63PR/OLTC PRESSURE RELIEF DEVICE RELAY TRIP(OLTC)
(HV/TC1) P1
BF2 2 86BF 63-A/HVCBX BUCHHOLZ ALARM (HV CABLE BOX)

PROT)
Q0 CT9, CORE-1 Q1
87

WI
3000/1A MRCT 63/HVCBX BUCHHOLZ TRIP (HV CABLE BOX)
33KV ABTS

CLOSE
T A/D 63PR/HVCBX HV CABLE BOX PRESSURE RELIEF
INITIATION 600/1A TAP
Q2 CONVERTER 01

DOCUMENT
FROM 33KV SWG CL. TPS 71Q1-A OIL LEVEL ABNORMAL ALARM (MAIN TANK)

BB
TRIP (TC1) & DWG: WA-345704, 71Q2-A OIL LEVEL ABNORMAL ALARM (OLTC)

33kV
RCA TRANSFORMER RUBBER CELL BROKEN ALARM

&
CLOSE BLOCK SH: 01 of 02
50 PHASE INSTANTANEOUS OVER CURRENT PROTECTION

TC-1/TC-2
Q0 (AD11) 74 LCC (AD11)
74

94BB1 (
86-1 50N NEUTRAL INSTANTANEOUS OVER CURRENT PROTECTION
Q0 (BH16) 86-1 Q0 Q0 DC-2
50BF BREAKER FAILURE PROTECTION
CT9, CORE-2 51 PHASE TIME OVER CURRENT PROTECTION
87REF

S
THI
BFI 3000/1A MRCT 51N NEUTRAL TIME OVER CURRENT PROTECTION
HV CT9
600/1A TAP

FROM
Q0 (AD11) 62BF TIMER FOR 50BF

P
TRI
CL. TPS 86 LOCKOUT RELAY

FROM
87T TRANSFORMER DIFFERENTIAL PROTECTION
87REF RESTRICTED EARTH FAULT PROTECTION

BLOCK
87M BUS BAR DIFFERENTIAL (MAIN ZONE)
FROM 33KV SWG 87REF
87CH BUS BAR DIFFERENTIAL (CHECK ZONE)
CT9, CORE-3

NED
DWG: WA-345704 LV 94 TRIPPING RELAY
3000/1A MRCT
SH: 01 of 02 98 PT FUSE FAILURE RELAY

SHALL BE OBTAI
CLOSE
3000/1A TAP
TRIP (TC1) & FIBER OPTIC CABLE
CL. TPS TRIP TC-2 FOC
BFI CLOSE BLOCK

BLOCK
LCP LOCAL CONTROL PANEL
Q0 (AD11) Q0 (AD11) CLOSE BLOCK 33KV C.B (BH16) BFI BREAKER FAILURE INITIATION

&

TC-2
74 Q0 (BH16) TFR TRANSIENT FAULT RECORDER

TC-2
CT9, CORE-4

TC-2
86-3
HMI HUMAN MACHINE INTERFACE

CLOSE
86-3 3000/1A MRCT
CT9 BAY UNIT

P
600/1A TAP B.U.

RETRI
SAVE
C.U. CENTRAL UNIT

P
CL. 0.2FS5,20VA,

TRI
33KV ABTS P2 ACCS AUTOMATIC CAPACITOR CONTROL SYSTEM

&
INITIATION BAY CONTROL UNIT
BCU
TC2
Q0

PART
DSM DYNAMIC SYSTEM MONITORING
2000A
40KA
TC1

BLOCK
BLOCK
49W 49W 63 63 63
MFM DIGITAL MULTI FUNCTION METER

N
HV LV T OLTC HVCBX

I
FULL OR
P2

CLOSE
CT10, CORE-2

CLOSE
TRANSFORMER MECHANICAL PQM POWER QUALITY METER
3000/1A MRCT
PROTECTION
3000/1A TAP

BLOCK
CL. TPS

TC-1 &
TC-1
TC-1 &
DV DIGITAL VOLTMETER

TC-1
132/33KV TRAFO CT10

N
I
P
PROT. PANEL SET-2 CT10, CORE-1

RETRI

CLOSE
SAVE

ON
P

P
3000/1A MRCT REVISION MARK

TRI

TRI
TFR

REPRODUCTI
HV HV 3000/1A TAP
CL. TPS P1 SCALE RANGE FOR 01 REVISION MARK
50N 50
TFR TRANSFORMER FEEDER METERS
51N 51 A 0-600A TO GIS
V 0-150KV HMI/SCADA
Q53 W +/-80MW
DELAYED

74 INST. 40KA VAR +/-80MVAR REFERENCE DRAWINGS


132KV LCP FO
DC-2 Q9 Q1

CLOSE
DRAWING TITLE DRAWING NO.

OPEN
2000A BB-1A FFR

NO
40KA 132/33KV DRAWING CONTROL SHEET WE-345334
Q2 BLOCK 25M
74TCS-2
(HV/TC2) BB-2A FFR TRAFO-1
Q0 BCU ACCS AMR DSM SCOPE OF WORK & TECHNICAL SPECIFICATIONS PTS-13WN337

CO.
Q8 RTCC
TRIP (TC2) 33KV
40KA PANEL PANEL PANEL PANEL
STAGE-1 BUS TIE BREAKER MAIN SWITCHING ONE LINE DIAGRAM WA-345700
Q6 -A, V, W, VAR,
Q0 (BH17) LA11 MFM ACCS PQM DSM DV

TY
TFR DWG: WA-345704, -25M
3-PH 120KV

CI
SH: 01 of 02 20KA CL-4

SAUDIELECTRI
50/51G
TFR BLK 25M
T 4A (TYP.)
SF6/XLPE
98T
TERMINATION M R
STAGE-2

TRIP (TC2)
& CLOSE BLOCK XLPE CABLE

Q0 (AD11) WDG-1
XLPE/OIL
Q0 (BH16) TERMINATION 20A TO 132KV COMMON SYNCHRONIZING SHT. 07 OF 09
DWG: WA-345704, WDG-1
P2
SH: 01 of 02 BFI BCT1-3 SEL BB VT
4A (TYP.)
74 20A

OF
86-2 Q0 (AD11) 3000/1A MRCT FROM SHT: 06 OF 09
FROM 51/51N-LV 86-2 3000/1A TAP DAR ENGINEERING
(DELAYED) CL. TPS, SPARE TO 132KV COMMON ENGINEERS & DESIGNERS
BLOCK

N ARE THE SOLE PROPERTY


WDG-2
FROM 33KV SWG SYNCHRONIZING SHT. 07 OF 09 DRAWING/DOCUMENT ISSUED FOR
33KV ABTS BCT4-6 TFR BASE DESIGN
DWG: WA-345704,
3000/1A MRCT 132KV BB WITH APPROVAL

SH: 01 of 02 BF PROT. PNL. INFORMATION ONLY

50/51G 3000/1A TAP CONSTRUCTION

TRIP (TC2) SEF CL. TPS, SPARE SYS. 1 DATE


25.02.2015
BY
TAKREEM ALI

& CLOSE BLOCK OPEN DELTA


BCT7-9 LCC(=AD11) 87B-1/BU11
Q0 (AD11) TFR (PT15) VOLTAGE
3000/1A MRCT
132KV/115V-115V/115V-115V GENERATED Q0 Q0
Q0 (BH16) 3000/1A TAP
INTERNALLY A/D
DWG: WA-345704, 74 BFI TFR 3 3 3 LCC(=AD11)
86-4
CL. TPS, SPARE CONVERTER
SH: 01 of 02 86-4 Q0 (AD11) CL: 0.2&3P (DUAL CLASS)
BCT10-12 100VA Q1
3000/1A MRCT AS-BUILT BY DATE
33KV ABTS TFR 62 86BF 74
INITIATION 3000/1A TAP
Q2 BF2 1 86BF
CL. 0.2FS5, 30VA
BCT14
FROM 50/50N-LV BCT13
3000/1A MRCT BCT15 SPARE (Y-PH)
49W/HV
(INST.) 3000/1A TAP 1000-600-300/1A 50BF 62 94BF 74
BY BFI FROM 86-1,

NED HEREI
FROM 33KV SWG CL. TPS CL:5P20 MANUFACTURE Q0 BF1 1 94BF
86-2, 86-3, 86-4 01 25.02.15 PAJ REVISED AS PER SEC COMMENTS TAK TAK TAK
P2 T601
DWG: WA-345704, & 33KV 94BB1 01
SH: 01 of 02 P1 P2 132/34.5/13.8KV
26 63PR 63PR 63PR 00 22.01.15 MHU FIRST ISSUE T.A T.A MRK
84/105 MVA
T T OLTC HVCBX N
P1 P2 ONAN/ONAF 86BB 74
REV.
BCT33 3-PH, 60Hz, YNyn0d1 POWER TRAFO. MECH. BB TRIP/ 1 86BB DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

CONTAI
NGR-1 1000-600-300/1A PROTN. TRIP &
BCT30 BCT31 BCT32 +12.5% TO -12.5% OLTC INTERTRIP
TRANSFORMER MECHANICAL 6.35 ohms CURRENT
4000/1A MRCT 1000-600-300/1A 1000-600-300/1A CL:5P20 50/51G/SEF
FROM ON 132KV SIDE BY PASS
PROTECTION 3000A 87B-1/CU
CL.TPS CL:5P20 CL:5P20 AVR IN STEPS OF 1.25% SWITCH
10SEC. RELAY
(SAME AS 33KV) SPARE %Z =17.5% (@84MVA BASE) FOC 87M 87CH
TC1 & TC2 FAULTY
Q0 Q0 74

ON
26-A P2
71Q1 71Q2 RCA BCT29 BCT24 BY SPRING NOT CHARGED

NFORMATI
T DC-1
SPARE (Y-PH) MANUFACTURER
SF6 LOW 2ND STAGE
BY 49W/LV
MANUFACTURE
M.HASSAN TAKREEM ALI NONE
DRAWN BY CHECKED BY SCALE:
BCT28
SPARE (Y-PH) JAN 2014

AND THE I
DATE STARTED DATE COMPLETED
4000/1A TO AVR
TRANSFORMER MECHANICAL
CL-0.2FS5 DWG: WA-345704 33KV ABTS INITIATION OPR'G. DEPT. ENG. DEPT.
PROTECTION ALARMS
(ONLY ON SH: 01 of 02
'Y'-PH)
THIS DRAWING IS NOT TO BE USED FOR APPROVAL/CERTIFICATION INFORMATION
BCT25-27 CONSTRUCTION OR FOR ORDERING
4000/1A MRCT TO 33KV METERING CIRCUIT MATERIAL UNTIL CERTIFIED AND DATED DDC NO. REV. NO.
CL 0.2FS5 DWG: WA-345704

NG
OIL/XLPE XLPE CABLE
BCT22-24
SH: 01 of 02 RELAY AND METERING ONE LINE DIAGRAM

S DRAW I
TERMINATION
4000/1A
CL.5P20
132kV SYSTEM
P1
(SAME AS
TO 33KV SWITCHGEAR CONSTRUCTION OF TABUK 380/132/33KV BSP
33KV INC CTS)
TABUK SAUDI ARABIA

THI
BCT19-21 BCT16-18
4000/1A MRCT 4000/1A MRCT CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
CL.TPS CL.TPS
(SAME AS 33KV INC CTS) (SAME AS 33KV INC CTS)
4400004642 1-1312042.03 P TB426 WA-345703 01 of 09
01
SEC-A (2004/10)

DMS VECTOR SECA00


OW NER.
01 02 of 09
TB426 WA-345703 P 44000046421-1312042.03
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. CT/VT DATA ARE SUBJECT TO THEIR SIZING CALCULATIONS
TYPICAL FOR 380/132/33KV TRANSFORMER FEEDERS
APPROVAL BY SEC.

TS
2. WHEN BF STAGE-2 OF ANY BAY OPERATES, BAY UNIT WILL SEND

OF I
132KV BB WITH BF PROT. PANEL SYS.1 INTERTRIP TO CENTRAL UNIT WHICH WILL BE DISTRIBUTED TO
FROM 380/132/13.8KV
OTHER BAYS BY THE CENTRAL UNIT AS PER SYSTEM TOPOLOGY.
AUTO TRANSFORMER TC1 & TC2 FAULTY
T801

CONSENT
87B-1/CU
SPRING NOT CHARGED
87M 87CH 74
SF6 LOW 2ND STAGE
FOC Q0 Q0 DC-1

POWER TRAFO. MECH.

TTEN
PROTN. TRIP &
BB TRIP/
(PT17) 50/51G/SEF
LA13 CURRENT INTERTRIP 86BB 74

THE W RI
132KV / 115V-115V x 115V-115V 3-1PH BFI FROM 86-1,86-2, 86-3, 86-4, BY PASS 1 86BB
3 3 3 120KV, 20KV 86BF (Q0-1), 86BF (Q0-3), SWITCH 87B-1/BU13
CL: 0.2/3P (DUAL CLASS) CL-4 94PD-2 (Q0-1) & 94PD-2 (Q0-3), LEGEND
100VA 86TE-1, 86TE-2 01 50BF 62 94BF 74
Q8
LCC(=AD13) Q0 BF1 1 94BF 87T TRANSFORMER DIFFERENTIAL PROTECTION
RTCC PANEL FOR T801

THOUT
WDG-1 40KA
87REF-T RESTRICTED EARTH FAULT PROTECTION
Q1
21 DISTANCE PROTECTION
TRANSFORMER
WDG-2 62 86BF 74 87M BUS BAR DIFFERENTIAL (MAIN ZONE)
Q6

WI
PROT. PANEL SET-1
DV M Q2 87CH BUS BAR DIFFERENTIAL (CHECK ZONE)
BF2 1 86BF
50BF BREAKER FAILURE PROTECTION

10A
10A

DOCUMENT
74TCS-1 LCC(=AD13) 62BF TIMER FOR 50BF
A/D
AVR FROM TR. T801 Q0 Q0 Q0 CONVERTER 74 SUPERVISION RELAY
BCT-12
3000/1A MRCT 86 LOCKOUT RELAY,HAND RESET
2500/1A TAP 94 TRIPPING RELAY,SELF RESET
FROM T802
CL.0.2 (B-PH ONLY)

TYP)
TPI Q9 98 PT FUSE FAILURE RELAY
OLTC
DWG: WA-345702 3150A LCP LOCAL CONTROL PANEL

TC-1 BFI&
(
SHT.XX 40KA

S
THI
TFR TRANSIENT FAULT RECORDER

BLOCK
4A
TPI TAP POSITION INDICATOR
AVR AUTOMATIC VOLTAGE REGULATOR
Q53 TRIP TC-1 & CLOSE BLOCK

FROM
FOC

BFI BREAKER FAILURE INITIATION

CLOSE
09
COMMON

NG
09
COMMON

NG
TO 87T(24MV) & 98/24MV 40KA

P
FOC FIBER OPTIC CABLE

TRI
ZI
ZI
RETRIP TC-1
REFER TO

SYNCHRONI

OF
SYNCHRONI

OF
74TCS TRIP CIRCUIT SUPERVISION RELAY
WA-345702 SAVE TC-1 & CLOSE BLOCK

NED
HMI HUMAN MACHINE INTERFACE

SHT.07
SHT.07
SH:XX

132KV
CT2, CORE-1

132KV
SAS SUBSTATION AUTOMATION SYSTEM
TO SAS

SHALL BE OBTAI
3000/1A MRCT P1 TRIP FROM: 380KV CB,s
B.U. BAY UNIT
3000/1A TAP
TFR 94PD-2 (Q0-1) Q0-1 & Q0-3 (C-5)
CL.TPS SAVE TC-1 & CLOSE BLOCK C.U. CENTRAL UNIT

TO
TO & 94PD-2 (Q0-3)
BCU BAY CONTROL UNIT
DWG: WA-345702,

BFI&
RETRIP TC-2
CT2 SHT. XX

BLOCK
TRIP TC-2 & CLOSE BLOCK DV DIGITAL VOLTMETER
TFR

TC-2
CT2, CORE-2
3000/1A MRCT
OPEN DELTA

CLOSE
3000/1A TAP
MFM DIGITAL MULTI FUNCTION METER

P
VOLTAGE CL.TPS TRIP & CLOSE

TRI
132KV BB WITH BF
GENERATED BLOCK FROM:

PART
P2 PROT. PANEL SYS.2
INTERNALLY 86-1 & 86-3,
REFER TO DSM DYNAMIC SYSTEM MONITORING
LCC(=AD13) 87B-2/BU13
DWG:WA-345702

N
Q0 Q0

I
TC1 SHT:XX
A/D
Q0

FULL OR
CONVERTER TFR TRANSIENT FAULT RECORDER
SCALE RANGE FOR 3150A TC2 LCC(=AD13)
TRANSFORMER FEEDER METERS 40KA
A 0-400A TO GIS TRIP & CLOSE 62 86BF 74
Q1
V 0-150KV HMI/SCADA BLOCK FROM:
BF2 2 86BF REVISION MARK
W +/-600MW
86-2 & 86-4,

