Relay Upgrade and Arc Flash Hazard Mitigation
Relay Upgrade and Arc Flash Hazard Mitigation
Relay Upgrade and Arc Flash Hazard Mitigation
BIBEK KARKI, IPS POWERSERVE AUGUST 8, 2024FALL 2024 INDUSTRY TOPICS, INDUSTRY TOPICS
Protective relays are the brain and intelligence behind a medium-voltage distribution system (Figure 1). They serve as critical
infrastructure for proper medium-voltage system operation, protection, and system reliability. Upgrading electromechanical to
microprocessor relays and mitigating arc flash hazards in a medium-voltage system can be performed in synergy to achieve
optimal system reliability and safety.
This article provides a snapshot of these concurrent topics and shows how the communication and automation capabilities of
microprocessor relays can be leveraged to mitigate arc flash hazards. It dives into various methods and procedures for arc
flash mitigation including maintenance mode settings, programming a breaker open/close delay, remotely opening and
closing the device, installing a virtual main, and expanding the differential zone of protection supplemented by SKM software
simulation results and case studies from field projects. Arc flash hazard mitigation goals can be achieved without
compromising power system reliability by harnessing the advancements in protective relaying technology.
Protective relays are an integral part of a medium-voltage power system because they ensure protection for equipment during
fault conditions. Engineering, programming, installing, and maintaining these devices can keep our power systems safe and
reliable, and it is critical to upgrade them to the current technology and standards.
Many electromechanical and solid-state relays are becoming obsolete, which means upgrading them is inevitable through
unplanned failures or during planned outages. Older-style protective relays near their end of life cannot be relied upon for the
equipment protection they provide. Instead, these relays have now become a safety hazard and liability.
One critical factor affecting arc flash risk is overcurrent protective device (OCPD) fault-clearing time, and this is where
advanced microprocessor relays come into the picture. The faster the fault is cleared, the lower the incident energy. Most
advanced relays are capable of detecting and interrupting a fault faster than their electromechanical counterparts. They also
provide advanced communication and automation abilities. This means the overcurrent device can be operated from a safe
distance, which increases the working distance and reduces the arc flash hazard.
A well-planned relay upgrade project can easily be complemented with an arc flash hazard mitigation project. Upgrading
protective relays and mitigating arc flash hazards can satisfy the common goals of maintaining power system reliability and
promoting worker and equipment safety. Meticulous planning and well-thought-out protective relay selection along with smart
engineering practices can help achieve both processes and their common goal.
Procuring relays follows the data-gathering process. The key is to be judicious when selecting the proposed relay. For
instance, selecting an overcurrent relay that includes an arc flash sensor would be an excellent choice for upgrading the relay
and mitigating the arc flash hazard. Selecting this type of relay aligns with the common goal and can be a cost-effective
solution for arc flash hazard mitigation. Procuring relays as soon as the project scope has been outlined helps reduce OEM
lead times.
Updating existing drawings while replacing or upgrading equipment is a highly recommended practice. This process helps
with wiring new relays in the field, provides the customer with updated protection schemes and documents that can be used
for future troubleshooting, and provides design engineers with an opportunity to incorporate remote operation of overcurrent
devices. Remote circuit breaker close and trip, which is one of the vital engineering controls for arc flash hazard mitigation,
can be incorporated into the upgraded system.
Offsite Wiring, Uploading Settings, and Testing Relays
Wiring relays and associated test switches to relay doors or insert panels offsite is recommended. Another good practice is to
upload relay settings and test relay elements and logic offsite. Doing the work offsite reduces the outage duration in the field
and helps accomplish milestones in the upgrade process.
Reducing outages is an important factor in the relay upgrade process, and being unable to schedule an outage can hinder a
relay upgrade project. Relays are a huge part of the power system’s automation and protection, and taking relays out of
service leaves it without protection and automation features, compromising system reliability and safety. Many relay upgrade
projects are postponed or suspended because the facility outage cannot be scheduled.
Another important step is to commission the entire system. At a minimum, this includes verifying polarities, CT ratios, phase
rotation, and DC trip checks. The goal is to improve system reliability and safety without causing nuisance power
interruptions. It is imperative to have detailed plans and procedures for removing the existing system, installing new relays,
and testing and commissioning the system while having contingency plans for any surprises during the upgrade process.
Elimination
Eliminating the hazard is the most effective method of arc flash hazard mitigation since it removes the hazard. Two
engineering methods are useful in eliminating the arc flash hazard from a medium-voltage system. These methods are based
on reducing fault clearing time.
Using reduced instantaneous (50) settings with the alternate group/maintenance mode setting. This is one of the
simplest and most effective ways to reduce incident energy and arc flash hazards. Most microprocessor relays provide for
multiple group settings.
The groups can be transferred over automatically using relay programming logic or manually using selector switches
mounted anywhere in the switchgear. For instance, Group 1 would use the normal system protection settings. Short
circuit, coordination, and arc flash studies must be performed to design the reduced instantaneous settings. This reduced
instantaneous value would then be programmed into Group 2 settings. The reason for creating separate groups is to
maintain system reliability and functionality. The user must switch settings into Group 2 before performing any switching
or interacting with the medium-voltage equipment. Once this electrical work has been completed, it is imperative to return
the maintenance switch to its original position or change the relay logic back to enabling Group 1 protective device
settings.
