NS130

Download as pdf or txt
Download as pdf or txt
You are on page 1of 113

Network Standard

Document No : NW000-S0088
Amendment No : 5
NETWORK Approved By : Head of AR&P
Approval Date : 01/10/2020
Review Date : 01/10/2023
Minor amendments approved 08/09/2021

NW000-S0088 NS130 LAYING UNDERGROUND CABLES UP TO AND


INCLUDING 11KV

NW000-S0088 UNCONTROLLED IF PRINTED Page 1 of 113


Unclassified
NS130 Laying Underground Cables up to and including 11kV Amendment No 5

ISSUE

For issue to all Ausgrid and Accredited Service Providers’ staff involved with the design and installation of underground cables and
conduits, and is for reference by field, technical and engineering staff.

Ausgrid maintains a copy of this and other Network Standards together with updates and amendments on www.ausgrid.com.au.

Where this Standard is issued as a controlled document replacing an earlier edition, remove and destroy the superseded document.

DISCLAIMER

As Ausgrid’s Standards are subject to ongoing review, the information contained in this document may be amended by Ausgrid at
any time. It is possible that conflict may exist between Standard documents. In this event, the most recent Standard shall prevail.

This document has been developed using information available from field and other sources and is suitable for most situations
encountered in Ausgrid. Particular conditions, projects or localities may require special or different practices. It is the responsibility of
the local manager, supervisor, assured quality contractor, accredited service provider and the individuals involved to make sure that
a safe system of work is employed and that statutory requirements are met.

Ausgrid disclaims any and all liability to any person or persons for anything done or not done, as a result of this Standard.

All design work, and the associated supply of materials and equipment, must be undertaken in accordance with and consideration of
relevant legislative and regulatory requirements, latest revision of Ausgrid’s Network Standards and specifications and Australian
Standards. Designs submitted shall be declared as fit for purpose. Where the designer wishes to include a variation to a Network
Standard or an alternative material or equipment to that currently approved the designer must obtain authorisation from the Network
Standard owner before incorporating the variation to a Network Standard or alternative material into a design. All designers including
external designers authorised as Accredited Service Providers will seek approval through the approved process as outlined in NS181
Approval of Materials and Equipment and Network Standard Variations. Seeking approval will ensure Network Standards are
appropriately updated and that a consistent interpretation of the legislative framework is employed.

Notes: 1. Compliance with this Network Standard does not automatically satisfy the requirements of a Designer Safety Report. The
designer must comply with the provisions of the Work Health and Safety Regulation 2017 (NSW - Part 6.2 Duties of designer of
structure and person who commissions construction work) which requires the designer to provide a written safety report to the person
who commissioned the design. This report must be provided to Ausgrid in all instances, including where the design was commissioned
by or on behalf of a person who proposes to connect premises to Ausgrid’s network, and will form part of the Designer Safety Report
which must also be presented to Ausgrid. Further information is provided in Network Standard (NS) 212 Integrated Support
Requirements for Ausgrid Network Assets.

2. Where the procedural requirements of this document conflict with contestable project procedures, the contestable project
procedures shall take precedent for the whole project or part thereof which is classified as contestable. Any external contact with
Ausgrid for contestable works projects is to be made via the Ausgrid officer responsible for facilitating the contestable project. The
Contestable Ausgrid officer will liaise with Ausgrid internal departments and specialists as necessary to fulfil the requirements of this
Standard. All other technical aspects of this document which are not procedural in nature shall apply to contestable works projects.

INTERPRETATION

In the event that any user of this Standard considers that any of its provisions is uncertain, ambiguous or otherwise in need of
interpretation, the user should request Ausgrid to clarify the provision. Ausgrid’s interpretation shall then apply as though it was
included in the Standard, and is final and binding. No correspondence will be entered into with any person disputing the meaning of
the provision published in the Standard or the accuracy of Ausgrid’s interpretation.

KEYPOINTS

This Standard has a summary of content labelled “KEYPOINTS FOR THIS STANDARD”. The inclusion or omission of items in this
summary does not signify any specific importance or criticality to the items described. It is meant to simply provide the reader with a
quick assessment of some of the major issues addressed by the Standard. To fully appreciate the content and the requirements of
the Standard it must be read in its entirety.

AMENDMENTS TO THIS STANDARD

Where there are changes to this Standard from the previously approved version, any previous shading is removed and the newly
affected paragraphs are shaded with a grey background. Where the document changes exceed 25% of the document content, any
grey background in the document is to be removed and the following words should be shown below the title block on the right hand
side of the page in bold and italic, for example, Supersedes – document details (for example, “Supersedes Document Type (Category)
Document No. Amendment No.”).

NW000-S0088 UNCONTROLLED IF PRINTED Page 2 of 113


Unclassified
KEY POINTS OF THIS STANDARD

Project Planning, Design and Installation of Conduits, Power


Scope and Risks Addressed Backfilling & Restoration
Excavation Cables, Pillars and Pits, Jointing

This network standard NS130 provides the This standard includes the following topics in Construction requirements may include Where there are post construction requirements
requirements for trenching, laying and relation to project planning and design and the references to safety and construction that need to be considered they should be
reinstatement of underground conduits and excavation works required: management processes: summarised here.
cables, for distribution circuits up to and
including a nominal 11kV in Ausgrid’s  The client is responsible for obtaining all  Describes details of Joint pits, bays, vaults  Describes the requirements of backfilling of
supply area. The standard is limited to development consents (refer NS104 and concrete construction work. excavations and reinstatement of
scope identified below and provides Specification for Electrical Network Project  Describes installation requirements of pavements and pathways.
controls for associated risks as listed below: Design Plans). conduits, power and control cables,
 General design requirements outlined for thermally stable bedding material.
 The needs of Ausgrid, developers, new residential subdivisions, CBD projects,  Specifies Standard depth of cover and
customers, Roads and Maritime roadway, driveway and rail track crossings. reduced depth of cover requirements
Services, local councils and other  Also outlined is the requirement for cable
service utilities have been addressed easements on private property, provision
in this standard. of detailed designs, Ausgrid site
 This standard frequently references inspections, and provision of field book
NATSPEC 1152 – Road Openings and recordings.
restorations (Utilities) document.

Where to for more information? Where to for more information? Where to for more information?
Section 4, 5, 6 & 7 Section 8, 9, 10, 11, 12 & 13 Section 14 & 15

Where to for more information?


Section 1, 2, 3 Tools and Forms
Annexure F

NW000-S0088 UNCONTROLLED IF PRINTED Page 3 of 113


NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Network Standard
NS130
Laying Underground Cables up to and including 11kV

Contents

PURPOSE ............................................................................................................................................. 8
SCOPE .................................................................................................................................................. 8
NATSPEC 1152 ..................................................................................................................................... 8
PROJECT PLANNING AND DESIGN ................................................................................................... 8
General ....................................................................................................................................... 8
New residential subdivisions ...................................................................................................... 8
Central business district (CBD) projects ..................................................................................... 8
Roadway crossings .................................................................................................................... 9
Driveway crossings ..................................................................................................................... 9
Railway track crossings .............................................................................................................. 9
Trenchless technology ................................................................................................................ 9
Ausgrid’s cables in easements on private property .................................................................... 9
Provision of detailed design by the client ................................................................................. 10
Inspection by Ausgrid ............................................................................................................... 10
Provision of field book recordings and survey plans ................................................................ 10
Field recording of network assets ............................................................................. 10
Survey plan (red line plan) ........................................................................................ 10
Registration of easement.......................................................................................................... 10
Installation of cables under waterways ..................................................................................... 10
SETTING OUT OF EXCAVATIONS .................................................................................................... 11
General ..................................................................................................................................... 11
Additional work ......................................................................................................................... 11
Shared trenching agreements .................................................................................................. 11
Dimensions of trenches ............................................................................................................ 12
Pegging of easements .............................................................................................................. 12
Set out for excavations in new subdivisions ............................................................................. 12
Set out for excavations in established areas ............................................................................ 13
EXCAVATION OF TRENCHES AND OTHER SITES ......................................................................... 14
General ..................................................................................................................................... 14
Removal of pavement layers in established areas ................................................................... 14
Locating existing services......................................................................................................... 14
Precautions ............................................................................................................................... 14
Excavation of trenches ............................................................................................................. 14
Excavation of joint holes ........................................................................................................... 15
Excavation of substation sites .................................................................................................. 15
BREAKING INTO AND REMOVAL OF CONCRETE ENCASED CONDUITS.................................... 15
JOINTING PITS ................................................................................................................................... 16
Removal and/or reconstruction of existing jointing pits containing cables/conduits................. 16
Construction of jointing pits ...................................................................................................... 16

NW000-S0088 UNCONTROLLED IF PRINTED Page 4 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

General...................................................................................................................... 16
Additional penetrations in cable pits ......................................................................... 16
CONCRETE CONSTRUCTION WORK .............................................................................................. 17
General ..................................................................................................................................... 17
Site mixed concrete .................................................................................................................. 17
Ready mixed concrete .............................................................................................................. 18
Concrete construction ............................................................................................................... 18
INSTALLATION OF CONDUITS ......................................................................................................... 20
General conduit requirements .................................................................................................. 20
Approved conduits .................................................................................................................... 20
Storage of conduits ................................................................................................................... 21
Coupling of conduits ................................................................................................................. 22
Conduit bends........................................................................................................................... 22
Installation of telecommunication conduits ............................................................................... 22
Sealing of conduits ................................................................................................................... 23
Laying of conduits ..................................................................................................................... 23
Banks of conduits ..................................................................................................................... 23
Standard conduit and cable spacings ...................................................................................... 23
Standard depth of cover ........................................................................................................... 24
Reduced depth of cover ........................................................................................................... 28
Bedding types ........................................................................................................................... 31
Concrete encased conduits ...................................................................................................... 32
General...................................................................................................................... 32
Conduit spacers ........................................................................................................ 34
Sand/cement bedding of banks of conduits ............................................................................. 34
Sand/cement bedding ............................................................................................... 34
Construction procedure ............................................................................................. 34
Standard bedding of banks of conduits .................................................................................... 34
Standard bedding material ........................................................................................ 34
Construction procedure ............................................................................................. 34
Procedure for dry bedded banks of conduits............................................................................ 35
Protection of conduits ............................................................................................................... 35
Use of warning tape .................................................................................................................. 36
Inspections by Ausgrid ............................................................................................................. 36
Kerb marking ............................................................................................................................ 36
Bridge crossings ....................................................................................................................... 37
THERMALLY STABLE BEDDING MATERIAL .................................................................................... 37
General ..................................................................................................................................... 37
Approved materials and mix design ......................................................................................... 38
Default slurry mix ...................................................................................................................... 39
General...................................................................................................................... 39
Installation of thermally stable slurry mixes .............................................................. 39
Dry mix...................................................................................................................................... 40
Alternative TSB materials ......................................................................................................... 41
Minimum coverage of thermally stable bedding ....................................................................... 41
Testing ...................................................................................................................................... 41
INSTALLATION OF PILLARS AND RAG-BOLT ASSEMBLIES FOR STEEL LIGHTING POLES ..... 42
Installation of pillar bases ......................................................................................................... 42
Installation of rag bolt assemblies for steel lighting poles ........................................................ 42

NW000-S0088 UNCONTROLLED IF PRINTED Page 5 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

INSTALLATION OF POWER AND CONTROL CABLES .................................................................... 44


General requirements ............................................................................................................... 44
Pilot Cables ............................................................................................................... 44
Testing of conduits prior to use ................................................................................................ 44
Direct buried cables .................................................................................................................. 44
General...................................................................................................................... 44
Standard cable spacing ............................................................................................. 45
Standard depth of cover for direct buried cables ...................................................... 45
Sealing of cables ...................................................................................................................... 45
General...................................................................................................................... 45
Method of sealing ...................................................................................................... 46
Safety precautions and first aid procedures for graphite coated cables ................... 46
Shorting of cable cores ............................................................................................................. 46
Multicore cables ........................................................................................................ 46
Single core neutral screened low voltage cables ...................................................... 47
Single core low voltage polymeric cables 185 mm2 and 300 mm2 ........................... 47
Single core copper wire screened high voltage cables ............................................. 47
Single core metallic sheathed PILC cables............................................................... 47
11kV UGOH terminations.......................................................................................... 47
Cable length and joints ............................................................................................................. 47
General...................................................................................................................... 47
Placement of cable joints near road crossings ......................................................... 48
Joints within the Cable Basement of Zone Substation Buildings .............................. 49
Joint bays.................................................................................................................................. 49
Damage to cables during construction ..................................................................................... 49
Bending radii of cables ............................................................................................................. 49
Cable pulling equipment ........................................................................................................... 52
Use of existing spare conduits.................................................................................................. 53
Excavations and cable chases ................................................................................................. 53
Cable installations involving jointing pits .................................................................................. 53
Installing cables in substations and switching stations ............................................................ 54
General...................................................................................................................... 54
Cable labelling ........................................................................................................... 54
Installing cables in kiosk type substations ................................................................ 55
Installing cables in cable risers ................................................................................................. 56
Clamping of 11kV paper insulated cables ................................................................................ 57
Clamping of 11kV polymeric insulated cables .......................................................................... 57
Underground to overhead transition points .............................................................................. 60
Standard depth of cover ........................................................................................................... 60
Reduced depth of cover ........................................................................................................... 60
Installation of underground cables in the vicinity of poles ........................................................ 60
Clearance to other utility services ............................................................................................ 60
BACKFILLING OF EXCAVATIONS ..................................................................................................... 61
Backfill material ........................................................................................................................ 61
General...................................................................................................................... 61
Roads and Maritime Services requirements ............................................................. 61
Additional Ausgrid requirements ............................................................................... 61
Backfill in landscape areas ....................................................................................................... 61
Backfill to subgrade level under footpaths, carriageways and heavy duty driveways.............. 61
Compaction of trench backfill ................................................................................................... 61
Disposal of surplus materials.................................................................................................... 61

NW000-S0088 UNCONTROLLED IF PRINTED Page 6 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Record keeping requirements .................................................................................................. 61


Testing of conduits ................................................................................................................... 62
REINSTATEMENT OF PAVEMENTS AND PATHWAYS ................................................................... 63
Temporary reinstatement ......................................................................................................... 63
Reinstatement requirements ..................................................................................... 63
Temporary steel road plates ..................................................................................... 63
Road furniture............................................................................................................ 63
Final reinstatement ................................................................................................................... 63
FREQUENCY OF TESTING OF BACKFILL AND TEMPORARY RESTORATIONS ......................... 64
CABLE JOINTING ............................................................................................................................... 65
CABLE TESTING REQUIREMENTS .................................................................................................. 65
PROTECTION OF EXPOSED UNDERGROUND CONSTRUCTION ................................................. 66
CABLE TUNNELS ............................................................................................................................... 66
Shared Cable Tunnels .............................................................................................................. 66
STORES AND MATERIALS ................................................................................................................ 67
AUTHORITIES AND RESPONSIBILITIES .......................................................................................... 68
COMPLIANCE FRAMEWORK ............................................................................................................ 68
RELATED DOCUMENTS .................................................................................................................... 68
Ausgrid documents ................................................................................................................... 68
Other standards and documents .............................................................................................. 69
Acts and regulations ................................................................................................................. 70
DEFINITIONS ...................................................................................................................................... 71
RECORDKEEPING ............................................................................................................................. 74
DOCUMENT CONTROL...................................................................................................................... 74
ANNEXURE A – LIST OF DRAWINGS ........................................................................................................... 75
ANNEXURE B – TYPICAL TRENCH DIMENSIONS ...................................................................................... 77
ANNEXURE C – TYPICAL CABLE ARRANGEMENTS IN FOOTWAYS ....................................................... 78
ANNEXURE D – FOOTWAY ALLOCATIONS................................................................................................. 83
ANNEXURE E – GUIDE TO MAXIMUM PULLING TENSIONS ..................................................................... 85
ANNEXURE F – GUIDE TO CALCULATING CABLE PULLING TENSION ................................................... 87
ANNEXURE G – STOCKCODES OF APPROVED ITEMS ............................................................................ 92
ANNEXURE H – CBD 16 WAY CONDUIT LINE ............................................................................................. 96
ANNEXURE I – 125MM AND 150MM SPACERS FOR CONDUITS .............................................................. 97
ANNEXURE J – TYPICAL FINAL RESTORATIONS ...................................................................................... 99
ANNEXURE K – INSTALLATION OF NETWORK CONDUIT LINES THROUGH BUILDINGS ................... 101
ANNEXURE L – TESTING OF BACKFILLS: THERMAL RESISTIVITY ....................................................... 105
ANNEXURE M – TYPICAL TSB RECIPES ................................................................................................... 113

NW000-S0088 UNCONTROLLED IF PRINTED Page 7 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

PURPOSE
This Network Standard provides the requirements for trenching, laying and reinstatement of
underground conduits and cables, for distribution cables up to and including 11kV in Ausgrid’s
network.

SCOPE
This Network Standard specifies the requirements for Trenching, Laying Conduits and
Reinstatement that have been established to meet the particular needs of Ausgrid, developers,
customers, Roads & Maritime Services (RMS), local councils and other service utilities.
Refer to NS168 for underground sub-transmission cables above 11kV.

NATSPEC 1152
This Network Standard frequently refers to the 1152 document which is an industry specification
dealing with road openings and restoration. It is managed by NATSPEC, and supersedes AUS-
SPEC#2, 306U, which was previously used in this regard.
The method used in this Network Standard to call up a specified Clause in the NATSPEC 1152
document is as follows, 1152.1.10 Subheading where 1.10 is the section number and Subheading
is the title of the relevant paragraph (generally a bold heading in 1152) if necessary.
A copy of the NATSPEC 1152 - Road Openings and Restorations (Utilities) document is available
from NATSPEC via their website.

PROJECT PLANNING AND DESIGN


General
The Client must comply with the requirements of Ausgrid’s Network Standard NS104, Specification
for Electrical Network Project Design Plans. Attention is drawn to Section 5 of that Network
Standard, regarding responsibility for obtaining consent from other parties. The Client must comply
with any special requirements of other authorities.

New residential subdivisions


In new residential subdivisions, the electricity network shall generally be installed underground in
accordance with Ausgrid’s current Network Standards (refer to document ‘Policy for ASP/1
Premises Connections’ clause 6.3 Infrastructure Design, for overhead and underground policy
details). The Client is responsible for the reticulation of the subdivision in accordance with Ausgrid’s
document Connection Policy, which provides for contestability of customer connections and some
system augmentation.

Central business district (CBD) projects


HV and LV cable installations in Sydney's Central Business District are generally pit and duct (pit
and conduit) configurations. Specific details relating to conduit configuration, number, size etc
depend on the purpose of the project and shall be provided on a project-by-project basis.
Where obstructions of service congestion prevent the installation of a ductline in accordance with
Annexure H, the matter shall be referred to the designer for advice. Alternatives such as
constructing a 5 x 3 ductline may be considered.

NW000-S0088 UNCONTROLLED IF PRINTED Page 8 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Roadway crossings
All distribution cables shall be laid in approved conduits across or along roadways to allow for
future system alterations/augmentations with minimal civil works. Refer to Section 10 for
construction requirements. Additional spare conduits in roadway crossings may also be required by
Ausgrid. This will be specified on the Design Information.
Due to the requirements of certain Roads Authorities (eg RMS and Local Councils), open trenching
across certain roadways and other public thoroughfares may not be permitted without specific
approval. Refer to Clause 4.7 Trenchless Technology.
Once an installation is completed, all conduits shall be tested in accordance with Clause 13.2
Testing of Conduits.

Driveway crossings
Where a cable route crosses concrete formed or paved driveways, special precautions shall be
taken to ensure minimal damage to such driveways. Trenchless methods of crossing these
driveways shall be considered to minimise the impact of cable laying on the local community, and
to reduce the overall cost of cable laying.
Once an installation is completed, all conduits shall be tested in accordance with Clause 13.2
Testing of Conduits.

Railway track crossings


An agreement must be obtained from the appropriate railway authority.
All new rail crossings (overhead or underground) should allow for all poles or the ends of conduit
banks to be located OFF rail property.
Poles must be located in the road reserve either side of a rail crossing, provided Rail's technical
requirements on maximum span lengths etc permit this.
Conduits must be run the full width of the rail corridor, finishing just outside the rail property
boundary, so that the need to enter rail land for works is minimised. The cable installation across
the railway tracks shall be made by trenchless methods in accordance with the requirements of the
Rail Authority concerned. Note that a bore across the entire width of rail land may not be
necessary.
Where new works on existing crossings permit, the opportunity to extend conduit banks or relocate
poles should be considered.

Trenchless technology
For information on using trenchless technologies refer to NS159 Installation of Cables and
Conduits using Trenchless Techniques.

Ausgrid’s cables in easements on private property


Where Ausgrid’s cables are to be installed on private property with the substation lease/easement
site set back from the street alignment, excluding the Sydney CBD;

 The cables should be installed in conduit for the full length of the easement unless the cable
route dictates otherwise; eg excessive conduit bends and/or jointing requirements.

 One spare conduit for each cable shall be installed at depth of cover appropriate for the cable
voltage.

 The cable route along the easement shall be marked in accordance with the requirements of
NS143.

 The installed conduits/cables must be surveyed to capture the correct installed location over
the entire length of the easement. For contestable projects, this survey shall occur prior to
electrification.

NW000-S0088 UNCONTROLLED IF PRINTED Page 9 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Provision of detailed design by the client


In accordance with the requirements of the Ausgrid publication, Contract for Design Related
Services, the Client must submit completed designs to Ausgrid for certification prior to commencing
construction.
The designs must be professional, detailed and site specific and must include details of the
calculated cable pulling tensions. Annexure F is a guide to calculating cable pulling tension.
The designer shall ensure that the cable route is fully located within Ausgrid’s allocation at standard
cover.

Inspection by Ausgrid
Ausgrid will carry out an appropriate level of site inspection during the construction phase to ensure
that the network assets, including cables and conduits, are being constructed in accordance with
the certified design, Ausgrid’s Network Standards, Policies and Safety requirements.
Unforeseen site conditions requiring a variation or design change must be documented and
referred to the designer for amendments to the design approval and re-certification as required.

Provision of field book recordings and survey plans


Field recording of network assets
Information regarding the construction, modification, repair, and/or retirement of Ausgrid’s network
assets must be recorded in accordance with NS100 - Field Recording of Network Assets. These
records must be submitted to the Data Maintenance team in accordance with NS100.

Survey plan (red line plan)


Where cables or substations are to be located on private property, a survey (lease/easement) plan
is required in order to establish easements or a lease to cover the electrical works. A copy of this
plan is to be provided to Ausgrid showing the following additions in red ink:
(a) The centreline of electricity cables (or cable conduits if used) with offsets to the easement
boundaries.
(b) The location of the substation and associated access and ventilation facilities if not already
shown on the original plan.
(c) Signature by the Registered Surveyor with an accompanying statement to certify that the
information shown in red ink has been accurately located to their satisfaction.

Registration of easement
Refer to the following documents,

 Policy for ASP/1 Premises Connections - Clause 2.3, Leases and Easements as well as
Section 10, The Connection Process, Stage 16.

 Model Standing Offer – Standard Connections Services for Contestable ASP/1 Premises
Connections no greater than 11kV – Clause 4 & Clause 5

 NS143 Easements, Leases and Rights of Way

Installation of cables under waterways


Cable installation under waterways (eg creeks, rivers, bays) is a special project and designs should
be carried out on case by case basis. These designs must be submitted to Ausgrid for certification
prior to commencing construction and must also conform to the requirements of the local maritime,
waterways, fisheries, environment and/or heritage authority. If a trenchless technique is used for
cable installation under waterways (eg creeks, rivers) the installation of cables and conduits shall
comply with the requirements of NS159.
Any waterway crossings associated with navigable waterways administered by NSW Roads and
Maritime Services (RMS) must comply with AS6947 Crossing of Waterways by Electricity
Infrastructure, the Crossings of NSW Navigable Waters: Electricity Industry Code.

NW000-S0088 UNCONTROLLED IF PRINTED Page 10 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

All waterway crossings must be risk assessed in accordance with a methodology approved by
Ausgrid. Ausgrid employees should refer to NEG OH14 – Guide to the Assessment of Waterway
Crossing Risk.

SETTING OUT OF EXCAVATIONS


General
The limits of the proposed excavation for trenches, pits and kiosk sites must be set out in
accordance with an Ausgrid approved Certified Design/Design Plan, this Network Standard, and
NATSPEC 1152.
Trenches in footways which have been or will be dedicated to public use, are to be excavated in
the space allocation dedicated for Electric Cables, as defined in Annexure D, except where
agreements are entered into for the sharing of trenches.
It should be noted that streets in the Sydney Metropolitan area that were dedicated prior to 1
January 1991 have different footway allocations to those dedicated after 1 January 1991. New
underground electricity work in streets dedicated before 1 January 1991 shall comply with the
original footway allocations (ie those applying before 1 January 1991).
The electricity allocation in state roads shall be in accordance with the requirements of the NSW
Streets Opening Coordination Council (SOCC) Guide to Codes and Practices for Streets Opening.
For minimum separation distances between Utility services, refer to NSW Streets Opening
Coordination Council (SOCC) Guide to Codes and Practices for Streets Opening.
The Client shall give appropriate notice to Ausgrid to allow inspection and approval of the set out
prior to commencing work.

Additional work
Local Council may request additional removal and restoration works beyond the scope of works
approved by Ausgrid (see 1152.3.3):

 If the additional work is deemed non-contestable, such work will be identified and defined by
Ausgrid in negotiation with the Local Council's Restoration Officer.

 If the additional work is contestable work, the Client shall consult with the Local Council's
Restoration Officer concerning Council's requirements and shall make these details available
to Ausgrid's Representative.

Shared trenching agreements


Ausgrid has 2 separate trench sharing agreements for new installations.
The first agreement is between The Electricity Supply Association of Australia and Australian Post
Office, and it was historically the default arrangement adopted. Trenching details of this agreement
are detailed in Annexure C. Where this agreement is invoked, all Telecommunication assets must
be in 0 - 300mm allocation from the property boundary. This can only be used in streets dedicated
prior to 1991.
The second agreement is between AGL, EnergyAustralia, Optus and Telstra “Underground
Services in a Shared Trench (NSW 1998)”. This agreement will only be considered by Ausgrid for
new underground developments that consist of newly dedicated roads where no other underground
services exist.
Where shared trenching is proposed under this agreement, Ausgrid’s approval must be obtained
and a shared trench agreement must be entered into in accordance with the “Underground
Services in a Shared Trench (NSW 1998)” agreement between AGL, EnergyAustralia, Optus and
Telstra (available on request from Ausgrid).
Note: No utility service shall be installed on top of any Ausgrid’s services - so as to allow future
access. A minimum of 100mm horizontal separation is required unless otherwise
approved by Ausgrid.

NW000-S0088 UNCONTROLLED IF PRINTED Page 11 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

No utility service shall be within 100mm of a low voltage cable or 300mm of a high
voltage cable.
Recording details of the project shall clearly define the start and finish points of the
shared trench, its dimensions and the service utilities involved (sectionalised if necessary
to indicate the presence or absence of certain utilities).

Dimensions of trenches
The trench size depends on the following factors:

 Number and type of cables

 Number and nominal size of conduits

 Location of trench (ie footpath or roadway)

 Any shared trenching arrangements agreed to with other utilities.


Unless otherwise specified, or changes have been approved by Ausgrid, the guidelines for trench
dimensions given in Annexure B, and the cable layouts shown in Annexure C must be used.

Pegging of easements
The location of the easement shall be pegged by a Registered Surveyor prior to commencement of
excavation work. If the pegs or marks made by the Surveyor have been disturbed or removed,
excavation shall not commence until the pegs or marks have been re-established. The only time re-
establishment of the pegs may not be required is if the easement boundaries have been thoroughly
marked subsequent to the Surveyor pegging them, and those boundary markings are sufficient to
permit the trench to be excavated and recorded relative to the easement boundaries. If it is
necessary to locate any part of the trench outside the planned easement boundaries due to other
obstructions, then the extent of the diversion must be clearly marked and the markings preserved
until the Surveyor can return to adjust the plan.
Final ground level shall be marked on all pegs.

Set out for excavations in new subdivisions


These requirements apply to all installations in dedicated public roadways/footways and
subdivisions intended to be dedicated as such.
In new subdivisions, the Client (or developer) must indicate the subdivision lot boundaries and
street alignment by installing pegs either at the street alignment or at a nominated distance from
that alignment (offset recovery pegs) before any excavation work takes place. Pegs showing final
footpath level must also be provided by the Client. In cases where footways are elevated above the
kerb and gutter level, the roadway surface near the footway will be accepted as the future final
level. Pegs must be clearly visible, easily identified and undisturbed after trench excavation to
facilitate accurate positioning and recording of assets.
The Client is responsible for the correct positioning of all cable trenches. Trenches in footways that
have been or will be dedicated to public use are to be excavated in the Ausgrid space allocations
as specified in Annexure D.
If it is necessary to occupy part of the footway usually allocated to another Authority, or part of the
roadway for laying cables, the Client must first obtain the approval of Ausgrid followed by the
written approval of the other Authority – or local council or road owner - before construction work
commences. Road crossings and crossings of other Authorities’ allocations must be at 90° to the
property alignment, unless written approval is obtained from Ausgrid.

NW000-S0088 UNCONTROLLED IF PRINTED Page 12 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Set out for excavations in established areas


The Client shall set out the limits of the proposed excavation for trenches, pits and chambers using
chalk or crayon so as to be readily understandable but without permanently defacing any surface.
The set out shall minimise damage to existing surfaces.
To minimise or eliminate residual small portions of paving slabs, the set out shall be adjusted as
necessary. Any adjustments will be with respect to the existing paved surfaces and joint patterns.
Adjustments shall generally be in accordance with the following guidelines, and must be approved
by Ausgrid before construction commences:
(a) Pathways
(i) The set out line shall be varied in accordance with the reinstatement requirements of the
NSW Streets Opening Coordination Council (SOCC) Guide to Codes and Practices for
Streets Opening.

 Bitumen and Concrete Paving - In accordance with the reinstatement provisions and
sketches of the NSW Streets Opening Coordination Council (SOCC) Guide to Codes
and Practices for Streets Opening.

 Segmental Paving Units - The set out line shall be at least one whole unit clear of
both sides of the minimal alignment of the trench.

