Drain & Culvert Design
Drain & Culvert Design
Drain & Culvert Design
GEOMETRY
3.85
0.35
0.35
LOAD CALCULATION
Top slab
(i) Dead load
Self weight of top slab = 8.75 kN/m2
Weight of sand cushion = 0 kN/m2
Weight of foot path = 0 kN/m2
Total dead load = 8.75 kN/m2
Bottom Slab
Dead load from top slab = 8.75 kN/m2
Self weight of wall = 16.67 kN/m2
Total dead load = 25 kN/m2
Live load on foot path = 3 kN/m2
Total Load (DL +LL) = 28 kN/m2
Pressure on wall
(i) Case 1: Box empty, earth pressure with live load surcharge equivalent to 1.2m height of earth fill both sides
Pressure due to live load surcharge = 10.80 kN/m2
Pressure due to earth surcharge = 0.00 kN/m2
Pressure due to earth fill = 39.15 kN/m2
BY: TATA CONSULTING ENGINEERS LIMITED JOB NO.: TCE.
DATE: CLIENT: SUBJECT:
Moment Distribution
Joint A B C D
Mem AB AD BA BC CB CD DC DA
D.F 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
F.E.M -14.51 41.72 14.51 -41.72 54.07 -35.10 35.10 -54.07
DIST -13.61 -13.61 13.61 13.61 -9.49 -9.49 9.49 9.49
C.O 6.80 4.74 -6.80 -4.74 6.80 4.74 -4.74 -6.80
DIST -5.77 -5.77 5.77 5.77 -5.77 -5.77 5.77 5.77
C.O 2.89 2.89 -2.89 -2.89 2.89 2.89 -2.89 -2.89
DIST -2.89 -2.89 2.89 2.89 -2.89 -2.89 2.89 2.89
BY: TATA CONSULTING ENGINEERS LIMITED JOB NO.: TCE.
DATE: CLIENT: SUBJECT:
CHD.: Nitesh PROJECT: Preparation of DPR for Storm Water Design DOC. NO.:
DATE: BU: INFRA DC: BLR DISC.: CIVIL SH. OF REV. NO.:
1.0 DESIGN DATA
Clear width of culvert/drain = 7.00 m
Clear height of culvert/drain = 3.00 m
Clear width of Road L = 5.30 m
Thickness of sand cushion above culvert/drain d = 0.00 m
Unit weight of Concrete = 25 kN/m3
Density of water δw = 10 kN/m3
Density of soil δs = 18 kN/m3
Angle of Repose = 30 degree
Ka = 0.50 Soil at rest
Grade of concrete fck = 25 N/mm2
Grade of steel fy = 500 N/mm2
Net Safe Bearing capacity = 100 kN/m2
GEOMETRY
7.20
0.2
0.2
LOAD CALCULATION
Top slab
(i) Dead load
Self weight of top slab = 5.00 kN/m2
Weight of wearing coat = 1.10 kN/m2
Weight of sand cushion = 0.00 kN/m2
Weight of road or foot path = 0.00 kN/m2
Total dead load = 6.10 kN/m2
1.80
1.10
Effective width
7.40
3.20
1.20
0.90
BY: Sudha J TATA CONSULTING ENGINEERS LIMITED JOB NO.: TCE.
DATE: CLIENT: Berhampur Municipal Corporation SUBJECT:
CHD.: Nitesh PROJECT: Preparation of DPR for Storm Water Design DOC. NO.:
DATE: BU: INFRA DC: BLR DISC.: CIVIL SH. OF REV. NO.:
2.7 t 2.7 t 11.4 t 11.4 t
7.40
Bottom Slab
Dead load from top slab = 6.10 kN/m2
Self weight of wall = 4.05 kN/m2
Total dead load = 10 kN/m2
Load due to Vehicle = 24 kN/m2
Total Load (DL +LL) = 34 kN/m2
Pressure on wall
(i) Case 1: Box empty, earth pressure with live load surcharge equivalent to 1.2m height of earth fill both sides
Pressure due to live load surcharge = 10.80 kN/m2
Pressure due to earth surcharge = 0.00 kN/m2
Pressure due to earth fill = 28.80 kN/m2
CHD.: Nitesh PROJECT: Preparation of DPR for Storm Water Design DOC. NO.:
DATE: BU: INFRA DC: BLR DISC.: CIVIL SH. OF REV. NO.:
Fixed end moment due to DL+LL = 146.47 kNm
Mid span moment due to DL+LL = 219.70 kNm
Moment Distribution
Joint A B C D
Mem AB AD BA BC CB CD DC DA
D.F 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
F.E.M -436.75 19.05 436.75 -19.05 23.96 -146.47 146.47 -23.96
DIST 208.85 208.85 -208.85 -208.85 61.25 61.25 -61.25 -61.25
C.O -104.43 -30.63 104.43 30.63 -104.43 -30.63 30.63 104.43
DIST 67.53 67.53 -67.53 -67.53 67.53 67.53 -67.53 -67.53
C.O -33.76 -33.76 33.76 33.76 -33.76 -33.76 33.76 33.76
DIST 33.76 33.76 -33.76 -33.76 33.76 33.76 -33.76 -33.76
C.O -16.88 -16.88 16.88 16.88 -16.88 -16.88 16.88 16.88
DIST 16.88 16.88 -16.88 -16.88 16.88 16.88 -16.88 -16.88
C.O -8.44 -8.44 8.44 8.44 -8.44 -8.44 8.44 8.44
DIST 8.44 8.44 -8.44 -8.44 8.44 8.44 -8.44 -8.44
FINAL -264.80 264.80 264.80 -264.80 48.31 -48.31 48.31 -48.31
CHD.: Nitesh PROJECT: Preparation of DPR for Storm Water Design DOC. NO.:
DATE: BU: INFRA DC: BLR DISC.: CIVIL SH. OF REV. NO.:
Percentage of steel provided pt = 0.17 0.17 0.17 %
CHD.: Nitesh PROJECT: Preparation of DPR for Storm Water Design DOC. NO.:
DATE: BU: INFRA DC: BLR DISC.: CIVIL SH. OF REV. NO.:
1.0 DESIGN DATA
Clear width of culvert/drain = 2.00 m
Clear height of culvert/drain = 2.00 m
Length considered for design L = 1.00 m
Thickness of road/ foot path above culvert/drain = 0.00 m
Thickness of sand cushion above culvert/drain d = 0.00 m
Unit weight of Concrete = 25 kN/m3
Density of water δw = 10 kN/m3
Density of soil δs = 18 kN/m3
Angle of Repose = 30 degree
Ka = 0.50 Soil at rest
Grade of concrete fck = 25 N/mm2
Grade of steel fy = 500 N/mm2
Net Safe Bearing capacity = 100 kN/m2
GEOMETRY
2.20
0.2
0.2
LOAD CALCULATION
Top slab
(i) Dead load
Self weight of top slab = 5.00 kN/m2
Weight of wearing coat = 1.80 kN/m2
Weight of sand cushion = 0.00 kN/m2
Weight of road or foot path = 0.00 kN/m2
Total dead load = 6.80 kN/m2
Bottom Slab
BY: Sudha J TATA CONSULTING ENGINEERS LIMITED JOB NO.: TCE.
DATE: CLIENT: Berhampur Municipal Corporation SUBJECT:
CHD.: Nitesh PROJECT: Preparation of DPR for Storm Water Design DOC. NO.:
DATE: BU: INFRA DC: BLR DISC.: CIVIL SH. OF REV. NO.:
Dead load from top slab = 6.80 kN/m2
Self weight of wall = 8.33 kN/m2
Total dead load = 15 kN/m2
Load due to Vehicle = 19 kN/m2
Total Load (DL +LL) = 34 kN/m2
Pressure on wall
(i) Case 1: Box empty, earth pressure with live load surcharge equivalent to 1.2m height of earth fill both sides
Pressure due to live load surcharge = 10.80 kN/m2
Pressure due to earth surcharge = 0.00 kN/m2
Pressure due to earth fill = 19.80 kN/m2
CHD.: Nitesh PROJECT: Preparation of DPR for Storm Water Design DOC. NO.:
DATE: BU: INFRA DC: BLR DISC.: CIVIL SH. OF REV. NO.:
Moment Distribution
Joint A B C D
Mem AB AD BA BC CB CD DC DA
D.F 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
F.E.M -32.83 7.55 32.83 -7.55 9.15 -13.62 13.62 -9.15
DIST 12.64 12.64 -12.64 -12.64 2.24 2.24 -2.24 -2.24
C.O -6.32 -1.12 6.32 1.12 -6.32 -1.12 1.12 6.32
DIST 3.72 3.72 -3.72 -3.72 3.72 3.72 -3.72 -3.72
C.O -1.86 -1.86 1.86 1.86 -1.86 -1.86 1.86 1.86
DIST 1.86 1.86 -1.86 -1.86 1.86 1.86 -1.86 -1.86
C.O -0.93 -0.93 0.93 0.93 -0.93 -0.93 0.93 0.93
DIST 0.93 0.93 -0.93 -0.93 0.93 0.93 -0.93 -0.93
C.O -0.46 -0.46 0.46 0.46 -0.46 -0.46 0.46 0.46
DIST 0.46 0.46 -0.46 -0.46 0.46 0.46 -0.46 -0.46
FINAL -22.79 22.79 22.79 -22.79 8.79 -8.79 8.79 -8.79
CHD.: Nitesh PROJECT: Preparation of DPR for Storm Water Design DOC. NO.:
DATE: BU: INFRA DC: BLR DISC.: CIVIL SH. OF REV. NO.:
4.3 Distribution reinforcement
Dia of the distribution bar = 8 8 8 mm
min.reinforcement = 0.12%bD = 240 240 240 mm2
Spacing required = 209 209 209 mm
Provided spacing = 200 200 200 mm
6 0.50 3.00 300 10Ø @ 175 c/c 10Ø @ 200 c/c 250
7 1.00 0.50 150 8Ø @ 175 c/c 8Ø @ 200 c/c 150
12 1.00 3.00 300 10Ø @ 175 c/c 10Ø @ 200 c/c 250
13 1.50 1.00 150 8Ø @ 175 c/c 8Ø @ 200 c/c 150
RW Stem Heel
Shear key
Height Top thk Bott thk Main Dist., L
3.50 0.35 x 0.45 0.20 0.35 12 @ 125 c/c 10 @ 150 c/c 1.50
5.00 0.35 x 0.60 0.20 0.45 16 @ 125 c/c 12 @ 200 c/c 1.90
6.50 0.50 x 1.00 0.20 0.50 20 @ 100 c/c 12 @ 175 c/c 1.90
Heel Toe
t Main Dist., L t Main
0.40 16 @ 100 c/c 10 @ 200 c/c 0.75 0.40 16 @ 200 c/c
0.45 20 @ 125 c/c 10 @ 175 c/c 0.75 0.45 16 @ 200 c/c
0.50 20 @ 100 c/c 10 @ 150 c/c 0.75 0.50 12 @ 100 c/c
Shear key
D
0.30
0.50
0.70
0
0
0
0
0
0
0
0
0
0
0
0
0.15
0.15
0.15
0.15
0.175
0.15
0.15
0.15
0.2
0.2
0.2
0.2
0.2
0.25
0.2
0.2
0.2
0.25
0.25
0.25
0.25
0.25
0.25
0.3
0.35
0.20
0.20
0.20
0.20
0.20
0.25
0.25
0.25
0.35
0.35
0.35
Dist.,
10 @ 200 c/c
10 @ 175 c/c
10 @ 150 c/c
Drain Wall
Span Depth
Sl.no TYPES Thk
(mm) Main Rft., Bar Mark
m m
1 D-I 0.5 to 1.0m 0.5 to 1.0m 150 8Ø @ 175 c/c W102
2 D-II 0.5 to 1.0m 1.5 to 2.0m 200 8Ø @ 175 c/c W102
3 D-III 1.0 to 2.0m 1.0 to 2.0m 150 8Ø @ 175 c/c W102
4 D-IV 1.0 to 1.5m 2.0 to 2.5m 200 8Ø @ 175 c/c W102
5 D-V 2.0 to 3.0m 1.0 to 2.5m 200 8Ø @ 150 c/c W101
6 D-VI 3.0 to 3.5m 1.5 to 3.0m 250 10Ø @ 175 c/c W104
7 D-VII 3.0 to 3.5m 3.5 to 4.0m 350 12Ø @ 125 c/c W106
8 D-VIII 1.5 to 2.0m 2.5 to 3.0m 250 10Ø @ 175 c/c W104
9 D-IX 2.5 to 3.0m 2.5 to 3.0m 250 10Ø @ 175 c/c W104
RC DETAILS F
Drain Wall
Span Depth
Sl.no
Thk
Main Rft., Bar Mark
(mm)
m m
1 C1-I Upto 1.0m 1.0 to 2.0m 200 8Ø @ 175 c/c W102
2 C1-II 1.0 to 2.0 1.0 to 2.0 200 10Ø @ 200 c/c W105
3 C1-III 2.0 to 3.0m 2.0 to 3.0m 250 10Ø @ 150 c/c W103
4 C1-IV 3.0 to 4.0m 3.0 to 4.0m 350 16Ø @ 200 c/c W109
RC DETAILS F
Drain Wall
Span Depth
Sl.no Thk Main Rft., Bar Mark
(mm)
m m
1 C2-I Upto 1.0m 1.0 to 2.0m 200 8Ø @ 175 c/c W102
2 C2-II 1.0 to 2.0m 2.0 to 3.0m 250 10Ø @ 175 c/c W104
3 C2-III 2.0 to 3.0m 2.0 to 3.0m 350 10Ø @ 175 c/c W104
4 C2-IV 3.0 to 4.0m 2.0 to 3.0m 450 12Ø @ 200 c/c W108
5 C2-V 4.00 4.00 450 12Ø @ 150 c/c W107
RC DETAILS FOR DRAINS
ain Wall Drain Bottom Slab Drain
Thk
Distribution Rft., Bar Mark (mm) Main Rft., Bar Mark Distribution Rft., Bar Mark Thk (mm)
8Ø @ 200 c/c W202 150 8Ø @ 175 c/c BS103 8Ø @ 200 c/c BS202
8Ø @ 200 c/c W202 150 8Ø @ 175 c/c BS103 8Ø @ 200 c/c BS202
8Ø @ 200 c/c W202 150 8Ø @ 175 c/c BS103 8Ø @ 200 c/c BS202 150
8Ø @ 200 c/c W202 150 8Ø @ 175 c/c BS103 8Ø @ 200 c/c BS202 150
8Ø @ 200 c/c W202 200 8Ø @ 175 c/c BS103 8Ø @ 200 c/c BS202 200
8Ø @ 150 c/c W201 250 10Ø @ 175 c/c BS105 8Ø @ 150 c/c BS201 250
10Ø @ 175 c/c W204 350 10Ø @ 150 c/c BS104 10Ø @ 175 c/c BS204 350
8Ø @ 150 c/c W201 200 8Ø @ 125 c/c BS101 8Ø @ 200 c/c BS202 200
8Ø @ 150 c/c W201 250 10Ø @ 175 c/c BS105 8Ø @ 200 c/c BS202 250
Thk
Distribution Rft., Bar Mark Main Rft., Bar Mark Distribution Rft., Bar Mark Thk (mm)
(mm)
8Ø @ 200 c/c W202 200 8Ø @ 175 c/c BS103 8Ø @ 200 c/c BS202 200
8Ø @ 200 c/c W202 200 10Ø @ 200 c/c BS106 10Ø @ 200 c/c BS205 200
10Ø @ 200 c/c W205 250 10Ø @ 150 c/c BS104 10Ø @ 200 c/c BS205 250
10Ø @ 175 c/c W204 350 12Ø @ 175 c/c BS107 10Ø @ 175 c/c BS204 350
Distribution Rft., Bar Mark Thk Main Rft., Bar Mark Distribution Rft., Bar Mark Thk (mm)
(mm)
8Ø @ 200 c/c W202 200 8Ø @ 175 c/c BS103 8Ø @ 200 c/c BS202 200
8Ø @ 150 c/c W201 250 8Ø @ 150 c/c BS102 8Ø @ 150 c/c BS201 250
10Ø @ 175 c/c W204 350 10Ø @ 175 c/c BS105 10Ø @ 175 c/c BS204 350
10Ø @ 125 c/c W203 450 12Ø @ 200 c/c BS107 10Ø @ 125 c/c BS203 450
10Ø @ 125 c/c W203 450 12Ø @ 200 c/c BS107 10Ø @ 125 c/c BS203 450
Drain Top Slab
Steel
Main Rft., Bar Mark Distribution Rft., Bar Mark kg/m3
55
65
8Ø @ 175 c/c TS103 8Ø @ 200 c/c TS202 55
8Ø @ 175 c/c TS103 8Ø @ 200 c/c TS202 55
8Ø @ 175 c/c TS103 8Ø @ 200 c/c TS202 55
10Ø @ 175 c/c TS105 8Ø @ 150 c/c TS201 60
10Ø @ 150 c/c TS104 10Ø @ 175 c/c TS204 65
8Ø @ 125 c/c TS101 8Ø @ 200 c/c TS202 65
10Ø @ 175 c/c TS105 8Ø @ 200 c/c TS202 60