Figure 3 shows the SKM PTW time current curve (TCC) along with the calculated fault current on how this reduced
instantaneous setting could be calculated. As long as this reduced instantaneous setting value is set below the fault
current line (dotted line), the reduced instantaneous setting can be calculated.
Figure 3: SKM Software TCC Displaying Reduced Instantaneous Settings (Blue Curve) vs. Normal
Instantaneous Settings (Red Curve)
Using the virtual main concept. This method, which involves installing additional hardware and relays, is an effective
method for reducing arc flash hazards in existing systems. In the past, most power systems were designed without a
physical main overcurrent protective device such as a circuit breaker or fused disconnect. Thus, whenever a medium-
voltage switchgear powered up a medium- to low-voltage transformer, the incident energy on the secondary side of the
transformer was very high. Without a main interrupting device, there were few options to reduce the incident energy.
The concept of a virtual main fills the void on a switchgear that is not designed with a main circuit breaker. In this method,
current transformers (CTs) are installed on the secondary side of the transformers and/or the switchgear. Instantaneous
overcurrent devices located upstream of this transformer are designed to operate if any fault current events occur on this
downstream switchgear.
Substitution
Eliminating the hazard is not feasible in all practical applications. If the hazard cannot be eliminated, substitution is the next
method on the hierarchy of risk control. This method involves designing engineering processes to replace something that
poses a high risk with a less hazardous option. The following innovative methods to substitute arc flash hazards in a medium-
voltage system are based on increasing the working distance.
Designing relay logic for remote switchgear operations. This method is simple and effective to implement in most
power systems equipped with automation. Most modern medium-voltage systems are equipped with remote operation.
The design engineer can simply incorporate remote bits into the circuit breaker operation logic to achieve this. Since the
protective relays would open or close the circuit breaker, the operator does not have to be physically present during the
switching process. This method increases the working distance from a few inches to several feet, thus keeping the
operator out of harm’s way. The only caveat for this method is that the switchgear must have automated switching
capabilities, which could be lacking in some older switchgear.
Using a delay timer in relay push buttons and control switches. This method is simple and effective for older and
newer switchgear systems, and the switchgear does not have to be automated. Using this method, the relay is
programmed with logic for circuit breaker open and close operations, and minimal changes are made to wiring during the
upgrade process.
A push button on the front panel of most microprocessor relays (Figure 4) initiates a small delay of 10 or 20 seconds,
providing ample time for an operator to push the button and safely move out of the switchgear room. For relays that do
not have a push button, the control switch that operates the circuit breaker can be programmed in a similar fashion. This
process is cost-effective and can be achieved with simple engineering design modifications.
The virtual main concept was implemented to reduce the incident energy on a low-voltage switchgear bus. Current
transformers (CTs) were installed on the secondary of the 2,000 kVA transformer. These CTs were connected to the existing
protective relay. Short circuit, coordination, and arc flash engineering studies were performed on this new system, and
instantaneous settings were designed for the virtual main and programmed into the protective relay. The incident energy on
the low-voltage switchgear bus was reduced to 6.85 cal/cm2 from 137 cal/cm2. This is a significant decrease in incident
energy. The single-line diagram created for this project is provided in Figure 5.
CONCLUSION
Protective relays are the backbone of protection, automation, and control for medium-voltage systems. They are critical to
power system performance and reliability and utmost importance should be given to maintaining and upgrading these relays.
Mitigating arc flash hazards is a vital part of electrical safety that helps protect lives and maintain the efficiency and reliability
of the power system. The arc flash reduction methods in this article can be carried out along with the relay upgrade process
as a comprehensive project. Using engineering brainpower and harnessing advancements in technology, we can keep our
electrical system safe and reliable.
Bibek Karki, PE, is an Engineering Manager at IPS PowerServe in Lewisville, Texas. He has 10-plus years of experience in
power system studies, electrical testing, and maintenance. Karki’s responsibilities at IPS include performing power system
studies including short circuit, load flow, equipment evaluation, coordination studies, motor starting, harmonic wave, and arc
flash hazard analysis using SKM and ETAP. He has performed studies at commercial and industrial sites, electrical
distribution substations, water treatment plants, oil pumps, data centers, and wind farms. He also performs preventative
maintenance, installation, modification, testing, and repairs of electrical switchgear, circuit breakers, transformers, protective
relays, and associated power distribution equipment. Karki was recognized as a 2022 40 under 40 winner by Consulting-
Specifying Engineer. He is a NETA Level 4 Certified Senior Technician, a NICET Level III
Technician, and a registered Professional Engineer in 26 states. He has been an IEEE member
since the start of his student career and is now an IEEE Senior Member and part of the IEEE
Power & Energy Society. Karki earned an MS in electrical engineering from Southern Methodist
University.