1. RUN ALL HORIZONTAL PIPING IN PERFECT ALIGNMENT AND AT A GRADE NOT LESS THAN TWO PERCENT (2%).
LEACHING CO DIGESTIVE
2. ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE DEGREES(45°) WYES, LONG SWEEP QUARTER CHAMBER CHAMBER
OUTLET
BEND, SIXTH-EIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL, A SINGLE ONE EIGHT
(1/8) BEND COMBINATION MAY BE USED ON VERTICAL STACKS, AND SHORT QUARTER BENDS MAY BE USED ON WASTE LINE, TEE
MANHOLE MANHOLE
AND CROSSES MAYBE USED IN BENT PIPES.
1500
1300
600
500
CO INTLET
3. NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES.
500 500
150 600 150 600 600 600
4. THE DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE OR VENT PIPES AND USE OF SADDLE HUB AND BEND ARE PROHIBITED.
100
5. PROVIDE CLEAN-OUTS UNDER THE FOLLOWING CONDITIONS:
PLAN
a. EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWO AND A HALF DEGREES(22.5°).
b. ONE AND ONE HALF METERS (1.5m) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE CONNECTION .
MANHOLE W/ 12mmØ
c. EVERY FIFTEEN METERS (15m) IN HORIZONTAL RUN OF PIPES. AT THE END OF ANY HORIZONTAL PIPE LINES. CONCEALED LIFT
HANDLE AS SHOWN
3000
6. NOT LESS THAN 0.30 METERS OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF THE TOP 4"Ø PVC
100 900 100 1800 100
OUTLET PIPE
SLAB. 150 600 150 600 600 600
500 500
CO CO
FFL
7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.
150
8. ALL PLUMBING WORKS SHALL BE DONE UNDER THE SUPERVISION OF A LICENSED MASTER PLUMBER OR SANITARY ENGINEER.
300
AIR SPACE
9. UNLESS NOTED OTHERWISE, ALL WATER SUPPLY PIPES SHALL BE Ø21" uPVC. INLET
OUTLET 10mmØ HORIZONTAL
BARS AT EVERY 3
DIGESTIVE LAYERS OF CHB
1350
1750
LEACHING CHAMBER
12mmØ BARS SPACED
CHAMBER
AT 150mm ON CENTER
BOTHWAYS
2% SLOPE 12mmØ VERTICAL BARS
SPACED AT 400mm ON
CENTER
LEGENDS:
250
100mm THICK CHB
300
100
75 350 75
300
6"Ø DRAINAGE PIPE
LAV LAVATORY SANITARY/DRAINAGE LINES
75
475
700
SHO SHOWER VENT PIPES
300
350
500
125
125
WATER LINES CONCRETE COVER
75
W/12mmØ CONCEALED
LIFT HANDLE
SECTION PLAN
CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: REVISIONS: SHEET NO.:
VALIDITY
CB
ST
.
IA
D
4"
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
PE
lav
.
9 9
IA
PI
D
8 8 CO
2"
C
PVC PIPE 4" DIA.
PV
7 6 5 4 3 2 1 7 6 5 4 3 2 1
PE
WC FD
PI
WC
C
FD RISER
PV
CO
SINK 16 D
E D R
PP T
15
HB 14
TA RES
1
13 2
12
F
3
CB A
11 4
NE
10 5
9 6
8 7
IA.
