0% found this document useful (0 votes)
215 views27 pages

Boiler Design Data 250 MW

Design data of boiler 250 MW thermal power plant.

Uploaded by

Amitava Pal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
215 views27 pages

Boiler Design Data 250 MW

Design data of boiler 250 MW thermal power plant.

Uploaded by

Amitava Pal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 27
CONTRACT DATA SHEET PAGE No. 1/2 ci ITE —— CONTRACT No. 0368 & 0369 CONTRACT DATE : 30.06.2004} PURCHASER : DAMODAR VALLEY CORPORATION PLANT NAME : CHANORAPURAg7&3—2%250uw]| CONSENGR OmUFy way | eenoasuty PROPOSED FUEL: COAL Kea /Kg (Hoty Fo x 3830 | voLx 1600 [we 180 [ax 1000] Sx 032) 4100 50 FUEL FIRING EQUIPMENT Tee ie [ GOAL: TITNG TNGSIMAL | [OL BURR | [RPE WE WL BBD A772 ware «vow. | % [ave : 20 Egive 7a Wake & Nox BreL = 3 conrea, | & [AR DANPER 32am onwpen | [eAPNaTY 75 1H @ maa F BAL Lon caPacTr(uad] Z [4.6 wkca /n waxaliowame)|® [11.3 weca/n | 2 MOTOR Kw: 2600 oisposimon | * | cowNERs corner EVSTEM:: pneseuecan/C010 PA FURNACE _[7Vee : BALANCED ORAFT [CONSTRUCTION : _fUSON WELDED WALLS TS WOT 15200 mm | OSH NEGE mm | eS [8B TEL HEAT WEUT hath 7 so BOILER | NATURAL GIRCULATON, RADIANT REHEAT OUTDOOR |S} desion : 1025 vesionanon Fas eS ERE 770 - E'S) sueemseaTer oumer: 156.0 [sme SOS Te] SopRRHE: ~ | 7955 ae TYPE :_LOW TEMP. SUPERMEATER = STAGE? & é ; INSTALLED TYPE; PLATEN SUPERHEATER = 1341 (PROJECTED) TOTAL HS. m? 11408 [Stage 6 TYPE; SPACED FINAL SUPERHEATER ae ATTEMPERATOR TRE: SPRAY Ne. OF STAGES: Single | NEDIUM OF SPRAY : FEED WATER REHEATER | TE: SPACED TALKS 5 3700 CONTROL : BURNER TILT, EXCESS ARR TOTAL HS RCONOMISER | 1WP= » PLAN TuBe o 5517 No. OF BLOCKS : TWO | ao — AIR HEATER | FE TOYAL AS. = 20613 | woroR KW 1 F = ROTARY REGENERATIVE mm? (EACH) ee 278 WMT 2000 | nos. wo MAKE: BHEL BOILEX AUXILIARIES FLOW] PRESS. [TENE] ORVE | SPEED | MOTOR FANS TPE ware [nos] 3 mmwe | ee Spee [ROTOR] conto. FO FAN [aPintsAT | BEL | 2 [ino | 223 | 50 [MOTOR] 1420 | 825 [BLADE PITCH PA FAN APZAT/Z are. | 2 | 75.0 | 1300 | 50 | wotor| 1480 | 1275 | BLADE PITCH ID FAN [nozv 33 spor) eFeL | 2 [2520 | 488 [10 | woTOR] 740 [1625 jxvo. COUPLNOTALET OANPER GR FAN [Not APPLICABLE IrcAL Ae Fan|wesr tae | FEL] 6 | 38 | 1682 | 50] woTOR| 2660 | “120 | NLET vANE(Manua) ‘SOOT BLOWERS & TEMPERATURE PROBES SATION TYPE WNE Nos] MEDIUM FURNACE TEMPERATURE PROBES BHEL 1 = i FURNACE WALL BLONERS: BHEL 55 | STEAM SARE & E00 LONG RETRACTABLE SOOT BLOWERS | BHEL 18 STEAM "AR HEATERS ROTARY SWIVEL ARM BHEL 2 STEAM | CONTRACT DATA SHEET PAGE Ne, 2/2 uffa he CONTRACT No, : 0368 & 0369 NRACT DATE « 30.06.2008 iy CO, SY COLE: | IME} BURT] GAS] press | HUE OS TG DUST COLLECTOR want fricio | Nos |RELOUSTT Gis, pees [TIE OECTION gms/Nm3 | t/h mmwe m/s EFFICIENCY % TETRORTAT iTATOR t EEEEEET fea fe] a] es | mes] [aoe [ame [PIPE LINES an sTcaN [HOT REVEAT (COLD RENEAT FEED WATER | ceriam | @ 2000x510 | 0 ssea x 2080 | co as72 x27 | oD 300 x a8 ‘se nou ee $A 335 P22 SA 335 922 ‘SA 106 cet SA 106 Ge No, OF UNES TAS M0 70 one BOILER MOUNTINGS Locanon | Tree, waxe | nos.| ser paessuRe xe/ent TSO Wa | BRE 1 /eZ5 on 40_W3_ BHEL 2 | 186.2,188.0 a awe eee 1887 SH OUTLET lev ie3e we ~ owl ener | 2 [eae Sal ¥ VALVES ‘RM INLET. 4786 WB — Rint ‘HET. 1 [sto rw ounet | 796 wo - avo | oie, | ze] anaase aa OMG i 2 wn NACE LEVEL avDIOAtCR WLI (SHELMSION 20M)) BHEL 2 MAIN PARANETERS FUEL DESIGN GOAL [unr ace | Two [sonawor| ag A Laid * 250 «| 150 250 TsuPthrear wh biog | rz0 [asta | 6.9 Row REMEAT vA cena [e559 | ate4 | 6702 TOTAL MEAT BUTY ee5i7m s27 fess [sao | ont 5. [PRESSURE AT SUPERHEATER OUTLET 1 kg/ema(gh 1550 | 1541 | woo | 1853 é TEMPERATURE AT SUPERMEATER OUTLET ca seo | sao | 540 540 ° [PRESSURE AT REHEATER INLET kaZemata a4 [are [233 | 386 | Tewbemanune aT @EREATER MET 8G 3431 | 3482 | sae | sole ESGURE_AT REREATER OUTLET tafe) as [asa [rr | 366 TEMPERATURE AT REHEATER OUTLET 0 [seo [$40 [sao | 540 FEED WATER TEMPERATE " % [28 | 2489 [2235 | Toso [AMGEN Am TENPERATURE % « | o | o | 0 COMBUSTION AIR TEMPERATURE SECONDARY °c m4 32 284 amt FUEL QUANTITY Uh vo [ie fase | 143 TAR QUANTITY CTOTAD ve aig _[ see | ass | [HE OF GAS AT BOKER EXIT (CORRECTED) fe 140 | se 1a EFFICIENCY 84se0 oN HHY x 067 | 2652} ases | 4739 | ca PREDICTED PERFORMANCE CONTENTS SECTION DESCRIPTION SHEET No. t FLOW 2 u TEMPERATURE 3 m PRESSURE (STEAM & WATER) 4 wv PRESSURES & DRAFTS (AIR & GAS) 5 v FUEL 6 vi MILL & BURNER PERFORMANCE: 7 vit Q2, 00) & EXCESS AIR 8 vil HEAT BALANCE s | The attached Performance Data are predicted only and are not tobe construed as being guaranteed except where the values coincide with guarantees stated under the performance guarantee section “Cuistomer/Piant DVCICHANDRAPURA TPS -Untsh7&S.2X2500W GontNo.:03688 0365 | Rev.00 Rov.01 Rov.02 Rev.03 Engineer: BM] Reviewer ACRISCS t [Approver:ScS t BOILER PERFORMANCE PROPOSALS Page 1019 GPT-T606 (035880369-V-A1-TD1-3 (ai 1) FLOW g HP Heaters in Both Description Unit ite out 100% 100% | 60% TMCR | 250MW BMCR TMCR 150MW 250M ‘Steam ‘Superheater outlet th 810.5 742.0 455.3 6819 Reheater outiet wh 694.4 665.9 415.4 670.2 Water Feed water uh 810.0 718.0 415.3 644.9 ‘SH spray th 8 24.0 40.0 37.0 Air af Airheater outlet uh 123.4 M47 80.9 139.8 Primary) - _| ‘Tempering air wh 107.4 110.3 80.5 86.1 ‘Aimeater outlet wh | 7133 | 6435 Wee 769 (Secondary) L Leakage air to boiler Uh. 50.0 50.0 50.0 50.0 Total Combustion Alr wh 993.8 916.5 ‘987.8 954.8 Flue Gas a Flue gas at AH niet th | 7080.0) 998m 390 7036.0_| Flue gas at AH outlet_| un | 1165.0 | 1081.0 7180 1121.0 Fuel ‘Coal(HHV= 4100 uh 149.0 138.0 884 143.0 kealrkg) “CustomeriPlant:0VG/CHANDRAPURA TPS -Units#7&0-2X250MW ‘Cont.No.:03688 0369 | Rev.00 Rev.ot Rowe Revs Engineer: BMM i Reviewer:ACRISCS | 4 [appreverscs BOILER PERFORWANCE EPROPOSALS PagoDore CPT-1806 (035880369-V-A1-T01-4 \L TEMPERATURE Description Unit HP Heaters in Both HP Heaters out 100% | 100% | 60% TMCR | 250MW emcr| TMCR | 150MW 250MW_ ‘Steam Sat. emp. in Drum “6 | 381 350, 34a 348 TISH outiot ce _ | 405 a0 aia a2 ‘SH Platen inlet "6 [405 395 74 a8i ‘SH Platen outlet =e | 506 506 514 502 ‘SH Finish inlet *o_| 506 50S 14 B02 [SH Finish outlet "| S40 40 540 540 Riiniet se | 342 342 330 32 RH outlot c_ | BAO ED BAO 0 Water Esoronearienee c | ar 246 223 165 Economiser outlet | 278 280 264 2a Air Ambient sc | 40 40 40 40. ‘AH Outlet (Primary) sc | 308 208, 284 2m ‘AH outlet (Scoondary) =o [314 32 286, 276 Gas SH Platen inlet "| ti82 [1782 718 1a RH Front inlet e_ | 0oT [1007 B24 oS RH Rear inlet 0 | ea7 wa 753 ear SH Finish inlet 76_|_740 732 ad 725 UisH inlet cf ei og 350 or Economiser inlet 6 | #48 a9 a5 wR Airheater inlet 7e_| 340 336 204 239 ‘Airheater outlet “c_| 140 740, 133 1s (Corrected) ‘Gustomer/Plant DVG/CHANDRAPURA TPS -Units#7&8-2X250MW ContNo.:0368&0369 | Rev.00 | Revi | Rev.02 Rev.03 Engineer: SMM Reviewer: ACRISCS, ‘Approver: SCS ‘BOILER PERFORMANCE SPROPOSALS Pagesaf8 OPT-1808 D36RB359-V-A1-TO1S I, PRESSURES (STEAM AND WATER) Description Unit HP Heaters in Both HP Heaters out_ 100% | 100% | GO%TMCR | 250MW emcr | T™cR | 150MW 250MW Pressure ‘Superheater outlet__| kglem™@) | 7650 | 1541 7508 1633 Platen SH Outiet Kofen(a) | 1609 | 1586 7527 ert LTSH outlet kgiom™(@) | 1653 | 1628 54a | 1008 Drum kgion™(g) [1700 | 1659 756.1 B42 Eoonomiser inlat Kgiom®(q) | 1748 | 1708 7593 158.4 Reheater inlet kgiom() | 384 | 378 233 386 Reheater outlet kgiem®(q) | 373 | 358 224 366 | Pressure Drop ‘Superheater system | kgm? | 150 | 128 32 709 Reheater system Kojo” [20 20 12 20 Eoonomiser (Fricton | ko/om™ | 2.6 22 } 19 only) ‘CustomeriPlant:OVC/CHANDRAPURA TPS -Unite#7&8-2x250MW_ ‘Cont.No.03688 0369 | Rev.00 Rev.0t Rev.02 Rev. Engineer: BMI ‘Approver:SCS BOILER PERFORMANCE SPROPOSALS Pagedofe OPT-1806 DGRBKORHO-V-A1-TOI-A (ie IV, PRESSURES AND DRAFTS (AIR AND GAS) Description | Unit HP Heaters in Both HPHeaters - _ out 100% | 100%TMCR | 60% TMCR | 250mW BMCR | 250MW 4500 Primary air PA Fan inlet mmwe | 19 8 7 “18 PA Fan outlet imme | 616 386 B14 603 ‘Aimoator niet mmwe | 585 556 296 B72 Almheater outlet | mmwe | 563 337 486 BAT Winter mamwe | 381 360 384 368 Will outlet mmc | 205 198 181 197 ‘Secondary air FD fan inlet camwe | 78 “18 5 “6 FD fan oulet Tame | 360 308 772 37 ‘Aimhoator iniot mamwe | 324 286 765 204 ‘Airheater outlet | mmwe | 165 146 4 749 Windbox pressure [mmwe | 100 700 700 700 Gas SH Platen inlet mmwc [<5 5 e 5 RH inlet mawe | 8 6 6 6 ‘SHFinish niet fmmwe | 1 10 8 at LTSH infot mmwe | 17 5 a0 TT Economiser inlet rimwe | 27 33 20 36 Airheater inlet mawe | 93 82 46 9 EP iniet mmwe | -248 “AT 107 225 1D fan inlet mmwe | 300 “263 a7 287 TD fan out! mirmne | 447 7 75 38 ‘Customer/Plant OVCICHANDRAPURA TPS -Units#7&8-2X250NW Gont.No.:03688 0369 | Rev.00 Rev.0t Rev Rev.03 Engineer: SMA Reviewer: ACRISCS ‘Approver:SCS. BOILER PERFORMANCE BPROPOSALS Page soto GPT-i806 (036880369-V-A1-T03-7 (a V. FUEL The fue! aata for Gesign coat are as totiows: Description Unit | Design Coal Fuel Proximate Analysis : Fixed carbon % 36.3 Volatile matter % 16.0 Moisture % 60 Ash % 40.0 ‘Grindabilty index HG 50 Higher Heating Value (HAV) Keavka 4100 Size of Coal to Mill mm 25 Ultimate Analysis Carbon) % 4283 Hydrogen % 267 Sulphur % 0.32 Nitrogen % 0.81 Oxygen % 7.37 Moisture % 60 Ash) % 40.00 ‘Customer/Piant:D VCICHANORAPURA TPS -Units#7E8-2X250MW ‘Cont.No.:03688 0369 | Rev.00 Reyot | Rev.02 Rev.03 | Engineer: BMI Reviewer:ACRISCS ‘Approver:SCS ‘BOILER PERFORMANCE EPROPOSALS age6ors _ GPT-1806 096880369-V-A1-T01-8 in VI. MILL AND BURNER PERFORMANCE Description Unit HP Heaters in Both HP Heaters out 700% | 100% | 60% TMCR | 250MW amc | twcR | 150mw | P= 250mW. No. of mills in 2 2 15 2 Operation Air flow per mill th | 1153 | 1125 107.6 113.9 Ac temp, at ml infet «c | 168 181 167 185 Mill outlet temperature | °C Fineness (thru! 200 % 2 6 80 73 mesh Bummer tit Deg | -12 45 +20 22 Burners in operation aBcD | ABCD CDE ABCD ‘Gont.No..03688 0369 | Rev.00 Rev.0t Rev.02 Rev.03 Engineer: BM Reviewer:ACRISCS ‘Approver:SCS. BOILER PERFORMANCE &PROPOSALS Page7 ofS OPT-1806 (096860359-V-A1-T01-8 VIL %0z, CO; (DRY VOL.) AND EXCESS AIR Description Unit HP Heaters in ‘Both HP Heaters Out 700% | 100% | 60%TMCR | 250MW BMCR | TMCR 150mW 250MW Oxygen in gas at % 3.55 3.55 3.55 3.55 Economisor outlot Carbor-dr-oxide in 156 156 166 156 gas at Economiser outlet Excess airin gas at |» oo 20 20 20 Economiser outlet ‘Customer/Plank DVCICHANDRAPURA TPS -Unite#78%-2X250MW ‘Cont.No0368& 0363 | Rev.00 Rev.0t Rev.02 Rev.03 Engineer: BMW Roeviowor ACRISCS L ‘Approver:SCS BOILER PERFORMANCE &PROPOSALS Pages os CPT-1806 (936880369-V-A1-T01-16 sa Vill, HEAT BALANCE(As per BS-2885) Description Unit HP Heaters in Both HPHeaters Out 100% 100% 60% TMCR: ‘250MW BMCR TMCR 150MW 250MW Losses Dry gas % | aa | ate 4.007 3.466 HO infuelsurtand | % | g9o7 | o.s07 0.903 0.897 inherent HO remeombuston] -y | seen | aes 3615 3.591 of He 1,0 inar % | 0255 | 062 0248 0215 Unburnt Carbon % 30 30 30 30 Radiation % 0.20 0.21 0.33 021 Unaccounted % 0.86 0.86 0.86 0.86 Manufacturer margin | % | 1.900 | 4.000 1.000 4.000 Total losses % 13.97 14.04 13.96 13.24 Heat credits %e 0.64 0.63 0.61 0.63 Efficiency % 86.67 86.62 86.65 87.39 TustomoriPlant OVCICHANDRAPURA TPS Unitsi7&3-2250MW Conta..03688 0368 | Rev.00 Rev.0i Rev Rev Engineer: BM RoviowersACRISCS ‘Approver:SCS. ‘BOILER PERFORWUANCE SPROPOSALS Page dof OPT-1806 (03684 0969-V-A1-T01- PREDICTED PERFORNANCE~CURVES: CONTENT: DESCRIPTION DESIGN COAL I LOAD Vs SHO FLOW a1 II LOAD Vs SHO PRESSURE 02 TII LOAD Ve SH/RH OUTLET STEAM TEMPERATURE 93 IV LOAD Vs EXCESS AIR (Design Coal) os ‘v LOAD Vs BURNER TILT (Design Coal) 05 VI LOAD Ve SH SPRAY(Design Coal) 06 VII LOAD Vs STEAM TEMP AFTER DESH (Design Coal) 07 VITI LOAD Ve TOTAL AIR FLOW (Design Coal) og 3 | The attached Performance curves are predicted only and | are not to be construed as being guaranteed except [ where the values coincide with guarantees stated under the performance guarantee section. ‘Busiome’/ Plant: OVCI CHANORAPURA #788 TPP 2x 250 WW (Bonk No. 66,0368 Ray. 6 Text Rent Rev OF I Oae_| Sgn [Dae | Sgn [baa | Sip | Bae Egnos BWA /P5 SeSeste Reviews SCS [las Aoprewer SCSRIKE BOILER PERFORMANCE & PROPOSALS CFT. 1807 (035880960-V-A1-T01-12 LOAD Vs SHO STEAM FLOW 300 800 700 & 1 800 5 E | z 5 500 g & 400 300 200 50 60 70 80 90 109 Loap % ewcR SHEET 10F 8 [Customer7Plant 1 —DVC/CHANDRAPURA =Ex ICont No. : 03680380 Revd Revi Feud Revs [Sign Date [Sign [Dote [Sign [Ooie Sign. _[Dcte [Enger Boa 7 PR | era] WicTeT fReviewer_SCS Gf tele [approver SCS/RKr BOILER PERFORMANCE & PROPOSALS CPT= i601 (036840359-V-At-TO1-13 (a |) FLOW HP Heaters in Both Description Unit HPHeaters out 100% | 100% | 60%TMCR| 250mW BMCR TMCR 4150MW 250MW ‘Steam —| ‘Superneator outlet th | 8100 | 7420 7553 ware Reheater oullat ah | aaa | 6659 ai5 a S702 Water Feed water wh | 8100 | 7780 a8 was ‘SH spray Uh 0 24.0 40.0 37.0 Air Altheater oullat wm | waa | 1147 309 188 {Primary) Tempering ar wm | tora 1103 B05 1 ‘Aiheater oulet wh | 7133 | 6435 a4 ‘3765 ‘Socondary) Leakage alr ioboler |" Th B00 500 300 500 Total Combustor Ar | un | 9938 | S785 587.8 WAS Flue Gas. Flue gas atAH inet [1080.0 | 3580 (S10) 70380 Fluo gas at AH outiot_| uh | 1165.0 | 1087.0 718.0 121.0 Fuel Coal(HHV= 4100 Uh 149.0 138.0 86.4 143.0 kealkg} ‘Customer/Plant:DVCICHANDRAPURA TPS “Unite#788-2X250NW Gont.No.:03588 0368 | Rev.00 Rev.01 Rev.o2 Rev.03 Engineer: BWIA Roviewer:ACRISCS ‘Approver SCS. BOILER PERFORWANCE &PROPOSALS Page Zoro OT 1806 (096860359-V-A1-TO1-4 Ci PREDICTED PERFORMANCE CONTENTS SECTION DESCRIPTION SHEET No. | 1 FLOW 2: W TEMPERATURE 3 w PRESSURE (STEAM & WATER) 4 v__ | PRESSURES & DRAFTS (AIR & GAS) 5 v FUEL - 6 l vi MILL & BURNER PERFORMANCE - vi [0;, CO, REXCESS AIR 8 vil) HEAT BALANCE 9 ‘The altached Performance Data are predicted only and are not to be construed as being guereniced excep where the values coincide with guarantees stated under the performance guarantee seciion. ‘Customer/Plant:DVC/CHANDRAPURA TPS -Unite#7&6.2X250NW Cont.No.:03686 0369 | Rev.00 Revor | Rev.02 Rev.03 T Engineer: BWM Reviewer: ACRISCS, i [Approver:SCS BOILER PERFORMANCE BPROPOSALS, Page TofS OPT-1806 (036880369-V-A1-T01-3, CONTRACT DATA SHEET PACE No, 2/2 ig -—~ CONTRACT No. : 0368 & 0369 | contract pare : 30.08.2008 _ COAL WET OUST] Gas] press | FLUE OAS Te DUST COLLECTOR wace [revo | Nos. [RELOUST] fas 7 press | Figs, OLLECTON gms/Nn3|_ 1h | mmuc | mi/s | emmeenor “CECTROSTATO PREGPITATOR Eveline su | a | 2 | o69 | 1655] 25 | sore | s.ze (FARR B1450~-7136150-2) ee PIPE LINES WAN STEAM HOT REHEAT cou eneat [FEED WATER eens © 2600310 | co 5088 28.58 | 00 «972% 127 | 00 368 x «8 Sie Matt. Spee SA 335 P22 5A 395 P22 SA 106 Gee A 106 Gee [Noor ones wo THO wo NE BOILER MOUNTINGS Toemio | RE wae [Nos [ser PRESSURE nt] RUM 173 VE Bet | 2 [issarwe0 carery vetmg OMT Poel BR 3 RE wer | 178s wo ma | see] 1] 70 mouner | 706 wo - mo | sia | 2e2 esas ome wa fe waren taven worcaron| wm | Od Ste | ‘eoour MAIN PARAMETERS rue DESIGN COAL ci wer | Ter [eonaver| S077 FFA GENERATOR ww = [20 wo | 230 SEER vm wae [720 [asa | oa Mad REHEAT vn eoaa | 6659 | 4154 | a7oz TOTAL FEAT UF ikea waa7 [a6 [so | oma PRESSURE AT SUPERMEATER OUTET iafenatey [1880 [1581 [moa | TSB 2 een Nera % a “9 [PRESSURE AY REHEATER INLET ig/em2(q) soe [sre [ass | sa6 | [eweteaTone at ReneATeR WLET 8 waar [3422 [2208 | Sore PRESSURE AT REHEATER OUTLET _badema(g) 35 | 38.8 22.1 366 TEMPERATURE AT REHEATER OUTLET % 540 540 540 540 FEED WATER TEVPERATRE % mea [rss [2233] 1036 AMBIENT AIR TEMPERATURE % | 40 40. 40 40 COMBUSTION AIR TEMPERATURE SECONDARY ee a4 32 284 an FUEL QUANTITY th 149 138 38+ 143, AIR QUANTITY (TOTAL) fn | 994 | s19 588 955 ] [Tew oF GAS AT SOLER EAT (CORRECTED) c ws sae z EFFICIENCY Asep ON HEV ® 86.67 | 86.62 | 85.65 | 87.39 4 cs68k0350-V-A1-TO12 # Han CONTRACT DATA SHEET PAGE No. 1/2 CONTRACT No. : 0368 & 0369 | contract ave : 20.06.2004] PURCHASER : OAMODAR VALLEY CORPORATION - PLANT NAME : CHANDRAPURA#7&3—2x250MW| CONS.ENGE : [unary {ASH FUSION TEMP. hy | OeNDASIUTY PROPOSED FUEL: COAL = * wears | te FE % 3830 | vox 1600 [ur 186 [ax a00%| sx 0.38 = ‘#00 | 80 FUEL FIRING EQUIPMENT PE [GOAL =TLTING TANGENTIAL ‘lL BURNER [ives = TUBE WL BaD 4772 WAKE @ Now| @ [SHEL : 24 By om 72 WAKE a Nox. BHEL = 3 CONTROL @ | AR oAWPER & | aie Daweer [GAPACITY :73 1/1 @ 72.9 7 SKU LOM GAPAGTY(Maxy % |_41.8 Nkcoi/h (WAKALLOMAGLE)|@ @ [11.3 Mkcal/n MOTOR KW s 2400 2 [corn & [oor YSTEM : pee Ssuncen/Oa0 PA OISPOSTION vERS ‘CORNER 07 J FURNACE | TYRE = BALANCED ORAFT CONSTRUCTION : FUSON WELDED WALLS [a UME m3 | 3668 aii ‘woTH 40 erm 1 mom | _AUME m® | 866 — OTH 15240 DEPTH 11808 ane tS BOILER | NATURAL ORCULATON, RADIANT REHEAT 7i200P S| oesGN 81225 1320 88-635, oesioxarion HES TES r77a ~ newe SUPERHEATER OUTLET :1550 = STAGE I a STAGE s INSTALLED TPE; PLATEN SUPERNEATER = | 1se (@Roecten) 2 TOTAL HS. mm? 11406 [SraGE ar 6 ue ano ATTEMPERATOR Tye: spRaY | Ne. OF STAGES: Single | MEDIUM OF SPRAY : FEED WATER REHFATER Te: SPACED TIAL HS, agg | CONTROL | @UER TA eaCESS AR TOTAL HS ECONOMISER | TRE: PLAN TUBE in 5517 | No. OF BLOCKS TWO s _ | a a AIR HEATER | TE [TOF BS 20ets | aTOR Kw 4 nora xeceneramve frm? (EACH) [eae geil 2.5 wT 2000 : two | make: eHEL BOILEK AUXILIARIES FANS | ne wan [non | FBR PRESS [EYP] ORE | SPEED THOTORT contro FD FAN API =18/47 BHEL | 2 B23_[ 50 [MaTOR| 1480 | 825 | BLADE PitcH [Pa ran [apa=i7/Az | ave | 2 [ wovoe| 1430 | 178 | stane prrcrh FAN [nozv 38 sioow| enEL [ 2 To [woos] 740] 1825 lwo. coupuncsAust OAMeR| GR FAN [NOT APPLCABLE { SEAL AR Faifeesr vos | Brel] © | 39 | 682 | 60 [ woTOR| 2600 | v20 [ier vaNE(uenua) SOOT BLOWERS é& TEMPERATURE PROBES 3CATION TE | waKe Twos] NEDUM ruRWACE TSVPERATURE PROBES ac 3 - FURNACE WAL BLOWERS BHEL 36 | _Sitaw SRW te B00 LONG RETRACTABLE SooT BLOWEDS | @HEL tw STEAM ‘AR HEATERS, ROTARY SWNEL ARM BaEL 2 STEAM To | - “|i LOAD Vs SHO PRESSURE | 70 — tes _ _| I] | | 169 { = | I 8 t e145 i ! 3 | | ves J - = | 135 = a | | | | 125 | = po of | so 89 7 80 90 102 load % eMcR SHEET 20F 8 (Costemer7Plant 7 BYC7CHANDRAPURA § 7kd —2 x 250 MW [Cont No 03680369 | Rev.0 Revi | Rew? Rev.5 a ~|Sign. _[Dote jan. |Date [Sign [Oate Sign, [Date [Engineer BMM | PSS SER fulssto | Reviewer SCS Pas [aporover SCS/RKF +e = — 4} BOILER PERFORMANCE & PROPOSALS | cPT— 1801 036820868-V-41-TOT-14 LOAD Vs SH/RH STEAM TEMPERATURE 575 4 | ss0 | { | SH ay 525 LL 3 8 1 500 5 5 475 {| 3 450 I 225 t ' 400 | | so DB a 08 loa = BOR SHEET OF @ | lesarer/ETant-— DVC7CHANDRAPURE BTS =2-¥ GSO | Co Ne 0366,0089 Ea ae ied a | _ Isign. Oote _|Sign._[Date Sign [Dote (Sign. _|Oate | rcineer Su JPET neal — Reviewer Sos Pataki [approver SCS/RKr 7 BOILER PERFORMANCE & PROPOSALS 368 0980-V-AT-TO1-15, EXCESS AIR (Design Coa‘) 2 | = i x 21 G { E 8 | < a = | & | 2 is | ' 14 + =i so 80 » 80 90 100 lon GMCR = SHEET 40F 8 |ecstomer7Plant-7—DVC7CRARDENPURAEYE5_=-x 