SAUDIARAMCO.

NOTES:
SITE LOCATION
1.ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE NOTED.
24 BERRI GAS PLANT (VISITOR CENTER)
2.ALL HEAVY DUTY MANHOLE COVERS SHALL HAVE A
RUBBER RING INSTALLED AT THE INNER FACE OF
THE COVER AND FRAME SEATING TO INSURE A
NON-ROCKING SEATING.
HEAVY DUTY CAST
3.THE MANHOLE COVER AND FRAME SHALL REST ON A

OF
IRON FRAME & COVER
COURSE OF BRICKS OR A CONCRETE RING, NOT ON
THE FIBERGLASS SUPPORT LEDGE.

CONSENT
ASPHALT PAVEMENT MARL PAVEMENT ASPHALT PAVEMENT
WHERE APPLICABLE MARL PAVEMENT 4.ALL MANHOLE COVERS SHALL HAVE ARABIC AND
WHERE APPLICABLE WHERE APPLICABLE
WHERE APPLICABLE ENGLISH ENGRAVING 'DRAINAGE'.
B 200
5.INTERIOR AND EXTERIOR SURFACES OF MANHOLES
FRAMES AND COVERS SHALL BE PAINTED WITH
BITUMINOUS PAINT.

TTEN
6.COATING OF CONCRETE BASE SHALL BE PROTECTED
WITH TWO COATS OF COAL TAR EPOXY ON BOTH
INTERNAL AND EXTERNAL SURFACES.

WRI
CONCRETE GRADING BRICKS
7.CONCRETE BEDDING SHALL BE USED WHEN THE
600 MORTAR BED (TYP.) CONCRETE GRADING BRICKS COMPACTION OF BEDDING IS NOT POSSIBLE, THE

THE
(MAX. 3 LAYERS IN MORTAR) GROUND SOIL IS SOFT OR AS DIRECTED BY SAUDI
OPENING

150
ARAMCO REPRESENTATIVE.
FACTORY JOINT

TYP.
8.CONTRACTOR SHALL SUBMIT SHEETING AND/OR

300

THOUT
COMPACTED FILL
SHORING PLANS FOR PIPE TRENCH TO SAUDI ARAMCO
300
FACTORY JOINT REPRESENTATIVE FOR APPROVAL.
STEPS DISTANCE 1200 DIA.
9.CONTRACTOR SHALL SUBMIT DEWATERING PLANS AND

WI
FRP LADDER EXCAVATION METHODS FOR PIPE TRENCHES AND
FRP LADDER PRODUCED BY
MANHOLES TO CLIENT REPRESENTATIVE FOR

NG
PRODUCED BY COMPACTED FILL MANHOLE
APPROVAL.

DRAWI
MANHOLE MANUFACTURER
10.IN PAVED (MARL OR ASPHALT) & PADS AREAS ALL
MANUFACTURER
MANHOLES COVERS SHALL BE HEAVY DUTY AND RIM
ELEVATIONS OF ALL MANHOLES SHALL BE FLUSH
WITH FINISHED GRADE ELEVATIONS. IN CASE OF

S
THI
DISCREPANCY BETWEEN RIM AND FINISHED GRADES
ELEVATIONS, THE FINISHED GRADE ELEVATIONS SHALL
EPOXY GROUT (TYP.)
1200 DIA. PREVAIL.

FROM
150 USE TWO RUBBER 11.THE CONTRACTOR SHALL CHECK LOCATIONS AND
GASKET JOINTS WITHIN ELEVATIONS OF ALL UTILITIES AND STRUCTURES
(TYP)
150 3.0m FROM STRUCTURE THAT MAY AFFECT HIS WORK PRIOR TO START OF
CONCRETE SEAL

TYP)
FOR uPVC (TYP.)

150
(TYP) CONSTRUCTION.

NED
(
12.ALL MANHOLES SHALL HAVE AN INTERNAL DIAMETER
400

OBTAI
OF 1200mm. FOR BELOW 600mm , USE 1800mm
400mm PIPE FOR 600mm & ABOVE.
13.FOR VENTILATION PURPOSES ALL HEAVY DUTY
MANHOLE COVER SETS SHALL HAVE FOUR HOLES.