 Textured or Patterned Concrete - The set out line shall enable an aesthetically
acceptable restoration of the pavement as approved by Ausgrid.
(ii) Where Ausgrid directs that certain driveways are not to be disturbed, services under
these driveways shall be installed by trenchless technology where suitable and no other
services are present. A risk assessment must be completed by the Constructor to ensure
no damage can occur to other services if trenchless technology is to be utilised.
(b) Carriageways
(i) In asphalt pavements, the trench set out shall be at minimum width, and wherever
possible, shall be at right angles to the street alignment.
(ii) In concrete pavements, the advice of the appropriate road authority and/or professional
engineering advice shall be sought regarding the location of trench set-out lines.
(iii) Any trench or surface work proposed in the vicinity of Permanent or State Survey Marks
shall be referred to the Land Information Centre of the Department of Lands, prior to
commencement of Work, to obtain protection or relocation requirements.
Refer to 1152.3.6 for further information.

NW000-S0088 UNCONTROLLED IF PRINTED Page 13 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

EXCAVATION OF TRENCHES AND OTHER SITES


General
Excavation work shall be carried out with minimal disturbance to the surrounding environment and
in accordance with the requirements of the relevant Local, State, and Federal authorities (eg
SafeWork NSW Codes of Practice, Safe Work Australia).
All excavations shall be excavated according to Ausgrid’s standard widths and depths as specified
in the Certified Design/Design Plan, Network Standards and/or other engineering/design drawings
approved by Ausgrid.
Before conduit or cable laying commences, the excavated trench must be inspected by a
Representative of Ausgrid.

Removal of pavement layers in established areas


In removing surface and sub-surface materials, maximum care shall be exercised to safeguard
existing underground services and other structures within and around the work site against
damage. The guidelines in 1152.3.5 shall be adhered to unless otherwise specifically approved by
Ausgrid.

Locating existing services


The Constructor performing the excavation is responsible for locating all existing services that may
be affected by the proposed works before any excavations take place. This includes contacting
DIAL BEFORE YOU DIG by visiting www.1100.com.au.
NATSPEC1152.3.6 Existing services, should be referred to for information on working in the vicinity
of other utilities, along with the SafeWork NSW Work Near Underground Assets - Guide.

Precautions
All cables and conduits detailed in underground plans in the vicinity of the proposed works must be
exposed. Excavations must be cleared of spoil to a minimum of 200mm around any cable covers,
joints, cables or conduits.
The persons carry out the works shall also observe the requirements of Network Standard NS156
Working Near or Around Underground Cables with regards to the safety aspects of working in
close proximity to underground cables.
When cutting cable covers or conduits, appropriate controls must be put in place to avoid creating
a hazardous condition through the contact with live cable.
Where existing cables have been exposed and found to be non-compliant with the standard depth
of cover in Table 3 and the reduced cover and backfill requirements in Table 4, Ausgrid’s
Representative shall be notified. The protection requirements of Table 4 should be retrospectively
implemented. Where these protection requirements are impractical to implement, as a minimum,
steel plates shall be installed across the full width and length of the exposed trench, above the
existing cables’ bedding. Details of reduced cover and backfill on existing cables shall be provided
to Ausgrid as part of field book recording to enable updating asset records in Ausgrid’s Geographic
Information System (GIS) see Clause 4.11.
Where it is found in URD areas where driveways have been lowered so that the initial standard
cover (Clause 10.11) has been reduced, the owner of the property serviced by the driveway shall
be asked to meet reduced cover requirements or restore the cover to the original level.

Excavation of trenches
Trenches shall be kept as straight as possible and the bottom of an open trench shall be firm and
smooth, free of rocks, pebbles, foreign matter and sharp projections. Where trenches pass from
footway to roadway and a change of level is necessary, the rise and fall shall be gradual.
If the excavated material is considered by Ausgrid to be unsuitable for re-use as backfill, the
material shall be removed and disposed of as specified in 1152.3.6 Unsuitable material /
Contaminated or hazardous material. Unsuitable backfill materials include building materials (eg

NW000-S0088 UNCONTROLLED IF PRINTED Page 14 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

concrete, bricks, pavers, rocks, roofing tiles, rubble), contaminated substances (including
Hazardous Materials) and other materials that cannot achieve the required compaction (eg heavy
clays).
If the excavated material meets the requirements of Section 0 and additionally is considered
suitable by Ausgrid, the excavated material shall be reused in backfilling operations. Stockpiling of
suitable excavated material shall be in accordance with NS174 and 1152.3.6 Excavated material
stockpiles.
Safe and direct access to substations must not be impeded by excavation works.

Excavation of joint holes


Exposed joints and cables in joint holes must be supported at one-metre intervals and protected
against damage or failure.
Open joint holes must be securely fenced off in accordance with the approved traffic management
plan and Work Health & Safety requirements.
Open joint holes (including trenches or excavations) containing existing assets must not be left
open or unattended unless appropriate precautions have been taken to secure and prevent
unauthorised access to the excavation and Ausgrid assets (eg secured fencing, road plates or
similar).

Excavation of substation sites


The excavation and foundation requirements for substation sites are detailed in the following
Network Standards:

 NS117, Design and Construction Standards for Kiosk Type Substations

 NS141, Site Selection and Site Preparation Standards for Kiosk Type Substations

 NS165, Safety Requirements for Non-Electrical Work in and Around Live Substations.

BREAKING INTO AND REMOVAL OF CONCRETE ENCASED


CONDUITS
The specified strength for concrete which encases conduits in roadways, including those in the
Sydney Central Business District (‘the City’) is 3 to 5MPa. However, some conduits have been
encased in concrete with strength well above 5MPa. Tests have identified 35MPa concrete in some
conduit installations. Concrete above about 3MPa is difficult to break into without using power
tools.
Conduits normally contain cables, some or all of which could be energised. When breaking into
such conduits, extreme care must be taken to avoid creating hazardous conditions to personnel,
and damage to equipment and loss of supply.
The persons carrying out the works shall consult with Ausgrid as to the options available for
minimising the risks involved, such as de-energising live cables and/or removing cables from the
conduits concerned.
In many circumstances it will not be reasonably practicable to de-energise or remove cables from a
conduit, so some cables may have to remain energised while concrete is being stripped. Under
these circumstances a procedure designed to minimise any risk of electric shock or flash burns to
the staff involved and the general public shall be prepared by the persons carrying out the works
and submitted to Ausgrid for review prior to any such work taking place. The procedure shall be:

 developed by a competent person, who has acquired through training, qualification or


experience, the knowledge and skills to carry out this task; and

 carried out by competent persons having regard to the nature of the work, the nature of the
risks associated with the work, and the control measures implemented.

NW000-S0088 UNCONTROLLED IF PRINTED Page 15 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

The procedure shall also safeguard Ausgrid’s assets against any mechanical damage. The
persons carrying out the works shall be responsible for the costs associated with working to an
approved procedure and for any damage caused.
Some of the existing conduits and troughing are made of asbestos cement and appropriate
asbestos handling methods shall be used.

JOINTING PITS
Removal and/or reconstruction of existing jointing pits containing
cables/conduits
Prior to commencing any demolition or reconstruction of existing jointing pit which contains cables
or conduits, special precautions must be taken to protect the cables and any joints involved against
mechanical damage.
It is critical that existing cables/conduits and associated joints are not disturbed unless
specific written approval has been obtained from Ausgrid to the contrary.
All cables and associated joints in a pit that is undergoing demolition and/or reconstruction work
shall be supported and protected using non-conductive structures. These structures shall be
mechanically capable of supporting the cables and associated joints.
Cables shall be secured to the horizontal member of the supporting structures with non-metallic
fixings at no more than 1500mm intervals. Joints shall be supported at both ends of the joint. The
supported cables and joints are to be enclosed in fibre reinforced non-conductive troughings.
Protective Mats (Refrasil mats) shall then be draped over the enclosed cables and supports and
secured to prevent dislodgment.
Prior to removing the roof/lid of a jointing pit the Constructor shall place timber sheeting to fully
cover all cables and joints to prevent damage by falling materials.

Construction of jointing pits


General
Construction of jointing pits shall be carried out in accordance with detailed drawings and
information prepared in accordance with NS172 Design Requirements for Cable Jointing Pits and
Vaults.
Precast concrete jointing pits are acceptable for use in appropriate applications. Refer to NS 172
and Ausgrid Drawing No. 249060, noting that this drawing provides typical pit details for use in the
development of site specific cable pit designs.

Additional penetrations in cable pits


Prior to core drilling, sawing or penetrating the structure of a cable pit a structural assessment shall
be conducted.
Additional penetration locations shall consider the effects for personnel access and egress and
must not impede this access or egress when cable is installed in these penetrations.
The structural assessment shall include but not be limited to the following:

 the impact the proposed works have on structural integrity

 strengthening required (if applicable)

 corrosion protection

 method of waterproofing the penetration.


Structural assessment shall be coordinated through Ausgrid’s Development Services Section.
Bell-mouths must be installed as per Clause 10.8.

NW000-S0088 UNCONTROLLED IF PRINTED Page 16 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

CONCRETE CONSTRUCTION WORK


General
All concrete shall be in accordance with the requirements of AS3600.
(a) Cement
Cement shall be Type GP general purpose Portland cement or equivalent complying with AS3972.
If requested by Ausgrid, a Certificate of Compliance with the requirements of the Australian
Standard shall be provided.
(b) Fine aggregate
Fine aggregate shall be approved washed river sand or Sydney Hill Sand having clean, sharp,
hard, durable grains, uniform in quality and free from harmful amounts of soft or flaky particles,
dust, lumps, loam, clay, slag, organic or other deleterious substances. The material shall comply
with AS2758.1.
(c) Coarse aggregate
Coarse aggregate shall comply with AS2758.1 and shall be approved crushed blue metal or
washed river gravel, of 20mm gauge, graded to 6mm, uniform in quality having clean, hard,
durable, uncoated particles, and free from flat, thin or elongated pieces of dust, organic or other
soluble or deleterious substances. Brecciated aggregates shall not be used.
(d) Testing of aggregates
Testing of aggregates to AS1141 shall be at the discretion of Ausgrid.
(e) Water
Water shall comply with the provisions of AS3600.
(f) Reinforcement
Reinforcement shall be either steel bars complying with AS4671 or hard drawn steel wire fabric
complying with AS4671. Reinforcement shall be accurately cut to size and bent to shape and shall
be free from scale, oil and loose rust.
Reinforcement shall be stored so as to prevent deterioration due to rust or any other cause.

Site mixed concrete


Concrete mixing carried out on site shall be by rotating batch mixers only, unless specifically
approved on a site by site basis.
The aggregates shall be gauged with approved gauge boxes only. Gauging by shovels is not
permitted.
Water shall also be measured using approved containers or other approved means.
Measured batches shall be thoroughly mixed together in a rotating batch mixer for at least two
minutes after all materials (including water) have been added and before any part of the batch is
discharged. A suitable timer shall be used to ensure sufficient mixing time.
The batch mixing drum of the rotating mixer shall be thoroughly emptied, and cleaned immediately
before and after each batch.
(a) Trial mixes
If required by Ausgrid, the correct proportions of water, cement and fine and coarse aggregates
shall be determined by trial mixes, and the proportions shall be adjusted to suit the available
aggregates and placing conditions. Preliminary test results of the trial mixes shall be submitted to
Ausgrid for approval before any concrete is poured.

NW000-S0088 UNCONTROLLED IF PRINTED Page 17 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Ready mixed concrete


Ready-mixed concrete from an approved central mixing plant will be acceptable provided that both
its use and properties comply with AS1379. The testing requirements of AS1379 shall be additional
to those of AS3600.
The method of ordering ready mixed concrete shall be as described in AS1379.

Concrete construction
(a) Formwork
Formwork shall comply with AS3610. Forms shall conform to the shapes, lines and dimensions
shown on the drawings. All forms and supports shall be of sound timber or steel, masonite,
plywood or similar material of sufficient strength and be adequately tight to prevent leakage of
mortar.
Formwork ties shall be used to maintain correct separation of vertical surfaces.
Timber formwork for exposed surfaces shall be dressed. All forming surfaces shall be coated with
an approved form release agent before pouring commences. Coating shall be done before any
reinforcement is fixed in position.
(b) Fixing of reinforcement
Reinforcement shall be accurately placed and tied at alternate intersections with 1.2mm soft iron
wire so as to form a rigid cage or mat which will maintain its shape and position both before and
during placing of concrete. Sufficient supporting devices shall be used to ensure the correct
concrete cover as shown on the drawings or as required by the provisions of AS3600, if not shown
on the drawings.
(c) Cast-in fixtures
All holding down bolts and other fixtures to be incorporated in the concrete shall be accurately fixed
in position before pouring.
(d) Inspection
Before any concrete pour, the reinforcement and fixtures for that pour may be inspected by a
Representative of Ausgrid. At the time of inspection, the work shall be in every respect, ready for
concrete placing. This requirement includes fixing and tying of all reinforcement and cleaning out of
formwork.
(e) Transporting of concrete
Concrete shall be transported to its final location as rapidly as practicable by methods which will
prevent segregation or loss of ingredients. Under no circumstances shall concrete which has
partially hardened, be used.
The containers used for transporting concrete shall be thoroughly cleaned before use.
Pumping of concrete will be acceptable provided the methods and equipment used are approved
by Ausgrid. Pumped concrete shall comply with this Specification in all other respects.
(f) Testing of concrete
Testing of concrete shall comply with the provisions of AS3600 and the constituent parts with
AS1012. Test results must be supplied to Ausgrid on request.
Test cylinders and slump tests may be taken on site as required by Ausgrid. The minimum
sampling frequency shall be that specified in AS3600.
Plant-control testing will be accepted at the discretion of Ausgrid’s Representative, provided that
the testing is by characteristic strength and that all relevant provisions of AS3600 are met.

NW000-S0088 UNCONTROLLED IF PRINTED Page 18 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

(g) Placing and compaction


All water and debris shall be removed from foundations and forms and any flow of water shall be
diverted before any concrete is placed.
Concrete shall be thoroughly compacted using mechanical vibration. Manual compaction shall be
permitted only when approved by Ausgrid. Over compaction shall be avoided. Concrete shall be
thoroughly worked around reinforcement and embedded fixtures and into the corners of the
formwork.
To minimise flotation or buoyancy forces on the conduits, the concrete shall have a low slump
value (typically 80 – 100mm) and be placed from a minimum height, not exceeding 1.8 metres.
(h) Construction joints
Before fresh concrete is placed against hardened concrete at construction joints, the joint surface
of the hardened concrete shall be cleaned by removing all loose and soft material and laitance.
The surface shall be well roughened, thoroughly wetted and covered with a coating of 1:2
sand/cement mortar, against which the fresh concrete is to be placed before the mortar has
attained its initial set.
(i) Curing
All concrete work shall be fully protected and kept moist for at least seven (7) days after pouring.
After initial set has occurred, all exposed surfaces shall be continuously protected against drying by
covering with reinforced building paper or an approved alternative.
(j) Construction loading and stripping time
Formwork and propping shall not be removed earlier than seven (7) days after pouring. During
such period, no construction loading of any type or duration shall be permitted without the specific
approval of Ausgrid. This requirement prohibits the transportation of loads across concrete
surfaces and stacking of materials thereon, prior to stripping of formwork and propping.
Formwork shall be removed in such a way as not to shock or jar the concrete.
(k) Concrete finishing
Unrendered off form surfaces shall comply with the tolerances and surface finish requirements
described in Class 3 Formwork of AS3610. Surfaces to be rendered shall comply with Class 4
Formwork of AS3610.
Unformed surfaces shall be finished by steel trowel or equivalent. The top surface of concrete
encased conduit banks need not be trowelled.

NW000-S0088 UNCONTROLLED IF PRINTED Page 19 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

INSTALLATION OF CONDUITS
General conduit requirements
Where required, the number of conduits and spare conduits shall be specified on the Certified
Design/Design Plan, and HV Connection diagram (HV Connection diagram applies only to High
Voltage designs). Conduits shall be of the approved type and shall be installed in accordance with
the requirements of the Certified Design/Design Plan, and this Network Standard.
Obstructions and other site constraints may make alterations to the Certified Design/Design Plan
necessary during installation. Any proposed departures from the Certified Design/Design Plan shall
first be submitted to Ausgrid for assessment prior to starting the proposed works.

Approved conduits
Ausgrid has approved a rationalised range of Unplasticised Poly Vinyl Chloride (UPVC) orange
conduits for underground cabling as a minimum standard. The stockcode numbers for these
conduits are listed in Annexure G. The application of the various sizes is as follows:
Table 1: Approved conduit size and application

Conduit Size Application

40mm Low voltage services

50mm Low voltage services and street lighting.

63mm Optical fibre pilot cables

80mm Low voltage services (refer to NS224)

100mm Low voltage services supplied from low voltage pits.

125mm Distribution cables (high voltage including 11kV, low voltage, some street
lighting and services).
Low voltage cables where high voltage cables have been direct buried

150mm 11kV 500mm2 three core cables where 125mm conduits are not considered
adequate, eg complex cable routes with multiple bends.
Sub-transmission cables, and at other locations as required by Ausgrid

The requirements for the various installation conditions are provided in Table 2. These
requirements constitute a minimum standard. The use of heavier class conduits of the same
nominal diameter as specified below will be at the cost of the Accredited Service
Provider/Contractor and subject to the written approval of Ausgrid. Heavier duty polyethylene
conduits are normally required for trenchless installation. Details are to be agreed with the
trenchless contractor.
Heavier class conduits can be considered for roadways etc where the ASP has elected to use
heavier compaction exceeding the minimum requirements of this Network Standard. In all cases,
heavier class conduits and bends shall comply with Clause 14.7 for Testing of Conduits including
the use of an approved solid mandrel. Under no circumstances shall a heavier class conduit be
joined to a continuous installed length of light duty conduit as this may create issues with the
testing of conduits using an approved mandrel ie the diameter of the standard mandrel used for the
light duty conduit will be too large for the heavier class conduit.

NW000-S0088 UNCONTROLLED IF PRINTED Page 20 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Table 2: Conduit specification

Installation Type Minimum Conduit Requirements

Complex cable routes with multiple bends 150mm Light Duty (LD) UPVC (orange) conduit to
when 500mm2 three core cables are used AS/NZS 2053.2
and at other locations approved by
Ausgrid.

Concrete encased and sand/cement 125mm Light Duty (LD) UPVC (orange) conduit to
encased conduits, regardless of location AS/NZS 2053.2
(eg CBD conduits, major roadway
crossings).

All sand/cement/TSB grouted bore holes 180mm HDPE pipes to AS/NZS 4130. 125mm ID
HDPE pipe is used where space constraints do not
allow installation of larger pipes.

All State Roadway crossings. All CBD 125mm Light Duty (LD) UPVC (orange) conduit to
roadway and laneway crossings. All AS/NZS 2053.2
commercial/industrial driveway crossings.

All local and regional roadway crossings, 125mm Light Duty (LD) UPVC (orange) conduit to
(eg URD subdivisions), for high voltage, AS/NZS 2053.2
low voltage and service cables.
All light traffic driveway crossings

Conduits in footways and non-roadway 125mm Light Duty (LD) UPVC (orange) conduit to
easements for high voltage and low AS/NZS 2053.2
voltage network cables

Conduits for low voltage services supplied 100mm Light Duty (LD) UPVC (orange) conduit to
from low voltage pits AS/NZS 2053.2

Optical fibre pilot cables 63mm Heavy Duty (HD) UPVC (orange) conduit to
AS/NZS 2053.2

Conduits for low voltage domestic 50mm Heavy Duty (HD) UPVC (orange) conduit to
services and street lighting cables in AS/NZS 2053.2
footpaths or non-roadway easements

Conduits in substation chambers and for Sizes, types and quantities are as specified in
high voltage and low voltage cables to Network Standard NS113, as amended
and from substation chambers

Note: Profile wall smooth conduit type conduits shall not be used.
Ausgrid does not presently have a standard range of approved polyethylene pipes for use in
trenchless technology (bores). The PE pipes to be used in bores shall generally comply with the
requirements of AS4130, with the internal diameter determined in accordance with NS159
Installation of Cables and Conduits using Trenchless Techniques, and wall thickness determined in
accordance with the requirements of the bore design (grouting pressure and temperatures).

Storage of conduits
Orange PVC pipe or conduit does not contain any temporary UV stabilisers. If it is exposed to UV
over time, it will whiten on the surface and although it will not lose tensile strength it will become
brittle and can become subject to damage from impact loads. Protection from prolonged exposure
to direct sunlight can be achieved by under-cover storage, or by covering pipe stacks with an
appropriate material such as Hessian. Heat entrapment should be avoided and ventilation
provided. Black plastic sheeting should not be used.

NW000-S0088 UNCONTROLLED IF PRINTED Page 21 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Coupling of conduits
Conduits are to be coupled using spigot and socket arrangements. A suitable primer must be used
first on both mating surfaces. PVC solvent cement shall then be applied to bond the primed
surfaces.
All joints must be properly made to eliminate the entry of water and foreign matter into the installed
conduits.

Conduit bends
Conduit bends shall be selected giving consideration to the ‘during installation’ minimum internal
cable bending radius as detailed in Tables 7, 8 & 9 of Section 13. Excessive bending of conduits to
avoid using conduit bends is not acceptable. Where obstructions require conduits to be diverted,
only gradual large radius bends (minimum 2.3 metres) shall be used so as not to limit the size of
cables that can be pulled through. Approved bends are listed in the Annexure G.

Installation of telecommunication conduits


Ausgrid utilises optical fibre cables to carry critical high voltage Tele-protection signals for HV in
line with our legal requirements and in accordance with the National Electricity Rules (NER’s).
Tele-control, building security, broadband wireless and other telecommunications services are also
transmitted through the optical fibre network.
The aim of the Secondary Systems team is to increase the quality and reach of the fibre network
through a process of new build and route replacement.
All planned high voltage underground conduit routes should be reviewed by the
telecommunications team prior to construction in order to facilitate the objective of a more secure
fibre network.
The inclusion of an orange 63mm outer diameter (OD) high density conduit to be run nested with
the underground conduits, and protected by HV feeders are only installed where a route potentially
forms part of a secure path between major substations.
Note: Low voltage underground installations are excluded from the requirement to install
protection fibre conduits.
Where protection fibre conduits are required to be run with the feeder installation, the following
Network Standards and drawings shall apply:

 NS203 Telecommunications Network: Master Policy Document.

 NS204 Communications Pits - Specification and Installation Guidelines.

 NS205 Telecommunications: Route Markers.

 NS234 Telecommunications Underground Physical Plant Installation.

 NS235 Telecommunications Underground to Overhead (UGOH) Transition.

 Standards drawing 212393 - Telecommunications Conduit Installations.

 Standards drawing 212386 - Telecommunications UGOH.


It is a mandatory requirement for the inclusion of protection fibre conduits to be installed alongside
all new high voltage conduit rail crossings.
Each end of the crossing must be brought outside of rail owned land, capped, sealed and marked
with frequency based marker devices as per NS205.
Should the conduit route extend beyond the rail corridor, the termination point should be confirmed
through a discussion with the telecommunications team.
For further information, refer to the Manager - Secondary Systems or for contestable works, the
Ausgrid officer facilitating the contestable project.

NW000-S0088 UNCONTROLLED IF PRINTED Page 22 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Sealing of conduits
Refer to NS171, Fire Stopping in Substations for details on Ausgrid’s specification and
requirements for the installation of fire stopping materials in openings in substation walls, floors and
ceilings.
Conduits which are direct buried shall be sealed against the ingress of water and any foreign
material which may hinder the removal and/or pulling through of cables. For conduits that form part
of a pit and duct system and the pits are located in a tidal area or below the water table, the
conduits need to be sealed against the ingress of water. Apart from being susceptible to blockage,
unsealed conduits may cause flooding of cable pits and basement type substations and
switchrooms.
Unused conduits shall be sealed using the appropriately sized conduit end cap or plug.
Used conduits (ie conduits with cables in them) shall be sealed using approved conduit sealing
foam/putty.

Laying of conduits
The roadway conduits at street intersections and other locations should be laid as nearly
perpendicular to the street as practicable, terminating at the road-side edge of Ausgrid’s cable
allocation. Refer to Annexure D for the cable allocation that applies in the relevant area. Minor
deviations to align with offset lot boundaries on opposite sides of the road are permitted.
All conduits shall be installed so that they are true to line. The ends of conduits shall be smooth
and cleanly cut, with sharp edges removed. Where conduits enter pits, bell mouths shall be
installed flush with the inside of the wall.
Once installed, the manufacturer’s markings on the conduits must be visible for inspection.

Banks of conduits
In busy shopping centres, pedestrian malls and the Central Business District of Sydney (‘the CBD’),
conduits are generally installed in multiple rows linking vaults and pits. These are usually referred
to as banks of conduits. Conduit requirements and layouts are usually specified on the Certified
design/ Design plan.
Banks of conduits shall be built so that their cross section is rectangular. The exit points at each
end of the conduits bank shall correspond exactly without any cross-overs along the conduit
lengths.
Conduit banks containing six or more power cable conduits must be installed in thermally stable
bedding (TSB) in accordance with Section 11. Conduit bedding material shall be specified on the
Certified design/ Design plan.
Conduit banks containing six or more power cable conduits which are short in length (eg for local
road crossings) may not need to be installed in TSB provided the cables at both ends of the conduit
bank are direct laid. In each case, the deletion of TSB shall require a rating assessment completed
by the Designer as per NS272 and the rating assessment shall be submitted to Ausgrid for review
and written approval.
The requirements above apply also to suburban and other areas where the design calls for conduit
banks containing six or more power cable conduits. For details regarding the installation of banks
of conduits on Private Property, see Clause 4.8.

Standard conduit and cable spacings


The horizontal and vertical separation between conduits, and between the outer conduits and the
bottom and sides of the trench, shall be 50mm for 125mm conduit, and 70mm for 150mm and
200mm conduits. The top layer of conduits shall be covered with 100mm bedding unless otherwise
required by this Network Standard.

NW000-S0088 UNCONTROLLED IF PRINTED Page 23 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Standard depth of cover


The depth of a trench for a conduit will depend on obstructions, the number of conduits to be
installed and their orientation with respect to one another. Banks of conduits shall be installed to
have a final cover in accordance with the requirements detailed in Table 3.
Table 3: Standard cover and bedding requirements for conduits

Location (Refer Note 1) Standard Minimum Bedding Material


Cover (mm)

The carriageway of Classified State Roads – Low 1000 Concrete or TSB to achieve 3 to
Voltage and High Voltage Conduits 5MPa
(Note: excluding footways) See Figure 3

1200 20:1 sand/cement dry mix


See Figure 4

The carriageway of Classified Regional & 750 Standard bedding material as per
Unclassified Roads and heavy commercial / Clause 10.16.1
industrial car parks – Low Voltage and High See Figure 1
Voltage Conduits
(Note: excluding City of Sydney Roadway or
Laneway)

City of Sydney Roadway or Laneway. 750 20:1 sand/cement dry mix or


TSB
See Figure 1 (for sand/cement)
or Figure 2 (for TSB)

Footways and driveways of Classified and 600 Standard bedding material as per
Unclassified Roads, light commercial / residential Clause 10.16.1
car parks - High Voltage Conduits See Figure 5

Footways and driveways of Classified and 500 Standard bedding material as per
Unclassified Roads, light commercial / residential Clause 10.16.1
car parks – Low Voltage Conduits See Figure 6

Note 1: Refer to the following RMS website link for the Schedule of Classified Roads and Unclassified
Regional Roads. Local Roads are unclassified roads and therefore are not included in the
Schedule.
https://www.rms.nsw.gov.au/business-industry/partners-suppliers/lgr/documents/classified-
roads-schedule.pdf

NW000-S0088 UNCONTROLLED IF PRINTED Page 24 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Figure 1: Standard Cover 750mm

Figure 2: Standard Cover 750mm (for TSB only)

NW000-S0088 UNCONTROLLED IF PRINTED Page 25 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Figure 3: Standard Cover 1000mm

Figure 4: Standard Cover 1200mm

NW000-S0088 UNCONTROLLED IF PRINTED Page 26 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Figure 5: Standard Cover 600mm HV

Figure 6: Standard Cover 500mm LV

If the standard depth of cover requirements cannot be met, reduced cover in accordance with the
requirements of Clause 0 may be allowed by Ausgrid if prior approval is sought.

NW000-S0088 UNCONTROLLED IF PRINTED Page 27 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Reduced depth of cover


Where it is absolutely necessary to reduce cover over conduits or cables in order to overcome
unavoidable site obstructions, the requirements below shall be followed, but only after consultation
with an agreement by the group responsible for design and ratings within Ausgrid. It should be
noted that this concession DOES NOT provide a blanket approval for reducing the depth of cover.
Note also that the cover/protection requirements below generally preclude directional drilling being
utilised at reduced cover.
(a) Cables must be laid in conduits.
(b) The reduced depth shall be limited to a maximum of 5 metres of continuous trench length. The
total length of trenching subject to reduced depth shall not exceed 5% of the total length of
trenching involved in any one project or part thereof, unless specifically approved by Ausgrid’s
Representative.
Where a roadway crossing involves obstructions which necessitate invoking this clause and it
can be demonstrated that it would be more practical to do the full roadway crossing at the
same reduced depth, Ausgrid will consider exempting the roadway crossing from the 5% rule.
(c) The transition between standard depth and reduced depth shall be gradual and shall not
exceed the minimum bending radius of the cables expected to be accommodated within the
conduits. For the purpose of determining the minimum bending radius of spare conduits, and
in the absence of any other information, it shall be assumed that 125mm and 150mm conduits
will respectively accommodate three core polymeric cables up to 400mm2 and 500mm2 in
cross sectional areas. Refer to Clause 10.5 for further information.
(d) Trench dimensions, bedding, backfill and protection requirements shall be as specified in
Table 4 below.
(e) Where it is impractical to comply with reduced cover requirements in special concrete encased
cable installations eg bridge culverts, underneath suspended slabs, within buildings (including
cable risers, walls and beams), a clearly visible permanent surface marking at 3 metre
intervals along the cable route shall be centrally affixed to all surfaces (where attachments
may be made or holes drilled) of the concrete encasement to warn of the presence of these
cables. An example of a suitable marking is a 150mm x 65mm rectangular stainless steel
warning plate with the words ‘DANGER, ELECTRIC CABLE REDUCED COVER'; secured to
surface by stainless steel mush head spikes. See Figure 7. Cable ratings outcome shall be
maintained.
An example of a larger steel plate is similar to the above marking with 250mm x 180mm
dimensions.

Figure 7: Surface marking

NW000-S0088 UNCONTROLLED IF PRINTED Page 28 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Table 4: Reduced cover and backfill requirements for conduits

Location Reduced Bedding / Backfill / Protection


Cover (mm) Requirements

LV and/or HV conduits in the Less than 1 Shall be negotiated with the RMS on a case-
carriageway of Classified State metre and by-case basis. In addition, polymeric cable
Roads greater than covers are to be used (refer to note 2)
(Note: excluding footways) 750mm

Less than Shall be negotiated with the RMS on a case-


750mm and by-case basis. In addition, steel plates and
greater than polymeric cable covers are to be used (refer to
500mm note 2)

LV and/or HV conduits in City of 500* 20:1 sand/cement dry mix or TSB (refer to
Sydney Roadway or Laneway. Figure 8 and Note 1)
Steel plates and polymeric cable covers are to
be used (refer to Note 2)

LV and/or HV conduits in any other 500* Standard bedding material or 20:1


type of roadway and heavy sand/cement dry mix - see Clauses 10.16.1 or
commercial / industrial car parks 10.15.1 (refer to Figure 8)
Steel plates and polymeric cable covers are to
be used (refer to Note 2)

HV conduits in footway 450 Standard bedding material - see Clause


10.16.1 (refer to Figure 9)
Steel plates and polymeric cable covers are to
be used (refer to Note 2)

LV conduits in footway 300 Standard bedding material - see Clause


10.16.1 (refer to Figure 10)
Steel plates and polymeric cable covers are to
be used (NB. steel plates are considered
equivalent to a concrete slab as per AS 3000)
(refer to Note 2)

LV and/or HV conduits in other public 450 Standard bedding material - see Clause
access areas, eg light commercial / 10.16.1 (refer to Figure 9)
residential car parks, recreation Steel plates and polymeric cable covers are to
areas. be used (refer to Note 2)

* In accordance with RMS Specification M209.


Notes:
1. For TSB mix refer to Clause 0.
2. Polymeric cable covers shall be laid across the full width of the trench. Refer to Clause
10.18 for installation parameters.

NW000-S0088 UNCONTROLLED IF PRINTED Page 29 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Figure 8: LV and/or HV Conduits in Roadways

Figure 9: HV Conduits in Footway

NW000-S0088 UNCONTROLLED IF PRINTED Page 30 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Figure 10: LV Conduits in Footway

Bedding types
Conduit bedding material shall be specified on the Certified design/ Design plan. The type of
bedding material used for banks of conduits (including single conduit installations) shall be in
accordance with Table 3 or Table 4.
Additionally, when conduits are installed either below or beside or above other cables or conduits,
the conduits shall be encased in the same bedding material as the adjacent cables or conduits
unless otherwise directed in the Design Information.
Conduit bedding material shall comprise of one of the following;

 Concrete

 TSB to achieve 1 to 2 MPa compressive strength in 28 days (refer to Table 6)

 TSB to achieve 3 to 5 MPa compressive strength in 28 days (refer to Table 6)

 20:1 sand/cement dry mix

 Standard bedding material.


Any variations to bedding materials will require Ausgrid's approval before implementation.

NW000-S0088 UNCONTROLLED IF PRINTED Page 31 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Concrete encased conduits


General
Refer to Section 9 for information on concrete construction work in general. All concrete used for
conduit encasement shall have a characteristic strength as stated in Table 3 or 4, at twenty eight
(28) days. Note that in order to maintain cable ratings, concrete used for encasing conduits must
not adversely affect the transfer of heat to the soil and atmosphere. In particular, the following
requirements must be adopted in designing the concrete mix:

 The specific concrete specifications required for the concrete encasement of the HV conduit
line is to be indicated on the drawings. Ausgrid's requirements, including those indicated below,
shall be referenced.

 Admixtures in the concrete mix shall be subject to the approval of Ausgrid following the
submission of a product specific data sheet. The use of accelerators to speed concrete curing
or admixtures that entrain air will not be approved.

 The total fly ash in the concrete mix (by weight) shall not exceed 5% unless separately
approved by Ausgrid. Fly ash reduces the thermal performance of the installed conduit bank.

 Lightweight aggregate and air entraining agents shall not be used.

 Where reinforcement is required, detailing shall be arranged to reduce the potential for induced
currents. Transverse reinforcement around the conduit bank shall not form a closed loop at any
location.

 ASPs or contractors wishing to vary concrete mix from approved requirements shall provide
documentation demonstrating that their proposal achieves the specified thermal resistivity (TR)
value without increasing the in-situ concrete curing temperature such that conduits are likely to
be damaged.

 The standard thickness of the concrete encasement on the top, bottom and each side of the
conduits in a conduit bank shall be as specified in Table 5 below. Where the depth of cover
over the conduits has to be reduced, the requirements for encasement shall be as specified in
Clause 0.
Table 5: Concrete encasement dimensions

Minimum Encasement Thickness (mm)

Conduit Size Top Bottom Sides

125mm 100 50 50

150mm 100 70 70

200mm 100 70 70

Encased conduits shall be installed with suitable spacers between the conduits prior to placing the
encasement material. Refer to Annexure I for further information on suitable spacers.
Where construction joints in the encasing material occur, each joint shall be provided with at least
four 16mm diameter steel dowels, extending into the encasement material for 450mm on either
side. Two additional dowels shall be provided for every additional row of four conduits above four
installed.
Conduits should be secured to avoid flotation during the pouring of concrete. This may be achieved
by tying the conduits with rope at three metre intervals and anchoring the conduits using timber
stakes driven into the cable trench, or by other approved methods.
Concrete encasement should be designed to ensure the heat of hydration does not result in
overheating and deformation of the conduits. Ausgrid specifies that conduits shall not be damaged
by operation at 80°C.

NW000-S0088 UNCONTROLLED IF PRINTED Page 32 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

The conduits shall be fixed in place so that the top concrete cover remains at no less than 100mm.
Special attention shall be paid to recording the depth of cover (refer to NS100, Field Recording of
Network Assets). The Constructor for the work shall be responsible for ensuring that the concrete
cover over the top conduits is uniform, or if this is not possible, that the actual cover is accurately
recorded, in accordance with NS100. Depth gauges may be used if required to measure the actual
cover at critical locations.
Figure 11 shows the typical layout of a nine-way bank of conduits where 125mm conduits are
installed as three layers of three. The conduit spacer shown in the illustration has stockcode which
appears in Annexure G.
Figure 12 shows a nine-way bank of 150mm conduits.

Figure 11: Nine-way bank of 125mm Conduits

Figure 12: Nine-way bank of 150mm Conduits

NW000-S0088 UNCONTROLLED IF PRINTED Page 33 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Conduit spacers
Foam spacers
The foam conduit spacers are for dry mix TSB or for bedding material that need to be compacted.
The purpose of the conduit spacers is to keep the conduits in their correct position relative to each
other and the surrounding soil. The foam conduit spacer must be installed where bedding needs to
be compacted or dry mix TSB is to be installed. Foam spacers shall not be installed where TSB
slurry mix or concrete slurry is to be applied.
The conduit spacers must be designed:

 not to indent or damage the conduits

 not adversely affect the thermal rating of the power cables.


Plastic spacers
The Plastic conduit spacers are for TSB slurry mix or concrete slurry material.
Plastic conduit spacers shall be used for installations to keep conduit separation based on cable
rating requirements and to allow TSB slurry mix/concrete slurry to flow as required. The main
purpose of the spacers is to keep the conduits in their correct position relative to each other and
the surrounding soil, and to prevent them from floating as the trench is backfilled. They must be
designed so as not to damage the conduits if they soften due to the heat generated by the TSB
slurry mix or concrete as it cures.
Various spacer types are commercially available.

Sand/cement bedding of banks of conduits


Sand/cement bedding
Sand/cement dry mix used for bedding conduits shall be portioned 20 parts sand to 1 part cement
and thoroughly mixed before placement to ensure that concentrations of cement do not occur.
Sand/cement dry mix shall be delivered direct from the batching plant and shall not be stockpiled
on site.

Construction procedure
Sand/cement bedded conduit banks shall be constructed using the procedure for dry bedding of
conduits in Clause 10.17.

Standard bedding of banks of conduits


Standard bedding material
It is of paramount importance that appropriate bedding material is used for bedding conduits in an
open trench. Standard bedding materials shall meet the following requirements unless specifically
approved otherwise by Ausgrid:
Standard bedding materials shall be finely divided and stone free where no less than 95% by mass
shall pass through a 2.36mm mesh sieve with 100% by mass passing through a 4.75mm mesh
sieve. The material shall be free of glass, metal, sharp objects, slag, organic or other harmful
substances. Clay that is removed during excavation work is not suitable as a standard bedding
material. It must be replaced with a suitable clean bedding material. Standard bedding material
must have suitable thermal resistivity to ensure the ductline meets the distribution network rating
requirements.
Recycled ‘GlassSand™’ and other recycled crushed glass products are not approved bedding
materials.

Construction procedure
The conduit banks shall be constructed using the procedure for dry bedded banks of conduits in
Clause 10.17.

NW000-S0088 UNCONTROLLED IF PRINTED Page 34 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Procedure for dry bedded banks of conduits


The bedding compaction ratio shall be minimum 3:2.
Dry bedded banks of conduits shall be constructed using the following procedure:
For 125mm conduits:
1. Place a 75mm deep layer of approved bedding material at the bottom of the trench and
compact the bedding down to 50mm.
2. Lay the first row of conduits. Maintain a minimum separation of 50mm between conduits, and
50mm between the outer conduits and the sides of the trench.
3. Place bedding material over the first row of conduits to a depth of 285mm and compact the
bedding material down to 190mm.
4. Lay any additional rows, then place more bedding material and compact between the rows in
the same manner.
5. Place a 150mm layer of bedding material over the top layer of conduits and compact down to
100mm.
For 150mm conduits:
1. Place a 105mm deep layer of bedding material at the bottom of the trench and compact the
bedding down to 70mm.
2. Lay the first row of conduits. Maintain a minimum separation of 70mm between conduits, and
70mm between the outer conduits and the sides of the trench.
3. Place bedding material over the first row of conduits to a depth of 345mm and compact the
bedding material down to 230mm.
4. Lay any additional rows, then place more bedding material and compact between the rows in
the same manner.
5. Place a 150mm layer of bedding material over the top layer of conduits and compact down to
100mm.
Notes: When adding and compacting the bedding material, care shall be taken to avoid
dislodging the laid conduits from their required position. Conduit spacers should be used
to progressively construct the conduit bank.
The layer of bedding material over the conduits shall be carefully consolidated using hand
rammers only. Under no circumstances shall mechanical rammers be used to consolidate
the bedding material.
On steep inclines and other locations where scouring of the bedding material is likely to
occur, bulkheads consisting of bags packed with 20:1 sand/cement mix must be installed
at regular intervals.

Protection of conduits
Conduits are considered to be inherently protected from mechanical damage, provided they are
installed with a standard depth of cover (refer to Clause 10.110) and are either:

 concrete encased, or

 TSB encased, or

 installed using Trenchless Technology.


These installations do not require cable protection covers unless specifically requested in writing by
Ausgrid. Critical or high risk Sydney CBD installations are possible locations where additional cable
protection covers may be required. Warning tapes shall be provided in accordance with Clause
10.19.

NW000-S0088 UNCONTROLLED IF PRINTED Page 35 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

All other conduit installations, including those installed with standard or reduced depth of cover with
standard bedding material or 20:1 sand/cement dry mix bedding, shall be protected against
mechanical damage using Ausgrid approved cable protection covers laid directly above the
bedding material.
For reduced cover installations, additional protection against mechanical damage shall also be
provided in accordance with Clause 0.
Currently approved cable protection covers are of the polymeric type complying with Ausgrid's
performance requirements. The standard sizes used and the corresponding stockcode numbers
are listed in Annexure G.
Where there is a single conduit in the trench, a single 150mm or 300mm wide strip of polymeric
cable cover shall be used. The single cable cover shall completely cover and be centred over that
conduit.
Where 2 or more conduits are laid side-by-side, the wider 300mm size of polymeric cable cover
shall be used.
If more than one strip of 150mm wide polymeric cable covers is required side by side, 300mm wide
strips shall be used.
Polymeric cable cover strips laid side-by-side shall butt up against each other. Polymeric cable
cover strips laid end-to-end shall overlap by approximately 20mm.
Cable covers must be immediately secured in position by covering with a 150mm thick (minimum)
layer of backfill material.

Use of warning tape


Warning tape, as listed in Annexure G, shall be used in the following circumstances:

 over concrete encased conduits

 over TSB encased conduits

 where specifically required by Ausgrid.


Where used, the tape shall cover the full width of the trench, or portion thereof containing the
conduits. Where two or more strips of warning tape are laid side-by-side, they shall overlap by
20mm. Warning strips shall be immediately secured in place by a 150mm minimum covering of
backfill material.

Inspections by Ausgrid
Ausgrid has the right to inspect all works regarding the installation of its assets. If access to our
assets is unavailable, then the constructor must provide Ausgrid access at the constructor’s
expense.

Kerb marking
Permanent kerb marking must be provided (except where there is no kerb or gutter) at all roadway
conduit crossings and under road borings, using the letter E (for Electricity). The markings shall be
done by engraving or other approved means, and shall be positioned on the face of the kerb
directly above the installed conduits at both sides of the roadway crossing.
Note: Permanent markings shall not be installed in heritage situations unless approved.
For example, permanent kerb marking may consist of an approved stainless steel ‘E’ plate
anchored onto the kerb as shown in Figure 13. The supplier is Hi-Tech Horizontal Drilling.
http://www.kerbmarkers.com.au

NW000-S0088 UNCONTROLLED IF PRINTED Page 36 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Figure 13: Approved kerb marking

Bridge crossings
Where bridge crossings are required, specific structural designs must be provided. Before any work
occurs, the design must be certified, and authorisation must be obtained from the relevant bridge
Authority/Owner and from Ausgrid.
The cable and cable/conduit support design shall allow for the expected bridge movements
(vertical and longitudinal).
Cable design shall meet the distribution network rating requirements.
For exposed HV and LV cables and conduits, suitable measures shall be used to provide adequate
mechanical protection and to restrict public access. These measures shall be subject to review and
approval by Ausgrid.
For all bridge crossings, clearly visible permanent surface marking at 3m intervals along the cable
route shall be provided, in accordance with Clause 0.
All bridge crossings shall have a rating assessment completed by the Designer as per NS272, and
the rating assessment shall be submitted to Ausgrid for review and written approval.

THERMALLY STABLE BEDDING MATERIAL


General
Ausgrid uses the generic term Thermally Stable Bedding (TSB) in referring to any thermally stable
bedding or backfill material which has been designed to achieve specific thermal characteristics.
Where Ausgrid specifies the use of TSB material, the installation shall meet the following
requirements, unless specifically approved otherwise by Ausgrid.
Generally, cable design should not require the use of thermal backfill above the cable warning
tapes on distribution projects as use of TSB could create an obstruction to other utility services in
footpath or road crossing locations.
TSB must be used in accordance with any relevant resource recovery orders and exemptions
issued by the NSW Environment Protection Authority (EPA). The coal ash order and exemption
2014 apply to products that contain fly ash.

NW000-S0088 UNCONTROLLED IF PRINTED Page 37 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Approved materials and mix design


TSB is available in the form of Slurry or Dry mix.
The slurry mix is the default mix. Dry mix shall only be used with the approval of the Ausgrid
representative.
The following table outlines the required performance characteristics of the TSB:
Table 6: Performance characteristics of TSB mixes

Thermal Compressive Strength


Compressive Strength
Site Location resistivity (TR) (MPa) at 120 days
(MPa) at 28 days
K.m/W (fully dry)

Footways, Unclassified 0.9 or less 1 to 2 Less than 3


roads & Classified Regional
roads

Classified State roads 0.9 or less 3 to 5 Less than 7

Any design requiring the use of TSB shall comply with the performance requirements of the above
table. The Designer shall clearly specify the site location of the TSB mix in the design in the
following way:

 ‘TSB - Footways, Unclassified roads & Classified Regional roads’, or

 ‘TSB - Classified State roads’.


For the Schedule of Unclassified Roads, Classified Regional Roads and Classified State Roads,
refer to the following RMS website link:
https://www.rms.nsw.gov.au/business-industry/partners-suppliers/lgr/documents/classified-roads-
schedule.pdf
The Constructor shall ensure that the selected TSB mix complies with the design.
Key parameters of TSB – unless otherwise approved by Ausgrid are:

 Flyash Content - 5% max (by weight) unless approved by Ausgrid

 Course Aggregate - 10mm max size crushed gravel.

 Admixtures for Pumping etc - subject to Ausgrid approval (product specific data sheet
required).

 Lightweight Aggregate - not allowed

 Air Entrainers - not allowed

 Early Strength Accelerators - not allowed.


Key components of TSB are:

 Cement

 Flyash

 Crushed gravel

 Coarse sand

 Water.
Ausgrid’s Approved Material List (AML) provides a list of suppliers of TSB mixes and their product
codes.

NW000-S0088 UNCONTROLLED IF PRINTED Page 38 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

TSB mixes from other suppliers not listed in the AML can also be submitted to the Ausgrid
Representative for consideration using the NS181 approval process. In this case, the Constructor
shall provide the Ausgrid Representative a TR test report, Compressive Strength test report and
mix design / recipe for review.
The Constructor shall provide a copy of the TSB delivery docket to the Ausgrid Representative for
every batch of TSB mix supplied and shall demonstrate compliance with the AML for the approved
TSB mix and site location specified in the design. If the TSB mix is not listed on the AML, the
Constructor shall demonstrate compliance of this TSB mix to a design approved by Ausgrid for the
site location.
Once approved, the TSB mix design shall not be modified without the further approval of Ausgrid.
All materials used in the approved mix design shall continue to be sourced from the original
locations to ensure consistent strength and TR values. Any change to the source of material supply
will require a revised mix design, re-testing of strength and TR values, and the subsequent
approval of Ausgrid.

Default slurry mix


General
Application: All trenches and banks of conduits requiring TSB unless otherwise authorised.
A slump of 110mm average (range 90mm to 130mm) shall be adopted as the standard for most
projects. Water may only be added on site to restore the correct slump – never to speed
installation.
Where vibration is required, it shall be strictly controlled in accordance with Clause 11.3.2.5 due to
the risk of aggregates segregating out and reducing thermal performance.
If a lower slump is required for sloping sites and it is found that the mixture is not fully
encapsulating the conduits, properly specified vibration (not more than 3 seconds in any one
location of TSB) shall be used to ensure the mix is properly blended. Vibrating must be monitored
to ensure it does not damage the conduits and to ensure components do not segregate out.
For typical examples of slurry mix designs that may satisfy the performance requirements, refer to
Annexure M.

Installation of thermally stable slurry mixes


11.3.2.1 Trench preparation
The trench should be free of all debris and standing water before the bedding mix is poured. A
small amount of water in the trench is acceptable.

11.3.2.2 Typical installation methodologies


The conduit installation methodology and the required trench dimensions shall be in accordance
with Clause 0 for concrete encased conduits.

11.3.2.3 Flotation
Since thermally stable bedding mixes are a hydraulic fill, conduits may tend to float, and therefore
they must be secured to the bottom of the trench. The TSB shall be placed from a minimum height
that does not exceed 1.8 metres.

11.3.2.4 Placing of TSB


TSB shall be supplied and transported to site in agitator trucks. The mix should be installed by
controlled pouring around the conduits or cables in accessible trench locations. Where the use of
mechanical compaction/ vibration is required, it shall be strictly controlled in accordance with
Clause 11.3.2.5.

11.3.2.5 Compaction of TSB


The normal TSB mix design, slump and placement techniques should be such that there is no need
for additional mechanical compaction/vibration for most installations.

NW000-S0088 UNCONTROLLED IF PRINTED Page 39 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Where further compaction of the TSB is deemed to be required, the preferred method is by the use
of immersion vibrators. Vibration of TSB shall only be undertaken by trained and experienced
operators using equipment that is suitably sized for the installation. The use of vibrators shall be
constantly monitored to ensure proper technique, suitable immersion times and complete coverage
of the TSB installation.
In this regard, it should be noted that compaction is a two stage process that involves:
(a) Initial Consolidation – aggregate particles are set in motion and slump to fill the formed
space giving a level top surface.
(b) Entrapped Air is expelled – air bubbles rise to the surface over a period of time after the
surface has levelled.
Both stages need to be effectively completed to produce a dense, compacted material with minimal
entrapped air voids.
Poorly monitored or excessive vibration may cause segregation of the mix aggregates and thereby
reduce the thermal performance of the TSB.

11.3.2.6 Air voids


TSB slurry mixes shall be designed to minimise entrapped air voids, and reduce the need for
additional mechanical compaction/ vibration where possible.
Work methods must ensure that any gaps and air voids (such as those caused by cracking of the
mix or removal of shoring materials) are completely filled with either a sand /cement mix or TSB as
required.

11.3.2.7 Bleed water and hardening


As the bedding mix starts to solidify, it will bleed excess water to the surface. In poorly draining
native soils, provision shall be made to allow this bleed water to either drain away or be pumped
away prior to the placement of any backfill material.
The bedding mix will set within 6-8 hours of it being placed. The mix shall be left for a minimum of 8
hours to cure without any disturbance and before backfilling of the trench commences.

11.3.2.8 Formwork removal


If the trenches are shored or bulkheads are used on sloping ground, the shoring should be
removed during the mix pour or within one hour after the mix is poured, that is, while the mix is still
in a semi fluid state. However, the mix should not to be allowed to develop cracks as it flows into
the space created by removal of the shoring.
If cracks or voids are found, these shall be filled in by pouring additional TSB material into them.
Limited vibration, in accordance with Clause 11.3.2.5, may be used to ensure the TSB effectively
fills the void left by the shoring.

Dry mix
Application: Difficult site locations where default slurry mix is not practical (steep slopes, road
crossings requiring immediate backfill). This mix must not be used unless written approval is
obtained from Ausgrid.
This dry mix gives a fully dry nominal thermal resistivity value of 0.9K.m/W when compacted to
98% Standard Proctor. Refer to Clause 10.17 for suitable installation methods applicable to dry
bedded banks of conduits.
Special care must be observed with thorough mixing of the ingredients, installed moisture content,
and proper compaction measures.
For a typical example of a dry mix design that may satisfy the performance requirements, refer to
Annexure M.

NW000-S0088 UNCONTROLLED IF PRINTED Page 40 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Alternative TSB materials


On any project, alternative mixes may be used, provided test results demonstrating thermal and
mechanical performance are submitted to the Ausgrid representative for approval prior to use.
Once approved, the alternative mixes may be used on other projects, provided there are no
unapproved changes to the mix design, and the TSB characteristics are compatible with the
requirements of the other projects.
Alternative mix designs shall not be modified once approved and all materials shall continue to be
sourced from the original locations as required by Clause 0.

Minimum coverage of thermally stable bedding


The minimum coverage of TSB around the conduits shall be 50mm on the sides and base, and
100mm above. This cover may need to be increased depending on the detailed cable design, for
example installations involving a large number of conduits at zone substation outlets (to ensure
they meet the distribution network rating requirements).
TSB shall not be used as backfill material (above the cable warning tapes) for installations in
footpaths or road crossings, unless approved in writing by Ausgrid.

Testing
For effective TSB performance, periodic tests are required to ensure that:

 the specified mix ingredients continue to be used, and “similar” ingredients are not substituted
without approval, and

 the TSB mixes achieve their designated function, including thermal and mechanical
characteristics.
TSB mixes shall be tested according to the following guidelines:

 prior to delivery of the first batch of a new mix (ie from a new batch plant or source of supply),
and

 whenever one or more ingredients are to be sourced from a different location or supplier, and

 at least every 50m length of trench or part thereof (see below).


Each test shall consist of assessment against the criteria specified in Clause 0. In addition, slump
shall be tested prior to every installation of slurries, while compaction testing of dry mixes shall be
as specified in Section 16 for testing of backfill materials at specific locations.
Testing Frequency for Trench Installations
An installation using TSB material shall have thermal resistivity (TR) and 28 day compressive
strength sampling and testing performed as follows:

 Trenches <50m long - one sample per trench location

 Trenches >50m long - one sample per 50m length of trench or part thereof, with sample
locations being equally spaced along the trench length.
The location/s of the sampling must be accurately recorded and provided with the TSB test results
to Ausgrid no later than six (6) weeks after the sampling, who will submit them to:

[email protected] for incorporation into Ausgrid's Geographic Information System (GIS), and

[email protected] for ongoing review of the TSB performance


characteristics and incorporation into Ausgrid’s ThermalRes database.
For thermal resistivity testing requirements and procedures refer to Annexure L.

NW000-S0088 UNCONTROLLED IF PRINTED Page 41 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

INSTALLATION OF PILLARS AND RAG-BOLT ASSEMBLIES


FOR STEEL LIGHTING POLES
Installation of pillar bases
The pillar base is installed in the footpath, square to the kerb, with the centre of the top opening
400mm in front of the street alignment, and normally in a direct line with the extension of the Lot
Boundary line. For link pillars (ie single and double) the short edge of the pillar base shall be
installed parallel to the building line and for all other pillars (ie solid pillars, service pillars) the long
side of the pillar base shall be installed parallel to the building line.
Refer to NS224 Low Voltage Suburban Commercial and Industrial Underground Distribution
Utilising Pillars, for installation requirements of suburban commercial and industrial pillars
Use sand-filled bags, or other means, to build a stable column in the trench to support the pillar
base, enclose the distributor, service cables and service conduit stubs, and cover any high voltage
cables.

Figure 14: Pillar Base Alignment Details

Position the base so that the top is level and 50mm above the footpath level at street alignment as
shown in the above figure. Allow for grass when determining the final footpath level.
Cable terminations shall be installed in accordance with NS127 Low Voltage Joints and
Terminations.
Once the distributor and service cables have been installed and terminated, the trench around the
base and supporting structure must be backfilled with well-compacted granular soil.

Installation of rag bolt assemblies for steel lighting poles


Rag-bolt assemblies are used as mounting bases for some steel lighting poles. Rag-bolt
assemblies must not be erected before the finished ground level has been ascertained from the
local authority.
Unless otherwise specified, the centre line of the rag-bolt assemblies shall be positioned 400mm
from the street alignment, as shown in Figure 15.

NW000-S0088 UNCONTROLLED IF PRINTED Page 42 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Figure 15: Rag-bolt Alignment Details

Installation of the pile footing, rag-bolt assembly and plinth shall be in accordance with Ausgrid
drawing 514087, using plinth steel mould to Ausgrid drawing 514020.
The rag-bolt assembly must be installed in a 600mm diameter hole. Where unstable ground exists
or shared trenching is used, a 600mm diameter former tube must be fitted to the hole.
The hole or former tube must be filled with 32MPa concrete. Any gaps around the concrete core
must be filled with well compacted granular soil, and any sharp edges must be removed after the
concrete has set.
Once in its final position, the rag-bolt assembly must:

 be vertically aligned in both planes

 be square to the kerb

 have its centre line 400mm from the street alignment (unless specified otherwise)

 have the top of the threaded rods 100mm above the top of the plinth steel mould in accordance
with Ausgrid drawing 514087.
Once the street lighting cables have been installed and terminated in accordance with NS119
Public Lighting Design and Construction, the trench around the rag-bolt assembly must be
backfilled with well compacted granular soil.

NW000-S0088 UNCONTROLLED IF PRINTED Page 43 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

INSTALLATION OF POWER AND CONTROL CABLES


General requirements
Refer to NS100, Field Recording of Network Assets – External Annexure C; Cable Codes &
Nomenclature.
Cables must be installed in the correct allocation, and with the specified separation from other
cables and the sides of the trench. Refer to Clause 10.10 and Annexures B, C and D for further
information.

Pilot Cables
13.1.1.1 Sydney CBD
The Sydney CBD 11kV Triplex network uses a "coloured" pilot cable system with:

 Red associated with the A, D, G, K, etc feeder

 White associated with the B, E, H, L, etc feeder

 Blue associated with the C, F, J, M, etc feeder.


Under no circumstances shall alternative coloured pilot cable be installed on the Triplex network.
Placing coloured heat shrink tubes over the pilot cable or using labels to indicate the pilot's true
colour is also not acceptable on the Triplex network.
The coloured pilot cable shall be installed in the same conduit as its associated Triplex feeder
power cable. Any deviation from this requirement shall require prior approval from Ausgrid via
NS181 processes. In cable pits, vaults, rooms, tunnels, chases, joint bays and risers, the coloured
pilot should be cable tied, cleated or grouped with its associated Triplex feeder power cable.

13.1.1.2 Other than Sydney CBD


The pilot cable shall be coloured black and installed in the same conduit as the feeder cable.

Testing of conduits prior to use


Prior to the commencement of the cable installation, all conduits intended to be used, whether
newly laid or pre-existing, shall be thoroughly cleaned and mandrelled in accordance with
Clause 14.7.

Direct buried cables


General
Direct buried cables shall not be installed in carriageways.
Direct buried cables may be buried in sand or 20:1 sand-cement dry mix, depending on site-
specific installation requirements. Refer to Clause 10.16.1 for standard bedding material
requirements, or to Clause 10.15.1 for sand/cement bedding material requirements.
The bedding material around direct buried cables shall be placed in three or more defined layers
using a minimum compaction ratio of 3:2 and shall meet the cable spacing requirements of Clause
13.3.2. Each bedding material layer shall be compacted down to 2/3 of the “loose” volume, shall
have a final compacted thickness not exceeding 200mm and shall be arranged so that the final
layer provides the required top cover to the direct buried cables. The layer of bedding material over
the direct buried cables shall be carefully consolidated using hand rammers only. Under no
circumstances shall mechanical rammers be used to consolidate the bedding material.
All direct buried cable installations shall be protected against mechanical damage using Ausgrid
approved cable protection covers laid directly above the bedding material.
Concrete or TSB shall not be used as bedding material around direct buried cables.
Coarse aggregates shall not be used in trenches with direct buried cables, due to risk of damage to
the cable during compaction.

NW000-S0088 UNCONTROLLED IF PRINTED Page 44 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Cables that are direct buried and surrounded or partially surrounded in a sand/cement mix are
known as solid laid cables. When excavating around such cables extreme care must be taken to
avoid creating a hazardous condition to personnel, or damage to the cables.
When solid laid cables are encountered, the constructor shall consult with Ausgrid to arrange for all
solid laid cables at the work site to be de-energised before work continues. This will eliminate the
possibility of hand held tools penetrating the energised cables. Alternatively, a hydro vacuum
excavator can be used to expose all solid laid cables without the need for de-energisation, provided
the precautions detailed in NS156 are followed.
Where the solid laid cables are de-energised, the constructor shall prepare a work procedure
designed to safeguard Ausgrid's assets against any mechanical damage whilst exposing the
cables.

Figure 16: Cable Installation Details (Direct Buried)

Standard cable spacing


Direct buried cables shall have minimum 50mm horizontal and vertical separation between cables
and between the outer cables and the bottom and sides of the trench. The top layer of cables shall
be covered with 100mm bedding unless otherwise required by the Network Standard. The
installation shall meet the distribution network rating requirements.

Standard depth of cover for direct buried cables


Standard depth of cover for direct buried cables is the same as in Clause 10.110. (Note: In this
case, the depth of cover is to the top of the cable).

Sealing of cables
General
All power and control cables shall be protected against moisture ingress, including while being laid,
regardless of site and/or weather conditions.
Cable ends which are not intended to be worked on immediately after laying must be electrically
shorted and sealed against moisture ingress as soon as they are cut. This requirement applies to
all cable ends, including cables in pillars and pillar-standards, cables intended to be abandoned or
temporarily decommissioned, and cables still on cable drums.
The seals and electrical shorts must not be removed until the cables are ready to be connected.
Stripping of the outer sheathing of LV service cables and connection of any of the cores must not
be carried out until connection of supply is required.

NW000-S0088 UNCONTROLLED IF PRINTED Page 45 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Where a laid cable is found to have high moisture content due to inadequate sealing, the
Constructor carrying out the works must remedy this at their own cost.

Method of sealing
Where LV cables/service cables enter a customer’s premises, the cable shall be at least single
sealed to avoid the risk of water entering the premises via the cable.
A triple end seal arrangement is required for all HV cables. A triple end seal arrangement is
required for all exposed LV Distributor cables. Only a single seal cap is required for LV Distributor
cables which are enclosed (eg cables left in a LV pillar or inside a kiosk for future connection). A list
of approved triple end seal kits is given in Annexure G. The triple end seals shall be constructed in
accordance with the installation instruction (ESD-3410-AU-5/03 for high voltage single core cables,
ESD-3408-AU-5/03 for multicore cables and ESD-5891-AU-07/12 for low voltage single core
polymeric cables) supplied in the triple end seal kit.
Completed permanent sealed ends must be laid in either suitable troughing or 1000mm lengths of
UPVC conduit, and filled with sand. The sealed ends must then be buried and protected with
approved polymeric cable covers. Sealed cable ends which are awaiting jointing shall be elevated
clear of any free standing water in the excavation.
For polymeric insulated/polymeric sheathed service cables of cross sectional area 50 mm2 or less,
which are intended to be buried, a single heatshrink cap over the mastic tape may be used instead
of the triple seal arrangement. The end caps used shall be selected from the approved range
specified in Annexure G.
Note that cable surfaces which will come into contact with adhesive lined heatshrink components
must be thoroughly cleaned, then degreased and abraded before applying the heatshrink
components. Some older cables may have graphite coatings on the outer sheaths, which must be
removed before the cable surfaces are cleaned. Refer to NS177 for the graphite removal
procedure.

Safety precautions and first aid procedures for graphite coated


cables
Graphite has been classified as having low toxicity, and is a non-carcinogenic substance. However,
normal industrial safety precautions such as wearing leather gloves, safety glasses and safety
boots should be observed.
First aid procedures are:

 Swallowed - Keep individual calm, do not induce vomiting, seek medical attention.

 Eye - Flush eyes with water for 15 minutes, seek medical attention if irritation persists.

 Skin - Wash with soap and water, remove contaminated clothing and launder before reuse.

 Inhaled - If affected, remove individual to fresh air, seek medical attention if breathing
difficulties occur.

Shorting of cable cores


Multicore cables
The conductors of multicore cables shall be shorted out using clouts and 10 turns of 1.63mm tinned
copper wire (Stockcode 68312). For stranded cables, the clouts shall be hammered into the
strands. For solid-core cables, the clouts shall be inserted between the insulation and the solid
cores.

NW000-S0088 UNCONTROLLED IF PRINTED Page 46 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Figure 17: Shorting the cable

Single core neutral screened low voltage cables


Remove 35mm of the cable sheathing material and 35mm of the insulation to expose the neutral
screen wires and the core conductor. Bind the concentric neutral wires to the core conductor using
10 turns of 1.63mm tinned copper wire (Stockcode 68312).

Single core low voltage polymeric cables 185 mm2 and 300 mm2
Refer to Installation Instruction ESD-5891-AU-11/11 and stockcode 182467 for the kit.

Single core copper wire screened high voltage cables


Remove 50mm of cable sheathing material and 50mm of the core insulation to expose the copper
wire screens and the core conductor. Bind the screen wires to the core conductor using 10 turns of
1.63mm tinned copper wire (Stockcode 68312).

Single core metallic sheathed PILC cables


Expose 15mm of metal sheath and clean it. Short the core conductor to the metal sheath using a
clout and tinned copper wire (Stockcode 68312). Apply 10 turns of the 1.63mm copper wire to the
clout and metal sheath, then tie-off the copper wire around the metal sheath.

11kV UGOH terminations


Where the UGOH cables have been terminated onto the termination plates but are not to be
immediately connected to the overhead mains, the UGOH cables must be short circuited and
earthed. Insulated black cable of not less than 25mm2 copper, lugged with M12 stud hole lugs is to
be used. These connections are to be made between the top of the termination plates and the
surge arrester earth bar.

Cable length and joints


General
Cables shall be laid in the longest lengths possible (subject to the maximum drum length and the
pulling tension requirements) to ensure minimum number of joints. Having an excessive number of
joints in a single cable section is not acceptable.
Where a cable section cannot be laid in one continuous length and joints are necessary, the joints
shall be positioned in accessible locations clear of any obstructions that have the potential to make
jointing difficult or impossible.
Cable joints shall be installed in a straight section of trench with at least 2 metres of straight cable
at either side of the proposed joint location to allow the joint components to be parked whilst the
joint is being constructed.
Cable installation plans, and installation of cables, must avoid the positioning of cable joints within
6 metres:

 from the ends of roadway and driveway crossing conduits,

 from concrete encased conduits,

 from street corners and similar sharp bends, and

NW000-S0088 UNCONTROLLED IF PRINTED Page 47 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

 from other locations limiting access for future joint repair/replacement.


Cable joints that are required to be installed in the carriageway shall comply with one of the
following requirements:

 Proposed joint locations subjected to high traffic volumes, and which have cables installed in
conduits, shall require the cable joints to be installed within a pit to the requirements of NS172.
Examples of high traffic locations include CBD areas and RMS roads.

 Proposed joint locations not subjected to high traffic volumes are permitted to have cable joints
direct buried under the carriageway, at a location which takes into consideration Ausgrid’s
future maintenance activities as determined by the Ausgrid Representative.
If the above conditions cannot be met regarding the positioning of cable joints, then the matter shall
be referred to the suitable Ausgrid Representative (ie for contestable projects, the Contestable
Project Co-ordinator, or for all other cases, the applicable Field Manager) to make a decision based
on a careful study of the local site specific conditions.
Cables are to be installed with a 1.2 metre overlap at all joint positions. Where two or more cables
are installed and the joints occur in the same vicinity, joints are to be staggered by a minimum of 1
metre if space is available.
Constructors shall employ sufficient controls to ensure that no damage is caused to newly laid
cables, or to existing cables and infrastructure. Particular attention shall be paid during cable
pulling to sections of the new cable route where there is a significant change in direction, and
where the cable enters a conduit.

Placement of cable joints near road crossings


11kV three-to-one straight through joints and LV joints should not be located within 6m of a road
crossing due to installation issues with respect to bending radii limitations of the cables. The joints
required may be for a UGOH or cable terminations at a kiosk substation. Designers are to make
sure that these requirements are met wherever practicable. The joints should be located away from
the exclusion zone given in yellow colour in Figure 18 below.

Figure 18

NW000-S0088 UNCONTROLLED IF PRINTED Page 48 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Joints within the Cable Basement of Zone Substation Buildings


Joints within the cable basement of zone substation buildings should be avoided in order to
minimise the risk of a joint failure damaging adjacent cables or initiating a fire. This can be
achieved by the selection of a cable type to eliminate the need for a joint altogether. Where a
dedicated cable joint pit is present and space is available, all joints shall be located in the cable
joint pit.
Where joints are required to be located within the cable basement, the risk of doing so shall be
mitigated by application of the controls detailed in NS171 Fire Stopping in Substations. The
Designer shall specify the exact location and controls for the joint to be constructed in the cable
basement on their design.
A System Alteration Order shall clearly identify the cables (by panel number) that have been
protected with the controls detailed in NS171.

Joint bays
Joint bays are the most likely section of a project to be re-excavated, and these locations shall be
filled with compacted, well graded standard bedding material as per Clause 10.16.1.
Coarse aggregates must not be used in joint bays due to risk of damage to the cable during
compaction.
Concrete or TSB shall not be used as a bedding material around direct buried cables in joint bays.
Refer to Clause 13.3.

Damage to cables during construction


Cables must not be stood on, and any sharp tools or objects are to be removed from the vicinity of
cables being laid in order to avoid damaging them.
Any cable or general infrastructure damages that are discovered or caused as a result of laying a
new cable shall be reported immediately to Ausgrid. Once inspected, Ausgrid will determine the
method of repair.
A suitable site specific risk assessment shall be completed and implemented to manage the risks
associated with cable pulling activities. The risk assessment shall include prevention of harm to
people, and prevention of damage to the cable being pulled and adjacent asset(s).
Ausgrid may decide, at its discretion, to carry out electrical tests on newly installed cables to check
for sheath integrity if it is suspected that such cables have been damaged during cable pulling.
Testing will be carried out in accordance with NS161 at the Constructor’s expense.

Bending radii of cables


The internal bending radius of the cable being laid shall not be less than the cable manufacturer’s
specification. Table 7 is based on the cable manufacturer’s specification. Nominal minimum internal
bending radii are provided in Tables 8 and 9 as a guide.
The persons carrying out the works must determine the exact minimum internal bending radius for
cables before they are laid if it is envisaged that the actual bending radius will be close to the
nominal minimum specified in the table.
When selecting an approved conduit bend the ‘during installation’ minimum internal bending radius
in Table 7 shall be used to calculate the minimum conduit bend radius.

NW000-S0088 UNCONTROLLED IF PRINTED Page 49 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Table 7: Minimum Internal Bending Radii for LV and 11kV Cables

Minimum Internal Bending Radius


Cable type
During Installation After Installation

Polymeric insulated cables

All Low Voltage cables with circular stranded


conductors

Less than or equal to 25mm diameter 6D 4D

Greater than 25mm diameter 9D 6D

All Low Voltage cables incorporating sector 12D 8D


shaped conductors, Solid Aluminium or
compacted

11kV HDPE sheathed cables 25D 15D

11kV Composite HDPE and PVC sheathed 25D 15D


cables

11kV Triplex Composite HDPE and PVC


sheathed cable

Bundled cable 15D 10D

Phase cable 25D 15D

11kV nylon sheathed cables 30D 20D

Nylon sheathed pilot cables 30D 20D

Paper insulated cables:

11kV multicore, lead sheathed, PVC 18D 12D


oversheathed

11kV multicore, lead sheathed, HDPE 25D 15D


oversheathed

11kV single core, lead sheathed, PVC 22D 15D


oversheathed

Note: “D” is the overall diameter of the cable in mm or the circumscribing overall diameter of a
bundled cable.
The minimum internal bending radius of each core of a three core polymeric cable after it has been
trifurcated is 15D, where D is the diameter of the rejacketed individual core. Refer to Table 9 for
more details.

NW000-S0088 UNCONTROLLED IF PRINTED Page 50 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Table 8: Nominal Minimum Internal Bending Radii for Specified Cables (Guide Only)

Minimum Internal Bending Radius


Cable type
During Installation (mm) After Installation (mm)
LV XLPE insulated cables:
185 CU1 XQ Z 145 95
185 CU1 XQ Z /COM/ 4 CABLES (Parrot 270 180
cable)
240 CU4 XQ Z 675 450
240 AL4 XQ Z/SAC 590 395
300 CU1 XQ Z 270 180
500 CU1 XQ Z 335 225
11kV TRXLPE insulated cables:
35 AL1 TRXQ 16 CU(WS) YQ 555 330
70 CU1 TRXQ 16 CU(WS) YQ 620 370
95 AL3 TRXQ 16 CU(WS) Z YQ 1380 830
150 CU3 TRXQ 35 CU(WS) Z YQ 1610 965
185 CU1 TRXQ 70 CU(WS) Z YQ 825 495
185 CU1 TRXQ 70 CU(WS) Z YQ/Triplex 1120(Bundled) 745(Bundled)
870 (Phase) 525 (Phase)
185 AL3 TRXQ 35 CU(WS) Z YQ 1700 1020
300 CU1 TRXQ 70 CU(WS) Z YQ 955 570
300 CU1 TRXQ 70 CU(WS) Z YQ/Triplex 1275(Bundled) 850 (Bundled)
960 (Phase) 575 (Phase)
300 CU1 TRXQ 150 CU(WS) Z YQ 990 595
300 AL3 TRXQ 35 CU(WS) Z YQ 1980 1190
400 AL3 TRXQ 35 CU(WS) Z YQ 2180 1305
500 AL3 TRXQ 35 CU(WS) Z YQ 2310 1385
500 CU3 TRXQ 35 CU(WS) Z YQ 2315 1390
630 CU1 TRXQ 120 CU(WS) Z YQ 1245 750
11kV Paper insulated cables:
300 CU3 P H L YQ 760 640
Nylon sheathed Pilot cable:
1.5CU4QQZNY/TR (Nylon Translay) 420 280

NW000-S0088 UNCONTROLLED IF PRINTED Page 51 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Table 9: Nominal Minimum Internal Bending Radii for the Individual Cores of the Three Core
Polymeric Cable (After Trifurcation) - Guide Only

Minimum Internal Bending Radius


Cable type
After Installation (mm)

11kV XLPE and TRXLPE insulated cables:

95 AL3 TRXQ 16 CU(WS) Z YQ 410

150 CU3 TRXQ 35 CU(WS) Z YQ 440

185 AL3 TRXQ 35 CU(WS) Z YQ 490

300 AL3 TRXQ 35 CU(WS) Z YQ 535

400 AL3 TRXQ 35 CU(WS) Z YQ 580

500 AL3 TRXQ 35 CU(WS) Z YQ 630

500 CU3 TRXQ 35 CU(WS) Z YQ 660

Cable pulling equipment


The pulling tension on power cables shall not exceed the cable manufacturer’s specification. Refer
to Annexure E for guidelines on maximum pulling tensions and use of pulling eyes.
A documented site specific cable pulling plan shall be completed by a competent person and
provided to Ausgrid. The completed site specific cable pulling plan shall be implemented for the
cable pull.
Where there is the potential for damage to other cables or to critical network infrastructure within
the vicinity of the cable pulling equipment (if it was to fail under load), appropriate barricading
and/or protective screens shall be put in place to protect the identified components.
Only load rated attachment points shall be used when pulling cables into the substation cable
marshalling areas, unless otherwise approved in writing by Ausgrid.
The pulling tension being used shall not exceed the rated working load limit (WLL) of the cable
pulling equipment proposed.
Appropriate rope tension fuses shall be used between the pulling rope and the stocking/pulling eye
for each cable pull where a power driven winch is used. Alternatively, a strain gauge with control
mechanism and logging capability shall be used.
If strain gauge is used with rope tension fuses, then the logging capability is not required as the
rope tension fuses will not allow to exceed the maximum pulling tension.
If the strain gauge is used without rope tension fuses, then the control mechanism of strain gauge
should ensure that the maximum pulling tension has not been exceeded throughout the entire
pulling process. Applied tension values should be able to be checked during and after the pull in
this method.
The cable pulling rope must be equipped with a swivel and attached to the cable by a stocking
unless pulling eyes have been fitted to the cable.
The pulling rope shall be made of synthetic material. The rope shall have high strength and high
abrasion resistance, eg Donaghy’s Aquatec® rope. The selected rope must be rated to withstand
the calculated pulling tension. The rope must not be tensioned beyond its design limit to avoid the
risk that it may snap or damage the conduit during a cable pull (eg by slicing the conduit wall).

