Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
215 views
27 pages
Boiler Design Data 250 MW
Design data of boiler 250 MW thermal power plant.
Uploaded by
Amitava Pal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Boiler Design Data 250 MW For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
215 views
27 pages
Boiler Design Data 250 MW
Design data of boiler 250 MW thermal power plant.
Uploaded by
Amitava Pal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Boiler Design Data 250 MW For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save Boiler Design Data 250 MW For Later
You are on page 1
/ 27
Search
Fullscreen
CONTRACT DATA SHEET PAGE No. 1/2 ci ITE —— CONTRACT No. 0368 & 0369 CONTRACT DATE : 30.06.2004} PURCHASER : DAMODAR VALLEY CORPORATION PLANT NAME : CHANORAPURAg7&3—2%250uw]| CONSENGR OmUFy way | eenoasuty PROPOSED FUEL: COAL Kea /Kg (Hoty Fo x 3830 | voLx 1600 [we 180 [ax 1000] Sx 032) 4100 50 FUEL FIRING EQUIPMENT Tee ie [ GOAL: TITNG TNGSIMAL | [OL BURR | [RPE WE WL BBD A772 ware «vow. | % [ave : 20 Egive 7a Wake & Nox BreL = 3 conrea, | & [AR DANPER 32am onwpen | [eAPNaTY 75 1H @ maa F BAL Lon caPacTr(uad] Z [4.6 wkca /n waxaliowame)|® [11.3 weca/n | 2 MOTOR Kw: 2600 oisposimon | * | cowNERs corner EVSTEM:: pneseuecan/C010 PA FURNACE _[7Vee : BALANCED ORAFT [CONSTRUCTION : _fUSON WELDED WALLS TS WOT 15200 mm | OSH NEGE mm | eS [8B TEL HEAT WEUT hath 7 so BOILER | NATURAL GIRCULATON, RADIANT REHEAT OUTDOOR |S} desion : 1025 vesionanon Fas eS ERE 770 - E'S) sueemseaTer oumer: 156.0 [sme SOS Te] SopRRHE: ~ | 7955 ae TYPE :_LOW TEMP. SUPERMEATER = STAGE? & é ; INSTALLED TYPE; PLATEN SUPERHEATER = 1341 (PROJECTED) TOTAL HS. m? 11408 [Stage 6 TYPE; SPACED FINAL SUPERHEATER ae ATTEMPERATOR TRE: SPRAY Ne. OF STAGES: Single | NEDIUM OF SPRAY : FEED WATER REHEATER | TE: SPACED TALKS 5 3700 CONTROL : BURNER TILT, EXCESS ARR TOTAL HS RCONOMISER | 1WP= » PLAN TuBe o 5517 No. OF BLOCKS : TWO | ao — AIR HEATER | FE TOYAL AS. = 20613 | woroR KW 1 F = ROTARY REGENERATIVE mm? (EACH) ee 278 WMT 2000 | nos. wo MAKE: BHEL BOILEX AUXILIARIES FLOW] PRESS. [TENE] ORVE | SPEED | MOTOR FANS TPE ware [nos] 3 mmwe | ee Spee [ROTOR] conto. FO FAN [aPintsAT | BEL | 2 [ino | 223 | 50 [MOTOR] 1420 | 825 [BLADE PITCH PA FAN APZAT/Z are. | 2 | 75.0 | 1300 | 50 | wotor| 1480 | 1275 | BLADE PITCH ID FAN [nozv 33 spor) eFeL | 2 [2520 | 488 [10 | woTOR] 740 [1625 jxvo. COUPLNOTALET OANPER GR FAN [Not APPLICABLE IrcAL Ae Fan|wesr tae | FEL] 6 | 38 | 1682 | 50] woTOR| 2660 | “120 | NLET vANE(Manua) ‘SOOT BLOWERS & TEMPERATURE PROBES SATION TYPE WNE Nos] MEDIUM FURNACE TEMPERATURE PROBES BHEL 1 = i FURNACE WALL BLONERS: BHEL 55 | STEAM SARE & E00 LONG RETRACTABLE SOOT BLOWERS | BHEL 18 STEAM "AR HEATERS ROTARY SWIVEL ARM BHEL 2 STEAM| CONTRACT DATA SHEET PAGE Ne, 2/2 uffa he CONTRACT No, : 0368 & 0369 NRACT DATE « 30.06.2008 iy CO, SY COLE: | IME} BURT] GAS] press | HUE OS TG DUST COLLECTOR want fricio | Nos |RELOUSTT Gis, pees [TIE OECTION gms/Nm3 | t/h mmwe m/s EFFICIENCY % TETRORTAT iTATOR t EEEEEET fea fe] a] es | mes] [aoe [ame [PIPE LINES an sTcaN [HOT REVEAT (COLD RENEAT FEED WATER | ceriam | @ 2000x510 | 0 ssea x 2080 | co as72 x27 | oD 300 x a8 ‘se nou ee $A 335 P22 SA 335 922 ‘SA 106 cet SA 106 Ge No, OF UNES TAS M0 70 one BOILER MOUNTINGS Locanon | Tree, waxe | nos.| ser paessuRe xe/ent TSO Wa | BRE 1 /eZ5 on 40_W3_ BHEL 2 | 186.2,188.0 a awe eee 1887 SH OUTLET lev ie3e we ~ owl ener | 2 [eae Sal ¥ VALVES ‘RM INLET. 