Shore Power System - NARI
Shore Power System - NARI
Overall Solution
Shipboard Power Receiving System (Equipment): Incoming Panel - Shipboard Trans-
former - Synchronization Panel - Distribution Panel - Shipboard Power Receiving Board.
NARI provides customers with overall solutions of clean, efficient, and reliable shore
power supply system. A ground power unit will be used to supply electric power for the
docking ship to replace the fuel auxiliary equipment on the ship and meet the demand
of electric equipment such as production, operation and living facilities on the ship.
The whole shore power supply system is divided into three parts: the onshore power
supply system, the shore to ship connection equipment and the shore power operation
Monitoring System.
1 2
Application Scenarios
HV Shore Power System iSolution
HV Shore Power System High Voltage and Large Capacity Shore Power System
Port Substation 10/6.6kV Voltage & Frequency HV Shore Power Box 6.6kV, 6kV HV Connection
Converter
Scenarios Application Application Voltage Application Capacity
» Coastal Large Container Terminal » 6.6kV » 1000kVA, 3000kVA,
Cruise Terminal » 6kV 5000kVA, 8000kVA,
12000kVA, 16000kVA
»
» Container Ships above 50k tons
» Large ro-ro Passenger Ship and Cruise
Port Substation Voltage & Frequency LV Shore Power Box 440V, 400V Low Voltage
10/0.4kV Converter connection
Power Supply Mode
Scenarios Application Application Voltage Application Capacity
» Large and Medium-sized Container Terminal » 440V » 100kVA, 200kVA, 300kVA,
» Dry Bulk Carrier Terminal » 400V 500kVA, 800kVA, etc.
» Container Ship below 50k tons
» Dry Bulk Carriers below 100k tons
Service Area Distribution Facility, 0.4kV LV Integrated Shore Power Pile 220V/380V Powered Ship
Scenarios Application Application Voltage and Capacity
Reason of Direct HV Connection
» Water Service Areas » 220V Single-phase Piles(16kVA)
» Anchoring Areas and Canalized Sections along » 380V Three-phase Piles(40kVA)
Canals and Lakes
» 1000-tons and 100-tons Bulk Carriers » Reduce the amount and diameter of cable
3 4
Main Components of Shore Power System High Voltage and Large Capacity Shore Power System
Turn the onshore 10kV power into 10kV low voltage power supply and directly provide it to the on-board electric-
ity devices. The output voltage can be up to 690V with the capacity of 200-1000kW. It‘s also suitable for 380V low
voltage fixed frequency power supply.
» Reduce the voltage to 690V or 3.3kV by transformer. Then turn it into stable 6.6kVpower supply using voltage
and frequency converter
» The main function of the variable voltage and frequency power source is to provide a stable 440V power supply
by converting the frequency and voltage
» Low voltage connection can avoid the reconstruction of ship
» Compatible with 380V fixed frequency power supply
5 6
Low Voltage Integrated Shore Power Pile
Product List
» Designed for inland river service zone, canalized waterway and inland river wharf. » Shipboard Transformer
» The integrated shore power pile has two types to provide 220V signal-phase power and 380V three-phase power, » Synchronous Panel
respectively. Each pile can provide power to two ships at the same time.
» The shore power pile supports swipe-to-pay. You will be charged by power type and time. » Distribution Panel
» Shipboard Connection
7 8
Product List Shore Power Platform
Specification Shore Power Operation Service Platform - PEC9000
Product Name Photo
and Model
PEC9210
PEC9110
PEC9120
9 10
Management
Shore Power Integrated Monitoring System - PEC9000
» Large and medium-sized riverside /coastal wharfs: The Group Co. can check and conduct statistical analysis
through the operation service platform with the 2-level monitoring system and the local integrated shore power PEC9000 integrated monitoring system is based on the NS5000 platform.Which researched and developed inde-
management system. pendently by NARI-TECH after many years of experience in market practice. PEC9000 system is a specialized software
developed and oriented to the application of shore p power supply field, and it can handle with the data interaction,
» Small inland river/Lake wharf: Self-service mode, The shore power service and operation platform is set up for monitoring and control and integrated management of each system of shore-to-ship power supply. The system archi-
provincial, municipal, and port level organizations.
tecture is reasonable and simple with rich display forms and excellent user experience.
PEC9000 integrated monitoring system of shore-to-ship power supply is mainly arranged at the port local level, which
is responsible for on-line monitoring and control of all levels of equipment (switchgear, variable frequency power sup-
ply, transformer, DC screen, auxiliary power systems, etc.) within the shore power system. It can realize the ship-shore
communication with the ship side. PEC9000 system is mainly composed of shore-to-ship power supply integrated
Monitoring System, integrated control cabinet, automatic screen cabinet and so on. The system is mainly suitable for
high-voltage shore power system or large-capacity low-voltage shore power system. It is usually arranged in the special
distribution room of shore power in port area or in the container of shore power system.
Features Description
» Different communication modes for different types of ports based on their needs.
» Due to the long distance between berths of large seaports and medium-sized ports along the river, there are
many monitoring contents, Optical fiber communication becomes a better option. The power consumption data
can be transmitted to the shore power operation center through the local monitoring system for unified data
management.
» Due to the short distance between inland river berths, simple equipment, and high cost of local monitoring
system, it is better to deploy concentrators and adopt wireless communication mode for unified management of
wide area.
11 12
Shore Power Variable Frequency Power Supply Equipment Ship-shore Connection Equipment
Features Description
Features Description
Scene Application
13 14
Zhuhai Shenhuayuedian Port
Typical Applications Port Situation
Port Situation
It’s a sub-company of Shenhua Group having two 100k tons Coal unloading berth, one 50k tons berth and four 3k
tons berth.
The length of Coastal line at Nantong Port is 600m. It mainly berths 30k-100k
tons bulk carriers with 3 pilot berths in total.
Rated capacity:
LV
Shore Power of Wharf Anchorage at Three Gorges Dam Area
300kVA Shore power box, Dual fre-
quency.
According to the six typical shore power system scenarios in the Three Gorges Dam Area, more than 10 core equip-
ments were developed such as shore power pile with different capacity, T-connection box, break-out-box, ship-
board powerhouse, buoy reel System and substation monitor system.
Adopting the shore side high voltage switching station, pontoon type shore power cable management system,
The container wharf at Nansha Port has four 100k One pilot berth, rated capacity: pontoon container type shore based power supply System, to solve the problem of large water level drop, large ca-
tons deep-water berths. The main coastal line is ble lenth and large capacity. The total shore capacitance of the project is 6*500KVA , with a total of 3MW. The pro-
3000kVA, dual frequency.
1400m long, compatible for the world’s largest ject has passed the acceptance test with more than 40 times of power transmission, transmitting more than 80000
container ship. kWh power in total with a nice using experience.
15 16
Sandy Bay and Water Area Shandong Binzhou
Sandy bay and water area has basically completed the construction of various types Port Situation
of Shore Power supply System, including:
» Onshore Fixed Type: Completed the construction of Shore Power System of No.1, The port has two pilot berths mainly for
No.5 and No.15 berths in Dingkao, and the trial operation of power transmission 20000-30000 DWT coal mine bulk carri-
to ship has been carried out; ers;
» Offshore Fixed Type: Completed the construction of Shore Power System of
No.6 and No.9 berthing piers in Xianrenqiao, and the trial operation of power
transmission to ship via T-connection Box has been carried out;
Low-voltage
» Integrated Water Service Center: Completed the construction of managment
of energy, living, pontoon and auto pontoon ladder, and the trial operation of
power transmission to ship via T-connection Box has been carried out; 2 sets of low-voltage shore power boxes
with capacity of 200KVA;
» Pilot Construction of Shipboard Powerhouses: Completed the construction of shipboard powerhouses. 10 pilot
powerhouses are providing service for cargo ships.
