Logistic Plan

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROJECT TIGER - SIEMENS HEALTHINEERS CAMPUS

nk
20

Ta
ter
Wa
Foot path

Foot path
13 27
Foot path
18 Stirrups making m/c 26
24
01

25 Threading Yard
17 12 Wast Oil
Metal Wast
Oil Socked Cooton
Plastic Waste
EN

METRIAL YARD STOCK


Rea
T RY
23 r Gate
For
Shuttering yard Wo
rke
rs a
nd
ma

Integrate
teria
ls

Alchemical MP
19

Steel yard
Steel Scrap Bin

Vehicle Movement

Steel yard

ent DC Area
E

d
yar
15

Vehicle Movem

el
Ste
Block 50.00m
STEEL CUTTING AREA

D
Block

Foot path

Foot path
17 12

Ste
el y
ard
Ste
e

ment DC Area
l ya
16

rd

Ste
Ste

Vehicle Move
el y
el y

ard
ard
Ste

Water Tank
el y
ard

Ste
el y
Emergency Point

ard
C

Fo
ot
Block

p ath

Foot path
4000

Steel yard
Foot path
15

Steel yard
15

Steel yard
50.00m
50.00m
7000
7000

ment
Vehicle Move
18 13
Emergency Point

Steel yard
24

Steel yard
A
B Block

Area
Block

Steel yard
ment Factory
rd
l ya

Vehicle Move
Stee

rd
l ya

Foot path
3000.000
Stee
16

ment DC Area
d
l yar

Vehicle Move
17

Foot path
Stee

22
d

21
l yar

16
Stee

STEEL CUTTING AREA

12 15
03

7500
14
Foot path Vehicle Movement

Gate
Foot path 13
Foot path
01 Foot path 13 Foot path
02 Flag Man 12
14 Foot path 11 Height Pass Structure

03
ment DC Area

Security

05
04 06
Vehicle Move

01 07 10
08 09
Security

Gate
Room

Gate
Tree
Gate Gate

ENTRY ENTRY
Security Room
ENTRY

You might also like