4786 WB — Rint ‘HET. 1 [sto rw ounet | 796 wo - avo | oie, | ze] anaase aa OMG i 2 wn NACE LEVEL avDIOAtCR WLI (SHELMSION 20M)) BHEL 2 MAIN PARANETERS FUEL DESIGN GOAL [unr ace | Two [sonawor| ag A Laid * 250 «| 150 250 TsuPthrear wh biog | rz0 [asta | 6.9 Row REMEAT vA cena [e559 | ate4 | 6702 TOTAL MEAT BUTY ee5i7m s27 fess [sao | ont 5. [PRESSURE AT SUPERHEATER OUTLET 1 kg/ema(gh 1550 | 1541 | woo | 1853 é TEMPERATURE AT SUPERMEATER OUTLET ca seo | sao | 540 540 ° [PRESSURE AT REHEATER INLET kaZemata a4 [are [233 | 386 | Tewbemanune aT @EREATER MET 8G 3431 | 3482 | sae | sole ESGURE_AT REREATER OUTLET tafe) as [asa [rr | 366 TEMPERATURE AT REHEATER OUTLET 0 [seo [$40 [sao | 540 FEED WATER TEMPERATE " % [28 | 2489 [2235 | Toso [AMGEN Am TENPERATURE % « | o | o | 0 COMBUSTION AIR TEMPERATURE SECONDARY °c m4 32 284 amt FUEL QUANTITY Uh vo [ie fase | 143 TAR QUANTITY CTOTAD ve aig _[ see | ass | [HE OF GAS AT BOKER EXIT (CORRECTED) fe 140 | se 1a EFFICIENCY 84se0 oN HHY x 067 | 2652} ases | 4739 |ca PREDICTED PERFORMANCE CONTENTS SECTION DESCRIPTION SHEET No. t FLOW 2 u TEMPERATURE 3 m PRESSURE (STEAM & WATER) 4 wv PRESSURES & DRAFTS (AIR & GAS) 5 v FUEL 6 vi MILL & BURNER PERFORMANCE: 7 vit Q2, 00) & EXCESS AIR 8 vil HEAT BALANCE s | The attached Performance Data are predicted only and are not tobe construed as being guaranteed except where the values coincide with guarantees stated under the performance guarantee section “Cuistomer/Piant DVCICHANDRAPURA TPS -Untsh7&S.2X2500W GontNo.:03688 0365 | Rev.00 Rov.01 Rov.02 Rev.03 Engineer: BM] Reviewer ACRISCS t [Approver:ScS t BOILER PERFORMANCE PROPOSALS Page 1019 GPT-T606 (035880369-V-A1-TD1-3(ai 1) FLOW g HP Heaters in Both Description Unit ite out 100% 100% | 60% TMCR | 250MW BMCR TMCR 150MW 250M ‘Steam ‘Superheater outlet th 810.5 742.0 455.3 6819 Reheater outiet wh 694.4 665.9 415.4 670.2 Water Feed water uh 810.0 718.0 415.3 644.9 ‘SH spray th 8 24.0 40.0 37.0 Air af Airheater outlet uh 123.4 M47 80.9 139.8 Primary) - _| ‘Tempering air wh 107.4 110.3 80.5 86.1 ‘Aimeater outlet wh | 7133 | 6435 Wee 769 (Secondary) L Leakage air to boiler Uh. 50.0 50.0 50.0 50.0 Total Combustion Alr wh 993.8 916.5 ‘987.8 954.8 Flue Gas a Flue gas at AH niet th | 7080.0) 998m 390 7036.0_| Flue gas at AH outlet_| un | 1165.0 | 1081.0 7180 1121.0 Fuel ‘Coal(HHV= 4100 uh 149.0 138.0 884 143.0 kealrkg) “CustomeriPlant:0VG/CHANDRAPURA TPS -Units#7&0-2X250MW ‘Cont.No.:03688 0369 | Rev.00 Rev.ot Rowe Revs Engineer: BMM i Reviewer:ACRISCS | 4 [appreverscs BOILER PERFORWANCE EPROPOSALS PagoDore CPT-1806 (035880369-V-A1-T01-4\L TEMPERATURE Description Unit HP Heaters in Both HP Heaters out 100% | 100% | 60% TMCR | 250MW emcr| TMCR | 150MW 250MW_ ‘Steam Sat. emp. in Drum “6 | 381 350, 34a 348 TISH outiot ce _ | 405 a0 aia a2 ‘SH Platen inlet "6 [405 395 74 a8i ‘SH Platen outlet =e | 506 506 514 502 ‘SH Finish inlet *o_| 506 50S 14 B02 [SH Finish outlet "| S40 40 540 540 Riiniet se | 342 342 330 32 RH outlot c_ | BAO ED BAO 0 Water Esoronearienee c | ar 246 223 165 Economiser outlet | 278 280 264 2a Air Ambient sc | 40 40 40 40. ‘AH Outlet (Primary) sc | 308 208, 284 2m ‘AH outlet (Scoondary) =o [314 32 286, 276 Gas SH Platen inlet "| ti82 [1782 718 1a RH Front inlet e_ | 0oT [1007 B24 oS RH Rear inlet 0 | ea7 wa 753 ear SH Finish inlet 76_|_740 732 ad 725 UisH inlet cf ei og 350 or Economiser inlet 6 | #48 a9 a5 wR Airheater inlet 7e_| 340 336 204 239 ‘Airheater outlet “c_| 140 740, 133 1s (Corrected) ‘Gustomer/Plant DVG/CHANDRAPURA TPS -Units#7&8-2X250MW ContNo.:0368&0369 | Rev.00 | Revi | Rev.02 Rev.03 Engineer: SMM Reviewer: ACRISCS, ‘Approver: SCS ‘BOILER PERFORMANCE SPROPOSALS Pagesaf8 OPT-1808 D36RB359-V-A1-TO1SI, PRESSURES (STEAM AND WATER) Description Unit HP Heaters in Both HP Heaters out_ 100% | 100% | GO%TMCR | 250MW emcr | T™cR | 150MW 250MW Pressure ‘Superheater outlet__| kglem™@) | 7650 | 1541 7508 1633 Platen SH Outiet Kofen(a) | 1609 | 1586 7527 