Project Features
Taizhou Jinjiang Xinhua Port It’s NARI’s first set of low-voltage SPS in service outside Jiangsu. It adopts the newly designed low-voltage
shore power socket box, equipped with the Shore Power service and operation platform. Online monitoring and
Project Features management can be realized by visiting the platform webpage.
It was put into operation in April 2015 as NARI’s first low-voltage shore power project in service. Xinhua port is
the first in Yangtze River Basin of Jiangsu Province to use low-voltage shore power system using the low-voltage
Economic Benefits
It’s a sub-company of Shenhua Group having two 100k tons Coal unloading berth, one 50k tons berth and four 3k
tons berth.
Port Situation
The coastline of Xinhua port is 745m long in total, with three pilot
berths mainly for 30k-50k DWT bulk carriers.
one berth adopts low-voltage variable frequency shore power, and the other two with low-voltage fixed frequency
one
Port Situation
VF Power Capacity
High/low voltage SPS for berths 1 and 2 (600kW), high/low voltage SPS for Berth 3 (600kW), and constant frequen-
cy low-voltage SPS for container branch (400kW).
» 300kVA, LV shore power box
» 380V shore power
17 18
Wuxi Xing'an Water Service Area Guangdong Zhongshan
The coastline of Wuxi Xing’an water service area is 250 meters long mainly for hundreds or thousands DWT inland The coastline of Zhongshan port in Guangdong is 260m mainly for hundreds or thousands DWT inland river bulk
river bulk carriers, It has the service area for crew to rest. carriers, and it has the service area for crew to rest;
SPS SPS
12 sets of LV integrated shore power piles in service totally, including 2 sets of 380V three-phase and 10 sets of 220 9 sets of customized low-voltage shore power piles in service totally, each of which has two 220V single-phase and
V single-phase shore power piles, with the total capacity of 240kVA; two 380V three-phase connectors, with the total capacity of 684kVA;
The shore power service and operation platform is equipped to monitor the operation information of the SPS on- Equipped with the shore power service and operation platform. The crew can use shore power pile by the dedicat-
line and manage the information of shore power card. ed card issued.
Connection with Vessels Shore Power Service Platform Project Features Economic Benefits
Project Features Economic Benefits It’s NARI’s first small capacity SPS put into oper- After connected to the SPS, the ships can save 309
ation in the Pearl River Delta region with customized tons of diesel and reduce 2450 tons of CO2 emission
shore power piles based on the port’s require- annually, saving 70,000.00 USD compared with using
It is the first water service area in Jiangsu to put the The coastline of Wuxi Xing’an water service area is
ments. Each shore power pile has two kinds of con- diesel.
low-voltage shore power pile system into operation, 250 meters long mainly for hundreds or thousands
nectors, 220V single-phase and 380 V three-phase,
and it is also NARI’s first low-voltage integrated DWT inland river bulk carriers, It has the service area
with the ability to provide shore power for four ships
shore power pile system project. for crew to rest.
at the same time;
19 20
Jiaxing luhuadang Service Area
SPS
Port Situation
The coastline of the water service area is 200m, mainly for hundreds or thousands DWT inland river bulk carriers,
and it has the service area for crew to rest;
Connection with Vessels Shore Power Service Platform Project Commissioning Ceremony
Project Features
It is the first water service area to put low-voltage shore power pile system into operation as a demonstration
project of shore power project, and typical project of electric energy substitution in Zhejiang. Related project is re-
ported by the Xinhua News Agency. leaders of Zhejiang Province and Jiaxing City participate in the commissioning
ceremony;
Economic Benefits
After connected in the SPS, the ships can save 103 tons of diesel and reduce 2325 tons of CO2 emission annually,
saving 63,000.00 USD compared with using diesel.
21