Daily MTC Report Sag Mill, 23 August 2023

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Work Center Bas. start date Op.

Short Text Description Status


8/23/2023 CLEAN UP EX MATERIAL ROLLER 2BC407 Done
CONCBAP4
8/23/2023 CLEAN UP EX MATERIAL ROLLER 2BC408 Done
8/23/2023 INSTALL HANDRAIL BROKEN 2BC301 Done
CONCBAPS 8/23/2023 INSTALL HANDLE AT GRATING FLOOR 2FC400 Done
8/23/2023 INSTALL & T/O STATIC LINE 2FCCC4 Done
8/23/2023 DAILY CLEAN UP STRAINER WATER COMPRESSOR 2CP307 Done
CONCFMM 8/23/2023 DAILY CLEAN UP STRAINER WATER COMPRESSOR 2CP308 Done
8/23/2023 PM DAILY COMPRESSOR CHECK C3 AND C4 2CP305 Done
8/23/2023 DAY-DAILY INSPECTION GIW PUMPS 2PC300 Done
8/23/2023 DAILY CLEAN UP WATER STARINER 2PC304 2PC304 Done
CONCKSB 8/23/2023 DAILY CLEAN UP WATER STARINER 2PC305 2PC305 Done
8/23/2023 PM 1800HRS CYCLONE FEED PUMP 2PC416 Postpone
8/23/2023 C/O GEARBOX 2PC416 Postpone
8/23/2023 2-WEEKLY INSPECTION & READJUST SCRAPPER 2BC302 Done
8/23/2023 2-WEEKLY INSPECTION & READJUST SCRAPPER 2BC303 Done
CONCSCMC
8/23/2023 PREPARE BLADE PRIMARY 2BC403 Done
8/23/2023 PREPARE BLADE PRIMARY 2BC409 Done
8/23/2023 WEEKLY CLEAN UP LUBE ROOM 2ML12 Done
8/23/2023 WEEKLY CLEAN UP LUBE ROOM 2ML13 Done
CONCSENV
8/23/2023 WEEKLY CLEAN UP LUBE ROOM 2ML14 Done
8/23/2023 DAILY INSPECTION OIL GEARTAC CONTAINMENT 2ML12 Done
8/23/2023 PREPARE PIPE FOR INSTALL LINE BREATHER (VENTILASI) 2PC441 Continue
CONCSKC1
8/23/2023 C/O SPOOL REDUCER 2PC315 Done
8/23/2023 FIX TRUNNION DISCHARGE 2ML18 Continue
8/23/2023 PREPARE LINER (SHUTDOWN) SAG1 Continue
CONCSM1
8/23/2023 PREPARE LINER (SHUTDOWN) 2ML12 Continue
8/23/2023 PREPARE FEEDER OVERHAUL 2FD301 Continue
8/23/2023 CLEAN UP MATERIAL & TOOLS 2BC408 Done
CONCSM2
8/23/2023 CLEAN UP MATERIAL& FAN BLOWER 2TK395 Done
8/23/2023 C/O SHAFT & DART VALVE STAGE 2 2FCCC4 Done
8/23/2023 C/O DISCHARGE REDUCER 2PC419 Postpone
CONCSM3 8/23/2023 CLEAN UP & BANDING EX CYCLONE 2ML12 7 EA 2ML12 Done
8/23/2023 C/O CYLONE ASSEMBLY 2CY310 Done
8/23/2023 LINE OVER FLOW 2CY408 Done
8/23/2023 DAILY CLEAN UP STRAINER BALLMILL 2ML12 Done
8/23/2023 DAILY INSPECTION LUBE SYSTEM FEEDER 2FD300 Done
CONCSM4
8/23/2023 DAILY INSPECTION LUBE SYSTEM SAGMILL 2SM1 Done
8/23/2023 DAILY INSPECTION LUBE SYSTEM BALLMILL 2ML12 Done
8/23/2023 MACHINING HANDLE DRILL CONCRET FOR FPJO SAG3 Continue
CONCSMPM 8/23/2023 GROOVED PIPE 6 IN X 6 IN (2 EA) 2PC441 Done
8/23/2023 C/O FLOW METER 2PC300 Done