LAV 4 "D
IPE
CP
PV
DIA
. CB
4"
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17 IPE
9 LAV F 9 F PV
CP
8 8 LAV
7 6 5 4 3 2 1 7 6 5 4 3 2 1
HB HB CB
SH SH
5 ISOMETRIC VIEW
P 1
CV
WM
GV
TAPPED TO THE
NEAREST WATERLINE
CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: REVISIONS: SHEET NO.:
VALIDITY
0.30m 0.30m
2. ALL ELECTRICAL WORKS HEREIN SHALL BE EXECUTED BY EXPERIENCED
SERVICE SPOOL PORCELAIN
MEN UNDER THE DIRECT SUPERVISION OF A DULY LICENSED ELECTRICAL [ BY OWNER / MERALCO ]
CT METERING BOX
5. ALL INSTALLATION SHALL BE CONCEALED FROM BY INSTALLING CONDUCTOR 2 THHN [ BLACK COLOR ] +
21-30mm GRD.[ WHITE COLOR ]
[ BY OWNER ]
1.80m
IN PVC EMBEDDED IN CONCRETE, PARTITION OR CEILING. IN 65mmØ PVC / IMC
GROUNDING WIRE
[ WHITE COLOR ]
[ LOOP AT GRND. ROD ]
NGL
6. MINIMUM SIZE OF CONDUCTOR AND CONDUIT WHEN NOT INDICATED SHALL BE
0.90m
1.6 mm DIA. ( NO. 14 ) AND 15 mm NOMINAL DIA. FOR CONDUIT RESPECTIVELY. EARTHFILL
1.20m
0.30m
TO PANELBOARD "LP"
7. MOUNTING HEIGHT OF DEVICES SHALL BE AS FOLLOWS: LOCATED INSIDE
KITCHEN
10mmØ GROUNDING ROD
3.0m LENGTH
EARTHFILL [ EMBEDDED ]
CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: REVISIONS: SHEET NO.:
VALIDITY
z 9 10
a1
m y
l
l Sz 6 5
PB
1 2 Sa1 PB
j 3 4
Sy
Slm S3w
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
9 9
8 k 8
w x 9 9
g Sk
8 8
7 6 5 4 3 2 1 7 6 5 4 3 2 1
7 6 5 4 3 2 1 7 6 5 4 3 2 1
Sw Sx
S(3w),g
Sdef Sqrs Stuv 7
ACU
8
ACU
s
c c f v
i
Shij Sabc
b d e t u
h h
r
a a q
q q
1 GROUND FLOOR LIGHTING LAYOUT 2 SECOND FLOOR LIGHTING LAYOUT 3 GROUND FLOOR CONV.OUTLET LAYOUT 4 SECOND FLOOR CONV. OUTLET LAYOUT
E 1 1:100mts E 1 1:100mts E 1 E 1
1:100mts 1:100mts
CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: REVISIONS: SHEET NO.:
VALIDITY
CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: REVISIONS: SHEET NO.:
VALIDITY
(NOTE 3)
VARIES
JOINT SEALANT
200
NON-EXTRUDING TYPE
JOINT FILLER
SUBGRADE COMPACTED TO
95% MDD BASED ON ASTM
D-698
1 21 X16
3
ANGLE BAR
6.12M
2.59M
0.92M 0.92M
5.55M
8.27M
1 12 X16
3
ANGLE BAR
2.59M
7.85M
6.12M
2.59M
0.92M 0.92M
11.10M
TRUSS-1 DETAIL
5.86M
SLAB SCHEDULE SLAB CONSTRUCTION NOTES 0.83M
1. EDGE PANELS:
1.00M 1.00M
EXTEND TOP BARS OF ADJACENT INTERIOR PANEL AND
11.60M
TERMINATE THE EDGE WITH A STANDARD 90° HOOK.
PROVIDE BOTTOM TEMPERATURE STEEL IN THE OPPOSITE TRUSS-2 DETAIL
TYP. BEAM ELEVATION DIRECTION.
2. INTERIOR PANELS:
NTS
EXTEND TOP BARS OF ADJACENT PANELS AT LEAST L/4 2X14 ANGLE BAR
OR MINIMUM DEVELOPMENT LENGTH WHICHEVER GREATER
AND PROVIDE BOTTOM TEMPERARUTRE STEEL IN BOTH DIRECTIONS.
