0% found this document useful (1 vote)
54 views4 pages

SITXMGT005 - AT3 Project

Uploaded by

crazyboys0047
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
54 views4 pages

SITXMGT005 - AT3 Project

Uploaded by

crazyboys0047
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

SITXMGT005 - Establish and Conduct Business Relationships

Assessment Task 3 – Project

FEEDBACK COVER SHEET

STUDENT NAME STUDENT ID

ASSESSOR
NAME
BENCHMARK REQUIREMENTS MET
EVIDENCE COLLECTED
1st Attempt 2nd Attempt 3rd Attempt

Project – Workplace Documentation

 Formal Agreement Template 1


 Formal Agreement with a Marketing
Consultant Template 2
 Business Relationship Policy Template

 Negotiation Policy Template

Satisfactory Satisfactory Satisfactory


OUTCOME
Not Not Not
Satisfactory Satisfactory Satisfactory

DATE / / 20 / / 20 / / 20

ASSESSOR INITIAL

FEEDBACK TO STUDENT

DATE of
ASSESSOR
FINAL
SIGNATURE
OUTCOME

Document Name: SITXMGT005 - AT3 Project RTO Code: 52010 CRICOS Code: 03548F
Version: 1.0 Approved on: 17 Nov 2023 Review Date: 17 Nov 2028 Page 1 of 4
PROJECT
Instructions for learners This assessment task involves you participating in an exercise
which reinforces the learning content.
You must complete all tasks within the assessment, ensuring
sufficient responses to demonstrate reflection and knowledge of
each task.
If your responses are too short or do not sufficiently demonstrate
knowledge or genuine reflection, you will be provided with
feedback.
If you do not satisfactorily complete this assessment, you will be
provided an opportunity to resubmit your work.
When you have completed this assessment, you will need to
submit this to your lecturer/tutor for grading.
By submitting your work, you are declaring that the material
contained within your submission is your own material, written
and developed by no other person except where due reference
is made. False declarations may lead to withdrawal of any
qualification or subject.

Document Name: SITXMGT005 - AT3 Project RTO Code: 52010 CRICOS Code: 03548F
Version: 1.0 Approved on: 17 Nov 2023 Review Date: 17 Nov 2028 Page 2 of 4
Project – Workplace Documentation

General learner instructions


This project requires you to demonstrate your ability to represent agreements in writing in accordance with
organisational procedures. You will read a scenario based on the Righteous Inn, a fictitious hotel, and then
prepare and complete four (4) business documents according to the organisation’s requirements, as outlined
in the scenario.

The four (4) workplace documents are:


1. Formal agreement
2. Formal agreement with a marketing consultant
3. Business relationship policy
4. Negotiation policy

Context of assessment
During the assessment, the assessor will review your submissions and provide feedback.
You are advised to check your understanding of what the assessor will be looking for when they review your
submissions.

You may reference the learning content for this unit and/or conduct additional research.
For this assessment, you will need to read the scenario and then prepare and complete the following
documents using the templates provided below:

Project Scenario

1. A formal agreement between your property and the Brisbane property agreeing to and detailing
the arrangements for the joint venture.
2. A formal agreement between you and a marketing consultant to assist you in developing,
implementing and evaluating the success of the initiative.
3. A Business Relationship Policy for the organisation to guide the employees in establishing and
maintaining strategic business contacts.
4. A Negotiation Policy for the organisation that guides employees in negotiation business deals and
agreements on behalf of the business.

Formal Agreement Formal Agreement with Business Relationship Negotiation Policy


Template 1 a Marketing Consultant Policy Template Template

Document Name: SITXMGT005 - AT3 Project RTO Code: 52010 CRICOS Code: 03548F
Version: 1.0 Approved on: 17 Nov 2023 Review Date: 17 Nov 2028 Page 3 of 4
Template 2

You will need to submit your completed documents to the assessor (acting in the role of management) for
approval:

 Four (4) fully completed documents as listed above


 Formatted and completed handouts, if relevant

Criteria for success


You must complete all tasks and demonstrate an understanding of required competencies in the Project
Checklist. All documents must be completed in full and to the required standard.
You need to achieve a result of ‘Satisfactory’(S) for each task to receive the final assessment outcome of
‘Competent’ (C).
Where you are marked as ‘Not Yet Satisfactory’ (NYS) for any task, the final assessment outcome will be
‘Not Yet Competent’ (NYC). In such cases, you will be provided with an opportunity to repeat the assessment
at a later date.
Once you have read and understood the instructions, upload your completed documents and submit this
assessment.

This is the end of the document

Document Name: SITXMGT005 - AT3 Project RTO Code: 52010 CRICOS Code: 03548F
Version: 1.0 Approved on: 17 Nov 2023 Review Date: 17 Nov 2028 Page 4 of 4

You might also like