Building Comletion Certificate
Building Comletion Certificate
Building Comletion Certificate
Proceedings No
Building Commencement Notice submitted by the Applicant Date
Building Completion Notice submitted by the Applicant Date
FILE No. |
I/ We hereby give notice that the erection of the building / erection of works have been completed as per Sanctioned Building
Plan. The work has been completed to my/our best satisfaction. The workmanship and all the materials (type and grade) have
been used strictly in accordance with general and detailed specifications. No provisions of the Building Bye-Laws/Rules,
conditions prescribed or orders issued thereunder have been transgressed in the course of the work. I/We hereby enclose the
plan of the building completed in all aspects. The land is fit for which it has been developed or redeveloped and the building is
fit for use for which it has been erected, re-erected or altered, constructed and enlarged. The necessary occupancy certificate
may be issued. Any subsequent changes from Completion Drawings will be the responsibility of the owner(s).
A NAME OF THE OWNER / DEVELOPER
1 Plot No.
2 Sanctioned Layout No. / LRS No.
3 Survey No. | Village |
4 Premises / Door No.
5 Road/ Street
6 Ward No. | Block No. |
7 Locality
8 Circle Division
9 City/ Town District
C DETAILS OF THE COMPLETED BUILDING
1 Building Permit / Date
Proceedings No.
To,
The Commissioner,
APCRDA, Vijayawada
D DETAILS OF OWNER / DEVELOPER / LICENCED TECHNICAL PERSONNEL
Sl. Name Licence No. Signature
No.
1 ............................................................................................
Owner / Owners / Lessee / Authorised Agent
2 ............................................................................................
Builder / Developer
3 ............................................................................................
Architect/ Engineer/ Surveyor
4 ............................................................................................
Structural Engineer
Enclosures:
3. Copy of the Completed Building Plan showing the changes if any to Approved Building Plan along with a
statement of deviations.
4. Photographs of constructed building showing setbacks on four sides, elevation and roof level
5. Land value certificate issued by the Revenue Department (If deviations are made to Sanctioned Plan)
To
The Commissioner,
APCRDA, Vijayawada
Ref: Building Permit / Date dd mm yyyy
Proceedings No
FILE No.
Sir / Madam,
I/We hereby give notice that the work of the construction will be commenced on (Date) ............................. as per the details
of the Sanctioned Plan as given below. (Due date for commencement of work is given in Building Permit Order)
A NAME OF THE APPLICANT
9 Height (m)
D DETAILS OF OWNER / DEVELOPER / LICENCED TECHNICAL PERSONNEL
Sl. Name Licence No. Signature
No.
1 ..........................................................................
Owner / Owners / Lessee / Authorised Agent
2 ..........................................................................
Builder / Developer
3 ..........................................................................
Architect/ Engineer/ Surveyor
4 ..........................................................................
Structural Engineer