Mc-Ph01-P04-06a07-Dea-Dwg-Ind-112603-A-Sr&mid Boys Joinery Scope Plan L1 Part 02

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NORTHING

PUPIL'S
TOILET
SB- L00-64

CORRIDOR
BIN STORE LV ROOM SB- L00-19
MB- L00-08 SB- L00-84
EXTERNAL
COURTYARD
STORE
LAUNDRY MB- L01-80 SEMINAR/PROJECTION
MB- L00-07
MB- L00-15 ROOM
SB- L00-65 A3 ORIGINAL
SHEET SIZE

READING
SB- L00-79
MASTERPLAN
SERVERY COUNSELLING
CLEANER'S SD.05.00 / LEARNING
ROOM LV SUPPORT COUNSELLING COUNSELLING COUNSELLING COUNSELLING
MB- L00-05 CUPBOARD HOSPITALITY SB- L00-83 / LEARNING / LEARNING / LEARNING / LEARNING
MB- L00-22 / SUPPORT SUPPORT SUPPORT SUPPORT
CATERING SB- L00-82 SB- L00-81 SB- L00-70 SB- L00-68
BB5106

TRAINING
STAIR 13
KITCHEN
MB- L00-14
MB- L01-18
READING
BB5106
SB- L00-78

KEY PLAN
READING
SB- L00-77

HOSPITALITY
/
CATERING
TRAINING
RESTAURANT
MB- L01-20

READING
SB- L00-76
N

QIBLA
NOTES - GENERAL

1. THIS DRAWING IS THE COPYRIGHT OF BREWER SMITH BREWER GROUP


AND MUST NOT BE RETAINED, COPIED OR USED WITHOUT THE ABOVE
CONSULTANT'S CONSENT.
2. DIMENSIONS ARE NOT TO BE SCALED FROM THIS DRAWING.
3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
4. ANY DISCREPANCIES, EITHER BETWEEN WRITTEN DIMENSIONS AND SITE
DIMENSIONS OR WITHIN THESE DRAWINGS SHOULD BE BROUGHT TO THE
IMMEDIATE ATTENTION OF THE ARCHITECT BEFORE EXECUTING THE
WORKS.
5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER
DOCUMENTATION FORMING THE CONSTRUCTION CONTRACT.
6. ALL EXISTING DIMENSIONS/ LEVELS ETC. INDICATED ON DRAWINGS ARE
TO BE VERIFIED ON SITE.
MIDDLE / 7. CONTRACTOR TO SUBMIT COORDINATED SHOP DRAWINGS FOR
SENIOR
SENIOR
EXTERNAL SCHOOL ENGINEER'S APPROVAL AS REQUIRED PRIOR TO COMMENCEMENT OF
DINING
COURTYARD LIBRARY WORKS AT SITE.
HALL
SB- L00-94 SB- L00-74
MB- L00-10 8. HEIGHT DATUM (COTE +0.000) IS SET ON WATER LEVEL WHICH IS +0.000m
RIYADH CONTROL POINT .
9. ANNOTATIONS AS FOLLOWS:
HALLWAY
MB- L01-105 NBS: SUB-CLAUSE SPECIFICATION SPECIFIC CLAUSE
DESCRIPTION ASSOCIATED DESCRIPTIVE TEXT

NOTES:
1. To be read in conjunction with Key Reference Schedule.
MC-PH01-P04-06A01-DEA-SPC-IND-008100

Specialist Furniture Tag

Specialist Equipment Tag

Sundry Items Tag

Architectural Metalwork Tag

HOSPITALITY
Fixtures, Fittings & Equipment Tag
/
CATERING
RESOURCE SPACE
Artwork (including naming signage) Tag
FOOD
TECHNOLOGY SB- L00-72
RISER
CLASSROOM FURNITURE
IT ROOM MB- L01-85
MB- L01-19 STORE
MB- L00-11 MB- L00-12

EXTERNAL
STORE
MB- L00-19 STORE
CORRIDOR SB- L00-91
MB- L00-13

UP
LV ROOM
LIBRARY SB- L00-75
BACK OF STAIR 06
HOUSE SB- L00-71
SB- L00-62

CORRIDOR LOBBY
SB- L00-18 SB- L00-61

CLEANER'S
CUPBOARD
SB- L01-20 FEMALE
GROUP RESOURCE VISITOR'S
ROOM COUNSELING SPACE TOILET
SB- L01-29 SB- L01-28 SB- L00-46 CORRIDOR
SB- L00-54

LV
PUPIL'S CUPBOARD PARENT'S
TOILET SB- L00-12 CAFE
DIGITAL/FUTURES
SB- L00-44 DIGITAL/FUTURES SD.04.00
UP

CORRIDOR ENGINEERING
ENGINEERING SB- L00-42 ENGINEERING SB- L00-87 PARENTS
& MOTOR SB- L00-48
MALE CAFE
SPORTS MAJLIS VISITOR'S SB- L00-51
WORKSHOP SB- L00-13
RESOURCE TOILET
SB- L00-40 CORRIDOR
SPACE
STAIR 05 SB- L00-47 SB- L00-53
CLEANER'S
SB- L00-41
STAIR 05 CUPBOARD
SB- L01-27 PASSENGER SB- L00-50
ROOF
TERRACE LIFT
SB- L01-31 SB- PL-2

LOUNGE & RESOURCE SPACE RESOURCE SPACE


T-POINT SB- L00-45
SB- L00-49
SB- L01-30

REVISION DESCRIPTION DATE BY


COVERED
HALLWAY OUTDOOR CLIENT:
COUNSELING
SB- L01-32 ENGINEERING SB- L00-02 SEATING
OASIS L00-90
SB- L00-115 STORE
LV SB- L00-86 LV
CUPBOARD CUPBOARD FOYER LOBBY
SB- L00-96 SB- L00-97 SB- L00-01 SB- L00-89

Teaching wall ENGINEERING


& PROGRAMME MANAGEMENT OFFICE:
MANUFACTURING
WORKSHOP
SB- L00-39
LISTENING
SPACE
SB- L00-69 --

PASSENGER PROJECT MANAGER:


LIFT
SB- PL-2

SECURITY
LV ROOM ROOM
SB- L00-60 SB- L00-03
LEAD CONSULTANT:
HALLWAY t +971 4 294 2042
SB- L00-02 MAKER
f +971 4 294 2101
e [email protected]
ENGINEERING PRAYER HALL a P.O. Box 50667, Dubai, UAE
RESOURCE SPACE
PREP ROOM SB- L00-103
SB- L00-59 EXTERNAL
ROOM / SB- L00-15
STORE
SB- L00-38
COURTYARD
SB- L00-14
RECEP
OFFICE
SB- L00-09
Brewer SmithBrewer Gulf
IT ROOM
SB- L00-05 LOCAL ARCHITECT OF RECORD:

RESOURCE LOBBY
SPACE SB- L00-04

ABLUTION
WET LOBBY
ELECTRONICS ABLUTIONS SB- L00-17
SERVICES LAB / SUPERVISION CONSULTANT
SB- L00-57 SB- L00-16
ELECTRICAL
ENGINEERING
SB- L00-58 FIRST AID
ROOM
SB- L00-06
STAFF
TOILET
SB- L00-43
MAIN CONTRACTOR

UP
MAKER
RESOURCE HALL STORE
SPACE SAUDI ARABIAN BAYTUR
SB- L00-11 CONSTRUCTION CO.
P.O.Box 30980 - Alkhobar 31952 KSA
Tel. : +966 3 8930179 / Fax : +966 3 8930148
STAIR 08
IT ROOM SB- L00-10
PROJECT
UP

SB- L00-55 PUPIL'S


TOILET
SB- L00-52
MISK SCHOOL
STAIR 07
RIYADH
SB- L00-56 RESOURCE RESOURCE RESOURCE RESOURCE RESOURCE RESOURCE KINGDOM OF SAUDI ARABIA
SPACE SPACE SPACE SPACE SPACE SPACE
SUB CONSULTANT

ArtLand Interior Design & Contracting


www.artlandinteriors.com
P.O.BOX 76561 Al Khobar 33952 K.S.A.
Tel: +966-13-8571158 / Fax: +966-13-8590448
Email: [email protected]

DRAWING TITLE

JOINERY SCOPE SENIOR & Senior & Middle School Boys


Teaching wall

Teaching wall

Teaching wall

Teaching wall

Teaching wall

Teaching wall

Teaching wall

Teaching wall

Teaching wall

Teaching wall

Teaching wall

HOME BASE HOME BASE Joinery Scope Plan


HOME BASE
CLASSROOM
2 BLENDED
HOME BASE
CLASSROOM
3
HOME BASE
CLASSROOM
2 BLENDED
CLASSROOM
3
SB- L00-28
HOME BASE
CLASSROOM
2 BLENDED
CLASSROOM
3
SB- L00-34 MIDDLE SCHOOL BOYS FIRST FLOOR- Sheet 3
SB- L00-21 LEARNING
SB- L00-23
SB- L00-22 SB- L00-27 LEARNING
SB- L00-29
SB- L00-33 LEARNING
SB- L00-35
FIRST FLOOR DRAWN DEA CHECKED AB APPROVED

(PART 02) SCALE 1 : N.T.S


ACONEX DRAWING No.

MC-PH01-P04-06A07-DEA-DWG-IND-112603
DATE August 2021 PROJ. No.
REVISION

A
MUNICIPALITY DRAWING No.
112603

You might also like