We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
445 views1 page

Casting of RE Panel

Casting of RE Panel

Uploaded by

Faisal Rizwan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CHAPTER-7

GEOSYNTHETICS AND REINFORCED EARTH


Quantity Amount
Reference to
Rate Remarks/
Sr No MORT&H Description Unit For Large Large
(Rs.) Input ref.
Specification Project Project
Reinforced Earth Structures using Facia material
and its placement, Assembling, joining with facing
elements and laying of the reinforcing elements.
(10.75m per sqm)
considering Average height of wall = 8 m.
7.4 3105 (ii) Facing elements of RCC
Unit = sqm
Taking output 200 sqm
a) Labour
Mate day 0.320 365.00 116.80 L-12
Mazdoor day 6.000 365.00 2190.00 L-13
Mazdoor skilled day 2.000 565.00 1130.00 L-15
b) Machinery
i) For Casting yard
Light crane with lifting capacity upto 3 tonne ( For 6908.90
hour 5.926 1165.88 P&M-63001
Lifting at casting yard)
ii) For transportation and placement at Casting site
Light crane with lifting capacity upto 3 tonne for hour 8636.13
7.407 1165.88 P&M-63001
loading & Unloading
Trailer 30 tonne capacity for transporting to t.km. 36 x 2.5 x 30 6.64 17935.54 P&M-72001
Light crane with lifting capacity upto 3 tonne ( For 9327.02
8.000 1165.88 P&M-63001
erection)
c) Material
Pre-cast RCC M-35 facing elements of size as cu.m 36.000 7919.00 285084.00
per design and 18 cm thick for 75 sqm. (Refer Item No. - 12.8
Item 12.8 (H) Basic Cost of Labour, Material & H Case II
Machinery )
Formwork @ 4 per cent on cost of concrete i.e. 11403.36
cost of material, labour and machinery
PVC Cavity for Facia panel Sqm 240.000 165.00 39600.00 M-107

HYSD steel @ 7 kg / sqm (Refer Item 12.6 tonnes 1.400 82608.00 115651.20 82693.00
,Basic Cost of Labour, Material & Machinery )

Add 2 per cent of cost of facia pannels, for all 9959.66


necessary temporary form work, scaffolding and
provision of loops/lugs for lifting of pannels and joining
the reinforcing elements.
d) Overhead charges @ 8% on 827.66
(a+b)
e) Contractor's profit @ 10% on 1117.34
(a+b+d)
Cost for 200 sqm = a+b+c+d+e 509887.60
Rate per sqm = (a+b+c+d+e)/200 2549.44
Say, 2549.00