BLOCK

BLOCK
86TE-1

86TE-2
&
VAR +/-500MVAR 01 Q2

TC-1 &
132KV LCP FO REFER TO

N
01 REVISION MARK

I
TC-2
Q1 DWG:WA-345702
CLOSE

P2 50BF 62 94BF 74
OPEN

BB-1A FFR CT1, CORE-4

ON
SHT:XX BFI FROM 86-1,86-2, 86-3, 86-4,

CLOSE

CLOSE
3000/1A MRCT Q0 BF1 2 94BF

FROM

FROM

REPRODUCTI
86BF (Q0-1), 86BF (Q0-3),

P
Q2

TRI

TRI
BB-2A FFR 1000/1A TAP
DSM 94PD-2 (Q0-1) & 94PD-2 (Q0-3),
BCU CL. 0.2FS5,60VA,
PANEL TRIP & CLOSE 86TE-1, 86TE-2 01
MFM
86BB 74
- A, V, W, VAR, BLOCK FROM:
POWER TRAFO. MECH. BB TRIP/ 2 86BB
DSM 86BF (Q0-1)
- 25M PROTN. TRIP & INTERTRIP REFERENCE DRAWINGS
& 86BF (Q0-3) CURRENT
50/51G/SEF
DWG: WA-345702, BY PASS 87B-2/CU DRAWING TITLE DRAWING NO.
SHT.XX SWITCH

NO
87CH 87M DRAWING CONTROL SHEET WE-345334
74
SF6 LOW 2ND STAGE
FOC Q0 Q0 DC-2
98T SCOPE OF WORK & TECHNICAL SPECIFICATIONS PTS-13WN337

CO.
CT1, CORE-3
M R TC1 & TC2 FAULTY
SEL BB VT (WDG-1) 3000/1A MRCT
TO 87REF-T MAIN SWITCHING ONE LINE DIAGRAM WA-345700
FROM SHT. 06 OF 09 3000/1A
SPRING NOT CHARGED
CL.TPS REFER TO:

TY
DWG: WA-345702,

CI
SHT.XX

SAUDIELECTRI
SAME AS
380kV GIS
FOR ALL TAPS

CT1
TRANSFORMER PROT. PANEL SET-2

OF
DAR ENGINEERING
ENGINEERS & DESIGNERS

N ARE THE SOLE PROPERTY


21-MV R
DRAWING/DOCUMENT ISSUED FOR

CT1, CORE-2 BASE DESIGN

3000/1A MRCT APPROVAL

21 98 INFORMATION ONLY
3000/1A M
MV BLOCK MV CONSTRUCTION
CL.TPS DATE
25.02.2015
BY
TAKREEM ALI

AS-BUILT BY DATE

DELAYED

NST.
I

NED HEREI
CT1, CORE-1
TO (87T)
3000/1A MRCT TO TRIP 86-2 TO TRIP 86-4 01 25.02.15 PAJ REVISED AS PER SEC COMMENTS TAK TAK TAK
REFER TO:
3000/1A REFER TO: REFER TO:
CL.TPS DWG: WA-345702,
WA-345702 WA-345702 00 22.01.15 MHU FIRST ISSUE T.A T.A MRK
P1 SHT. XX
SHT.XX SHT.XX
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI
74TCS-2
Q0
~

~
132KV, 3150A, 40KA (1 SEC), 3PH, 60HZ, BUS-1A =AD13

ON
NFORMATI
Q1
3150A
40KA
M.HASSAN TAKREEM ALI NONE
DRAWN BY CHECKED BY SCALE:

Q51
JAN 2014

AND THE I
DATE STARTED DATE COMPLETED
40KA

OPR'G. DEPT. ENG. DEPT.

Q52
APPROVAL/CERTIFICATION INFORMATION
40KA THIS DRAWING IS NOT TO BE USED FOR
Q2 CONSTRUCTION OR FOR ORDERING

3150A MATERIAL UNTIL CERTIFIED AND DATED DDC NO. REV. NO.

40KA
~

NG
132KV, 3150A, 40KA (1 SEC), 3PH, 60HZ, BUS-2A
RELAY AND METERING ONE LINE DIAGRAM

S DRAW I
132kV SYSTEM
CONSTRUCTION OF TABUK 380/132/33KV BSP
TABUK SAUDI ARABIA

THI
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

4400004642 1-1312042.03 P TB426 WA-345703 02 of 09


01
SEC-A (2004/10)

DMS VECTOR SECA00


1 2 3 4 5 6 7 8

OW NER.
01 03 of 09
TB426 WA-345703 P 44000046421-1312042.03
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO. TABUK#4 CKT-1
TYPICAL FOR 132KV OHL FEEDERS 1. CT/VT DATA ARE SUBJECT TO THEIR SIZING CALCULATIONS

SA APPROVAL BY SEC.
96KV

TS
2. SAME TAPS SHALL BE USED AT BOTH ENDS, AND THE
CL-4

OF I
ADAPTED TAP SHALL BE CONFIRMED AFTER REMOTE END
AIR/XLPE BUSHING BASE DSIGN

3. WHEN BF STAGE-2 OF ANY BAY OPERATES, BAY UNIT WILL SEND

CONSENT
1CX2000sqmm 132KV BB WITH BF INTERTRIP TO CENTRAL UNIT WHICH WILL BE DISTRIBUTED TO
XLPE/PH 132KV BB WITH BF PROT PANEL SYS.1 PROT PANEL SYS.2 OTHER BAYS BY THE CENTRAL UNIT AS PER SYSTEM TOPOLOGY.
A
SF6/XLPE
87B-1/CU 87B-2/CU
TERMINATION

LA12

TTEN
(PT16) 3-1PH
87CH 87M 74 87CH 87M 74
132KV / 115V-115V x 115V-115V 120KV
FOC Q0 Q0 FOC Q0 Q0

THE W RI
DC-1 DC-2
3 3 3 20KA
CL: 0.2/3P (DUAL CLASS) CL-4
TC1 & TC2 FAULTY TC1 & TC2 FAULTY
100VA LEGEND
BB TRIP/ BB TRIP/
HS
M
SPRING NOT CHARGED INTERTRIP 86BB 74 SPRING NOT CHARGED INTERTRIP 86BB 74
WDG-1 1 86BB 2 86BB
SF6 LOW 2ND STAGE SF6 LOW 2ND STAGE

THOUT
87B-1/BU12 87B-2/BU12
87 DIFFERENTIAL RELAY
WDG-2 Q6 Q8
21 DISTANCE RELAY
40KA 50BF 62 94BF 74 50BF 62 94BF 74

WI
FROM 94-1 & 94-2 FROM 94-1 & 94-2 49 THERMAL OVERLOAD RELAY
Q0 BF1 1 94BF Q0 BF1 2 94BF

20A

20A
TRANSFER TRIP 50BF BREAKER FAILURE PROTECTION
LCC(=AD12) TRANSFER TRIP TO LCC(=AD12)

DOCUMENT
Q9 REMOTE END CB TO REMOTE END 62BF TIMER FOR 50BF
2000A (CH-1) CB (CH-2)
Q1 62 86BF 74 Q1 62 86BF 74 87M BUS BAR DIFFERENTIAL (MAIN ZONE)
40KA

TYP)
BF2 1 86BF BF2 2 86BF 87CH BUS BAR DIFFERENTIAL (CHECK ZONE)
Q2 BLOCK A/R Q2 BLOCK A/R 86 LOCKOUT RELAY

(
A/D SET-1/SET-2 A/D SET-1/SET-2
Q53 94 TRIPPING RELAY

4A
LCC(=AD12) CONVERTER LCC(=AD12) CONVERTER

S
B 40KA 01 01

THI
LCP LOCAL CONTROL PANEL
Q0 Q0 Q0 Q0
TFR TRANSIENT FAULT RECORDER

FOC FIBER OPTIC CABLE

FROM
CT4, CORE-1 P1

09
COMMON

NG
3000/1A MRCT BFI BREAKER FAILURE INITIATION

09
COMMON

NG
CB CLOSE COMAND CB CLOSE COMAND

ZI
3000/1A TAP 98 FUSE FAIL SUPERVISION RELAY

ZI

SYNCHRONI

OF
CL. TPS
SYNCHRONI

OF
74TCS TRIP CIRCUIT SUPERVISION RELAY

NED
SHT.07

CT4
132KV
SHT.07 B.U. BAY UNIT

SHALL BE OBTAI
132KV

CT4, CORE-2
C.U. CENTRAL UNIT
3000/1A MRCT
3000/1A TAP TRIP TC-1 & CLOSE BLOCK TRIP TC-2 & CLOSE BLOCK SAS SUBSTATION AUTOMATION SYSTEM

TO
TO

CL. TPS P2 FL FAULT LOCATOR


TFR RETRIP TC-1 RETRIP TC-2 MCP MCP MEDIA CONVERTOR PANEL
BCU BAY CONTROL UNIT
OPEN DELTA SAVE TC-1 & CLOSE BLOCK SAVE TC-2 & CLOSE BLOCK
VOLTAGE DYNAMIC SYSTEM MONITORING
DSM
GENERATED
INTERNALLY

TFR

PART
MFM DIGITAL MULTI FUNCTION METER
Q0 TC-1
2000A
40KA TC-2
TO GIS RM REVENUE METER

N
I
SCALE RANGE(TYPICAL) FOR
HMI/SCADA
132KV LINE FEEDER METERS

FULL OR
C A 0-2000A
V 0-150KV FO REVISION MARK

CLOSE

OPEN
W +/-400MW
132KV
VAR +/-200MVAR 01
REVENUE REVISION MARK
132KV LCC (AD12)
METERING
PANEL DSM
BCU

N
P2

I
CT3, CORE-4
2000/1A MRCT

ON
2000/1A TAP - A, V, W, VAR,

REPRODUCTI
MFM RM DSM
CL. 0.2FS5,60VA - 25M

BLK
25M
Q1
BB-1A FFR BLOCK 25M

Q2 M R
BB-2A FFR
98L REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
SEL BB VT WDG-1

NO
SHT: 06 of 09
DRAWING CONTROL SHEET WE-345334

SCOPE OF WORK & TECHNICAL SPECIFICATIONS PTS-13WN337

CO.
SET-2 LINE PROT. PANEL MAIN SWITCHING ONE LINE DIAGRAM WA-345700

TY
LCC VT SEL-3{

CI
SAUDIELECTRI
CT3, CORE-3 Q1 MCP
WDG-2
D 2000/1A MRCT BB-1A
M
2000/1A TAP Q2
WDG-2 U1 < U2
CL.TPS, SPARE BB-2A U2 < U1 (BLK) 25A
98B
PSE CABINET-2
WDG-1 Q1
BB-1A R
RACK-1
CT3 Q2
WDG-1 87L-2 RELAY
CT3, CORE-2 BB-2A CB MANUAL CLOSE TX/RX
INT.
2000/1A MRCT
(ENABLE SOFT) NO. 1

OF
2000/1A TAP 74

ROUTE-2

END
CL.TPS VT MCB TRIP 87L 21 DC-2 DAR ENGINEERING
FL 79 25A RELAY ENGINEERS & DESIGNERS
-2 -2

N ARE THE SOLE PROPERTY


A/R CLOSE INT.

REMOTE
DRAWING/DOCUMENT ISSUED FOR
CB STATUS COMMAND (Q0) NO. 2

TO
BASE DESIGN

MUX
67N APPROVAL

S/S
CB SPRING INFORMATION ONLY
-2

F/O
ON
CHARGED A/R BLOCK CONSTRUCTION

CATI
25.02.2015 TAKREEM ALI

TABUK#4
DATE BY
01
A/R BLOCK FROM RACK-2

COMMUNI
86BF (SET-1/SET-2) 85 RELAY
DTTR-2 INT.
01 M
FROM NO. 1
98L 01
74TCS-2 74 94 86BF-2
-2 Q0 94-2 -2 (SYS-2) RELAY
SPARE INT.
AS-BUILT BY DATE
R
NO. 2

BFI
E Q0 (AD12)

NED HEREI
01 25.02.15 PAJ REVISED AS PER SEC COMMENTS TAK TAK TAK

SET-1 LINE PROT. PANEL 00 22.01.15 MHU FIRST ISSUE T.A T.A MRK
MCP

CT3, CORE-1 REV. DATE BY CHKD. CERT. APPD.


DESCRIPTION
NO.

CONTAI
2000/1A MRCT
2000/1A TAP
(BLK) 25A PSE CABINET-1
CL. TPS
P1
RACK-1

RELAY
TX/RX

ON
87L-1 INT.
CB MANUAL CLOSE

NFORMATI
NO. 1
(ENABLE SOFT)

ROUTE-1

END
87L 21
VT MCB TRIP FL 79 25A RELAY
~

132KV, 3150A, 40KA (1SEC), 3PH, 60HZ BUS-1A =AD12 -1 -1 A/R CLOSE
INT.

REMOTE
M.HASSAN TAKREEM ALI NONE
COMMAND DRAWN BY CHECKED BY SCALE:
NO. 2

TO
MUX
CB STATUS (Q0)

S/S
67N JAN 2014
Q1

AND THE I
DATE STARTED DATE COMPLETED

F/O
CB SPRING

ON
2000A -1

CATI
A/R BLOCK

TABUK#4
40KA OPR'G. DEPT. ENG. DEPT.
CHARGED
RACK-2

COMMUNI
Q51 01 A/R BLOCK FROM
40KA 01 RELAY THIS DRAWING IS NOT TO BE USED FOR APPROVAL/CERTIFICATION INFORMATION
86BF (SET-1/SET-2) INT.
F 85 FROM CONSTRUCTION OR FOR ORDERING
NO. 1
DTTR-1 MATERIAL UNTIL CERTIFIED AND DATED DDC NO. REV. NO.
86BF-1
M

NG
Q52 (SYS-1)
98L 74
RELAY RELAY AND METERING ONE LINE DIAGRAM

S DRAW I
40KA 74TCS-1 74 94
SPARE INT.
94-1 -1
Q2
-1 Q0 DC-1 NO. 2
132kV SYSTEM
2000A R
CONSTRUCTION OF TABUK 380/132/33KV BSP
~

132KV, 3150A, 40KA (1SEC), 3PH, 60HZ BUS-2A 40KA BFI


TABUK SAUDI ARABIA

THI
Q0 (AD12)
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

4400004642 1-1312042.03 P TB426 WA-345703 03 of 09


01
SEC-A (2004/10)
1 2 3 4 5 6 7
DMS VECTOR SECA00
1 2 3 4 5 6 7 8

OW NER.
01 04 of 09
TB426 WA-345703 P 44000046421-1312042.03
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. CT/VT DATA ARE SUBJECT TO THEIR SIZING CALCULATIONS
APPROVAL BY SEC.

TS
2. WHEN BF STAGE-2 OF ANY BAY OPERATES, BAY UNIT WILL SEND

OF I
INTERTRIP TO CENTRAL UNIT WHICH WILL BE DISTRIBUTED TO
OTHER BAYS BY THE CENTRAL UNIT AS PER SYSTEM TOPOLOGY.

CONSENT
A TYPICAL FOR 132KV BUS COUPLER

LEGEND

TTEN
THE W RI
87M BUS BAR DIFFERENTIAL (MAIN ZONE)
87CH BUS BAR DIFFERENTIAL (CHECK ZONE)
50BF BREAKER FAIL PROTECTION
62BF-1 BREAKER FAIL STAGE-1 TIMER
62BF-2 BREAKER FAIL STAGE-2 TIMER
132KV BB WITH BF PROT. PANEL SYS.1
86 LOCKOUT RELAY

THOUT
87B-1/CU
94 TRIPPING RELAY

TC1 & TC2 FAULTY 87M 87CH 50 PHASE INST. OVER CURRENT PROTECTION

WI
~

~
132KV, 3150A, 40KA (1SEC), 3PH, 60HZ, BUS-1A FOC Q0 Q0 50N NEUTRAL INST. OVER CURRENT PROTECTION
=AD14 SPRING NOT CHARGED
51 PHASE TIME OVER CURRENT PROTECTION

DOCUMENT
SF6 LOW 2ND STAGE 51N NEUTRAL TIME OVER CURRENT PROTECTION

CB CLOSE COMAND BB TRIP/INTERTRIP 86BB 74 74 SUPERVISION RELAY

FOC
1 86BB TFR TRANSIENT FAULT RECORDER EQUIPMENT
Q1
M 3150A 87B-1/BU14A TC TRIP COIL
40KA LCP LOCAL CONTROL PANEL

S
B

THI
50BF 62 94BF 74 BFI BREAKER FAILURE INITIATION
BFI FROM
Q0 BF1 1 94BF FOC FIBER OPTIC CABLE
Q51 94-BC
40KA LCC (AD14) 74TCS TRIP CIRCUIT SUPERVISION RELAY

FROM
SAS SUBSTATION AUTOMATION SYSTEM
Q2 62 86BF 74
B.U. BAY UNIT
BF2 1 86BF
CENTRAL UNIT

NED
P1 C.U.
CT7, CORE-1
A/D BCU BAY CONTROL UNIT

SHALL BE OBTAI
BLOCK
3000/1A MRCT

BLOCK
CONVERTER
3000/1A TAP
MFM DIGITAL MULTI FUNCTION METER
CL-TPS

CLOSE
87B-1/BU14B

CLOSE
A/D
74
CONVERTER

TC-1 &

TC-1
DC-1

TC-1 &
LCC (AD14)

Q0 Q0 50BF 62
CT7, CORE-2

P
RETRI
3000/1A MRCT Q0 BF1

SAVE

PART
TRI
3000/1A TAP
CT7 LCC (AD14)
CL-TPS 62

Q1 BF2

N
I
132KV BC PROT. PANEL

FULL OR
C
74
TFR
DC/BC
CT7, CORE-3 50 50N
TFR
3000/1A MRCT 51 51N
3000/1A TAP 74TCS-1

N
I
CL-TPS Q0
P2

ON
REPRODUCTI
74TCS-2 74 94
BFI Q0 (AD14)
Q0 94/BC BC

Q0 TC1
3150A
REFERENCE DRAWINGS
40KA
TC2 DRAWING TITLE DRAWING NO.
CB CLOSE COMAND

NO
DRAWING CONTROL SHEET WE-345334
132KV BB WITH BF PROT. PANEL SYS.2

132KV LCC (AD14) SCOPE OF WORK & TECHNICAL SPECIFICATIONS PTS-13WN337

CO.
87B-2/BU14A
SCALE RANGE (TYPICAL) FOR MAIN SWITCHING ONE LINE DIAGRAM WA-345700
132KV BUS-COUPLER LCC (AD14)
50BF 62

BLOCK

BLOCK

TY
A 0-4000A Q0 Q0
P2 Q0 BF1

CI
CT8, CORE-3 BCU

SAUDIELECTRI
3000/1A MRCT
D - A LCC (AD14)

CLOSE

CLOSE
3000/1A TAP MFM
- 25M 62
CL.0.2FS5, 60VA Q2
BF2
CLOSE

A/D

&
OPEN

TC-2

&
CONVERTER 74
FO

TC-2

TC-2
DC-2

P
RETRI
87B-2/BU14B

SAVE
CT8, CORE-2

P
TRI
TO SAS
3000/1A MRCT TO GIS

OF
A/D
3000/1A TAP
CONVERTER DAR ENGINEERING
CT8 CL-TPS ENGINEERS & DESIGNERS

N ARE THE SOLE PROPERTY


DRAWING/DOCUMENT ISSUED FOR
LCC (AD14) 62 86BF 74 BASE DESIGN

APPROVAL

BF2 2 86BF INFORMATION ONLY


Q1
CONSTRUCTION
25.02.2015 TAKREEM ALI
DATE BY

CT8, CORE-1 BFI FROM


50BF 62 94BF 74
3000/1A MRCT 94-BC
Q0 BF1 2 94BF
3000/1A TAP

FOC
CL-TPS
CB CLOSE COMAND AS-BUILT BY DATE
P1
86BB 74
SF6 LOW 2ND STAGE
Q52 BB TRIP/INTERTRIP 2 86BB
E 40KA TC1 & TC2 FAULTY 87B CU-2

SPRING NOT CHARGED

NED HEREI
FOC 87M 87CH
01 25.02.15 PAJ REVISED AS PER SEC COMMENTS TAK TAK TAK
Q0 Q0
Q2
00 22.01.15 MHU FIRST ISSUE T.A T.A MRK
3150A
40KA
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI
~

132KV, 3150A, 40KA (1SEC), 3PH, 60HZ, BUS-2A


~

ON
NFORMATI
M.HASSAN TAKREEM ALI NONE
DRAWN BY CHECKED BY SCALE:

JAN 2014

AND THE I
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR APPROVAL/CERTIFICATION INFORMATION

CONSTRUCTION OR FOR ORDERING


F
MATERIAL UNTIL CERTIFIED AND DATED DDC NO. REV. NO.

NG
RELAY AND METERING ONE LINE DIAGRAM

S DRAW I
132kV SYSTEM
CONSTRUCTION OF TABUK 380/132/33KV BSP
TABUK SAUDI ARABIA

THI
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

4400004642 1-1312042.03 P TB426 WA-345703 04 of 09


01
SEC-A (2004/10)
1 2 3 4 5 6 7
DMS VECTOR SECA00
1 2 3 4 5 6 7 8

OW NER.
01 05 of 09
TB426 WA-345703 P 44000046421-1312042.03
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. CT/VT DATA ARE SUBJECT TO THEIR SIZING CALCULATIONS
APPROVAL BY SEC.

TS
2.WHEN BF STAGE-2 OF ANY BAY OPERATES, BAY UNIT WILL SEND

OF I
INTERTRIP TO CENTRAL UNIT WHICH WILL BE DISTRIBUTED TO
OTHER BAYS BY THE CENTRAL UNIT AS PER SYSTEM TOPOLOGY.

CONSENT
TYPICAL FOR 132KV BUS SECTION
A

132KV BB WITH BF PROT. PANEL SYS.1

TTEN
87B-1/CU LEGEND
TC1 & TC2 FAULTY

THE W RI
87M 87CH
Q15A Q15B 87M BUS BAR DIFFERENTIAL (MAIN ZONE)
M M FOC Q0 Q0
40KA 40KA SPRING NOT CHARGED 87CH BUS BAR DIFFERENTIAL (CHECK ZONE)
132KV, 3150A, 40KA (1SEC), 3PH, 60HZ, BUS-1A 132KV, 3150A, 40KA (1SEC), 3PH, 60HZ, BUS-1B 50BF BREAKER FAIL PROTECTION

~
SF6 LOW 2ND STAGE
~

62BF-1 BREAKER FAIL STAGE-1 TIMER


=AD15 BB TRIP/
62BF-2 BREAKER FAIL STAGE-2 TIMER
INTERTRIP 86BB 74

THOUT
CB CLOSE COMAND
86 LOCKOUT RELAY

FOC
Q1A Q1B 1 86BB
3150A M 3150A M 94 TRIPPING RELAY
87B-1/BU15A
40KA 40KA 50 PHASE INST. OVER CURRENT PROTECTION

WI
50BF 62 94BF 74 50N NEUTRAL INST. OVER CURRENT PROTECTION
BFI FROM

DOCUMENT
Q0 BF1 1 94BF 51 PHASE TIME OVER CURRENT PROTECTION
94-BS
Q51 Q52 LCC (AD15) 51N NEUTRAL TIME OVER CURRENT PROTECTION
40KA 40KA
74 SUPERVISION RELAY
Q1B 62 86BF 74
P1 TFR TRANSIENT FAULT RECORDER EQUIPMENT
BF2 1 86BF
CT6, CORE-1 TC TRIP COIL
3000/1A MRCT
LCP LOCAL CONTROL PANEL

S
B A/D

THI
3000/1A TAP
CL-TPS CONVERTER BFI BREAKER FAILURE INITIATION

BLOCK

BLOCK
FOC FIBER OPTIC CABLE

FROM
P1 87B-1/BU15B 74TCS TRIP CIRCUIT SUPERVISION RELAY

CLOSE
SUBSTATION AUTOMATION SYSTEM

CLOSE
SAS
CT5, CORE-1
A/D 74 B.U. BAY UNIT
3000/1A MRCT
CONVERTER

NED
DC-1
3000/1A TAP C.U. CENTRAL UNIT
LCC (AD15)

TC-1 &

TC-1
CL-TPS

TC-1 &

SHALL BE OBTAI
62 BCU BAY CONTROL UNIT
CT6, CORE-2 Q0 Q0
3000/1A MRCT 50BF BF2

P
3000/1A TAP

RETRI
CT6 Q0
MFM DIGITAL MULTI FUNCTION METER

SAME
CL-TPS

P
LCC (AD15)

TRI
62
CT5, CORE-2
3000/1A MRCT BF1
CT5 Q1A
3000/1A TAP
132KV BS PROT. PANEL
CL-TPS

74 CB CLOSE COMAND
TFR
DC/BS
50 50N

PART
CT5, CORE-3 CT6, CORE-3
TFR
3000/1A MRCT 3000/1A MRCT 51 51N
3000/1A TAP 3000/1A TAP 74TCS-1
CL.0.2FS5,60VA Q0 CL-TPS Q0
P2 P2

N
I
3150A
40KA

FULL OR
C 74 94 BFI Q0 (AD15)
74TCS-2
Q0 94/BS BS
TC2

TC1

N
I ON
CB CLOSE COMAND

REPRODUCTI
132KV BB WITH BF PROT. PANEL SYS.2
132KV LCC (AD15)
87B-1/BU15A
SCALE RANGE (TYPICAL) FOR
132KV BUS-COUPLER LCC (AD15)

BLOCK
50BF 62

BLOCK
A 0-4000A
Q0 Q0 REFERENCE DRAWINGS
Q0 BF1
BCU DRAWING TITLE DRAWING NO.

