D&B Parameters Analysis
D&B Parameters Analysis
2) QA/QC Results
3) Tie-up
4) Pictures
5) Effects on wall
None.
6) Mining Comment
CMA_STG1_1230_004
CMA_STG1_1230_004 CMA_STG1_1230_005
4) Pictures
CMA_STG1_1230_004
5) Effects on wall
None.
6) Mining Comment
Is possible to see big blocks zonified in these blasts, mostly in 165 mm blast. During digging of this le
CMA_STG1_1230_004
No toes on next floor drilling. Although it was very difficul to drill on this level, for zones where 1.2 m
CMA_STG1_1230_005
CMA_STG1_1230_005
st. During digging of this level, many complaints from excavator operators and supervisor were directed to EPSA's D&B dep
el, for zones where 1.2 m of subdrilling was done on top level's blasts. The floor was totally broken and collar holes collapse
CMA_STG1_1230_006
CMA_STG1_1230_005
ected to EPSA's D&B department. "The muckpile had oversize rocks, boulders and were "packed" to dig them"
n and collar holes collapsed during the drilling. The next pictures are from CMA_STG1_1240_005 PREBLAST REPORT:
1) Drill & Blast Design Approval Parameters
2) QA/QC Results
4) Pictures
5) Effects on wall
6) Mining Comment
CMA_STG1_1230_005
PREBLAST REPORT: