2) Painting works
i) old paint removing
ii) Putty work
iii) Pop Cornice 355000.00
iv) Chalk Mitti and scrubbing work
v) Plastic paint 3 coat (Asian Paint)
vi Enamel Paint on window/Doors /windows Frame after removing existing paint
3) Plumbing
i) Old Piping removal
ii) New Cpvc and Pvc Fittings
225000.00
iii) Water proofing
iv) C.P. and Sanitary Fittings
v) 1000 ltr water tank
4) Tiling
i) Removal of Mozac Flooring
357000.00
ii) Pcc
iii) New Tiling(Tile Cost @30/Sqf)
5) Electrical
i) New wiring with Switch Socket 240000.00
a) Removal of Old Wiring and Switch Socket
6) Wood Work
i) Bathroom Counter-18 sqf@1800 32400.00
ii) Old Window Pallas repairing only
REMARKS
Putty-Asian/Birla
Paint-Asian/Nerolac
outer paint-weathercoat/Apex
W/C-10000
Angle Cock-1050
Wash Basin-3500
water tank(triple layer)
TILE COST-30/Sqf
wire-Finolex/Havells
Switch Socket-havels/Penta/
Water proof board(Accen texa)
Hinges-hettich