ert LTSH outlet kgiom™(@) | 1653 | 1628 54a | 1008 Drum kgion™(g) [1700 | 1659 756.1 B42 Eoonomiser inlat Kgiom®(q) | 1748 | 1708 7593 158.4 Reheater inlet kgiom() | 384 | 378 233 386 Reheater outlet kgiem®(q) | 373 | 358 224 366 | Pressure Drop ‘Superheater system | kgm? | 150 | 128 32 709 Reheater system Kojo” [20 20 12 20 Eoonomiser (Fricton | ko/om™ | 2.6 22 } 19 only) ‘CustomeriPlant:OVC/CHANDRAPURA TPS -Unite#7&8-2x250MW_ ‘Cont.No.03688 0369 | Rev.00 Rev.0t Rev.02 Rev. Engineer: BMI ‘Approver:SCS BOILER PERFORMANCE SPROPOSALS Pagedofe OPT-1806 DGRBKORHO-V-A1-TOI-A(ie IV, PRESSURES AND DRAFTS (AIR AND GAS) Description | Unit HP Heaters in Both HPHeaters - _ out 100% | 100%TMCR | 60% TMCR | 250mW BMCR | 250MW 4500 Primary air PA Fan inlet mmwe | 19 8 7 “18 PA Fan outlet imme | 616 386 B14 603 ‘Aimoator niet mmwe | 585 556 296 B72 Almheater outlet | mmwe | 563 337 486 BAT Winter mamwe | 381 360 384 368 Will outlet mmc | 205 198 181 197 ‘Secondary air FD fan inlet camwe | 78 “18 5 “6 FD fan oulet Tame | 360 308 772 37 ‘Aimhoator iniot mamwe | 324 286 765 204 ‘Airheater outlet | mmwe | 165 146 4 749 Windbox pressure [mmwe | 100 700 700 700 Gas SH Platen inlet mmwc [<5 5 e 5 RH inlet mawe | 8 6 6 6 ‘SHFinish niet fmmwe | 1 10 8 at LTSH infot mmwe | 17 5 a0 TT Economiser inlet rimwe | 27 33 20 36 Airheater inlet mawe | 93 82 46 9 EP iniet mmwe | -248 “AT 107 225 1D fan inlet mmwe | 300 “263 a7 287 TD fan out! mirmne | 447 7 75 38 ‘Customer/Plant OVCICHANDRAPURA TPS -Units#7&8-2X250NW Gont.No.:03688 0369 | Rev.00 Rev.0t Rev Rev.03 Engineer: SMA Reviewer: ACRISCS ‘Approver:SCS. BOILER PERFORMANCE BPROPOSALS Page soto GPT-i806 (036880369-V-A1-T03-7(a V. FUEL The fue! aata for Gesign coat are as totiows: Description Unit | Design Coal Fuel Proximate Analysis : Fixed carbon % 36.3 Volatile matter % 16.0 Moisture % 60 Ash % 40.0 ‘Grindabilty index HG 50 Higher Heating Value (HAV) Keavka 4100 Size of Coal to Mill mm 25 Ultimate Analysis Carbon) % 4283 Hydrogen % 267 Sulphur % 0.32 Nitrogen % 0.81 Oxygen % 7.37 Moisture % 60 Ash) % 40.00 ‘Customer/Piant:D VCICHANORAPURA TPS -Units#7E8-2X250MW ‘Cont.No.:03688 0369 | Rev.00 Reyot | Rev.02 Rev.03 | Engineer: BMI Reviewer:ACRISCS ‘Approver:SCS ‘BOILER PERFORMANCE EPROPOSALS age6ors _ GPT-1806 096880369-V-A1-T01-8in VI. MILL AND BURNER PERFORMANCE Description Unit HP Heaters in Both HP Heaters out 700% | 100% | 60% TMCR | 250MW amc | twcR | 150mw | P= 250mW. No. of mills in 2 2 15 2 Operation Air flow per mill th | 1153 | 1125 107.6 113.9 Ac temp, at ml infet «c | 168 181 167 185 Mill outlet temperature | °C Fineness (thru! 200 % 2 6 80 73 mesh Bummer tit Deg | -12 45 +20 22 Burners in operation aBcD | ABCD CDE ABCD ‘Gont.No..03688 0369 | Rev.00 Rev.0t Rev.02 Rev.03 Engineer: BM Reviewer:ACRISCS ‘Approver:SCS. BOILER PERFORMANCE &PROPOSALS Page7 ofS OPT-1806 (096860359-V-A1-T01-8VIL %0z, CO; (DRY VOL.) AND EXCESS AIR Description Unit HP Heaters in ‘Both HP Heaters Out 700% | 100% | 60%TMCR | 250MW BMCR | TMCR 150mW 250MW Oxygen in gas at % 3.55 3.55 3.55 3.55 Economisor outlot Carbor-dr-oxide in 156 156 166 156 gas at Economiser outlet Excess airin gas at |» oo 20 20 20 Economiser outlet ‘Customer/Plank DVCICHANDRAPURA TPS -Unite#78%-2X250MW ‘Cont.No0368& 0363 | Rev.00 Rev.0t Rev.02 Rev.03 Engineer: BMW Roeviowor ACRISCS L ‘Approver:SCS BOILER PERFORMANCE &PROPOSALS Pages os CPT-1806 (936880369-V-A1-T01-16sa Vill, HEAT BALANCE(As per BS-2885) Description Unit HP Heaters in Both HPHeaters Out 100% 100% 60% TMCR: ‘250MW BMCR TMCR 150MW 250MW Losses Dry gas % | aa | ate 4.007 3.466 HO infuelsurtand | % | g9o7 | o.s07 0.903 0.897 inherent HO remeombuston] -y | seen | aes 3615 3.591 of He 1,0 inar % | 0255 | 062 0248 0215 