250 NW ont No. 05680060 | Rev0 Revi feud | __ fev TSaa joes Sen [bole [Sion _[Dale [Sex [Date as Nips, pena sos7aee | — t BOWLER PERFORMANCE & PROPOSATS ePT= 1801 0368°.0969-V-A1-T01-16 i LOAD Vs BURNER TILT - Design Coa TAT — DEGREES a | -15 4 | “ so &0 10 20 oe aie Costomer/Plent > DVO/CHANDRAPURA f-7H5=2 x 250 MW [Cont No, : 0368,0969 Rev 0 Real Reva Reus sige Toles [sign _[Oote [Sige [Date [Sign _[oote [enaineor pum PTT | ey |i Jes Tot | Reviewer SCS. (pa fee Seam 1 OT C BOILER PERFORMANCE & PROPOSALS CPT— 1801 036840908-V-A1-101-77 \ | = LOAD Vs SH SPRAY-Design Coal | { } 40 { } | | | Sy \ 3 + © i q s 20 — pas \ j oO | Q : 4 a Loag % @MCR | SHEET 6 OF 6 [Sustomer’Piont , DVC7CHANDRAPURA pf 7&2 [cont No ~:068,0389 Rev fez 4 ign. |Daie Sign. [Date Enanesr Bu 2 ose “| Reviewer SCS ee me IO i Ll BOILER PERFORMANCE & PROPOSATS __. CPT— 1601 096680960-V-Ai-7O1-18 LOAD Vs STEAM TEMPERATURE AFTER DESH (Design Coal) 410 = 380 fu. STEAM TEMPERATURE ~ DEG.C + t 40 30 80 70 a 30 100 \oaD % BCR = __ as SHEET 7 OF 8 | (Customer 7eTary =< OVC CHANDRAPD ee) [Cont No. + 0366,0369. Rev. | Rev.3 [ser [Dole Sign. [Dek Engineer Bu [P| 1 Reviewer SCS. { lapprover Scs/REr_— = i t BOILER PERFORMANCE & PROPOSALS. CPT— 1801 | osa8ng69-v-Al-TO1-18 LOAD Vs TOTAL AIR FLOW — Design Coal 1000 | i; | | 900 : T a 800 = g = 1 = 5 2 % 700 { a | Py ~ T BO + + so 60 70 eo so 100 Lon % BMCR SHEET 8 OF 8 {eustomor7PIGnT —DVC7CHANDRAFORE 778 Ex PSO NW Gont No 0808,0862 T Rev.d fav Hed] Rew Sign Jools [Sign Oete [Sign [Date _[Sign._[Date [Engineer DWM 77) 1 _| i Revinwer SCS | 1 {BKr 1 BOILER PERFORMANCE _& PROPOSAIS _—cPT= 1807 196880980-V-A1-T01-20, am — Sooper [ & [ = T 2 8] yo0rauo [eon nv 39 ae "hung eh vis : Ia sn ae ae ee he oo io iol Ok OOH BE Oo auiinn SivShuomia avant ave nde ° an bse x * BLASTING VANdVYaNVHD nollvNastos Sty vee eive ae Eon Foe E Moon eer eesy 8 (0) e054 Ge ~aanssaee HE 4 a th] o» F Soe F Goo. £ Bone | e Ee be a not coos a3 = Fos Fs oor F Eos: &| cove B fs G Es — JH Roe Et cor F| ove t ass — ae — Ee eas Fg aoa ose 5 2. 18S “dna ws Hes | = Ee _| = oxi FF cs L e590 ot 1 ; on E| coe were mou sn 2/8 osi-rasaws on + | al ; 1 01 E cop j 3 as ig ae H nee la ae le B j [| can ra snes EE z ? ae Ie Hi] tp oom ais ¢ z g ul eg: 8 i 2 2 Ta Us Bit a Se a | aa, 78 ls et lla Mid ie ala|- Pan abs ig als rite fl a £ moe ia ae 8 iF fe Hid Tad E : | dg i f ue P 8 “ 3 i Ly 3 é [| t \ Li t z } if | 2 LI NTE SR) «| 7 Evo nas wa a g 8 3 8 g 8 OSUNTT STVORILOg IA AAVEH LvaVHE WN Oz 2 S#PL#SLINN VUNdVHINVED NOWWADENOS LSTA aN ae 00 rose 16 ames wai + 9. G28 ana wis Haus MoU is | soveerabr aptherereber (ehewn/O ur aerssteg WEIS renee penn Prarie, NeRETOT ~ynncoane

You might also like