Innovations Workplan

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views22 pages

Innovations Workplan

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 22

Republic of the Philippines

Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

WORK PLAN ON THE IMPLEMENTATION OF PROJECT AKLAT


(A project which aims to address the needs of the learners in order to improve the reading literacy and decrease the non-readers
and struggling readers through appropriate approaches given by teachers can be strengthened and achieved)
August 2022-June 2023

PROGRAM STRATEGIES/ACTIVITIES TIMELINE PEOPLE BUDGETARY SUCCESS


COMPONENT INVOLVED REQUIREMENT INDICATOR

PRE Planning and Orienting phase


IMPLEMENTATION of the program
Information
Ø Communication with parents August- School Head P 2,000.00 dissemination about
the goals and objectives of the
September the PPA
project. Teachers
2022
Ø Preparation and submission of
Project Proposal for Approval. Parents Assessment result of
Ø Giving diagnostic test in student’s current
language, literacy and numeracy performance
for primary learners.
Ø Recording the results of the
diagnostic test.

DURING The following are the activities

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

IMPLEMENTATION to be implemented as part of


the implementation of
September- Teachers/ Class At least 75% of the
Project AKLAT: A project April 2023 Advisers target learners have
which aims to address the shown progress in
needs of the learners in order reading literacy
to improve the reading literacy
and decrease the non-readers
and struggling readers
through appropriate
approaches given by teachers
can be strengthened and
achieved
 Identify appropriate and
effective teaching approaches
to develop the primary
learners basic skills.
 Monitor the progress of
the learners.
 Giving post-test upon the
implementation of the
project.

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

POST  Documentation and May-June School Head, Accomplishment


IMPLEMENTATION preparation of report of 2023 Teachers/ Report
accomplishment. Class Advisers
 Evaluation of the results of
the project for feedback.

Prepared by:

MICHAELA ROSE B. RIVERA


Project Proponent
Noted:
JENNIFER R. SUAYAN
Principal II
WORK PLAN ON THE IMPLEMENTATION OF PROJECT QUEST

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

(A project that aims to create action research/ action plan focusing on strategic intervention in improving the teaching practices of
teachers and give resolutions for challenges experienced in school.)
August 2022-June 2023

PROGRAM STRATEGIES/ACTIVITIES TIMELINE PEOPLE BUDGETARY SUCCESS


COMPONENT INVOLVED REQUIREMENT INDICATOR

PRE Planning and Orienting phase


IMPLEMENTATION of the program
Ø Activities to be August 2022 School Head P1,500.00 Workable plans for
undertaken
Master Teacher program
Ø People to be involved
Ø Budget implementation shall
Teachers have been made
Ø Timeline
Ø M&E Tool Research available.
Coordinator

DURING The following are the activities


to be implemented as part of
IMPLEMENTATION
the implementation of
September Program To increase the
Project QUEST aims to create

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

action research/ action plans 2022-June proponent performance level of


focusing on strategic 2023 teachers and learners.
School Head
intervention in improving the
teaching practices of teachers Master Teacher
and giving resolutions for
challenges experienced in Teachers
school.
Specifically, this project aims to:
- Developed an action plan
focusing on strategic
intervention in improving
the teaching practices of
teachers.
- Produce an intervention
plan that will be
implemented to the
school to address the
learning needs of the
learners.
POST Assessing, Addressing June 2023 Program Accomplishment
IMPLEMENTATION the other challenges met proponent Report shall have been
and refining the existing finished every quarter.
School Head
project

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

Master Teacher
Furnishing the completion Research
report of the accomplished Coordinator
project for transparency, Teachers
sustainability and replication

Prepared by:

MICHAELA ROSE B. RIVERA


Project Proponent

Noted:

JENNIFER R. SUAYAN
Principal II
WORK PLAN ON THE IMPLEMENTATION OF PROJECT PARTNERS
(A project which aims to improve create a strong linkage and responsive partnership between the school and the stakeholders)

August 2022-June 2023


PROGRAM STRATEGIES/ACTIVITIES TIMELINE PEOPLE BUDGETARY SUCCESS
COMPONENT INVOLVED REQUIREMENT INDICATOR

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

PRE Planning and Orienting phase


IMPLEMENTATION of the program
Information
ØPreparation and Designation August- Teacher/SH Donations dissemination about
of a committee for the conduct
September /PTA/LGU MOOE the PPA
of the PPA
2022
ØConducting a meeting with /Stakeholders
the principal, school
development planning team,
and the committee (PTA) in
preparing the program’s Action
Plan
ØMaking a list of priorities
based on inspection with
projected cost estimates and
identified potential donors
ØConducting a meeting with
the program committee and the
Parent-Teacher Association
(PTA) for strategizing scheme
on project implementation
DURING The following are the activities
to be implemented as part of
IMPLEMENTATION
the implementation of

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

 Project PARTNERS: A September- School Head, Plan and implement


project which aims to April 2023 Teachers/PTA/ school’s PPA in
improve create a strong LGU/ partnership with
linkage and responsive Stakeholders stakeholders and
partnership between the other community
school and the stakeholders partners
Identify appropriate and
effective teaching approaches
to develop the primary
learners basic skills.
 Sending of
communication to identified
benefactors through letters
 Conducting advocacy
through announcements and
broadcasted media
 Implementation of PPAs
with the help of community
partners and stakeholders
 Continuing of
implementation monthly or
quarterly per year level per
section

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

POST  Documentation and May-June School Head, Accomplishment


IMPLEMENTATION preparation of report of 2023 Teachers/ Class Report
accomplishment. Advisers
Evaluation of the results of the
project for feedback.

Prepared by: Noted:

MICHAELA ROSE B. RIVERA JENNIFER R. SUAYAN


Project Proponent Principal II

WORK PLAN ON THE IMPLEMENTATION OF PROJECT BISA


(A project which aims to address the learning losses brought about by the pandemic in the Key Stage 1 learners, improve the learners’ basic
skills in early languages, literacy and numeracy and to improve/maintain the achievement rate of learners in early languages, literacy and
numeracy in the Key Stage 1)

August 2022-June 2023


PROGRAM STRATEGIES/ACTIVITIES TIMELINE PEOPLE BUDGETARY SUCCESS INDICATOR
COMPONENT INVOLVED REQUIREMENT

PRE The following are the activities First School Head Workable plans as to
IMPLEMENTATION to be implemented as part of Quarter program
Master Teacher

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

the implementation of SY2022-2023 Teachers implementation shall


have been made
Project BISA: A project which Parents
available.
aims to address the learning Information
Learners
losses brought about by the dissemination about the
pandemic in the Key Stage 1
PPA.
learners, improve the learners’
basic skills in early languages,
literacy and numeracy and to
improve/maintain the achievement
rate of learners in early languages,
literacy and numeracy in the Key
Stage 1)
Specifically, this project aims to:
*Nurture the learner’s effective
learning in connection with
improving the basic skills of the
primary learners such as early
language,literacy and
numeracy(ELLN)
*To maintain/improve the
achievement rate of learners to
at least 75% in early

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

languages,literacy and
numeracy.

Planning and Orientation


phase of the program
-Communication with parents
the objectives of the project.
-Preparation and submission of
Project Proposal for Approval.
-Coordinating the programs
and projects to project
proponents
-Plan for the activities to be
done in every project through
meetings and conferences
DURING The following are the activities Second- Program Php 5,000.00 At least 50% of the
to be implemented as part of Fourth proponent learning
IMPLEMENTATION
the implementation of Project Quarter SY materials/supplementar
2022-2023 School Head y materials have been
BISA
Master Teacher distributed.
-Creating communication At least 50% of the target
Teachers
linkages between teachers and learners shall have the
basic skills in early

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

parents Parents languages,


literacy and numeracy.
-Giving activity sheets and Learners
.
reading materials to the
learners to improve their skills
in early languages,literacy and
numeracy.
-Regular monitoring of the
progress of the learners online
and face to face.

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

POST -Assessing, Addressing the Second- Program At least 75% of the


IMPLEMENTATION other challenges met. Fourth proponent target learners shall
-Refining the existing project. Quarter SY have the basic skills
2022-2023 School Head in early languages,
-Furnishing the completion
report of the accomplished Master Teacher literacy and
project for transparency, numeracy.
Teachers Accomplishment
sustainability and replication
Parents Report shall have
been finished every
Learners quarter.

Prepared by:

MICHAELA ROSE B. RIVERA


Project Proponent
Noted:

JENNIFER R. SUAYAN
Principal II

WORK PLAN ON THE IMPLEMENTATION OF PROJECT TASA

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

(A project which aims to provide teachers knowledge on creation of learning resources meeting DepEd Portal’s standard, Review of LRMDS
portal and register LR Portal user account and Develop materials containing originally created activities and exercises)
August 2022-June 2023

PROGRAM STRATEGIES/ACTIVITIES TIMELINE PEOPLE BUDGETARY SUCCESS


COMPONENT INVOLVED REQUIREMENT INDICATOR

PRE Planning and Orienting phase


IMPLEMENTATION of the program
Ø Planning for the conduct August 2022 School Head None LAC Training Matrix
Training Workshop on
LR Master Teacher
Ø Preparation of the Teachers
materials needed
LR Coordinator

DURING The following are the activities


to be implemented as part of
IMPLEMENTATION
the implementation of
September Program
Project TASA aims to provide 2022-June proponent
technical assistance to teachers 2023 To update LRMDS
in accessing LRMDS portal