Unburnt Carbon % 30 30 30 30 Radiation % 0.20 0.21 0.33 021 Unaccounted % 0.86 0.86 0.86 0.86 Manufacturer margin | % | 1.900 | 4.000 1.000 4.000 Total losses % 13.97 14.04 13.96 13.24 Heat credits %e 0.64 0.63 0.61 0.63 Efficiency % 86.67 86.62 86.65 87.39 TustomoriPlant OVCICHANDRAPURA TPS Unitsi7&3-2250MW Conta..03688 0368 | Rev.00 Rev.0i Rev Rev Engineer: BM RoviowersACRISCS ‘Approver:SCS. ‘BOILER PERFORWUANCE SPROPOSALS Page dof OPT-1806 (03684 0969-V-A1-T01-PREDICTED PERFORNANCE~CURVES: CONTENT: DESCRIPTION DESIGN COAL I LOAD Vs SHO FLOW a1 II LOAD Vs SHO PRESSURE 02 TII LOAD Ve SH/RH OUTLET STEAM TEMPERATURE 93 IV LOAD Vs EXCESS AIR (Design Coal) os ‘v LOAD Vs BURNER TILT (Design Coal) 05 VI LOAD Ve SH SPRAY(Design Coal) 06 VII LOAD Vs STEAM TEMP AFTER DESH (Design Coal) 07 VITI LOAD Ve TOTAL AIR FLOW (Design Coal) og 3 | The attached Performance curves are predicted only and | are not to be construed as being guaranteed except [ where the values coincide with guarantees stated under the performance guarantee section. ‘Busiome’/ Plant: OVCI CHANORAPURA #788 TPP 2x 250 WW (Bonk No. 66,0368 Ray. 6 Text Rent Rev OF I Oae_| Sgn [Dae | Sgn [baa | Sip | Bae Egnos BWA /P5 SeSeste Reviews SCS [las Aoprewer SCSRIKE BOILER PERFORMANCE & PROPOSALS CFT. 1807 (035880960-V-A1-T01-12LOAD Vs SHO STEAM FLOW 300 800 700 & 1 800 5 E | z 5 500 g & 400 300 200 50 60 70 80 90 109 Loap % ewcR SHEET 10F 8 [Customer7Plant 1 —DVC/CHANDRAPURA =Ex ICont No. : 03680380 Revd Revi Feud Revs [Sign Date [Sign [Dote [Sign [Ooie Sign. _[Dcte [Enger Boa 7 PR | era] WicTeT fReviewer_SCS Gf tele [approver SCS/RKr BOILER PERFORMANCE & PROPOSALS CPT= i601 (036840359-V-At-TO1-13(a |) FLOW HP Heaters in Both Description Unit HPHeaters out 100% | 100% | 60%TMCR| 250mW BMCR TMCR 4150MW 250MW ‘Steam —| ‘Superneator outlet th | 8100 | 7420 7553 ware Reheater oullat ah | aaa | 6659 ai5 a S702 Water Feed water wh | 8100 | 7780 a8 was ‘SH spray Uh 0 24.0 40.0 37.0 Air Altheater oullat wm | waa | 1147 309 188 {Primary) Tempering ar wm | tora 1103 B05 1 ‘Aiheater oulet wh | 7133 | 6435 a4 ‘3765 ‘Socondary) Leakage alr ioboler |" Th B00 500 300 500 Total Combustor Ar | un | 9938 | S785 587.8 WAS Flue Gas. Flue gas atAH inet [1080.0 | 3580 (S10) 70380 Fluo gas at AH outiot_| uh | 1165.0 | 1087.0 718.0 121.0 Fuel Coal(HHV= 4100 Uh 149.0 138.0 86.4 143.0 kealkg} ‘Customer/Plant:DVCICHANDRAPURA TPS “Unite#788-2X250NW Gont.No.:03588 0368 | Rev.00 Rev.01 Rev.o2 Rev.03 Engineer: BWIA Roviewer:ACRISCS ‘Approver SCS. BOILER PERFORWANCE &PROPOSALS Page Zoro OT 1806 (096860359-V-A1-TO1-4Ci PREDICTED PERFORMANCE CONTENTS SECTION DESCRIPTION SHEET No. | 1 FLOW 2: W TEMPERATURE 3 w PRESSURE (STEAM & WATER) 4 v__ | PRESSURES & DRAFTS (AIR & GAS) 5 v FUEL - 6 l vi MILL & BURNER PERFORMANCE - vi [0;, CO, REXCESS AIR 8 vil) HEAT BALANCE 9 ‘The altached Performance Data are predicted only and are not to be construed as being guereniced excep where the values coincide with guarantees stated under the performance guarantee seciion. ‘Customer/Plant:DVC/CHANDRAPURA TPS -Unite#7&6.2X250NW Cont.No.:03686 0369 | Rev.00 Revor | Rev.02 Rev.03 T Engineer: BWM Reviewer: ACRISCS, i [Approver:SCS BOILER PERFORMANCE BPROPOSALS, Page TofS OPT-1806 (036880369-V-A1-T01-3,CONTRACT DATA SHEET PACE No, 2/2 ig -—~ CONTRACT No. : 0368 & 0369 | contract pare : 30.08.2008 _ COAL WET OUST] Gas] press | FLUE OAS Te DUST COLLECTOR wace [revo | Nos. [RELOUST] fas 7 press | Figs, OLLECTON gms/Nn3|_ 1h | mmuc | mi/s | emmeenor “CECTROSTATO PREGPITATOR Eveline su | a | 2 | o69 | 1655] 25 | sore | s.ze (FARR B1450~-7136150-2) ee PIPE LINES WAN STEAM HOT REHEAT cou eneat [FEED WATER eens © 2600310 | co 5088 28.58 | 00 «972% 127 | 00 368 x «8 Sie Matt. Spee SA 335 P22 5A 395 P22 SA 106 Gee A 106 Gee [Noor ones wo THO wo NE BOILER MOUNTINGS Toemio | RE wae [Nos [ser PRESSURE nt] RUM 173 VE Bet | 2 [issarwe0 carery vetmg OMT Poel BR 3 RE wer | 178s wo ma | see] 1] 70 mouner | 706 wo - mo | sia | 2e2 esas ome wa fe waren taven worcaron| wm | Od Ste | ‘eoour MAIN PARAMETERS rue DESIGN COAL ci wer | Ter [eonaver| S077 FFA GENERATOR ww = [20 wo | 230 SEER vm wae [720 [asa | oa Mad REHEAT vn eoaa | 6659 | 4154 | a7oz TOTAL FEAT UF ikea waa7 [a6 [so | oma PRESSURE AT SUPERMEATER OUTET iafenatey [1880 [1581 [moa | TSB 2 een Nera % a “9 [PRESSURE AY REHEATER INLET ig/em2(q) soe [sre [ass | sa6 | [eweteaTone at ReneATeR WLET 8 waar [3422 [2208 | Sore PRESSURE AT REHEATER OUTLET _badema(g) 35 | 38.8 22.1 366 TEMPERATURE AT REHEATER OUTLET % 540 540 540 540 FEED WATER TEVPERATRE % mea [rss [2233] 1036 AMBIENT AIR TEMPERATURE % | 40 40. 40 40 COMBUSTION AIR TEMPERATURE SECONDARY ee a4 32 284 an FUEL QUANTITY th 149 138 38+ 143, AIR QUANTITY (TOTAL) fn | 994 | s19 588 955 ] [Tew oF GAS AT SOLER EAT (CORRECTED) c ws sae z EFFICIENCY Asep ON HEV ® 86.67 | 86.62 | 85.65 | 87.39 4 cs68k0350-V-A1-TO12# Han CONTRACT DATA SHEET PAGE No. 1/2 CONTRACT No. : 0368 & 0369 | contract ave : 20.06.2004] PURCHASER : OAMODAR VALLEY CORPORATION - PLANT NAME : CHANDRAPURA#7&3—2x250MW| CONS.ENGE : [unary {ASH FUSION TEMP. hy | OeNDASIUTY PROPOSED FUEL: COAL = * wears | te FE % 3830 | vox 1600 [ur 186 [ax a00%| sx 0.38 = ‘#00 | 80 FUEL FIRING EQUIPMENT PE [GOAL =TLTING TANGENTIAL ‘lL BURNER [ives = TUBE WL BaD 4772 WAKE @ Now| @ [SHEL : 24 By om 72 WAKE a Nox. BHEL = 3 CONTROL @ | AR oAWPER & | aie Daweer [GAPACITY :73 1/1 @ 72.9 7 SKU LOM GAPAGTY(Maxy % |_41.8 Nkcoi/h (WAKALLOMAGLE)|@ @ [11.3 Mkcal/n MOTOR KW s 2400 2 [corn & [oor YSTEM : pee Ssuncen/Oa0 PA OISPOSTION vERS ‘CORNER 07 J FURNACE | TYRE = BALANCED ORAFT CONSTRUCTION : FUSON WELDED WALLS [a UME m3 | 3668 aii ‘woTH 40 erm 1 mom | _AUME m® | 866 — OTH 15240 DEPTH 11808 ane tS BOILER | NATURAL ORCULATON, RADIANT REHEAT 7i200P S| oesGN 81225 1320 88-635, oesioxarion HES TES r77a ~ newe SUPERHEATER OUTLET :1550 = STAGE I a STAGE s INSTALLED TPE; PLATEN SUPERNEATER = | 1se (@Roecten) 2 TOTAL HS. mm? 11406 [SraGE ar 6 ue ano ATTEMPERATOR Tye: spRaY | Ne. OF STAGES: Single | MEDIUM OF SPRAY : FEED WATER REHFATER Te: SPACED TIAL HS, agg | CONTROL | @UER TA eaCESS AR TOTAL HS ECONOMISER | TRE: PLAN TUBE in 5517 | No. OF BLOCKS TWO s _ | a a AIR HEATER | TE [TOF BS 20ets | aTOR Kw 4 nora xeceneramve frm? (EACH) [eae geil 2.5 wT 2000 : two | make: eHEL BOILEK AUXILIARIES FANS | ne wan [non | FBR PRESS [EYP] ORE | SPEED THOTORT contro FD FAN API =18/47 BHEL | 2 B23_[ 50 [MaTOR| 1480 | 825 | BLADE PitcH [Pa ran [apa=i7/Az | ave | 2 [ wovoe| 1430 | 178 | stane prrcrh FAN [nozv 38 sioow| enEL [ 2 To [woos] 740] 1825 lwo. coupuncsAust OAMeR| GR FAN [NOT APPLCABLE { SEAL AR Faifeesr vos | Brel] © | 39 | 682 | 60 [ woTOR| 2600 | v20 [ier vaNE(uenua) SOOT BLOWERS é& TEMPERATURE PROBES 3CATION TE | waKe Twos] NEDUM ruRWACE TSVPERATURE PROBES ac 3 - FURNACE WAL BLOWERS BHEL 36 | _Sitaw SRW te B00 LONG RETRACTABLE SooT BLOWEDS | @HEL tw STEAM ‘AR HEATERS, ROTARY SWNEL ARM BaEL 2 STEAM To| - “|i LOAD Vs SHO PRESSURE | 70 — tes _ _| I] | | 169 { = | I 8 t e145 i ! 3 | | ves J - = | 135 = a | | | | 125 | = po of | so 89 7 80 90 102 load % eMcR SHEET 20F 8 (Costemer7Plant 7 BYC7CHANDRAPURA § 7kd —2 x 250 MW [Cont No 03680369 | Rev.0 Revi | Rew? Rev.5 a ~|Sign. _[Dote jan. |Date [Sign [Oate Sign, [Date [Engineer BMM | PSS SER fulssto | Reviewer SCS Pas [aporover SCS/RKF +e = — 4} BOILER PERFORMANCE & PROPOSALS | cPT— 1801 036820868-V-41-TOT-14LOAD Vs SH/RH STEAM TEMPERATURE 575 4 | ss0 | { | SH ay 525 LL 3 8 1 500 5 5 475 {| 3 450 I 225 t ' 400 | | so DB a 08 loa = BOR SHEET OF @ | lesarer/ETant-— DVC7CHANDRAPURE BTS =2-¥ GSO | Co Ne 0366,0089 Ea ae ied a | _ Isign. Oote _|Sign._[Date Sign [Dote (Sign. _|Oate | rcineer Su JPET neal — Reviewer Sos Pataki [approver SCS/RKr 7 BOILER PERFORMANCE & PROPOSALS 368 0980-V-AT-TO1-15,EXCESS AIR (Design Coa‘) 2 | = i x 21 G { E 8 | < a = | & | 2 is | ' 14 + =i so 80 » 80 90 100 lon GMCR = SHEET 40F 8 |ecstomer7Plant-7—DVC7CRARDENPURAEYE5_=-x 250 NW ont No. 05680060 | Rev0 Revi feud | __ fev TSaa joes Sen [bole [Sion _[Dale [Sex [Date as Nips, pena sos7aee | — t BOWLER PERFORMANCE & PROPOSATS ePT= 1801 0368°.0969-V-A1-T01-16i LOAD Vs BURNER TILT - Design Coa TAT — DEGREES a | -15 4 | “ so &0 10 20 oe aie Costomer/Plent > DVO/CHANDRAPURA f-7H5=2 x 250 MW [Cont No, : 0368,0969 Rev 0 Real Reva Reus sige Toles [sign _[Oote [Sige [Date [Sign _[oote [enaineor pum PTT | ey |i Jes Tot | Reviewer SCS. (pa fee Seam 1 OT C BOILER PERFORMANCE & PROPOSALS CPT— 1801 036840908-V-A1-101-77\ | = LOAD Vs SH SPRAY-Design Coal | { } 40 { } | | | Sy \ 3 + © i q s 20 — pas \ j oO | Q : 4 a Loag % @MCR | SHEET 6 OF 6 [Sustomer’Piont , DVC7CHANDRAPURA pf 7&2 [cont No ~:068,0389 Rev fez 4 ign. |Daie Sign. [Date Enanesr Bu 2 ose “| Reviewer SCS ee me IO i Ll BOILER PERFORMANCE & PROPOSATS __. CPT— 1601 096680960-V-Ai-7O1-18LOAD Vs STEAM TEMPERATURE AFTER DESH (Design Coal) 410 = 380 fu. STEAM TEMPERATURE ~ DEG.C + t 40 30 80 70 a 30 100 \oaD % BCR = __ as SHEET 7 OF 8 | (Customer 7eTary =< OVC CHANDRAPD ee) [Cont No. + 0366,0369. Rev. | Rev.3 [ser [Dole Sign. [Dek Engineer Bu [P| 1 Reviewer SCS. { lapprover Scs/REr_— = i t BOILER PERFORMANCE & PROPOSALS. CPT— 1801 | osa8ng69-v-Al-TO1-18LOAD Vs TOTAL AIR FLOW — Design Coal 1000 | i; | | 900 : T a 800 = g = 1 = 5 2 % 700 { a | Py ~ T BO + + so 60 70 eo so 100 Lon % BMCR SHEET 8 OF 8 {eustomor7PIGnT —DVC7CHANDRAFORE 778 Ex PSO NW Gont No 0808,0862 T Rev.d fav Hed] Rew Sign Jools [Sign Oete [Sign [Date _[Sign._[Date [Engineer DWM 77) 1 _| i Revinwer SCS | 1 {BKr 1 BOILER PERFORMANCE _& PROPOSAIS _—cPT= 1807 196880980-V-A1-T01-20,am — Sooper [ & [ = T 2 8] yo0rauo [eon nv 39 ae "hung eh vis : Ia sn ae ae ee he oo io iol Ok OOH BE Oo auiinn SivShuomia avant ave nde ° an bse x * BLASTING VANdVYaNVHD nollvNastos Sty vee eive ae Eon Foe E Moon eer eesy 8 (0) e054 Ge ~aanssaee HE 4 a th] o» F Soe F Goo. £ Bone | e Ee be a not coos a3 = Fos Fs oor F Eos: &| cove B fs G Es — JH Roe Et cor F| ove t ass — ae — Ee eas Fg aoa ose 5 2. 18S “dna ws Hes | = Ee _| = oxi FF cs L e590 ot 1 ; on E| coe were mou sn 2/8 osi-rasaws on + | al ; 1 01 E cop j 3 as ig ae H nee la ae le B j [| can ra snes EE z ? ae Ie Hi] tp oom ais ¢ z g ul eg: 8 i 2 2 TaUs Bit a Se a | aa, 78 ls et lla Mid ie ala|- Pan abs ig als rite fl a £ moe ia ae 8 iF fe Hid Tad E : | dg i f ue P 8 “ 3 i Ly 3 é [| t \ Li t z } if | 2 LI NTE SR) «| 7 Evo nas wa a g 8 3 8 g 8OSUNTT STVORILOg IA AAVEH LvaVHE WN Oz 2 S#PL#SLINN VUNdVHINVED NOWWADENOS LSTA aN ae 00 rose 16 ames wai + 9. G28 ana wis Haus MoU is | soveerabr aptherereber (ehewn/O ur aerssteg WEIS renee penn Prarie, NeRETOT ~ynncoane
You might also like
Write Up On 135 MW Unit Control Philosophy
PDF
No ratings yet
Write Up On 135 MW Unit Control Philosophy
18 pages
O&M Manual XRP 1003
PDF
100% (1)
O&M Manual XRP 1003
169 pages
Parameter 500 MW
PDF
100% (1)
Parameter 500 MW
3 pages
Coal Combustion Modelling in A Frontal Pulverized
PDF
No ratings yet
Coal Combustion Modelling in A Frontal Pulverized
8 pages
Fans Soft
PDF
No ratings yet
Fans Soft
291 pages
Welcome To 12 Week Classroom Training Program: STEAG Energy Services
PDF
No ratings yet
Welcome To 12 Week Classroom Training Program: STEAG Energy Services
44 pages
Bharat Heavy Electricals Limited: Neyveli Lignite Corporation Limited (NLC LTD)
PDF
No ratings yet
Bharat Heavy Electricals Limited: Neyveli Lignite Corporation Limited (NLC LTD)
1 page
Adtps Report
PDF
No ratings yet
Adtps Report
35 pages
Air&flue Gas 800MW
PDF
No ratings yet
Air&flue Gas 800MW
12 pages
Stage 1 Mills
PDF
100% (1)
Stage 1 Mills
34 pages
2X70 Power Plant Technical Specification
PDF
No ratings yet
2X70 Power Plant Technical Specification
53 pages
Aditya Tech Diary PDF
PDF
100% (1)
Aditya Tech Diary PDF
155 pages
Sliding Pressure Operation
PDF
100% (1)
Sliding Pressure Operation
5 pages
Takniki Darpan - Issue 7
PDF
No ratings yet
Takniki Darpan - Issue 7
40 pages
Badarpur Thermal Power Satation
PDF
100% (2)
Badarpur Thermal Power Satation
132 pages
Final Year
PDF
0% (1)
Final Year
51 pages
Boiler Datasheet & Pred Perf Paramerters & Curves
PDF
No ratings yet
Boiler Datasheet & Pred Perf Paramerters & Curves
21 pages
Cold Start Up Salaya
PDF
No ratings yet
Cold Start Up Salaya
28 pages
Boiler Coal Feeder
PDF
No ratings yet
Boiler Coal Feeder
11 pages
PA Fan SOP in Standard Format
PDF
100% (1)
PA Fan SOP in Standard Format
2 pages
Erosion & Corrosion in Boilers
PDF
No ratings yet
Erosion & Corrosion in Boilers
17 pages
Mill Reject System NTPC Farakka
PDF
No ratings yet
Mill Reject System NTPC Farakka
26 pages
Mill Stage II
PDF
No ratings yet
Mill Stage II
68 pages
Review Paper On Ultra Supercritical Power Plants Full Length Paper
PDF
No ratings yet
Review Paper On Ultra Supercritical Power Plants Full Length Paper
7 pages
Bhel - Trichy: Training Programme FOR Power Sector Executives ON CFBC Boilers
PDF
No ratings yet
Bhel - Trichy: Training Programme FOR Power Sector Executives ON CFBC Boilers
41 pages
Basic Importance of Burner Tilt in Thermal Power Plant
PDF
No ratings yet
Basic Importance of Burner Tilt in Thermal Power Plant
9 pages
Quality - Concept of Combustion
PDF
100% (1)
Quality - Concept of Combustion
3 pages
DR NTTPS
PDF
100% (1)
DR NTTPS
41 pages
Two Coal Mill Operation
PDF
No ratings yet
Two Coal Mill Operation
3 pages
BCP Installation & Commissioning
PDF
100% (2)
BCP Installation & Commissioning
18 pages
Super Critical & Ultra Super Critical
PDF
100% (1)
Super Critical & Ultra Super Critical
1 page
Coastal Cold Start Up Checklist
PDF
No ratings yet
Coastal Cold Start Up Checklist
13 pages
Boiler & Aux Operation PMI
PDF
No ratings yet
Boiler & Aux Operation PMI
53 pages
DH3 Buckstay
PDF
No ratings yet
DH3 Buckstay
1 page
DH3-31HFC-T-ITP-0010 ITP For Commissioning of Coal Pulverizing System REV.0
PDF
No ratings yet
DH3-31HFC-T-ITP-0010 ITP For Commissioning of Coal Pulverizing System REV.0
69 pages
Paper 4 Dynamic Operating Regimes of Ball and Tube Mill
PDF
100% (1)
Paper 4 Dynamic Operating Regimes of Ball and Tube Mill
28 pages
Steam Turbine Combined Reheat Stop Description and Control Valves
PDF
100% (4)
Steam Turbine Combined Reheat Stop Description and Control Valves
2 pages
Advanced Cycles JIPT
PDF
No ratings yet
Advanced Cycles JIPT
26 pages
DVC Combustion Modification Package August 2019
PDF
No ratings yet
DVC Combustion Modification Package August 2019
31 pages
Secondary Air Damper Control
PDF
No ratings yet
Secondary Air Damper Control
3 pages
Lub Oil System
PDF
100% (1)
Lub Oil System
20 pages
Soot Blowers Keep The Heat Transfer Surfaces in A Boiler Clean
PDF
100% (1)
Soot Blowers Keep The Heat Transfer Surfaces in A Boiler Clean
50 pages
Policy Brief - Transition Plan For Thermal Power Plants in India
PDF
No ratings yet
Policy Brief - Transition Plan For Thermal Power Plants in India
4 pages
Chapter - 1 1.1. Overview of 500 MW Power Plant
PDF
No ratings yet
Chapter - 1 1.1. Overview of 500 MW Power Plant
8 pages
Intelligent Soot Blowing
PDF
No ratings yet
Intelligent Soot Blowing
8 pages
Coal Feeder Paper
PDF
No ratings yet
Coal Feeder Paper
8 pages
PG Test of BTG
PDF
No ratings yet
PG Test of BTG
7 pages
JPL-JIPT Manual General Description
PDF
No ratings yet
JPL-JIPT Manual General Description
3 pages
011 (Boiler Hydro Test)
PDF
No ratings yet
011 (Boiler Hydro Test)
5 pages
Research in Varying Burner Tilt Angle To Reduce Rear Pass Temperature in Coal Fired Boiler
PDF
No ratings yet
Research in Varying Burner Tilt Angle To Reduce Rear Pass Temperature in Coal Fired Boiler
9 pages
BTG Ets MFT Alarm List
PDF
No ratings yet
BTG Ets MFT Alarm List
20 pages
Instruction Manual For Speed Reduction Gearbox: 2250 KW, 989 / 119.99 RPM M/S. DVC Mejia Thermal Power Station
PDF
No ratings yet
Instruction Manual For Speed Reduction Gearbox: 2250 KW, 989 / 119.99 RPM M/S. DVC Mejia Thermal Power Station
19 pages
Hydro Test Procedure - REV 02
PDF
100% (4)
Hydro Test Procedure - REV 02
14 pages
TH 1694
PDF
No ratings yet
TH 1694
91 pages
NTPC 2012-13 KT Meet
PDF
No ratings yet
NTPC 2012-13 KT Meet
26 pages
CEA Plant Performance Report 2011-12
PDF
No ratings yet
CEA Plant Performance Report 2011-12
251 pages
Cold-Start Up of Coal Fired Powerplants
PDF
No ratings yet
Cold-Start Up of Coal Fired Powerplants
6 pages
TNEB Thermal Power Plant
PDF
0% (1)
TNEB Thermal Power Plant
107 pages
Troubleshooting Coal Feeders
PDF
No ratings yet
Troubleshooting Coal Feeders
3 pages
Fuel & Combustion
PDF
No ratings yet
Fuel & Combustion
22 pages
Power Plant Operations Assignment
PDF
No ratings yet
Power Plant Operations Assignment
7 pages
Salient Features of Milling Plant (BBD4760)
PDF
No ratings yet
Salient Features of Milling Plant (BBD4760)
3 pages
National Thermal Power Corporation 3
PDF
No ratings yet
National Thermal Power Corporation 3
46 pages
Lignite Drying Process in USA
PDF
No ratings yet
Lignite Drying Process in USA
7 pages
Advance NDE Training
PDF
100% (2)
Advance NDE Training
112 pages
Safety Valve Floating
PDF
No ratings yet
Safety Valve Floating
15 pages
Surface Area Volume and Capacity Cuboid Cube and Cylinder - Important Qs - Surface Area and Volume - Important Qs - Worksheet ICSE
PDF
No ratings yet
Surface Area Volume and Capacity Cuboid Cube and Cylinder - Important Qs - Surface Area and Volume - Important Qs - Worksheet ICSE
2 pages
Boiler Circulation 2
PDF
No ratings yet
Boiler Circulation 2
20 pages
Ball and Tube Mill Opn
PDF
100% (1)
Ball and Tube Mill Opn
5 pages
Mill Performance Graph
PDF
No ratings yet
Mill Performance Graph
11 pages
SKF Shaft Alignment Tools
PDF
No ratings yet
SKF Shaft Alignment Tools
8 pages
Detail Technical Specification of Grinding Balls
PDF
No ratings yet
Detail Technical Specification of Grinding Balls
17 pages
CASE STUDIES ON NDT BASED DEFECT DETECTION-Cource Material-160817
PDF
No ratings yet
CASE STUDIES ON NDT BASED DEFECT DETECTION-Cource Material-160817
12 pages
Energy Saving Potential For Water Pump With Enhanced Extended Life
PDF
No ratings yet
Energy Saving Potential For Water Pump With Enhanced Extended Life
33 pages
Shell Bolt Specification
PDF
No ratings yet
Shell Bolt Specification
6 pages
Nox Modification Work
PDF
No ratings yet
Nox Modification Work
6 pages
Report of Oxygen Mapping at Aph I/L & O/L, Esp I/L & O/L of U #3, MTPS, DVC
PDF
No ratings yet
Report of Oxygen Mapping at Aph I/L & O/L, Esp I/L & O/L of U #3, MTPS, DVC
3 pages
Algebra Word Problems Worksheet 2
PDF
No ratings yet
Algebra Word Problems Worksheet 2
6 pages
Manual - Alignment Checking System - Inline2
PDF
No ratings yet
Manual - Alignment Checking System - Inline2
17 pages
PPT of BOP
PDF
No ratings yet
PPT of BOP
4 pages