Measurement Sheet
Measurement Sheet
399.95088
running Bill 2
earthfill
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service Descripton L B H Vol
Sl. No. Accounting (DSR'16 Items-civil works) particulars no (M) (M) (M) (Cub.M)
codes)
sc1 14 2.6 2.8 3 305.76
sc2 4 2.55 2.4 3 73.44
GB
GB1 1 31.056 0.68 0.6 12.670848
GB2 1 14.54 0.68 0.6 5.93232
GB3 1 31.056 0.68 0.6 12.670848
GB4 1 14.54 0.68 0.6 5.93232
earthfill above GB
2.25 Filling available 1 14.54 30.146 0.195 85.4729538
excavated earth
( excluding rock ) &
moorum in trenches ,
plinth ,sides of foundation
etc , in layers not
3 995433 exceeding 20 cm in depth . deduction rcc
Consolidating each SC1 raft 14 2 2.2 0.5 30.8
deposited layer by SC1 column 14 0.5 0.3 1.8 3.78
ramming, watering , lead SC2 raft 4 1.95 1.8 0.4 5.616
upto 50 m and lift upto 1.5
m. SC2 column 4 0.45 0.3 1.9 1.026
deduction pcc
SC1 pcc 14 2.3 2.5 0.1 8.05
SC2 pcc 4 2.25 2.2 0.1 1.98
deduction GB
GB1 1 30.66 0.23 0.45 3.17331
GB2 1 14.54 0.23 0.45 1.50489
GB3 1 30.66 0.23 0.45 3.17331
GB4 1 14.54 0.23 0.45 1.50489
earthfill around G.B around plinth
441.2708898
EXCAVATION
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service Descripton L B H Vol
Sl. No. Accounting (DSR'16 Items-civil works) PARTICULARS NO. (M) (M) (M) (Cub.M)
codes)
GB
2.6 Earthwork in
excavation over areas GB1 1 0.396000000000001 0.68 0.6 0.161568 111.84
( exceeding 30 cm in
depth, 1.5m in
width as well as 10 sqm on GB2 1 0.27 0.68 0.6 0.11016 60.78012
2 995433 plan ) including disposal of
excavated earth , lead GB3 1 0.396000000000001 0.68 0.6 0.161568
upto 50m ; disposed earth
to be levelled and neatly GB4 1 0.27 0.68 0.6 0.11016
dressed.
2.6.1All kinds of soil
0.543456
EXCAVATION
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service Descripton L B H Vol
Sl. No. Accounting (DSR'16 Items-civil works) PARTICULARS NO. (M) (M) (M) (Cub.M)
codes)
sc1 14 2.6 2.8 3 39.68
bill 1 modification
DETAIL OF RCC DETAIL OF RCC
Schedule- 3a Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a) Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC SAC
Service L B H Service L B H
Descripton (DSR'16 Items-civil works) Vol Descripton (DSR'16 Items-civil works) Vol
Sl. No. Accounting SC1 & SC2 no. Sl. No. Accounting no.
(Cub.M) (Cub.M)
codes) (M) (M) (M) codes) (M) (M) (M)
SC1 raft 14 2 2.2 0.5 30.8 SC1 column 14 0.5 0.3 0.9 1.89
SC1 column 14 0.5 0.3 2.25 4.725 SC2 column 4 0.45 0.3 0.9 0.486
SC2 raft 4 1.95 1.8 0.4 5.616 5724.51 34342.55
5.33 Providing and laying in position SC2 column 4 0.45 0.3 2.35 1.269 GB4 1 14.54 0.23 0.45 1.50489
5.33 Providing and laying in position machine
machine batched and machine mixed
42.41 batched and machine mixed design mix M-25 GB1+2+3 1 0.378 0.23 0.45 0.039123 3.623213
design mix M-25 grade cement concrete for
GB1 1 30.606 0.23 0.45 3.167721 grade cement concrete for reinforced cement
reinforced cement concrete work, using
concrete work, using cement content as per
cement content as per approved design GB2 1 14.54 0.23 0.45 1.50489 coping-1 2 30.66 0.23 0.1 1.41036
approved design mix, of centering, shuttering,
mix, of centering, shuttering, finishing and GB3 1 30.606 0.23 0.45 3.167721 coping-2 2 14.54 0.23 0.1 0.66884
finishing and reinforcement, including
reinforcement, including admixtures in
admixtures in recommended proportion as per
recommended proportion as per IS:9103 to GB4 1 14.54 0.23 0.45 1.50489 not counted
IS:9103 to accelerate,retard setting of
15 995457 accelerate,retard setting of 9.345222 15 995457
concrete,improve workability without
concrete,improve workability without TOTAL (CUM) 51.755222 TOTAL (CUM) 5.999213
impairing strength and durability as per
impairing strength and durability as per
direction of Engineer-in-charge."(Note:-
direction of Engineer-in-charge."(Note:-
Cement content considered in this item is @
Cement content considered in this item is
330 kg/cum."Excess/less cement used as per
@ 330 kg/cum."Excess/less cement used as
design mix is payable /recoverable seprately).
per design mix is payable /recoverable
5.33.1 All works
seprately).
upto plinth level
5.33.1 All works upto plinth level
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service L B H
Descripton (DSR'16 Items-civil works) Vol
Sl. No. Accounting no.