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

and the standards in School Head portal accounts of


developing learning resource teachers
Master Teacher
materials.
Specifically, this project aims to: Developed learning
Teachers
- aims to provide teachers resource materials
knowledge on creation of
learning resources
meeting DepEd Portal’s
standard
- Review of LRMDS portal
and register LR Portal
user account
- Develop materials
containing originally
created activities and
exercises
POST - Consolidation of the June 2023 Program Accomplishment
IMPLEMENTATION developed learning proponent Report
resource materials
School Head
- Validation and evaluation
Master Teacher
of LRs
Research
- Furnishing the
Coordinator
completion report of the

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

accomplished project for Teachers


transparency,
sustainability and
replication

Prepared by:

MICHAELA ROSE B. RIVERA


Project Proponent
Noted:

JENNIFER R. SUAYAN
Principal II

WORK PLAN ON THE IMPLEMENTATION OF PROJECT GABAY


(A project which aims to strengthen the school’s goals to decrease the non-readers and struggling readers through appropriate approaches
given by teachers.)
August 2022-June 2023

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

PROGRAM STRATEGIES/ACTIVITIES TIMELINE PEOPLE BUDGETARY SUCCESS INDICATOR


COMPONENT INVOLVED REQUIREMENT

PRE Planning and Orienting phase


IMPLEMENTATION of the program August- School Head Pre-Test Passages
September Project
Ø Coordinating the PPA to 2022 Proponent Letter to Parents and
every adviser for preparatory Teachers Contact Numbers
activities Parents
Ø Assessment of pupils’
reading level by giving Pre-
Test.
Ø Assessing the learners’
status of learning
Ø Orientation of Parents and
Pupils who will undergo the
Program

DURING The following are the activities


to be implemented as part of
IMPLEMENTATION the implementation of
Year round School Head Php 1,000.00 Instructional Materials
 Project GABAY: A Teachers
project which aims to Parents Interventions/
strengthen the school’s Remediation Strategies
goals to decrease the

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

non-readers and Reading Materials


struggling readers
through appropriate
approaches given by
teachers

 Implementation of Project
GABAY with the help of
all class advisers.
 Embracing reading at
home with the guidance
of the parents, sisters,
brothers and others.
Continuing of implementation
monthly or quarterly per year
level per section
POST  Evaluation of pupils
IMPLEMENTATION reading level. April-June School Head Furnish Post Test: Oral
 Monitoring and Evaluation 2023 Reading and Written Reading Test
of the project Coordinator
 Collection of feedbacks/ Project Leader Summary of M&E
testimonies from the Teachers Results
beneficiaries Parents
Feedback forms

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

Prepared by:

MICHAELA ROSE B. RIVERA


Project Proponent
Noted:

JENNIFER R. SUAYAN
Principal II

WORK PLAN ON THE IMPLEMENTATION OF PROJECT COUNT


(A project which aims to improve the number of non-readers by at least 75% at the end of the school year.)
August 2022-June 2023

PROGRAM STRATEGIES/ACTIVITIES TIMELINE PEOPLE BUDGETARY SUCCESS INDICATOR


COMPONENT INVOLVED REQUIREMENT

PRE Planning and Orienting phase


IMPLEMENTATION of the program August School Head Pre-Test in Numeracy
2022 Project
Ø Project dissemination Proponent Letter to Parents/

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

through posting and Teachers Communication Letter


meeting with the Parents for the conduct of
stakeholders. Inovation
Ø Assessment of pupils’
reading level by giving Pre-
Test.
Ø Assessing the learners’
status of learning
Ø Communication to Parents
and Pupils who will undergo
the Program

DURING The following are the activities


to be implemented as part of
IMPLEMENTATION the implementation of
Year round School Head Php 1,000.00 Numeracy Tools
 Project COUNT: A Teachers
project which aims to Activity Sheet
improve the number of
non-readers by at least Intervention/
75% at the end of the Remediation
school year

 Implementation of Project
COUNT with the help of
all class advisers.

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

 Learning Interventions
and remediations in
Mathematics
 Crafting of learning
materials in numeracy
 Use of Numeracy Tools in
teaching Mathematics
Continuing of implementation
monthly or quarterly per year
level per section
POST  Evaluation of pupils
IMPLEMENTATION numeracy skills June 2023 School Head Post Test
 Monitoring and Evaluation Reading
of the project Coordinator Summary of M&E
 Accomplishment Report Project Leader Results
Teachers
Parents Feedback forms

Prepared by:

MICHAELA ROSE B. RIVERA


Project Proponent

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS
TOONG ELEMENTARY SCHOOL
TOONG TUY, BATANGAS

Noted:

JENNIFER R. SUAYAN
Principal II

TOONG ELEMENTARY SCHOOL


Address: Toong Tuy, Batangas
School e-mail address: [email protected]