GEMINI ENGI-FAB LIMITED
INTERNAL INSPECTION REPORT Date :
Stage of Inspection / Tests Job No. :11529B/HE
A : Material B : Interim C : Re-Inspection D : Final
Client : Indian Oil Corporation Limited ProjectQty
Equpt. : IOCL-Lupech
: 01 No. Inspection Agency :
Equipment Name : REGENERATOR REBOILER vcs
P.O. NO. & Date: 77154/109/27621024 DT: 02.03.2022
ITP NO. & Date: 077154C-000-SR-0610-001B-B1002-0004
Drawing No. : 077154-000-SR-0610-001B-A2001-0007, Rev:01 EQPT. No. : 1814-E-002A
NOZZLE SETUP ON MAIN SHELL
Sr. Nozzle Nozzle SCH. Orientation Elevation Projection
Rating/Type Remark
No. No. Size THK Reqd. Actual Reqd. Actual Reqd. Actual
SCH 1250 mm from sliding 1250 mm from 1470 mm from centre
1 N3 10" 300# WNRF At 180˚ At 180˚ 1473
100 saddle sliding saddle line
SCH 2100 mm from fixed 2100 mm from fixed 1470 mm from centre
2 N4 10" 300# WNRF At 180˚ At 180˚ 1474
100 saddle saddle line
Signature : Signature :