0% found this document useful (0 votes)
56 views7 pages

Measurement Sheet

Uploaded by

ar.ajaypatel14
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views7 pages

Measurement Sheet

Uploaded by

ar.ajaypatel14
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

running Bill 1

EXCAVATION Descripto EXCAVATION


Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a) Construction of steel
n Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC SAC
Service Descripton Service (DSR'16 L B H Vol
L B H Vol
Sl. No. Accounting (DSR'16 Items-civil works) PARTICULARS NO. (M) (M) (M) (Cub.M) Sl. No. Accountin Items- PARTICULARS NO.
codes) g codes) civil (M) (M) (M) (Cub.M)
works)

sc1 14 2.6 2.8 3 305.76 sc1 14 2.6 2.8 3 305.76


3
2.6 Earthwork in
excavation over areas sc2 4 2.55 2.4 3 73.44 sc2 4 2.55 2.4 3 73.44
( exceeding 30 cm in
depth, 1.5m in total 379.2 total 379.2
width as well as 10 sqm on
2 995433 plan ) including disposal of GB bill correct 995433 GB
excavated earth , lead modification
upto 50m ; disposed earth GB1 1 30.66 0.68 0.6 12.50928 GB1 1 31.056 0.68 0.6 12.67085
to be levelled and neatly GB2 1 14.27 0.68 0.6 5.82216 GB2 1 14.27 0.68 0.6 5.82216
dressed. GB3 1 30.66 0.68 0.6 12.50928 GB3 1 31.056 0.68 0.6 12.67085
2.6.1All kinds of soil
GB4 1 14.27 0.68 0.6 5.82216 GB4 1 14.27 0.68 0.6 5.82216
deduction for sc1 -12 2.2 0.68 0.6 -10.7712 deduction -12 2.2 0.68 0.6 -10.7712
deduction for sc2 -6 2.1 0.68 0.6 -5.1408 deduction -6 2.1 0.68 0.6 -5.1408
20.75088 21.07402

399.95088

running Bill 2
earthfill
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service Descripton L B H Vol
Sl. No. Accounting (DSR'16 Items-civil works) particulars no (M) (M) (M) (Cub.M)
codes)
sc1 14 2.6 2.8 3 305.76
sc2 4 2.55 2.4 3 73.44
GB
GB1 1 31.056 0.68 0.6 12.670848
GB2 1 14.54 0.68 0.6 5.93232
GB3 1 31.056 0.68 0.6 12.670848
GB4 1 14.54 0.68 0.6 5.93232
earthfill above GB
2.25 Filling available 1 14.54 30.146 0.195 85.4729538
excavated earth
( excluding rock ) &
moorum in trenches ,
plinth ,sides of foundation
etc , in layers not
3 995433 exceeding 20 cm in depth . deduction rcc
Consolidating each SC1 raft 14 2 2.2 0.5 30.8
deposited layer by SC1 column 14 0.5 0.3 1.8 3.78
ramming, watering , lead SC2 raft 4 1.95 1.8 0.4 5.616
upto 50 m and lift upto 1.5
m. SC2 column 4 0.45 0.3 1.9 1.026
deduction pcc
SC1 pcc 14 2.3 2.5 0.1 8.05
SC2 pcc 4 2.25 2.2 0.1 1.98
deduction GB
GB1 1 30.66 0.23 0.45 3.17331
GB2 1 14.54 0.23 0.45 1.50489
GB3 1 30.66 0.23 0.45 3.17331
GB4 1 14.54 0.23 0.45 1.50489
earthfill around G.B around plinth

441.2708898

EXCAVATION
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service Descripton L B H Vol
Sl. No. Accounting (DSR'16 Items-civil works) PARTICULARS NO. (M) (M) (M) (Cub.M)
codes)

GB

2.6 Earthwork in
excavation over areas GB1 1 0.396000000000001 0.68 0.6 0.161568 111.84
( exceeding 30 cm in
depth, 1.5m in
width as well as 10 sqm on GB2 1 0.27 0.68 0.6 0.11016 60.78012
2 995433 plan ) including disposal of
excavated earth , lead GB3 1 0.396000000000001 0.68 0.6 0.161568
upto 50m ; disposed earth
to be levelled and neatly GB4 1 0.27 0.68 0.6 0.11016
dressed.
2.6.1All kinds of soil

0.543456

EXCAVATION
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service Descripton L B H Vol
Sl. No. Accounting (DSR'16 Items-civil works) PARTICULARS NO. (M) (M) (M) (Cub.M)
codes)
sc1 14 2.6 2.8 3 39.68

2.6 Earthwork in sc2 4 2.55 2.4 3 35.82


excavation over areas GB
( exceeding 30 cm in
depth, 1.5m in
width as well as 10 sqm on GB 1 & 3 trenches 12 2.7 0.68 0.6 60.912 111.84
plan ) including disposal of GB 2 & 4 trenches 4 2.985 0.68 0.6 22.4472
excavated earth , lead
2 995433 upto 50m ; disposed earth GB 2 & 4 trenches 2 2 0.68 0.6 7.52
to be levelled and neatly Total 166.3792 18607.85
dressed.
2.6.1All kinds of soil
running Bill 1 running Bill 2

bill 1 modification
DETAIL OF RCC DETAIL OF RCC
Schedule- 3a Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a) Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC SAC
Service L B H Service L B H
Descripton (DSR'16 Items-civil works) Vol Descripton (DSR'16 Items-civil works) Vol
Sl. No. Accounting SC1 & SC2 no. Sl. No. Accounting no.
(Cub.M) (Cub.M)
codes) (M) (M) (M) codes) (M) (M) (M)

SC1 raft 14 2 2.2 0.5 30.8 SC1 column 14 0.5 0.3 0.9 1.89
SC1 column 14 0.5 0.3 2.25 4.725 SC2 column 4 0.45 0.3 0.9 0.486
SC2 raft 4 1.95 1.8 0.4 5.616 5724.51 34342.55
5.33 Providing and laying in position SC2 column 4 0.45 0.3 2.35 1.269 GB4 1 14.54 0.23 0.45 1.50489
5.33 Providing and laying in position machine
machine batched and machine mixed
42.41 batched and machine mixed design mix M-25 GB1+2+3 1 0.378 0.23 0.45 0.039123 3.623213
design mix M-25 grade cement concrete for
GB1 1 30.606 0.23 0.45 3.167721 grade cement concrete for reinforced cement
reinforced cement concrete work, using
concrete work, using cement content as per
cement content as per approved design GB2 1 14.54 0.23 0.45 1.50489 coping-1 2 30.66 0.23 0.1 1.41036
approved design mix, of centering, shuttering,
mix, of centering, shuttering, finishing and GB3 1 30.606 0.23 0.45 3.167721 coping-2 2 14.54 0.23 0.1 0.66884
finishing and reinforcement, including
reinforcement, including admixtures in
admixtures in recommended proportion as per
recommended proportion as per IS:9103 to GB4 1 14.54 0.23 0.45 1.50489 not counted
IS:9103 to accelerate,retard setting of
15 995457 accelerate,retard setting of 9.345222 15 995457
concrete,improve workability without
concrete,improve workability without TOTAL (CUM) 51.755222 TOTAL (CUM) 5.999213
impairing strength and durability as per
impairing strength and durability as per
direction of Engineer-in-charge."(Note:-
direction of Engineer-in-charge."(Note:-
Cement content considered in this item is @
Cement content considered in this item is
330 kg/cum."Excess/less cement used as per
@ 330 kg/cum."Excess/less cement used as
design mix is payable /recoverable seprately).
per design mix is payable /recoverable
5.33.1 All works
seprately).
upto plinth level
5.33.1 All works upto plinth level

Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service L B H
Descripton (DSR'16 Items-civil works) Vol
Sl. No. Accounting no.
(Cub.M)
codes) (M) (M) (M)

flooring M20 1 30.146 14.54 0.1 43.832284


deduction
5.33 Providing and laying in position machine
batched and machine mixed design mix M-25
grade cement concrete for reinforced cement sc1 14 0.3 0.39 0.1 0.1638
concrete work, using cement content as per
approved design mix, of centering, shuttering,
finishing and reinforcement, including
admixtures in recommended proportion as per sc2 4 0.3 0.298 0.1 0.03576 6438.12
IS:9103 to accelerate,retard setting of 240043.5
15 995457
concrete,improve workability without
impairing strength and durability as per mc1
direction of Engineer-in-charge."(Note:-
Cement content considered in this item is @ 32 0.23 0.23 3.75 6.348
330 kg/cum."Excess/less cement used as per
design mix is payable /recoverable seprately).
5.33.1 All works
above plinth level upto floor V.

TOTAL (CUM) 37.284724


running Bill 1 running Bill 1 modification
pcc
Schedule- 3a Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a) Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
n
SAC SAC (DSR'16
Service L B H Service Items- L B H Vol
Descripton (DSR'16 Items-civil works) Vol
Sl. No. Accounting particular no. (Cub.M) Sl. No. Accountin civil particular no.
codes) (M) (M) (M) g codes) works) (M) (M) (M) (Cub.M)

sc1 14 2.3 2.5 0.1 8.05 sc1 14 2.3 2.5 0.1 8.05
sc 2 4 2.1 2.25 0.1 1.89 sc 2 4 2.1 2.25 0.1 1.89
Gb 1 1 30.906 0.38 0.1 1.174428 Gb 1 1 30.906 0.38 0.1 1.174428 3976.64
Gb 2 1 14.27 0.38 0.1 0.54226 Gb 2 1 14.54 0.38 0.1 0.55252
15 995457 Gb 3 1 30.906 0.38 0.1 1.174428 15 995457 Gb 3 1 30.906 0.38 0.1 1.174428
Gb 4 1 14.27 0.38 0.1 0.54226 Gb 4 1 14.54 0.38 0.1 0.55252
deduction deduction
sc1 14 0.3 0.19 0.1 0.0798 sc1 14 0.3 0.19 0.1 0.0798
sc2 4 0.3 0.153 0.1 0.01836 sc2 4 0.3 0.153 0.1 0.01836
TOTAL 13.275216 TOTAL 13.29574

running Bill 2
pcc
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service L B H
Descripton (DSR'16 Items-civil works) Vol
Sl. No. Accounting particular no. (Cub.M)
codes) (M) (M) (M)

4.1 Providing and laying in position cement


concrete of specified grade excluding the cost flooring pcc 1 30.146 14.54 0.1 43.832284 4275.37
of centring and shuttering : All works upto
plinth level.
4.1.6 1:3:6 ( 1 Cement : 3 coarse sand deduction
(zone-III):6 graded stone aggregate 40 mm
8 995454 nominal size). sc1 14 0.3 0.39 0.1 0.1638
186546

sc2 4 0.3 0.298 0.1 0.03576

43.632724

Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service L B H
Descripton (DSR'16 Items-civil works) Vol
Sl. No. Accounting particular no. (Cub.M)
codes) (M) (M) (M)

Gb 2 1 0.27 0.38 0.1 0.01026


Gb 4 1 0.27 0.38 0.1 0.01026
coping-1 2 30.66 0.23 0.1 1.41036
coping-2 2 14.54 0.23 0.1 0.66884
TOTAL 2.09972

Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service L B H
Descripton (DSR'16 Items-civil works) Vol
Sl. No. Accounting R.C.C OF G.B (Cub.M)
codes) (M) (M) (M)

5.33 Providing and laying in position machine GB1 30.606 0.23 0.45 3.167721
batched and machine mixed design mix M-25
grade cement concrete for reinforced cement GB2 30.606 0.23 0.45 3.167721
concrete work, using cement content as per GB3 15 0.23 0.45 1.5525
approved design mix, of centering, GB4 15 0.23 0.45 1.5525
shuttering, finishing and reinforcement,
including admixtures in recommended
proportion as per IS:9103 to accelerate,retard
setting of concrete,improve workability
without impairing strength and durability as
per direction of Engineer-in-charge."(Note:-
Cement content considered in this item is @
15 995457 330 kg/cum."Excess/less cement used as per
design mix is payable /recoverable seprately).
5.33.1 All
works upto plinth level

9.440442
running Bill 2

DETAIL OF brick work


Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service L B H Vol
Sl. No. Descripton (DSR'16 Items-civil works) particular no.
Accounting
codes) (M) (M) (M) (Cub.M)

below plinth below plinth


side 1 and 3 2 30.66 0.23 0.65 9.16734 85728.64
side 2 and 4 2 15 0.23 0.65 4.485
mc1 deduction 32 0.23 0.23 0.65 1.10032 13.60772
Column deduction 18 0.3 0.23 0.65 0.8073
above plinth
side 1 1 30.66 0.23 3 21.1554 6300
side 2 1 11.2 0.23 3 7.728 4678.97
side 3 1 30.66 0.23 3 21.1554
side 4 1 11.2 0.23 3 7.728
57.7668 39.52504
deduction above plinth
25 995456 6.32 Brick work with
window 14 2 0.23 1.65 10.626 184936.5
door 2 1 0.23 2 0.92
mc1 32 0.23 0.23 3 5.0784
half brick for column 18 0.3 0.115 3 1.863
lintel window 14 2.6 0.23 0.18 1.50696
lintel door 2 1.6 0.23 0.15 0.1104 18.24176
Total
270665.1

