Inverter Type 11tr QUOTATION STORE 54 ARDC HAL

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Mr. Sudhir Gaur Sr.

Manager
HAL ARDC Bangalore

Sub: Store 54 HVAC

Sl RATE AMOUNT
DESCRIPTION OF ITEMS UNIT QTY TOTAL
No SUPPLY INSTALLATION SUPPLY INSTALLATION
HIGH SIDE
Supply of 11.0 TR High static Ductable inverter split air conditioner suitable
as per site requirement, indoor unit with ecofriendly refrigerant gas complete with
1 in-built pump drainage arrangements, fan, refrigerant liquid and wired remote Nos 2 3,23,466.00 6,46,932.00 6,46,932.00
controller etc.
Make : Daikin FDK R400 AV16 ( Refrigerant R 410a)
TOTAL HIGH SIDE (without GST) 6,46,932.00
GST @ 28% 1,81,140.96
TOTAL HIGH SIDE (with GST) 8,28,072.96
LOW SIDE
Installation ,Testing and Commissioning of 11.0 tr Ductable split AC with
1 Nos 2 20,000.00 - 40,000.00 40,000.00
fittings

Supply and Installation of plenum box, Canvas and Duct modification with 9 mm
2 thick Thermal insulation, supply of grill, Testing and Commissioning with fittings LOT 1 36,000.00 20,000 36,000 20,000 56,000
of Ductable split AC

Supply, laying / fixing, testing and commissioning of refrigerant copper pipe


for liquid line / suction line with 9mm thick elastomeric nitrile rubber insulation
3 Mtr 30 21,00 250 63,000 7,500 70,500
for cassette AC and concealed AC ( approx.)
Make : Mandev/Mexflow/Uniflow/Equivalent
Supply, installation of control/communication cable of 4CX 2.5 Sqmm from
4 ODU to IDU. Mtr 60 250 50 15,000 3,000 18,000
Make : Polycab/Equivalent
Supply, Installation of condensate drain water piping with necessary clamps,
supports, hangers and fitting such as bend, tees, reducers etc. duly insulated with
5 Mtr 20 220 50 4,400 1,000 5,400
9 mm thick chemically cross-linked closed cell polyethylene foam.
Make : Ashirvad/Astral/Equivalent
Outdoor stand for Condensing unit and unit erection on the stand with suitable
6 Nos 2 10,200 20,400 - 20,400
fittings

7 Existing Package machine of 8.5 tr dismantle and shiffting Nos 2 25,000 - 50,000 50,000

Additional Civil work of wall Cutting and Core Cutting according to the copper
8 Lot 1 35,000 35,000 35,000
pipping and ducting
TOTAL LOW SIDE (without GST) 2,95,300
GST@ 18 % 53,154
TOTAL LOW SIDE (with GST) 3,48,454

GRAND TOTAL (HIGH SIDE + LOW SIDE without GST) 8,28,072.96

GRAND TOTAL (HIGH SIDE + LOW SIDE with GST) 1,176,526.96

Terms & Conditions:


1 Taxes: The above mentioned price is inclusive of tax as applicable.

2 ANY WORK APART FROM THE QUOTE IS CONSIDERED AS NT ITEMS

3 FINAL BILLING WILL DO ONLY ASPER ACTUAL MEASUREMENT

4 Piping length mentioned in the quotation are approximate only. Actual may warry accordding to site conditions.

5 Prices: The above prices are standard, only vendor can amend the quote at mutual acceptance.

Delivery: All shipments of goods shall be delivered to the site and for equipment we required for 15 working days time from the date
6
of PO/Advance. Supply, installation ,testing & commissioning complete with in 20 working days.

Payment Terms: For High Side 100% advance along with PO ( including all taxes ). For Low Side 50% advance along with PO,
7
50% after completion of job.

8 Warranty: Daikin - 1 year warranty from the day of commissioning,

9 Drain connection will do up to main drain line, final termination to main drain line is not in our scope of work

10 ODU incoming power supply to MCB is not in our scope, from MCB up to ODU cable termination will need to be done by .
11 Liability: If any civil works, Scaffolding, MS Support works or wall cutting/core cutting, power supply, will be customer scope.
12 Price for AC valid till 15-07-2024