1 12 X16
3
ANGLE BAR
4.46M
1.40M
1.00M
4.24M
CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: REVISIONS: SHEET NO.:
VALIDITY
14.40M
14.40M
1 1
3.10M 2.78M
3.10M
2 2
11.10M
2.78M
2.65M
2.65M
3 11.10M
3 11.10M
2.78M
3.25M
3.25M
4 4 2.00M
2.19M 2.19M
2.10M
2.10M
11.90M
COLUMN SCHEDULE
NOTE: MAIN REINFORCEMENT, ASTM GRADE 60
LATERAL TIES, ASTM GRADE 40
COMPACTED SUBGRADE C1 C2 C3
0.10m BASE COURSE
LEVEL FDN-2ND FLOOR FDN-ROOF BEAM FDN-TOP OF BEAM
CONF. REINF.
0.12m THK SLAB ON GRADE 120 MM THK SLAB ON GRADE
D
COMPACTED SUBGRADE
0.12m
JOINT REINF.
0.10m BASE COURSE
L
CONF. REINF.
D
TIE BEAM REINFORCEMENT FOR COL. BAR SPLICES
(SEE DETAIL) SEE TABLE OF MIN. LAP 6 -D16 MAIN BARS
SPLICE LENGTH OF COL.
TIE BEAM REINFORCEMENT
COLUMN TIES AS
PER SCHEDULE
W W TYP. TB SECTION
H
C1
TYPICAL PLAN
CONF. REINF.
D
LEVEL 2ND - ROOF BEAM
JOINT REINF.
10Ø VERT./HOR.
BARS @ 600 O.C.
FOOTING SCHEDULE
120 MM THK
SLAB ON GRADE
CONF. REINF.
D
REINFORCEMENT
D
FOOTING
NOTES:
SECTION
1. YIELD STRESS OF HOOPS = 40 KSI
2. D = USE MAXIMUM COLUMN DIMENSION,
1/6 CLEAR HEIGHT OR 18" (450mm)
TYP. WALL TO TIE BEAM
WHICHEVER IS GREATER.
3. NUMBER OF HOOP TIES SAME AS PER
CONNECTION DETAIL
COLUMN TIES SCHEDULE.
FOOTING DETAIL 4. ALL CONCRETE REINFORCEMENT DETAIL
SHOULD BE DONE IN ACCORDANCE WITH
ACI DETAILING MANUAL 1980 PUB SP-66
5. THE CONTRACTOR SHALL NOTIFY THE ENGINEER
AFTER FOOTING EXCAVATION HAS BEEN COMPLETED,
TO CONFIRM THE DESIGN SOIL BEARING CAPACITY.
FOOTING AND COLUMN TO BE ADJUSTED UPON
CONFIRMATION OF THE ACTUAL SOIL BEARING
CAPACITY.
CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: REVISIONS: SHEET NO.:
VALIDITY
1 S E C T I O N A 2 S E C T I O N B
A 3 1:100mts A 3 1:100mts
3 R O O F P L A N
A 3 1:100mts
D D D D D
1 2 2 3 4
0.50M 0.60m
W W W W
1 2 3 4 W W
(7 SETS) (2 SETS) (8 SET ) (2 SET )
5 6
ALUMINUM POWDER COATED ALUMINUM POWDER COATED ALUMINUM POWDER COATED ALUMINUM POWDER COATED (1 SETS ) (3 SETS )
TINTED GLASS TINTED GLASS TINTED GLASS TINTED GLASS
ALUMINUM POWDER COATED ALUMINUM POWDER COATED
AWNING WINDOWS FIXED WINDOWS SLIDING WINDOWS FIXED WINDOWS
TINTED GLASS TINTED GLASS
LOCATION: BEDROOMS, LIVING AREA LOCATION: GUEST & MASTER BEDROOM LOCATION: BEDROOM, CARPORT LOCATION: BEDROOM, CARPORT SLIDING WINDOWS SLIDING WINDOWS
LOCATION: KITCHEN SINK LOCATION: T&B
CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: REVISIONS: SHEET NO.:
VALIDITY
14.40M 9.80M
W W W W W
1 1
5 3 3 6 3
1.35M
1.58M 3.00M
2.85M
2 2 Groove Finished
W 3.17M Decostone/Wall Tiles
3 SECOND FFL
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
Stainless Railing
2.65M W 9
2.65M 2.65M W
9 3.05M 2.65M
4
8
2.35M 9.10M 4 8
9.10M
W
7 6 5 4 3 2 1 1.62M W
6 7 6 5 4 3 2 1 1.50M 6
1.40M 1.40M
4 W W W W W W
4 W W W
1 1 1 1 1 2 1 1 2
3 FRONT ELEVATION
2.10M 2.00M 2.10M 2.00M A 2 1:100mts
1.00M
5 5
4.50M 1.70M 4.00M 4.20M 1.70M 4.00M 4.20M
14.40M 9.90M
5 4 3 2 1 1 2 3 4 5 D C B A
1.21M
2.56M 2.56M
1.35M
4.35M
Plastered Finished
3.20M 3.20M Plastered Finished 3.20M
Painted ( Wood Finished )
CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: REVISIONS: SHEET NO.:
VALIDITY
PTR No.
ISSUED AT TWO (2) STOREY RESIDENTIAL UNIT
AS SHOWN
A
ISSUED ON
TIN
2 3
I CERTIFY THAT THIS WORK WAS PREPARED BY ME
OR DONE UNDER MY DIRECT SUPERVISION LOCATION: PUROK #4, BRGY. MALASIN, AURORA, ISABELA ADDRESS: PUROK #4, BRGY. MALASIN, AURORA, ISABELA NO. DESCRIPTION DATE
Republic of the Philippines
DRAWING LIST Department of Public Works &
TECHNICAL DESCRIPTIONS SHEET CONTENTS
Highways
OFFICE OF THE BUILDING OFFICIAL
LINE BEARING DISTANCE ARCHITECTURAL
LOT 2643-PART, PLS 1085-D A1 PERSPECTIVE
STRUCTURAL
LO
T2 S1 FOUNDATION PLAN
Y
2 643 Line & Grade
PL -PA
SECOND FLOOR FRAMING PLAN
S-1 RT ROOF FRAMING PLAN
085 ,
A
-D TYPICAL ISOLATED FOOTING
TYPICAL STRAP FOOTING
SCHEDULE OF COLUMN FOOTING
W
S2 BEAM SCHEDULE
3 STAIR DETAIL
TYPICAL BEAM DETAIL
F
Architectural
TYPICAL TWO WAY SLAB DETAIL
TRUSS DETAIL
1 PERSPECTIVE
O
S3 GENERAL CONSTRUCTION NOTES AND TABLE
T
5 SECOND FLOOR LIGHTING LAYOUT
GROUND FLOOR POWER LAYOUT
Structural
H
SECOND FLOOR POWER LAYOUT
LOAD SCHEDULE & COMPUTATION
GENERAL NOTES
G
A=1,273 Sq.m.
-D
THE SITE E2 GENERAL NOTES
85
Sitio Tagaytay Dalid,
-10
Tabuelan,Cebu
LS
R
,P
PLUMBING & SANITARY Sanitary
RT
P1 GROUND FLOOR SANITARY LAYOUT
-PA
SECOND FLOOR SANITARY LAYOUT
D
GROUND FLOOR WATERLINE LAYOUT
643
1 ISOMETRIC VIEW
A
T2
CATCH BASIN DETAIL
SEPTIC TANK DETAIL
LO
O
SYMBOLS
Electrical
(R. GENERAL NOTES
R.O
.W
R
LO )
T2 6
PL 64
S-1 3-P
085 AR
-D T,
Mechanical
CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: REVISIONS: SHEET NO.:
VALIDITY