Excel Project 3
Excel Project 3
5. For the 1stDay average column calculate the average temperature of each town From the Day 1.
6. For the 2nd Day average column calculate the average temperature of each town from the Day 2.
7. Calculate the two-Day average which is the average of the two days temperature.
8. Insert a new sheet in your work book
9. Rename the new sheet as Rank & enter the following data on Rank.
Rank of hotness
TOWN Rank Comment
Awassa
Ambo
Diredewa
Bahir dar
Mekele
Gambella
10. Calculate the rank of each town in the rank column using the two Days average.
11. Give comments according to the following.
If two Days average >30, say” very hot”
If two Days average >=25, say “hot”
If two Days average >=20say “moderate”
If two Days average <20, say “cold”
1. Insert One Row Above The Data And Type The Title “ PAYROLL FOR JUNE 2003 ”
2. Apply The Following Format To The Title ,Font Size 14,Font Type –Comic Sans Ms Alignment Center
Of The Row
3. Insert One Column Between Id And Sex And Give It The Title Position
4. Write the appropriate function to fill this column using the condition that employee will be part
time if salary is less than 500 otherwise full time
5. Sort the name by ascending order
6. Calculate pension as 4%of salary
7. Calculate the tax according to the tax law of Ethiopia
8. Calculate the net pay
9. Calculate the total for Basic Salary ,pension, Tax, Net pay
10. Filter and copy all Female worker to sheet2
11. Filter and copy all Workers whose salary is between 500 and 1000 to same sheet
12. Insert appropriate chart for name versus salary
13. Paper orientation –landscape ,header and footer as shown below
Left Center Right
Header FETAN TYPING SSOM DESSIE
Footer Ms –Excel project Date Your name