CLOSE

NO
LCC (AD15)

CLOSE
- A DRAWING CONTROL SHEET WE-345334
MFM
- 25M 62
Q1B SCOPE OF WORK & TECHNICAL SPECIFICATIONS PTS-13WN337
BF2

CO.
&

TC-2

&
A/D MAIN SWITCHING ONE LINE DIAGRAM WA-345700

TC-2
74

CLOSE

TC-2
CONVERTER

OPEN
DC-2

TY
FO

P
RETRI

CI
SAME
87B-1/BU15B

P
TRI

SAUDIELECTRI
D
TO SAS A/D
TO GIS CONVERTER

LCC (AD15) 62 86BF 74


BF2 2 86BF
Q1A

OF
BFI FROM 50BF 62 94BF 74 DAR ENGINEERING
ENGINEERS & DESIGNERS
94-BS Q0 BF1 2 94BF

N ARE THE SOLE PROPERTY


FOC
DRAWING/DOCUMENT ISSUED FOR

BASE DESIGN

APPROVAL

INFORMATION ONLY

86BB 74 CONSTRUCTION
22.02.2015 TAKREEM ALI
CB CLOSE COMAND DATE BY

BB TRIP/INTERTRIP 2 86BB

87B-2/CU
SF6 LOW 2ND STAGE

TC1 & TC2 FAULTY FOC 87M 87CH


Q0 Q0
SPRING NOT CHARGED AS-BUILT BY DATE

NED HEREI
01 25.02.15 PAJ REVISED AS PER SEC COMMENTS TAK TAK TAK

00 22.01.15 MHU FIRST ISSUE T.A T.A MRK

REV. DATE BY CHKD. CERT. APPD.


DESCRIPTION
NO.

CONTAI ON
NFORMATI
M.HASSAN TAKREEM ALI NONE
DRAWN BY CHECKED BY SCALE:

JAN 2014

AND THE I
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR APPROVAL/CERTIFICATION INFORMATION

CONSTRUCTION OR FOR ORDERING


F
MATERIAL UNTIL CERTIFIED AND DATED DDC NO. REV. NO.

NG
RELAY AND METERING ONE LINE DIAGRAM

S DRAW I
132kV SYSTEM
CONSTRUCTION OF TABUK 380/132/33KV BSP
TABUK SAUDI ARABIA

THI
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

4400004642 1-1312042.03 P TB426 WA-345703 05 of 09


01
SEC-A (2004/10)
1 2 3 4 5 6 7
DMS VECTOR SECA00
1 2 3 4 5 6 7 8

OW NER.
01 06 of 09
TB426 WA-345703 P 44000046421-1312042.03
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1. CT/VT DATA ARE SUBJECT TO THEIR SIZING CALCULATIONS

~~

~~

~~

~~
132KV, 3150A, 40KA (1 SEC), 3PH, 60HZ, BUS-1A 132KV, 3150A, 40KA (1 SEC), 3PH, 60HZ, BUS-1B APPROVAL BY SEC.

TS
OF I
132KV, 3150A, 40KA (1 SEC), 3PH, 60HZ, BUS-2A 132KV, 3150A, 40KA (1 SEC), 3PH, 60HZ, BUS-2B

CONSENT
A Q16A Q26A Q16B Q26B

(PT01) (PT03) (PT02) (PT04)


132KV 115V 115V 132KV 115V 115V 132KV 115V 115V 132KV 115V 115V

TTEN
-115V x -115V -115V x -115V -115V x -115V -115V x -115V
3 3 3 3 3 3 3 3 3 3 3 3 LEGEND
WDG-1 WDG-2 WDG-1 WDG-2 WDG-1 WDG-2 WDG-1 WDG-2

THE W RI
CL. 0.2/3P (DUAL CLASS) CL. 0.2/3P (DUAL CLASS) CL. 0.2/3P (DUAL CLASS) CL. 0.2/3P (DUAL CLASS)
100VA 100VA 100VA 100VA TFR TRANSIENT FAULT RECORDER

20A 20A 20A 20A 20A 20A 20A 20A BCU BAY CONTROL UNIT

MFM DIGITAL MULTI FUNCTION METER

THOUT
4A 4A 4A 4A
4A 4A 4A
(TYP) (TYP) (TYP) (TYP) DYNAMIC SYSTEM MONITORING
(TYP) (TYP) (TYP) DSM

WI
DOCUMENT
PANEL
LOAD
SCHEME

SCHEME

SCHEME

SPARE

SPARE

SCHEME

SPARE
SPARE
LOAD

LOAD

LOAD

LOAD
COMMON

COMMON
PANEL

PANEL

PANEL
LOAD

LOAD

LOAD
TFR

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE
SPARE

SPARE

SPARE

SPARE
TRANSIENT FAULT RECORDER

SPARE

SPARE

COMMON

COMMON

09

09
NG

NG
09

09
NG

NG

ZI

ZI
33KV
33KV

33KV

33KV

33KV
ZI

ZI
33KV

33KV

33KV

NG
SYNCHRONI

SYNCHRONI
OF

OF
NG

NG

NG
SYNCHRONI

SYNCHRONI
OF

OF
NG

NG

NG

NG
132KV

132KV
SHEDDI
132KV

132KV
SHEDDI

SHEDDI

SHEDDI
SHEDI

SHEDI

SHEDI

SHEDI
SHT.08

SHT.08
SHT.07

SHT.07

S
B

THI
TO

TO
TO

TO

FROM
132KV LCC-AD14 132KV LCC-AD14 132KV LCC-AD17 132KV LCC-AD17

MFM
TFR DSM MFM
TFR DSM MFM DSM TFR MFM
TFR

NED
SHALL BE OBTAI
BCU (AD14) DSM BCU (AD14) DSM BCU (AD17) DSM BCU (AD17)
TFR TFR BLOCK FROM TFR BLOCK FROM TFR
98B1B 98B2B
OPEN DELTA OPEN DELTA OPEN DELTA OPEN DELTA
VOLTAGE VOLTAGE VOLTAGE VOLTAGE
0-150KV

0-150KV

0-150KV

0-150KV
GENERATED GENERATED GENERATED GENERATED

-V1B

-V2B
-V1A

-V2A
25M

25M

25M

25M
INTERNALLY INTERNALLY INTERNALLY INTERNALLY

DSM
V

PART
DSM

BLOCK FROM BLOCK FROM

N
I
98B1A 98B2A

FULL OR
C

N
I ON
REPRODUCTI
LCC(=AD04) LCC(=AD18) LCC(=AD23)

Q1 Q1 Q1
SEL BB VT SEL BB VT SEL BB VT REFERENCE DRAWINGS
(WDG-1) (WDG-1) (WDG-1)
DRAWING TITLE DRAWING NO.
SHT: XX Q2 Q2 SHT: XX Q2 SHT: XX

NO
DRAWING CONTROL SHEET WE-345334
SEL BB VT SEL BB VT SEL BB VT
SCOPE OF WORK & TECHNICAL SPECIFICATIONS PTS-13WN337

CO.
WDG-1 WDG-1 WDG-1
SHT: 07 OF 09 SHT: 09 OF 09 SHT: 09 OF 09
MAIN SWITCHING ONE LINE DIAGRAM WA-345700

TY
LCC(=AD05) LCC(=AD19) LCC(=AD24)

CI
Q1 Q1 Q1

SAUDIELECTRI
SEL BB VT SEL BB VT SEL BB VT
D
(WDG-1) (WDG-1) (WDG-1)
SHT: XX Q2 Q2 SHT: XX Q2 SHT: XX

SEL BB VT SEL BB VT SEL BB VT


WDG-1 WDG-1 WDG-1
SHT: 07 OF 09 SHT: 09 OF 09 SHT: 09 OF 09

LCC(=AD06) LCC(=AD10) LCC(=AD20) LCC(=AD25)

