Format No.

PDAIL/QC/CON/15

Civil infra & PHE Work for Development of Residential Plots at 15 Acre & Koolwal
Project
Land
Client Emaar India Limited

Contractor M/s P. D. Agrawal Infrastucture Ltd.

COMPRESSIVE STRENGTH OF CUBE


Test Method: (As per IS:516)
Laboratory No. QA/QC /LAB Date of Casting 21/03/2024

Location RMC PLANT Date of Casting 28/03/2024

Part of Structure MIX DESIGN Cast and Tested BY JOINTIY

Grade of Concrete M-05 Protection and Curing WATER TANK

Size of Cube : 150*150*150 mm Age in Days 7 DAY

Weight of Cube Density of Cube Load Compressive Strength Average Compressive Strength
Sr.No. 2 2
(gm) (gm/cc) (kN) (N/mm ) (N/mm )

1 8452 2.504 195 8.67

2 8520 2.524 190 8.44 8.55

3 8511 2.522 192 8.53

4 8565 2.538 190 8.44

5 8621 2.554 193 8.58 8.47

6 8526 2.526 189 8.40

2
Average compressive Strength:…………… N/mm

Remarks:

For Contractor's Representative For Claint Representative