GA08 - Method Statement
GA08 - Method Statement
Description of work
This method statement has been developed and must be read with the following risk assessments
Work commences on
Areas to be worked in
Personnel (include details of all personnel involved in the task and any specific training, skills or qualifications required)
Other Other
Construction dust (Note: construction dust is harmful and can lead to fatal lung diseases such as silicosis)
© Construction Industry Training Board Extracted from Construction site safety (GE 700) publication
GA08 Method statement continued
Hazardous materials
Are COSHH/DSEAR data
Are hazardous materials to be used? Yes No Yes No
sheets available?
(Where appropriate include information such as sketches, details of significant risk control, sequence of works, etc.)
Briefing register
A copy of this briefing register must be attached to the method statement, together with other relevant information
(such as the associated risk assessments, permits or COSHH assessments).
© Construction Industry Training Board Extracted from Construction site safety (GE 700) publication
GA08 Method statement continued
I confirm that I have read and understand the requirements of this method statement and associated risk assessments and have
communicated them to operatives under my control and to those who may be affected by its requirements.
Note: it is important that you test the operatives’ understanding and assume they have read and understood the method
statement and risk assessments.
I understand and will agree to adhere to the contents of this method statement and the associated risk assessments.
I have attended a site induction/briefing that explained the general site rules and necessary site specific arrangements.
If you have any doubt about information given or contained in this method statement – ask for clarification.
© Construction Industry Training Board Extracted from Construction site safety (GE 700) publication