BILL OF MATERIAL
MARK QTY UNIT DESCRIPTION STOCK CODE M.R. / P.O.No.
75 LGH 13MM DIA x 6M LG;BAR METAL; CARBON STEEL; ASTM A615; DEFORMED BY CONTRACTOR
9 SHT 8MM DIA ;150MM SQM; WIRE MESH: KNITTED; REFERENCE; 2.1M WDX5.4M LG BY CONTRACTOR
150 BOX 152.4MM x 914.4MM x WEAR LAYER 0.2MM ; THK 0.3MM ; VINYL TACO TILE (FOR FLOOR) BY CONTRACTOR
7 BOX 20CMx20CM GRANIT CERAMIC TILE (FOR TOILET) BY CONTRACTOR
1 ROLL PLASTIC SHEET 14 FT WD. X 10 MIL THK. X 50 MTR LG BY CONTRACTOR
3
17 M CONCRETE, PREMIX;MEDIUM STRENGTH GRADE; 28 MPA BY CONTRACTOR
1 BOX SIKAFLEX® PRO-3 BY CONTRACTOR
1 SHT 1200MM X 2000MM; 19MM THK; SIKA BITUMEN IMPREGNATED BOARD BY CONTRACTOR
20 EA 1000MM WD x 0.70MM THK x 2,5M LGFLOORDECK BY CONTRACTOR
4 EA 1000MM WD x 0.70MM THK x 3.5M FLOORDECK BY CONTRACTOR
4 EA 1000MM WD x 0.70MM THK x 2.7M FLOORDECK BY CONTRACTOR
3
11 M STONE FOUNDATION BY CONTRACTOR
108 M ² KALSI BOARD WITH STEEL FRAME BY CONTRACTOR
870 EA 200MM x 200MM x 400MM CONCRETE BLOCK BY CONTRACTOR
1 SET WALL PAINT BY CONTRACTOR
3 EA DOUBLE GLASS DOORS + ACCESSORIES BY CONTRACTOR
4 EA W01 WINDOW + ACCESSORIES (REFER TO DWG 000-8514-C) BY CONTRACTOR
3 EA W03 WINDOW + ACCESSORIES (REFER TO DWG 000-8514-C) BY CONTRACTOR
1 EA W04 WINDOW + ACCESSORIES (REFER TO DWG 000-8514-C) BY CONTRACTOR
1 EA W08 WINDOW + ACCESSORIES (REFER TO DWG 000-8514-C) BY CONTRACTOR
2 EA L01 VENTILATION + ACCESSORIES (REFER TO DWG 000-8514-C) BY CONTRACTOR
2 EA D-L DOOR + ACCESSORIES (REFER TO DWG 000-8512-C) BY CONTRACTOR
4 EA D-N DOOR + ACCESSORIES (REFER TO DWG 000-8512-C) BY CONTRACTOR
1 EA D-V DOOR + ACCESSORIES (REFER TO DWG 000-8512-C) BY CONTRACTOR
1 EA D-F DOOR + ACCESSORIES (REFER TO DWG 000-8512-C) BY CONTRACTOR
REMARK :
Sheet 1 of 2
REBAR SCHEDULE
EWR NO : RBS NO : 932-0003-C
BY DATE TITLE: REV DESCRIPTION BY DATE
DRAWN SY 1.09.'23 POMALAA CAMP A FOR CONSTRUCTION
CHECK NNA 14.09.23 CONCRETE STRUCTURE B
APPRV NNA 14.09.23 CLINIC FLOOR PLAN C
D
n/a
n/a
Sheet 2 of 2