Emergency Stop Button Checklist

Uploaded by

Afieq Aieman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
539 views14 pages

Emergency Stop Button Checklist

Uploaded by

Afieq Aieman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

ISRINA RESOURCES SDN BHD(

No. 20 Tingkat 1, Jalan Bukit Mahkota 2/1, Seksyen 2, Bandar B


Telephone: 03-89120999
Email: [email protected]

Emergency Stop Button C


This checklist will be used to ensure that all emergency stop buttons within th

Building Name:

Date:

Location:

Quantity of Buttons:

NO Inspection/ Task

1 Button installed.
Button is installed within easy
2 reach for an operative to activate if working on the corresponding
equipment.
3 There is adequate clearance
around the Button, and it is not impeded.
4 Button is a ‘ Mushroom’ Type.
5 Button is ‘ Self Latching’
6 Button is Colored ‘ Red’.
7 Button shows molded arrows that are used to note ‘ Unlatching
Direction’, for resetting.
8 Button is installed with/ on a ‘Yellow’ background.
9 Button is ‘ Direct Opening’
10 Button and enclosure have been
checked for visible damage with no issues noted.

Activation of the Button has been tested, proving it ‘Latches’ and


11 ‘Immediately Activates’ the shutdown of equipment.
12 Upon activation ‘ Alarms’ for the
correct equipment are sent to the Building Management System.
13 Equipment can’t be restarted
manually after Button has been activated.
14 Button upon ‘Reset’ does not
restart the Equipment it serves.

15 Equipment can be restarted


manually after Button has been reset.
Prepared by:

Name:
Date:
Company:
ISRINA RESOURCES SDN BHD(438624-U)
ngkat 1, Jalan Bukit Mahkota 2/1, Seksyen 2, Bandar Bukit Mahkota, 43000 Kajang, Selangor.
Telephone: 03-89120999
Email: [email protected]

Emergency Stop Button Checklist


ed to ensure that all emergency stop buttons within the building are inspected and documented

PETRONAS LEADERSHIP CENTRE (PLC)

Parking lot 19

Yes / No

on the corresponding

note ‘ Unlatching

ound.

ted.

ving it ‘Latches’ and


pment.

anagement System.
Checked by: Verified by:

Name: Name:
Date: Date:
Company: Company:
43000 Kajang, Selangor.

st
inspected and documented

Notes

I t should not restart.


Verified by:
ISRINA RESOURCES SDN BHD(438624-U)
No. 20 Tingkat 1, Jalan Bukit Mahkota 2/1, Seksyen 2, Bandar Bukit Mahkot
Telephone: 03-89120999
Email: [email protected]

Emergency Stop Button Check


This checklist will be used to ensure that all emergency stop buttons within the building

Building Name: PETRONAS LEADERSHIP CENTRE (PLC)


Date:
Location: Parking lot 6
Quantity of Buttons: 2

NO Inspection/ Task
1 Button installed.
2 Button is installed within easy
3 reach for
There an operative
is adequate to activate if working on the corresponding
clearance
4 around
Button is a ‘ Mushroom’it Type.
the Button, and is not impeded.
5 Button is ‘ Self Latching’
6 Button is Colored ‘ Red’.
7 Button shows molded arrows that are used to note ‘ Unlatching
8 Direction’, for resetting.
Button is installed with/ on a ‘Yellow’ background.
9 Button is ‘ Direct Opening’
10 Button and enclosure have been
11 checked
Activationforofvisible damage
the Button haswith
beenno issuesproving
tested, noted. it ‘Latches’ and
12 ‘Immediately
Upon activationActivates’
‘ Alarms’thefor
shutdown
the of equipment.
13 correct equipment are sent
Equipment can’t be restarted to the Building Management System.
14 manually
Button uponafter‘Reset’
Buttondoes
has not
been activated.
restart the Equipment it serves.
15 Equipment can be restarted
manually after Button has been reset.
Prepared by: Checked by:

Name: Name:
Date: Date:
Company: Company:
S SDN BHD(438624-U)
n 2, Bandar Bukit Mahkota, 43000 Kajang, Selangor.
03-89120999
[email protected]

Button Checklist
uttons within the building are inspected and documented

ENTRE (PLC)

Yes / No Notes

I t should not restart.

ked by: Verified by:

Name:
Date:
Company:
ISRINA RESOURCES SDN BHD(438624-U)
No. 20 Tingkat 1, Jalan Bukit Mahkota 2/1, Seksyen 2, Bandar Bukit Mahkota,
Telephone: 03-89120999
Email: [email protected]

Emergency Stop Button Checkli


This checklist will be used to ensure that all emergency stop buttons within the building are

Building Name: PETRONAS LEADERSHIP CENTRE (PLC)


Date:
Location: Parking lot 170
Quantity of Buttons: 3

NO Inspection/ Task
1 Button installed.
2 Button is installed within easy
3 reach for
There an operative
is adequate to activate if working on the corresponding
clearance
4 Button is a ‘ Mushroom’it Type.
around the Button, and is not impeded.
5 Button is ‘ Self Latching’
6 Button is Colored ‘ Red’.
7 Button shows molded arrows that are used to note ‘ Unlatching
8 Direction’,
Button for resetting.
is installed with/ on a ‘Yellow’ background.
9 Button is ‘ Direct Opening’
10 Button and enclosure have been
11 checked
Activationforofvisible damage
the Button haswith
beenno issuesproving
tested, noted. it ‘Latches’ and
12 ‘Immediately
Upon activation Activates’
‘ Alarms’thefor
shutdown
the of equipment.
13 correct equipment are sent
Equipment can’t be restarted to the Building Management System.
14 manually
Button after‘Reset’
upon Buttondoes
has not
been activated.
restart the Equipment it serves.
15 Equipment can be restarted
manually after Button has been reset.
Prepared by: Checked by:

Name: Name:
Date: Date:
Company: Company:
ISRINA RESOURCES SDN BHD(438624-U)
an Bukit Mahkota 2/1, Seksyen 2, Bandar Bukit Mahkota, 43000 Kajang, Selangor.
Telephone: 03-89120999
Email: [email protected]

gency Stop Button Checklist


ure that all emergency stop buttons within the building are inspected and documented

PETRONAS LEADERSHIP CENTRE (PLC)

Parking lot 170


3
Yes /
Notes
No

the corresponding

ote ‘ Unlatching
nd.

d.g it ‘Latches’ and


ent.
agement System.
ment it serves. I t should not restart.

Checked by: Verified by:

Name:
Date:
Company:
ISRINA RESOURCES SDN BHD(438624-U)
No. 20 Tingkat 1, Jalan Bukit Mahkota 2/1, Seksyen 2, Bandar Bukit Mahkota
Telephone: 03-89120999
Email: [email protected]

Emergency Stop Button Checkl


This checklist will be used to ensure that all emergency stop buttons within the building ar

Building Name: PETRONAS LEADERSHIP CENTRE (PLC)


Date:
Location: Parking lot 105
Quantity of Buttons: 4

NO Inspection/ Task
1 Button installed.
2 Button is installed within easy
3 reach for
There an operative
is adequate to activate if working on the corresponding
clearance
4 around is
Button thea Button, and it Type.
‘ Mushroom’ is not impeded.
5 Button is ‘ Self Latching’
6 Button is Colored ‘ Red’.
7 Button shows molded arrows that are used to note ‘ Unlatching
8 Direction’,
Button for resetting.
is installed with/ on a ‘Yellow’ background.
9 Button is ‘ Direct Opening’
10 Button and enclosure have been
11 checked
Activationforofvisible damage
the Button haswith
beenno issuesproving
tested, noted. it ‘Latches’ and
12 ‘Immediately
Upon activationActivates’
‘ Alarms’thefor
shutdown
the of equipment.
13 correct equipment
Equipment can’t bearerestarted
sent to the Building Management System.
14 manually after Button
Button upon ‘Reset’ does has not
been activated.
restart the Equipment it serves.
15 Equipment can be restarted
manually after Button has been reset.
Prepared by: Checked by:

Name: Name:
Date: Date:
Company: Company:
ISRINA RESOURCES SDN BHD(438624-U)
n Bukit Mahkota 2/1, Seksyen 2, Bandar Bukit Mahkota, 43000 Kajang, Selangor.
Telephone: 03-89120999
Email: [email protected]

gency Stop Button Checklist


re that all emergency stop buttons within the building are inspected and documented

PETRONAS LEADERSHIP CENTRE (PLC)

Parking lot 105


4
Yes /
Notes
No

he corresponding

e ‘ Unlatching
.

it ‘Latches’ and
t.
ement System.
nt it serves. I t should not restart.

Checked by: Verified by:

Name:
Date:
Company:
ISRINA RESOURCES SDN BHD(438624-U)
No. 20 Tingkat 1, Jalan Bukit Mahkota 2/1, Seksyen 2, Bandar Bukit Mahkota,
Telephone: 03-89120999
Email: [email protected]

Emergency Stop Button Checkli


This checklist will be used to ensure that all emergency stop buttons within the building are

Building Name: PETRONAS LEADERSHIP CENTRE (PLC)


Date:
Location: Parking lot 105
Quantity of Buttons: 4

NO Inspection/ Task
1 Button installed.
2 Button is installed within easy
3 reach
There for an operative
is adequate to activate if working on the corresponding
clearance
4 around thea Button,
Button is and it Type.
‘ Mushroom’ is not impeded.
5 Button is ‘ Self Latching’
6 Button is Colored ‘ Red’.
7 Button shows molded arrows that are used to note ‘ Unlatching
8 Direction’, for resetting.
Button is installed with/ on a ‘Yellow’ background.
9 Button is ‘ Direct Opening’
10 Button and enclosure have been
11 checked forofvisible
Activation damage
the Button haswith
beenno issuesproving
tested, noted. it ‘Latches’ and
12 ‘Immediately Activates’ the
Upon activation ‘ Alarms’ for theshutdown of equipment.
13 correct equipment
Equipment can’t bearerestarted
sent to the Building Management System.
14 manually
Button uponafter‘Reset’
Buttondoes
has not
been activated.
restart the Equipment it serves.
15 Equipment can be restarted
manually after Button has been reset.
Prepared by: Checked by:

Name: Name:
Date: Date:
Company: Company:
ISRINA RESOURCES SDN BHD(438624-U)
Bukit Mahkota 2/1, Seksyen 2, Bandar Bukit Mahkota, 43000 Kajang, Selangor.
Telephone: 03-89120999
Email: [email protected]

ency Stop Button Checklist


that all emergency stop buttons within the building are inspected and documented

PETRONAS LEADERSHIP CENTRE (PLC)

Parking lot 105


4
Yes /
Notes
No

e corresponding

‘ Unlatching

t ‘Latches’ and

ment System.
it serves. I t should not restart.

Checked by: Verified by:

Name:
Date:
Company: