GA09 - Method Statement Review
GA09 - Method Statement Review
Method
statement title
Date issued
to site
management
Temporary works 1st review date Status* Name 2nd review date Status* Name
co-ordinator
(as required)
1st review date Status* Name 2nd review date Status* Name
Technical advisor
(as required)
1st review date Status* Name 2nd review date Status* Name
H,S&E function
(as required)
(Method statement content is to be reviewed in accordance with the prompt list overleaf).
Note: clearance to proceed with this method statement does not relieve the sub-contractor of their contractual obligations,
including safety, structural integrity or any implications to permanent works arising from these proposals.
© Construction Industry Training Board Extracted from Construction site safety (GE 700) publication
GA09 Method statement review continued
Fully describes the work, tasks, sequence, method and process for change?
Specific risk assessment attached and satisfactory? Have all the risks been evaluated?
Are there arrangements in place for reviewing control measures due to changing
circumstances?
Supervision?
Spillage containment?
Special welfare?
© Construction Industry Training Board Extracted from Construction site safety (GE 700) publication
GA09 Method statement review continued
Security?
Special training (confined space, tower erection, use of plant, and so on)?
Environmental risks?
Pollution prevention?
Monitoring – by whom?
Change requirements?
Comments
© Construction Industry Training Board Extracted from Construction site safety (GE 700) publication