(Cub.M)
codes) (M) (M) (M)
sc1 14 2.3 2.5 0.1 8.05 sc1 14 2.3 2.5 0.1 8.05
sc 2 4 2.1 2.25 0.1 1.89 sc 2 4 2.1 2.25 0.1 1.89
Gb 1 1 30.906 0.38 0.1 1.174428 Gb 1 1 30.906 0.38 0.1 1.174428 3976.64
Gb 2 1 14.27 0.38 0.1 0.54226 Gb 2 1 14.54 0.38 0.1 0.55252
15 995457 Gb 3 1 30.906 0.38 0.1 1.174428 15 995457 Gb 3 1 30.906 0.38 0.1 1.174428
Gb 4 1 14.27 0.38 0.1 0.54226 Gb 4 1 14.54 0.38 0.1 0.55252
deduction deduction
sc1 14 0.3 0.19 0.1 0.0798 sc1 14 0.3 0.19 0.1 0.0798
sc2 4 0.3 0.153 0.1 0.01836 sc2 4 0.3 0.153 0.1 0.01836
TOTAL 13.275216 TOTAL 13.29574
running Bill 2
pcc
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service L B H
Descripton (DSR'16 Items-civil works) Vol
Sl. No. Accounting particular no. (Cub.M)
codes) (M) (M) (M)
43.632724
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service L B H
Descripton (DSR'16 Items-civil works) Vol
Sl. No. Accounting particular no. (Cub.M)
codes) (M) (M) (M)
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service L B H
Descripton (DSR'16 Items-civil works) Vol
Sl. No. Accounting R.C.C OF G.B (Cub.M)
codes) (M) (M) (M)
5.33 Providing and laying in position machine GB1 30.606 0.23 0.45 3.167721
batched and machine mixed design mix M-25
grade cement concrete for reinforced cement GB2 30.606 0.23 0.45 3.167721
concrete work, using cement content as per GB3 15 0.23 0.45 1.5525
approved design mix, of centering, GB4 15 0.23 0.45 1.5525
shuttering, finishing and reinforcement,
including admixtures in recommended
proportion as per IS:9103 to accelerate,retard
setting of concrete,improve workability
without impairing strength and durability as
per direction of Engineer-in-charge."(Note:-
Cement content considered in this item is @
15 995457 330 kg/cum."Excess/less cement used as per
design mix is payable /recoverable seprately).
5.33.1 All
works upto plinth level
9.440442
running Bill 2
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service L B H Vol
Sl. No. Descripton (DSR'16 Items-civil works) particular no.
Accounting
codes) (M) (M) (M) (Cub.M)
above plinth
side 1 1 30.606 3 91.818
side 2 1 11.2 3 33.6
side 3 1 30.606 3 91.818
side 4 1 11.2 3 33.6
deduction
window 16 2 1.65 52.8
door 2 1 2 4
mc1 32 0.23 3 22.08
half brick for column 18 0.3 3 16.2
lintel 16 2.6 0.3 12.48
coping 1 83.612 0.15 12.5418
Total 0
DETAIL OF CENTERING AND SHUTTERING
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a) Construction of stee
SAC
Service Descripton (DSR'16 L B H
QUANTITY
Sl. No. Accounting Items-civil works) particular no. Sl. No.
(SQ.M)
codes) (M) (M) (M)
FOUNDATION FOOTING
SC 01 14 2 2.2 0.5 58.8
SC 02 4 1.95 1.8 0.4 12
TOTAL 70.8
COLUMN,PILLARS
SC 01 COLUMN 14 0.5 0.3 1.8 40.32
SC 02 COLUMN 4 0.45 0.3 1.9 11.4
SC1 14 0.385 0.3 0.45 8.631
SC2 4 0.335 0.3 0.45 2.286
mc1 32 0.23 0.23 3 88.32
LINTEL,BEAMS
GB 01 1 30 0.23 0.45 13.5
GB 02 1 15 0.23 0.45 6.75
GB 03 1 30 0.23 0.45 13.5
GB 04 1 15 0.23 0.45 6.75
coping-1 2 30.66 0.23 0.1 6.132
coping-2 2 14.54 0.23 0.1 2.908
DETAIL OF CENTERING AND SHUTTERING
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
Descripto
SAC n (DSR'16
Service Items- L B H QUANTIT
Accountin civil particular no. Y
g codes) works) (M) (M) (M) (SQ.M)
FOUNDATION FOOTING
SC 01 14 2 2.2 0.5 58.8
SC 02 4 1.95 1.8 0.4 12
TOTAL 70.8
COLUMN,PILLARS
SC 01 COL 14 0.5 0.3 1.8 40.32
SC 02 COL 4 0.45 0.3 1.9 11.4
SC1 14 0.385 0.3 0.45 8.631
SC2 4 0.335 0.3 0.45 2.286
mc1 32 0.23 0.23 3 88.32
LINTEL,BEAMS
GB 01 1 30 0.23 0.45 13.5
GB 02 1 15 0.23 0.45 6.75
GB 03 1 30 0.23 0.45 13.5
GB 04 1 15 0.23 0.45 6.75
coping-1 2 30.66 0.23 0.1 6.132
coping-2 2 14.54 0.23 0.1 2.908
running Bill 2
below plinth
2.27 Supplyimg and filling in plinth with sand 1 30.146 14.54 0.075 32.87421 814.97 26791.5
sand under floors, including watering ,
25 995456
ramming , consolidating and dressing
complete
Schedule- 3b
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service NON-SCHEDULE ITEM L B H Vol
Sl. No. Accountin particular no.
g codes) (M) (M) (M) (Cub.M)
below plinth
wmm 1 30.146 14.54 0.23 100.8143 1620 163319.1
3 995456 deduction
NS-3
sc1 14 0.3 0.39 0.23 0.37674
sc2 4 0.3 0.298 0.23 0.082248
Total 100.3553
SAC
Service NON-SCHEDULE ITEM L B AREA
Sl. No. Accountin particular no. THK
g codes) (M) (M) (SQ.M)