TP SOLSR LTD

TP SOLSR LTD 4 GW MFG PLANT TIRUNELVELI


JOB SAFETY ANALYSIS
JSA Ref No: TL/Enviro/TPSL/JSA/E&I/02 Rev No: Rev. Dt :
Job Descripition Cable Laying
Location TP Solar Project
Type of Risk High Risk

Sequance of basic job steps Potential Hazard Control Measures / Recommended action Responsible Person

1.Person should under go medical fitness checkup,


Induction and L1,L2 training.
Mobilation Of Manpower Lake of Knowledge Of the involved 2.Every worker should be breafed about PTW and JSA Site Engineer
of the activity.
3.Every person should have above 18 years old
1. The loading/unloading shall be carried out under
1. Fall / slip of objects due to
supervision of Thermax site engineer & in day-light
inadequate handling facilities.
only.
2. Caught in between finger / foot 2. Hand gloves must be wear along with all required
injuries PPE,s.
3. Provide side wedge to restrict side shifting. Provide
3. Damages to the material due to
red flag on projected material and red-light during
Loading/unloading of materials not following the safety instructions night if possible.
Site Engineer
at site
4. Roll down of vehicle during
4. Ensure weight of all items to be lifted.
unloading and shifting of material.

5. Tool box Talk: - discuss about safety for material


5. work in poor illuminations handling and lifting equipment’s.
6. Proper lighting arrangement should be provided.

1.Caught in between finger / foot 1. Use of proper PPEs like hand gloves, safety shoes,
injuries safety goggles etc.

2. Follow safe material handling procedure: - Use of


proper material handling tools & tackles/Use of
categorized skilled manpower /equipment for
stacking the materials.
Storage / stacking of materials Site Engineer
2. Fall of materials due to improper
stacking, resulting in to accidents 3. Use of suitable wooden stopper orwedge supports
and damage to material to avoid fall of stacked material/Provide sufficient
cover like temporary shed / tarpaulin to avoid the
damages to the material due to dust / rain.

4. Material storage area should be barricaded and


proper stacked
1.Proper lighting arrangement to bedone in case of
1.Injury
poor natural lighting
2.Ensure all electrical cable should be joint free
3.Ensure all electrical cable should be laying above 6
Usage of portable Power tools & mtr height with identification
2.Electrical shock Site Engineer
Lighting arrangement
4.All electrical conection should be routed through
RCCB
5.Rubber mat should be provided infront of DB
3.Fire 6.Fire extinquisher shuld be provided.

1. slip and trip hazard 1.Access should be free of obstructions

Shifting materials to the work 2.Material fall 2.Material should be handled care fully
Site Engineer
area 3.Hit injury 3.Recommended PPEs should be worn

4.Cut injury 5.Ensure per person onely carry below 25kg weight
1.Collapse of Mobile scaffolding 1.PTW system to be follow
2.Fall of material 2.TBT should be conduct before start the job
3.Fall of Person 3.Trained person to be involved in height work
4.All power tools to be handled carefully to avoide
personal injures, Ensure safeguards shall be fitted to
the equipment

5.Mobile scaffoldings and scissor lift to be used on


leveled base for Access & inspection tag should be
displayed.
6.Proper access to be provided at work area.
Cable Laying by scissor lift or
Site Engineer
Aluminum scaffilding 7.Barricade the working area before start the work.

8.Activity should be carried out under 100%


supervision
9.Power and lifting tools should be inspected monthly
basis
10.Minimum 12mm Wire rope Lifeline should be
provided on the rack
11.Use proper PPE as per work
requirement,FBH,Safety helmet,Safety shoes, Hand
gloves Safety goggle/ face sheild

Cut and physical injury due to sharp 1. Use all apporpriate PPE along with hand gloves.
Area housekeeping Site Engineer
edge
2.Area should be clear after job completion.
1.Portable fire extinquisher shall be maintained at
1.Fire or explosion location
2.First-aid box to be available
3.Ensure emergencey plan in place and know to all
the engaged people Site Engineer / Safety
Emergency preparedness 2.Severe weather Officer
4.Safe assembly point shall be explained to worker by
supervisor
4.Slip & trip
5.Access should be clear from unwanted materials.
5.Cut & hit injury
Required PPE

Goggles Cotton hand gloves Safety Shoe Nose Mask

Safety helmet Reflective Jacket Double Lanyard FBH with Shock Absorber Ear plug

Black goggles Welder & Grinder suit

Prepared by Checked by Approved by