BE
14.HEAVY DUTY MANHOLE COVER SETS SHALL HAVE A
COMBINED WEIGHT (FRAME & COVER) OF NOT LESS

PART,SHALL
THAN 250 KGS.
15.MEDIUM DUTY MANHOLE COVER SET SHALL HAVE A
COMBINED WEIGHT (FRAME AND COVER) OF NOT LESS
150 NOTE-6 THAN 160 KGS.

300

100
(TYP) 16.ALL REINFORCING STEEL BARS SHALL BE GRADE 60,

LIMIT OF DEFORMED AND FUSION BONDED EPOXY COATED.

150 100
CONCRETE BASE 17.ALL CONCRETE SHALL CONFORM WITH SPECIFICATIONS

N
AND HAVE A MINIMUM COMPRESSIVE STRENGTH OF

I
TYP)

150
LIMIT OF
4000 PSI AT 28 DAYS. ALL LEAN CONCRETE SHALL

FULL,OR
CONCRETE BASE
HAVE A COMPRESSIVE STRENGTH OF 2000 PSI AT

100
RUBBER GASKET STEEL REINFORCEMENT

N.

N.
28 DAYS.

350
AROUND MANHOLE RETAINING HOOK

350
MI

MI
PERIMETER 12mm BARS (4 REQUIRED) 18.WARNING TAPES SHALL BEAR THE FOLLOWING
CONCRETE
CONCRETE EXPRESSION IN ARABIC AND ENGLISH:
LEAN "CAUTION, BURIED DRAINAGE LINE"

100
LEAN CONCRETE 100

N
CONCRETE

I
19.DIMENSIONS AND CONSTRUCTION OF DROP MANHOLES
SHALL BE SIMILAR TO TYPICAL MANHOLE DETAIL,

ON
B EXCEPT AS SHOWN.

REPRODUCTI
300 75 300 75
16 @ 200 REFERENCE DRAWINGS
16 @ 200 (TYP.) (TYP.)
1800 1800 DWG. CONTROL FOR J.O. 10-00965-0001 RD-631949

SITE DEVELOPMENT PLAN & STRIPPING PLAN RA-631960


SITE NON-ELECTRIC UTILITIES LAYOUT RA-631970
SECTION A-A SECTION B-B

SAUDIARAMCO.NO
1 FIBERGLASS DRAINAGE AND SEWER MANHOLE
- SCALE NTS

OF
PROPERTY
HEAVY DUTY CAST
N IRON COVER AND FRAME

SOLE
O
I
T
R OILY SEWER
O
P . )
D P
E TY 2
D ( 0
D
E L 0

THE
B L
E
M A 15
W
IN
4
5
0

ARE
I
C CONCRETE
GRADING

N
E

HEREI
C 2
A 0 RING
F
O
T
0 L
0 L
2 A
W
F
O

NED
SCALE: NTS

CONTAI
0
5
3 REVISION VALIDATION

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

ON
10-00965-0001-024
200 600 200

NFORMATI
ISOMETRIC DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
CLEAR OPENING
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

FOA NMM ZAA MHH


06/20/22 06/20/22 06/20/22 06/20/22

REV.NO. DATE REVISION DESCRIPTION

I
00 06/20/22 ISSUED FOR CONSTRUCTION

2 FRP STEP DETAIL 3 TYPICAL MANHOLE COVER DETAIL

THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR

SCALE NTS SCALE NTS 10-00965-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
- -
SAUDI ARABIAN OIL COMPANY

AND
DRAWING TYPE

NON-ELEC STORM WATER DETAILS UTI

NG
UPGRADE SECURITY FACILITIES-DH & NA

DRAWI
NGL PROCESS PLANT

BERRI SAUDI ARABIA

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
470 S RA-631971 008 00
E:\KH2117\KH2117\24. Berri Gas Plant - B (Visitor Center) - Plant No. 470\RA-631971.008 6/27/2022 10:19:02 AM CADD-50 SHAHID Saudi Aramco 2615 ENG. (05/05)

RA-631971.008 6/27/2022 10:19:02 AM PLOTTER=OTHERS\POSTSCRIPT\AM_BLACK.PLT


RESTRICTED VECTOR CADD-01

You might also like