SAVOY ICE CREAM FACTORY LIMITED
Plot # 804-813, Mirerchar, Barpara, Dorikandi,
Sonargaon, Narayanganj
Minutes of the Management Review Meeting
Doc No.: SIFL/FAC/HR/16.0.0
MRM No. : ___02___Date : _ 14/12/2023__Chaired By : Mr. KN Sharma (Director)
S. Agenda Discussions & Action to be taken Respons Target Review Reviewed
No Points ible Date By Pending There are no pending points from 1. Points from the last M.R.M. Last M. R. M. Quality Policy was reviewed and we have decided to continue with it. 2 Review of We will review it again and if the Quality Policy need arises, we will change it and accordingly. Objectives. Objectives were reviewed one by one and we have decided to keep the objective till the next year. Mr. Fanishwer Singh (M.R.) stated the audit for all the departments. 3 Review of During the audit some non- Internal conformities were raised. All the Audit. non-conformities are closed satisfactorily. Mr. Ahsan Uddin stated that Planned GM- 31/01/24 Preventive Maintenances were Mainten 4 Equipment conducted as scheduled. The ance Maintenance occurrences of major break downs has further minimized. 5 External The Certification Audit is scheduled Quality Audit. to be conducted on 18th December Head 2023 by SGS.
Fanishwer Singh (Management Representative) Attendees: Name Designation & Department Signature
Mr. KN Sharma Director
Mr. Fanishwer Singh Thakur M. R. & Quality Control Head