half brick masonary 18 0.3 0.115 3 16.2

coping 1 2 0.23 0.15 0.069

Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service L B H Vol
Sl. No. Descripton (DSR'16 Items-civil works) particular no.
Accounting
codes) (M) (M) (M) (Cub.M)

above plinth
side 1 1 30.606 3 91.818
side 2 1 11.2 3 33.6
side 3 1 30.606 3 91.818
side 4 1 11.2 3 33.6

deduction
window 16 2 1.65 52.8
door 2 1 2 4
mc1 32 0.23 3 22.08
half brick for column 18 0.3 3 16.2
lintel 16 2.6 0.3 12.48
coping 1 83.612 0.15 12.5418
Total 0
DETAIL OF CENTERING AND SHUTTERING
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a) Construction of stee
SAC
Service Descripton (DSR'16 L B H
QUANTITY
Sl. No. Accounting Items-civil works) particular no. Sl. No.
(SQ.M)
codes) (M) (M) (M)

FOUNDATION FOOTING
SC 01 14 2 2.2 0.5 58.8
SC 02 4 1.95 1.8 0.4 12
TOTAL 70.8

COLUMN,PILLARS
SC 01 COLUMN 14 0.5 0.3 1.8 40.32
SC 02 COLUMN 4 0.45 0.3 1.9 11.4
SC1 14 0.385 0.3 0.45 8.631
SC2 4 0.335 0.3 0.45 2.286
mc1 32 0.23 0.23 3 88.32
LINTEL,BEAMS
GB 01 1 30 0.23 0.45 13.5
GB 02 1 15 0.23 0.45 6.75
GB 03 1 30 0.23 0.45 13.5
GB 04 1 15 0.23 0.45 6.75
coping-1 2 30.66 0.23 0.1 6.132
coping-2 2 14.54 0.23 0.1 2.908
DETAIL OF CENTERING AND SHUTTERING
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
Descripto
SAC n (DSR'16
Service Items- L B H QUANTIT
Accountin civil particular no. Y
g codes) works) (M) (M) (M) (SQ.M)

FOUNDATION FOOTING
SC 01 14 2 2.2 0.5 58.8
SC 02 4 1.95 1.8 0.4 12
TOTAL 70.8

COLUMN,PILLARS
SC 01 COL 14 0.5 0.3 1.8 40.32
SC 02 COL 4 0.45 0.3 1.9 11.4
SC1 14 0.385 0.3 0.45 8.631
SC2 4 0.335 0.3 0.45 2.286
mc1 32 0.23 0.23 3 88.32
LINTEL,BEAMS
GB 01 1 30 0.23 0.45 13.5
GB 02 1 15 0.23 0.45 6.75
GB 03 1 30 0.23 0.45 13.5
GB 04 1 15 0.23 0.45 6.75
coping-1 2 30.66 0.23 0.1 6.132
coping-2 2 14.54 0.23 0.1 2.908
running Bill 2

DETAIL OF FILLING UNDER P.C.C


Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service Descripton (DSR'16 Items-civil works) L B H Vol
Sl. No. Accountin particular no.
g codes) (M) (M) (M) (Cub.M)

below plinth

2.27 Supplyimg and filling in plinth with sand 1 30.146 14.54 0.075 32.87421 814.97 26791.5
sand under floors, including watering ,
25 995456
ramming , consolidating and dressing
complete

Schedule- 3b
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service NON-SCHEDULE ITEM L B H Vol
Sl. No. Accountin particular no.
g codes) (M) (M) (M) (Cub.M)

below plinth
wmm 1 30.146 14.54 0.23 100.8143 1620 163319.1
3 995456 deduction
NS-3
sc1 14 0.3 0.39 0.23 0.37674
sc2 4 0.3 0.298 0.23 0.082248
Total 100.3553

SAC
Service NON-SCHEDULE ITEM L B AREA
Sl. No. Accountin particular no. THK
g codes) (M) (M) (SQ.M)

SHEET 1 30.146 14.54 438.3228

You might also like