Cableship DP Capability Comparison
Cableship DP Capability Comparison
Comparison of the dynamic positioning (DP) ratings of ships is commonly made but not always understood.
This ESCA overview briefly outlines the main points relating to DP notation and to provide the reader with some context
when considering comparison between ships and their DP ratings.
Readers seeking a more comprehensive understanding of DP matters should refer to the IMO “Guidelines for Vessels
with Dynamic Positioning Systems” (Circular 645), Classification Societies’ rules & standards, published literature from
organisations such as the International Marine Contractors Association (IMCA) e.g. and other authoritative sources.
Some basics:
• A dynamically positioned vessel means a unit or a vessel which automatically maintains its position (fixed location
or predetermined track) exclusively by means of thruster force.
• DP requirements are set by Classification Societies interpreting the guidance provided by IMO Circular 645.
• IMO DP equipment class identifies the degree of redundancy the system provides; i.e. 1, 2 or 3. Classification
Societies provide their own notation relating to the IMO equipment class to allow for differences in Classification
Societies’ rules, and any exemptions made.
• Redundancy means the ability of a component or system to maintain or restore its function when a single failure
has occurred.
• Redundancy can be achieved for instance by installation of multiple components, systems or alternative means of
performing a function.
• Failure mode effect analysis and capability assessments in a range of defined environmental conditions are key
factors in any assessment of a DP vessel.
In respect of DP, ships are surveyed by classification societies during build and operation to standards compliant with
the Class rules and the requirements of IMO, Flag State and industry. The classification societies define their
interpretation of the IMO guidelines with different notation terminology. For instance, Lloyds Register use class
notation of DP1, DP2 and DP3 while DNV use the terms DYNPOS, DYNPOS AUT, DYNPOS AUTR similarly. Other
classification societies use different class notation.
For simplicity the Lloyds Register notation is used in this note, as it aligns with the colloquial expression used in most DP
discussions.
In 1977 Det Norske Veritas (DNV, now DNV GL) established the Environmental Regularity Number (ERN) to indicate the
effectiveness of a DP system under metocean conditions. In 2016 DNV GL introduced a new DP Capability Standard
(DNVGL-ST-0111 – Assessment of Station Keeping Capability of Dynamic Positioning Vessels) with the stated objective
of providing a unified standard for industry. It addresses both the intact vessel condition and the worst-case single
failure conditions corresponding to the vessel’s Dynamic Positioning class notation.
Some background:
Before DP became available and when anchored moorings were not an option, ships involved in position sensitive
operations, when stationary or at very low speeds, maintained position control manually. An accomplished seaman
could achieve a sufficient degree of balance of the various dynamic forces acting on the vessel, maintaining position by
manual control to achieve the task in hand. This required a level of skill, derived from experience of ship handling, an
intimate knowledge of the vessel, its manoeuvring characteristics and a sense of what the immediate environment
(wind, waves and currents) was doing and might do. The intended operations were constrained by the operability limits
of the vessel in this mode.
Of course, nothing stays the same for long at sea and a slight wind shift, change of current or momentary lapse of
concentration, would soon upset the hard-earned equilibrium. Joystick systems were introduced which simplified
control, in that fewer knobs and levers needed to be managed to achieve a desired result, and so a degree of fine tuning
was made more accessible.
The industry soon required better operability and a broader operating envelope to conduct ever more challenging
operations, to increasingly higher safety standards and demanding commercial objectives. Computer aided positioning
was developed which evolved into DP systems to facilitate these operations, allowing more precise control and so
widening the scope of work which could be achieved: A vessel could maintain more accurate positioning for longer
periods, allowing more challenging tasks to be undertaken.
Rapid or unexpected changes can create difficult situations; a large wind shift, a lost thruster or main engine, an
interruption of the navigation/ position reference system, etc., often required the DP operator (DPO) to take the system
back into manual control. By providing backup, segregation and or duplicate elements to the system and ensuring
electrical supply through design, increasing levels of redundancy were provided. To this day however the DPO remains
an integral and significant part of a DP system as continued surveillance and intervention are as essential now as ever
before.
DP Control:
As with any marine operation it is essential to plan and control the operations within a vessel’s operable limits. With all
elements functioning correctly a vessel will operate within its designed DP envelope. Exceeding a vessels capability will
result in a departure from the design envelope, regardless of DP rating. Consequently, maintaining control requires
system availability appropriate to the environmental conditions likely to be experienced. Redundancy levels can be
considered in the context of the criticality of position control and essential up-time on site.
A DP system relies on the effectiveness and performance of each component. A high degree of engineering and
development goes into these vessels and the higher the DP rating the more expensive they are to design, build and
operate. The quality, competence and continued performance of the human element is just as critical as the hardware
and software, arguably more so in fact, as the control of the system is directly under the influence of the DPO. Also, the
continued performance of each element of the system is entirely reliant upon the effectiveness of the management and
maintenance systems employed and the competence of the engineers and technicians maintaining them.
Summary:
DP1 A DP system which provides full automation of the control system but with less than 100% redundancy of its
system elements.
DP2 A system that provides 100% redundancy across all system elements.
DP3 A DP2 system with improved physical segregation and protection of key system elements from fire and
flooding, as well as achieving higher degrees of redundancy of systems, meeting the necessary design standard
and reliability.
Any system is only as good as the weakest component. The adequacy and effectiveness of the training and management
systems established by the ship operators, owners and charterers are equally part of the system.
The information supplied in this document ("Information") has been compiled by members of the European Subsea Cables Association based upon their shared experience and knowledge of the industry
and is published in good faith with the aims of promoting the highest standards of reliability and safety in the submarine cable environment. Whilst the European Subsea Cables Association believes the
Information to be valid, it is up to the individual members or others who may seek to rely on such Information to satisfy themselves as to the accuracy thereof. The European Subsea Cables Association
does not accept any liability for any errors in the Information or for any adverse consequences arising from its adoption.