OF
Q1 Q1 Q1 Q1 DAR ENGINEERING
SEL BB VT SEL BB VT LCC-AD15 SEL BB VT SEL BB VT ENGINEERS & DESIGNERS

N ARE THE SOLE PROPERTY


(WDG-1) WDG-1 (WDG-1) (WDG-1) DRAWING/DOCUMENT ISSUED FOR

SHT: XX Q2 Q2 BCU Q2 Q2
BASE DESIGN

SHT: XX SHT: XX SHT: XX APPROVAL

INFORMATION ONLY

SEL BB VT SEL BB VT -25M SEL BB VT SEL BB VT


CONSTRUCTION
22.02.2015 TAKREEM ALI
DATE BY

WDG-1 WDG-1 WDG-1 WDG-1


SHT: 07 OF 09 SHT: 07 OF 09 SHT: 09 OF 09 SHT: 09 OF 09
M M

LCC(=AD07) LCC(=AD11) 98B BLOCK BLOCK 98B LCC(=AD21) LCC(=AD26)

Q1 Q1 1A 1B Q1 Q1
SEL BB VT SEL BB VT R R SEL BB VT SEL BB VT AS-BUILT BY DATE
(WDG-1) (WDG-1) (WDG-1) (WDG-1)
TO BAYS AD04-AD15
SHT: XX Q2 SHT: XX Q2 Q2 SHT: XX Q2 SHT: XX

E
SEL BB VT SEL BB VT SEL BB VT SEL BB VT
WDG-1 WDG-1 WDG-1 WDG-1

NED HEREI
SHT: 07 OF 09 SHT: 07 OF 09 SHT: 09 OF 09 SHT: 09 OF 09
01 22.02.15 PAJ REVISED AS PER SEC COMMENTS TAK TAK TAK

LCC(=AD08) LCC(=AD12) LCC(=AD22) LCC(=AD27) 00 22.01.15 MHU FIRST ISSUE T.A T.A MRK
LCC-AD16
Q1 Q1 Q1 Q1
REV.
SEL BB VT SEL BB VT BCU SEL BB VT SEL BB VT DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

CONTAI
(WDG-1) TO (WDG-1) (WDG-1) (WDG-1)
Q2 SHT: XX Q2 -25M Q2 SHT: XX Q2 SHT: XX
SHT: XX

SEL BB VT SEL BB VT SEL BB VT SEL BB VT


WDG-1 WDG-1 WDG-1 WDG-1
M M

ON
SHT: 07 OF 09 SHT: 07 OF 09 SHT: 09 OF 09 SHT: 09 OF 09

NFORMATI
98B BLOCK BLOCK 98B
2A 2B
LCC(=AD09) LCC(=AD13) LCC(=AD28)
R R
Q1 Q1 Q1 M.HASSAN TAKREEM ALI NONE
TO BAYS AD20-AD28 DRAWN BY CHECKED BY SCALE:
SEL BB VT SEL BB VT SEL BB VT
(WDG-1) TO (WDG-1) (WDG-1) JAN 2014

AND THE I
DATE STARTED DATE COMPLETED
Q2 SHT: XX Q2 Q2 SHT: XX
SHT: XX
OPR'G. DEPT. ENG. DEPT.

SEL BB VT SEL BB VT SEL BB VT


WDG-1 WDG-1 WDG-1 THIS DRAWING IS NOT TO BE USED FOR APPROVAL/CERTIFICATION INFORMATION

SHT: 07 OF 09 SHT: 07 OF 09 SHT: 09 OF 09 CONSTRUCTION OR FOR ORDERING


F
MATERIAL UNTIL CERTIFIED AND DATED DDC NO. REV. NO.

NG
RELAY AND METERING ONE LINE DIAGRAM

S DRAW I
132kV SYSTEM
CONSTRUCTION OF TABUK 380/132/33KV BSP
TABUK SAUDI ARABIA

THI
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

4400004642 1-1312042.03 P TB426 WA-345703 06 of 09


01
SEC-A (2004/10)
1 2 3 4 5 6 7
DMS VECTOR SECA00
1 2 3 4 5 6 7 8

OW NER.
01 07 of 09
TB426 WA-345703 P 44000046421-1312042.03
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1. CT/VT DATA ARE SUBJECT TO THEIR SIZING CALCULATIONS


TO
APPROVAL BY SEC.
SHT: 08 OF 09

TS
RUN

NC

OF I
I
/1F

RUN

NC
M)

R)

I
M)

R)

(
LCC AD04+S

(
(
(
LCC AD10+S

CONSENT
M)

M)
R)

R)
(

(
(

(
Q1 EMG A A EMG Q1
BB1A WDG-2
A
FROM M M
SHT:6 Q2 Q2
BB2A WDG-2

WDG-2

TTEN
WDG-2
A A
FROM SEL BB VT (WDG-1) SEL BB VT (WDG-1)

THE W RI
SHT:06 OF 09 SHT. 06 of 09

of 09

BB2A
BB1A
A A
WDG-2 WDG-2
VT

VT
LEGEND
M M
FEEDER

FEEDER
SHT.03
TFR TRANSIENT FAULT RECORDER
A A
WDG-1 WDG-1

THOUT
BCU BAY CONTROL UNIT

VS VOLTMETER SELECTOR SWITCH

WI
98 VT FUSE FAILURE SUPVN. RELAY

LCC AD05+S LCC AD11+S

DOCUMENT
Q1 EMG A A EMG Q1

M M
Q2 Q2

S
B

THI
A A
FROM SEL BB VT (WDG-1) SEL BB VT (WDG-1)
FROM
SHT:06 OF 09
SHT:06 OF 09
A A

FROM
WDG-2 WDG-2
VT

VT

01 of 09
M M
FEEDER

FEEDER
SHT.

NED
A A
WDG-1 WDG-1

SHALL BE OBTAI
LCC AD06+S LCC AD12+S

Q1 EMG A A EMG Q1

M M
Q2 Q2

PART
A A
FROM SEL BB VT (WDG-1) SEL BB VT (WDG-1)
SHT:06 OF 09 SHT. 06 of 09

of 09

N
I
A A
WDG-2 WDG-2
VT

VT

FULL OR
C
M M
FEEDER

FEEDER
SHT.03
A A
WDG-1 WDG-1

N
I ON
REPRODUCTI
LCC AD07+S LCC AD13+S

Q1 EMG A A EMG Q1

M M
Q2 Q2
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
A A
SEL BB VT (WDG-1) SEL BB VT (WDG-1)

NO
FROM WE-345334
DRAWING CONTROL SHEET
SHT:06 OF 09 SHT. 06 of 09

of 09
A A SCOPE OF WORK & TECHNICAL SPECIFICATIONS PTS-13WN337

CO.
WDG-2 WDG-2
VT

VT
MAIN SWITCHING ONE LINE DIAGRAM WA-345700
M M
FEEDER

FEEDER
SHT.02

TY
A A

CI
WDG-1 WDG-1

SAUDIELECTRI
D

LCC AD08+S

Q1 EMG A

M
Q2

OF
DAR ENGINEERING
ENGINEERS & DESIGNERS

N ARE THE SOLE PROPERTY


A
FROM SEL BB VT (WDG-1) DRAWING/DOCUMENT ISSUED FOR

BASE DESIGN

SHT:06 OF 09 APPROVAL

INFORMATION ONLY
09

A
WDG-2 CONSTRUCTION
VT

25.02.2015 TAKREEM ALI


DATE BY
OF
FROM

M
FEEDER

SHT:03

A
WDG-1

AS-BUILT BY DATE

LCC AD09+S
E
Q1 EMG A

NED HEREI
M 01 25.02.15 PAJ REVISED AS PER SEC COMMENTS TAK TAK TAK
Q2

00 22.01.15 MHU FIRST ISSUE T.A T.A MRK

A
SEL BB VT (WDG-1) REV. DATE BY DESCRIPTION CHKD. CERT. APPD.
SHT. 06 of 09 NO.

CONTAI
A
WDG-2
VT

M
FEEDER

ON
A
WDG-1

NFORMATI
WDG-2
WDG-2

M.HASSAN TAKREEM ALI NONE


DRAWN BY CHECKED BY SCALE:

JAN 2014

AND THE I
DATE STARTED DATE COMPLETED
BB2A
BB1A

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR APPROVAL/CERTIFICATION INFORMATION


/7A TO
CONSTRUCTION OR FOR ORDERING
F SHT: 08 OF 09 MATERIAL UNTIL CERTIFIED AND DATED DDC NO. REV. NO.

