office unit 706/707, 55 Corporate Avenue, Saki vihar road , Andheri (e) Mumbai
STELMEC, Corporate Avenue, 7th Floor Descon Engineers
No. Description Qty. Unit
I Breaking / Removing
1.7.1 Cutting in to wall and replastering for accomodation of AC piping ets 1 job 13,000.00 13000.00
1.8 4" Brick masonary with plasre on both faces 100 Sft. 200.00 20000.00
Rate is Including Siporex Blocks, Cement and Labour
1.8.1 Siporex walls 3' and 6" 215 Sft. 180.00 38700.00
Siporex walls with plaster
Cocealing Pipes?, UPVC ?. Schedule should have added here in this BOQ
Other Accessories (Like Tissue Holder, Towel Ring Etc) 2 Nos 10,000.00 20000.00
142400.00
4 CARPENTRY / FURNITURE WORK
4.1 Making full height glazed partition 8'-0" ht. 425 Sft. 625.00 265625.00
STELMEC, Corporate Avenue, 7th Floor Descon Engineers
No. Description Qty. Unit
(8mm clear glass) and solid partition above in 2" x 1" alu. Pipe framing with 8 mm
C ply paneling and laminated finish
4.2 Full height soilid partition with Alu framing 375 Sft. 575.00 215625.00
sandwitched with 8 mm ply and laminate
or Gup board with paint
4.3 Making Partitions with Laminate fin in Cabin Areas behind work stations 280 sft 550.00 154000.00
4.4 Pin up boards in cabin 65 Sft. 300.00 19500.00
4.5 Making Alu. Openable windows in Toilet area of Size 2' x 4' 2 no 4,000.00 8000.00
6 Doors/Panelling etc.
6.1 Toilet door laminated finish (Door in Block Board with Laminate Finish) 4 no. 22,000.00 88000.00
6.1.A Toilet door frames with Laminate Fin (Door frame in Ply with Laminate Finish) 68 rft 350.00 23800.00
6.2 Laminated doors for conference,meeting 1 no. 20,000.00 20000.00
and for cabins ( mounted on floor spring)
6.2.A Glass doors 5 no 25,000.00 125000.00
6.3 Laminate paneling to exist.Ent. Door 1 no 28,000.00 28000.00
6.4 Safety Shutter 1 Nos 25,000.00 25000.00
6.5 Wood work paneling for wall in cabin areas 350 sft 375.00 131250.00
1237800.00
7 MODULAR FURNITURE
( quotation attached)( incl.Taxes)
Estimated @
450/ Sq. ft for
covering all work stations with partitions, 1 11,75,000.00 1175000.00
area of 1533.00
Sq.ft
9 MISCELLANIOUS WORK
9.1 Mid back chairs for cabins
Staff chairs,etc( conference ,meeting rm) 35 no 5,500.00 192500.00
9.2 visitors chairs 9 no 4,500.00 40500.00
Mid Back Exe. Chairs 4 no. 7,000.00 28000.00
9.3 venetian blinds ( Roller blinds) 410 Sft 120.00 49200.00
9.4 Carpeting the office area 140 Sft 120.00 16800.00
9.5 Carpeting of Entire Area 1200 Sft 120.00 144000.00
327000.00
10 ELECTRICAL PROVISION
Making elec. Provision with necessary power
sypply and lighting
1) 5 amp pl pt ( stabilised)
2)15 amp pl pt ( Stabilised)
4) Power Circuit with 2 no 4 sq.mm and
1no 2.5 sq.mm earth wire
STELMEC, Corporate Avenue, 7th Floor Descon Engineers
No. Description Qty. Unit
12Tr
11 A.C system, Supply ( Ductable split) Daikin 45000 Avg/Tr 7,20,000.00 720000.00
Approx
1.5 Tr High Wall for pantry
1 Tr for Server room
SUMMARY
I Breaking/ removing 102250.00
II Making / redoing
1 Civil work 505100.00
2 P.O.P. / false ceiling work 222900.00
3 plumbing / Saniatry 196400.00
4,5,6 Carpentry / furniture work 1237800.00
7 Modular furniture 1175000.00
8 Painting work 189750.00
9 Miscellaneous work 327000.00
10 Electrical work / Data 480000.00
11 A.C system 720000.00
5156200.00
A Sensor Light, Inside all the cabins and Toilets 8 2,000.00 16000.00
B Smoke detector With Alarm System, Cabling and Fixing included 7 12,500.00 87500.00
C Fire Extinguisher 3 4,000.00 12000.00
Meeting Room Booking Display system, Only Wiring and Conduiting considered
D 1 8,000.00 8000.00
Considered, Customer to supply end Fittings
131500.00
5287700.00
Payment Terms
1 30% Advance Against Order
2 20% Advance on Completion of MEP Works and Partition Framing