NG
RELAY AND METERING ONE LINE DIAGRAM

S DRAW I
132kV SYSTEM
CONSTRUCTION OF TABUK 380/132/33KV BSP
TABUK SAUDI ARABIA

THI
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

4400004642 1-1312042.03 P TB426 WA-345703 07 of 09


01
SEC-A (2004/10)
1 2 3 4 5 6 7
DMS VECTOR SECA00
1 2 3 4 5 6 7 8

OW NER.
01 08 of 09
TB426 WA-345703 P 44000046421-1312042.03
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1. CT/VT DATA ARE SUBJECT TO THEIR SIZING CALCULATIONS


APPROVAL BY SEC.

TS
OF I
FROM
SHT: 07 OF 09

CONSENT
RUN INC
A

M)

R)
M)

R)

(
(
(
(

TTEN
LCC AD14+S

THE W RI
EMG A
BB1A WDG-2
LEGEND

09
M

OF
TFR TRANSIENT FAULT RECORDER

THOUT
07
A BCU BAY CONTROL UNIT
BB1A WDG-1

FROM
VS VOLTMETER SELECTOR SWITCH

WI
A 98 VT FUSE FAILURE SUPVN. RELAY
BB2A WDG-2

DOCUMENT
M

A
BB2A WDG-1

S
B

THI
FROM NED
SHALL BE OBTAI
LCC AD15+S

EMG A

PART
M

N
I
A

FULL OR
BB1A WDG-1
C

N
I
A
BB1B WDG-1

ON
REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WE-345334

SCOPE OF WORK & TECHNICAL SPECIFICATIONS PTS-13WN337

CO.
MAIN SWITCHING ONE LINE DIAGRAM WA-345700

CITY
LCC AD16+S

SAUDIELECTRI
D EMG A

M
09

A
BB1B WDG-2 BB2A WDG-1
OF
FROM
06

OF
BB2B WDG-2
SHT:

DAR ENGINEERING
ENGINEERS & DESIGNERS
M

N ARE THE SOLE PROPERTY


DRAWING/DOCUMENT ISSUED FOR

BASE DESIGN

A APPROVAL
BB2B WDG-1 INFORMATION ONLY

CONSTRUCTION
25.02.2015 TAKREEM ALI
DATE BY

AS-BUILT BY DATE

NED HEREI
01 25.02.15 PAJ REVISED AS PER SEC COMMENTS TAK TAK TAK

LCC AD17+S
00 22.01.15 MHU FIRST ISSUE T.A T.A MRK

EMG A
BB1B WDG-2 REV. DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

CONTAI
M
09
OF
TO
09

A
BB1B WDG-1
SHT:

ON
NFORMATI
A
BB2B WDG-2

M
M.HASSAN TAKREEM ALI NONE
DRAWN BY CHECKED BY SCALE:

A JAN 2014
BB2B WDG-1

AND THE I
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR APPROVAL/CERTIFICATION INFORMATION

CONSTRUCTION OR FOR ORDERING


F
MATERIAL UNTIL CERTIFIED AND DATED DDC NO. REV. NO.

NG
RELAY AND METERING ONE LINE DIAGRAM

S DRAW I
RUN INC
132kV SYSTEM
FROM
SHT: 09 OF 09 CONSTRUCTION OF TABUK 380/132/33KV BSP
TABUK SAUDI ARABIA

THI
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

4400004642 1-1312042.03 P TB426 WA-345703 08 of 09


01
SEC-A (2004/10)
1 2 3 4 5 6 7
DMS VECTOR SECA00
1 2 3 4 5 6 7 8

OW NER.
01 09 of 09
TB426 WA-345703 P 44000046421-1312042.03
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1. CT/VT DATA ARE SUBJECT TO THEIR SIZING CALCULATIONS


FROM
SHT: 08 OF 09 APPROVAL BY SEC.

TS
RUN

NC

OF I
I
M)

R)
M)

R)

(
LCC AD18+S

(
(
(
LCC AD24+S

CONSENT
09
Q1 EM A Q1 EM A
BB1B WDG-2
A

OF
FROM
M M

08
Q2 Q2

SHT:
BB2B WDG-2

TTEN
A A
SEL BB VT (WDG-1) SEL BB VT (WDG-1)
SHT. 06 of 09 SHT. 06 of 09

THE W RI
A A

VT
WDG-2 WDG-2

VT
LEGEND

FEEDER
M M

FEEDER
TFR TRANSIENT FAULT RECORDER
A A
WDG-1 WDG-1

THOUT
BCU BAY CONTROL UNIT

M)

M)
R)

R)
VS VOLTMETER SELECTOR SWITCH

(
(

WI
98 VT FUSE FAILURE SUPVN. RELAY

LCC AD19+S LCC AD25+S

DOCUMENT
Q1 EM A Q1 EM A

M M
Q2 Q2

S
B

THI
A A
SEL BB VT (WDG-1) SEL BB VT (WDG-1)
SHT. 06 of 09 SHT. 06 of 09
A A

VT

VT

FROM
WDG-2 WDG-2

FEEDER

FEEDER
M M

NED
A A
WDG-1 WDG-1

SHALL BE OBTAI
LCC AD20+S LCC AD26+S

Q1 EM A Q1 EM A

M M
Q2 Q2

PART
A A
SEL BB VT (WDG-1) SEL BB VT (WDG-1)
SHT. 06 of 09 SHT. 06 of 09

N
I
A A
VT

VT
WDG-2 WDG-2

FULL OR
C
FEEDER

FEEDER
M M

A A
WDG-1 WDG-1

N
I ON
REPRODUCTI
LCC AD21+S LCC AD27+S

Q1 EM A Q1 EM A

M M
Q2 Q2
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
A A
SEL BB VT (WDG-1) SEL BB VT (WDG-1)

NO
DRAWING CONTROL SHEET WE-345334
SHT. 06 of 09 SHT. 06 of 09
A A SCOPE OF WORK & TECHNICAL SPECIFICATIONS PTS-13WN337
VT

VT

CO.
WDG-2 WDG-2
FEEDER

FEEDER
MAIN SWITCHING ONE LINE DIAGRAM WA-345700
M M

TY
A A

CI
WDG-1 WDG-1

SAUDIELECTRI
D

LCC AD22+S LCC AD28+S

Q1 EM A Q1 EM A

M M
Q2 Q2

OF
DAR ENGINEERING
ENGINEERS & DESIGNERS

N ARE THE SOLE PROPERTY


A A
SEL BB VT (WDG-1) SEL BB VT (WDG-1) DRAWING/DOCUMENT ISSUED FOR

BASE DESIGN

SHT. 06 of 09 SHT. 06 of 09 APPROVAL

INFORMATION ONLY
A A
VT

VT
WDG-2 WDG-2 CONSTRUCTION
25.02.2015 TAKREEM ALI
DATE BY
FEEDER

FEEDER
M M

A A
WDG-1 WDG-1

AS-BUILT BY DATE

LCC AD23+S
E
Q1 EM A

NED HEREI
M 01 25.02.15 PAJ REVISED AS PER SEC COMMENTS TAK TAK TAK
Q2

00 22.01.15 MHU FIRST ISSUE T.A T.A MRK

A
SEL BB VT (WDG-1) REV. DATE BY DESCRIPTION CHKD. CERT. APPD.
SHT. 06 of 09 NO.

CONTAI
A
VT

WDG-2
FEEDER

ON
A
WDG-1

NFORMATI
132KV DRAWN BY
M.HASSAN
CHECKED BY
TAKREEM ALI
SCALE:
NONE

EMERGENCY
JAN 2014

AND THE I
DATE STARTED DATE COMPLETED
MANUAL
SYN. PNL.
OPR'G. DEPT. ENG. DEPT.

R
98 APPROVAL/CERTIFICATION INFORMATION
THIS DRAWING IS NOT TO BE USED FOR
INC.
CONSTRUCTION OR FOR ORDERING
F M
MATERIAL UNTIL CERTIFIED AND DATED DDC NO. REV. NO.
R
SWING FRAME-1 SWING FRAME-2 SWING FRAME-3 SWING FRAME-4

NG
98
RUN. RELAY AND METERING ONE LINE DIAGRAM

S DRAW I
M
S S S S
132kV SYSTEM
25 CONSTRUCTION OF TABUK 380/132/33KV BSP
2F 2F 2F 2F

TABUK SAUDI ARABIA

THI
74DC
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
2V 2V 2V 2V

44000046421-1312042.03 P TB426 WA-345703 09 of 09


01
SEC-A (2004/10)
1 2 3 4 5 6 7
DMS VECTOR SECA00