NW000-S0088 UNCONTROLLED IF PRINTED Page 52 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

The plant used to pull cables shall be firmly anchored before a pull commences to prevent uneven
tension on the cable due to winch movement. Prior to securing any floor mounted pulling
equipment to the substation floor in accordance with the manufacturer’s instructions, written advice
shall be obtained from a competent person (ie a Civil / Structural Engineer) regarding the structural
integrity and load capacity of the substation floor, and the suitability of the anchoring method
proposed. The cable shall be drawn smoothly into position with a minimum of stops and at a
maximum speed of 12-15 metres per minute. The cable drum shall be placed so that the cable is
pulled from the top of the drum.
On completion of a cable pulling operation, all cable ends shall be inspected for damage. The
length of cable laid shall be extended to compensate for damaged cable ends.

Use of existing spare conduits


Ausgrid has existing spare conduits as part of its underground infrastructure. The depth of cover of
these conduits generally varies between 450mm and 750mm.
Spare conduits are intended to be used to get around the need to re-excavate. The depth of cover
of the conduits should be consistent with the requirements of the cables being laid (refer to Section
10). Ausgrid is not responsible for or warrants the location & condition of existing spare conduits or
that the existing spare conduits are fit for intended purpose.
Where high voltage conduits are not available, pulling of high voltage cables into low voltage
conduits may be allowed at the discretion of Ausgrid’s Representative, provided the depth of cover
is consistent with the requirements for high voltage cables (refer to Section 10). Permission to use
the conduits must be obtained in advance of their use.
Spare conduits shall not be used in any location where excavation is required to lay adjacent
parallel cables. Ausgrid may also reject an application to use existing spare conduits if a need is
foreseen to use the conduits for other purposes.
For existing conduits which have been installed under reduced cover, a case-by-case approach
shall be carried out by Ausgrid to determine the suitability of the conduits (eg safety risk, cable
ratings, mechanical loads) for cable installation.
Some of the existing conduits are made of asbestos cement and appropriate asbestos handling
methods shall be used.

Excavations and cable chases


Where cables are to be installed in excavations and cable chases, cable rollers are to be used to
support and guide the cables. Rollers must not be located more than 3 metres apart and positioned
to prevent excessive side wall pressure on the cable. Where the cable is to be pulled around
corners or angles, special corner rollers are to be used. The cable must not enter or leave any
cable roller at an excessive angle, or exceed the cable manufacturer’s recommendations for
minimum internal bending radius.

Cable installations involving jointing pits


The maximum point load (working load) of a conventional pulling eye fitted to the wall of a jointing
pit is 50kN. For cable pulls that are expected to exceed 50kN, two or more pulling eyes may be
utilised (if available) with the use of slings between them. The strength of the pit wall should be
checked before two eyes are installed.
Note: Cables and cable joints in jointing pits must not be walked on for safety and operational
reasons.
When installing cables into or through jointing pits that have existing cables, precautions must be
taken prior to commencing work to avoid damaging these cables. All existing cables are to be
covered with protective mats (Refrasil mats) or any other method approved by Ausgrid, and these
mats must be secured in position to prevent dislodgment.
Cables should not be damaged on the pit entry when installing cables into cable pits. Cables and
joints should not rest on or make contact with other joints in the pit.

NW000-S0088 UNCONTROLLED IF PRINTED Page 53 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Where existing conduits have cables installed and are not fitted with bellmouths at the cable pit
entry, a “split type” bellmouth should be installed where it is safe to do so. This may require cables
to be de-energised and/or isolated.
Cables for which the existing supporting structure is to be removed in order to allow the new cables
to be installed, shall be temporarily supported so that no movement occurs to the cable and
associated cable joints while the existing support is removed. All temporary supports are to be of
non-metallic materials. Refer to Clause 8.1 for further information regarding cable supporting
requirements.
On completion of the cable installation, the existing supporting system is to be restored.
Consideration must be given to cable management in pits to ensure the safe and efficient access
and emergency egress for personnel and equipment. This is achieved through the use of thorough
job planning, and use of cable stands, tray, cleats, etc. Cable pits shall be kept clean by removing
all scrap joints, cable and materials, debris, and general rubbish from the pit at the conclusion of
works.

Installing cables in substations and switching stations


General
Refer to Ausgrid’s Electrical Safety Rules for restrictions on entering Ausgrid premises.
Where cables are to be installed in substations and switching stations, Ausgrid’s Representative
must be requested to arrange access. Notice for access is required at least 7 days prior to
commencing work in order to allow the necessary screens and protective devices to be installed.
All cables installed in substations and switching stations shall be designed to meet the distribution
network rating requirements.
Weatherproof labels shall be attached to all cable ends installed in substations or future substation
sites detailing the location of the remote cable ends (eg Cable 1, joint bay O/S 24 Smith St. on one
end Cable 1, joint bay O/S 72 John St at the other end). Labels shall be marked with a permanent
waterproof marker.

Cable labelling
Multiple cable installations shall have the cables identified as “cable 1”, “cable 2”, “cable 3” etc to
assist identification. Labels must be removed upon commissioning of cables or modified at the new
cable ends in the case of in-line joints carried out before commissioning.
During cable installation, the cables shall be labelled as shown in the design drawings. The cable
identification labels must to be placed on the cable ends at the termination points and in joint bays.
For example, a design drawing will show the cable labels at termination points as follows:

Figure 19a

NW000-S0088 UNCONTROLLED IF PRINTED Page 54 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Whilst the design drawing does not show the joint bay locations as they are determined at
construction stage, cables must be labelled in the joint bays with respective cable labels as shown
below:

Figure 19b

The Certified design/Design drawing will include the following in the Important Note section:
“For identification and jointing purposes, all cable ends shall be labelled at the termination locations
and in joint bays during cable installation. The cables must be labelled as per certified
design/design drawing.”

Installing cables in kiosk type substations


To minimise bending of terminating cables:

 All High Voltage cables shall be laid so that they enter perpendicular to the High Voltage infill
panels and vertically up inside the HV cable entry area of the kiosk. All Low Voltage cables
shall be laid as per the range of acceptance entry angles as per the diagram given below.

 The internal bending radius of the cable being laid shall not be less than the cable
manufacturer’s specification. The cable manufacturer’s specifications are based on Tables 8 &
9.
Ausgrid will not accept excessive bending of cables.

NW000-S0088 UNCONTROLLED IF PRINTED Page 55 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Figure 20

Installing cables in cable risers


Cables installed in cable risers shall be clamped at a maximum of 1 metre intervals using approved
cable clamps. Clamps shall be free from sharp edges and burrs. To prevent local heating of cables
caused by eddy currents, clamps shall be either made of non-ferrous materials or where they are
made from ferrous material the two halves shall not touch at both sides, and shall be fixed together
using non-ferrous bolts, nuts, and washers. Cable clamps can be directly bolted to cable riser
walls, or to Unistrut-type supporting channels.

NW000-S0088 UNCONTROLLED IF PRINTED Page 56 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Clamping of 11kV paper insulated cables


Paper cables may be clamped using either hardwood or metal clamps. The internal diameter of
hardwood clamps shall be chosen such that the overall diameter of the cable is marginally larger
than the internal diameter of the clamp so that when the clamp is tightened the pressure is
distributed evenly without deforming the cable.

Clamping of 11kV polymeric insulated cables


Cables shall be appropriately clamped to ensure that:

 they are firmly held in position;

 the clamps carry the weight of the cable(s) if the latter are not supported on trays;

 the cables are sufficiently restrained to stop them from whipping around under fault conditions;

 the clamps are not over-tightened to the extent that they damage the cable, particularly under
cyclic loading.
Polymeric cables have a relatively high thermal coefficient of expansion and will soften when
operating at high temperatures. If a polymeric cable is clamped too tightly when it is installed, the
polymeric insulation may permanently deform when the cable heats up resulting in a reduction in
the insulation thickness.
Another possible cable damage that could occur as a result of over-clamping is that the screen
wires could be forced through the insulation screen and into the polymeric insulation. Therefore,
clamps shall be tightened only to the extent necessary to ensure that the cables are held firmly in
place.
Where single core cables are used, the cables shall be laid and clamped in a trefoil configuration
unless specified otherwise. The following also applies:

 Where single core cables are clamped in a trefoil configuration, the clamps used must be
sufficiently robust to withstand the potential repulsive forces acting on individual phase cables
under fault conditions. Clamps utilising magnetic material can be used for clamping single core
cables in a trefoil configuration, as magnetic fields generated by the three currents cancel each
other out.

 Where single core cables are required to be clamped individually in a flat formation, the clamps
shall be of a non-magnetic material to prevent localised heating of the cores due to the closed
magnetic circuit of the clamp.
Clamps approved by Ausgrid are listed in Table 10. All cable clamps shall be used with a nitrile or
neoprene rubber-cushioning strip of minimum thickness 3mm, wrapped around the cable
assembly.
Other clamps may be acceptable subject to Ausgrid’s Representative’s approval. Examples of the
approved clamps are shown in Figure 21 below.

NW000-S0088 UNCONTROLLED IF PRINTED Page 57 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Table 10: Cable Clamps for Polymeric Cables

CABLE SIZE (mm2)

Installation 70 Cu 1 185 Cu 1 300 Cu 1 630 Cu 1 300 Al 3 400 Al 3 500 Al 3


Environment

Flat on trays ABB:EA- ABB:EA- ABB:EA- ABB:EA- ABB:EA- ABB:EA- ABB:EA-


UKR100 UKR100 UKR100 UKR100 UKR100 UKR100 UKR100

Trefoil on trays UNISTRUT: UNISTRUT: UNISTRUT: ABB:EA- - - -


TF27 TF37 TF41 UKRB200*

Flat, perpendicular UNISTRUT: UNISTRUT: UNISTRUT: UNISTRUT: UNISTRUT: UNISTRUT: UNISTRUT:


to Unistruts (in P2031SS P2033SS P2035SS P2039SS P2049SS P2051SS P2055SS
substations, High-
rise buildings etc)

Trefoil, UNISTRUT: UNISTRUT: UNISTRUT: IdTechnik - - - -


perpendicular to TF27 TF37 TF41 KP39/53
Unistruts (in
substations, High-
rise buildings etc)

Flat, at an angle to ABB:EA- ABB:EA- ABB:EA- ABB:EA- ABB:EA- ABB:EA- ABB:EA-


Unitstruts UKR100 UKR100 UKR100 UKR100 UKR100 UKR100 UKR100

Trefoil, at an angle ABB:EA- ABB:EA- ABB:EA- ABB:EA- - - -


to Unitstruts UKR100 UKR100 UKR100 UKRB200*

Trefoil, UNISTRUT: UNISTRUT: UNISTRUT: IdTechnik- - - -


freestanding TF27 TF37 TF41 KP39/53

Individual or trefoil ABB:EA- ABB:EA- ABB:EA- ABB:EA- ABB:EA- ABB:EA- ABB:EA-


on UGOHs UKR100 UKR100 UKR100 UKRB200* UKR100 UKR100 UKR100

* Note: EA-UKRB200 is supplied with one bracket. Use an additional bracket (ABB part number
EA-B200) on trefoils of large cables such as 630 mm2 polymeric cable.

NW000-S0088 UNCONTROLLED IF PRINTED Page 58 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

ABB: EA–UKR100 ABB: EA–UKRB200 (See *Note above)

UNISTRUT: P Series (Stainless Steel) UNISTRUT: TF Series

IdTechnik: KP Series Nitrile rubber liner to be used with all


clamps

Figure 21: Approved Cable Clamps

NW000-S0088 UNCONTROLLED IF PRINTED Page 59 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Underground to overhead transition points


Low voltage underground to overhead transition points are to be installed in accordance with
NS127, Low Voltage Cable Joints and Terminations.
High voltage underground to overhead transition points are to be installed in accordance with
NS129, 11kV Joints and Terminations - Paper Insulated Lead Covered Cables and NS177, 11kV
Joints (including Transition Joints) and Terminations - Polymeric Insulated Cables.

Standard depth of cover


Standard depth of cover over direct buried cables shall be in accordance with Clause 10.11. Note
that Clause 0 requires all road crossings or cable installations in roadways to be installed in
conduits, so this clause only applies to direct buried cables for footway installations.

Reduced depth of cover


The portions of cables in a cable run subject to reduced cover shall be laid in conduits, and shall
comply with the requirements of Clause 0.

Installation of underground cables in the vicinity of poles


A 350mm exclusion zone shall be maintained between underground cables and poles. Only UGOH
cables erected on the pole are to enter this zone and must leave the pole as depicted in the Figure
22 below. The purpose of the exclusion zone is to reduce any risk of damage to underground
cables due to excavations for pole inspection work.

Figure 22: Installation of Underground Cables in the vicinity of poles

Clearance to other utility services


Clearances to other assets should generally be in accordance with the NSW Streets Opening
Coordination Council (SOCC) Guide to Codes and Practices for Streets Opening; however, the
construction of Ausgrid assets (including excavation, installation and backfill) at any time in the
vicinity of other utility infrastructure must be undertaken with an appropriate risk assessment by
those carrying out the work.
The onus shall be on the Constructor not to damage another utility's infrastructure. This may
include consultation with the other utility.

NW000-S0088 UNCONTROLLED IF PRINTED Page 60 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

BACKFILLING OF EXCAVATIONS
Backfill material
General
Ideally, the backfill material should restore the sub-grade to its original condition, which may be
achieved by replacing the excavated materials in the same position from which they were
excavated, and in the same state with regard to moisture content and compaction. This is usually
difficult with "moisture unstable" soils. Where these exist under heavy traffic pavements, it will
generally be required to import granular material that is capable of spreading the traffic load over a
larger area of sub-soil.

Roads and Maritime Services requirements


In general, backfilling materials shall be to the satisfaction of the Roads Authority (Local Council or
RMS). Where Ausgrid or the relevant Roads Authority considers the backfilling material unsuitable
for a particular project, this material shall be removed and replaced by material which is considered
suitable by that Authority.

Additional Ausgrid requirements


Trenching can alter or even divert existing sub-surface drainage so as to concentrate sub-surface
water with disruptive scouring effects where flow occurs. In the selection of backfill material this
aspect shall be taken into account in relation to the nature and topography of the particular
location.
Where sub-surface water flow exists or is likely to occur (eg steep inclines) or where sand is used
as backfill material, suitable water barriers shall be provided in the trench, spaced at regular
intervals appropriate to site conditions.
Approved water barriers are bulkheads consisting of bags packed with 20:1 sand/cement mix.
Persons working on the network must comply with the guidelines relating to the seepage of water
found in 1152.3.8 Backfill.

Backfill in landscape areas


The Constructor must carry out backfilling in landscape areas as specified in 1152.3.8 Verge and
landscape areas.

Backfill to subgrade level under footpaths, carriageways and heavy


duty driveways
The Constructor must comply with the guidelines in 1152.3.8 Under footpaths, carriageways and
heavy duty driveways.

Compaction of trench backfill


Compaction of trench backfill shall be carried out by the Constructor in accordance with 1152.3.9
and Annexure J.
Frequency of compaction testing shall be in accordance with Section 16.
Ausgrid reserves the right to witness any or all of the compaction tests.

Disposal of surplus materials


Surplus materials and rubbish must be disposed of lawfully.

Record keeping requirements


The Constructor shall maintain accurate records of the type and source of materials used for
backfilling at every site and shall produce such records to Ausgrid on demand. The records shall be
kept for a minimum period of three years after completion of the works.

NW000-S0088 UNCONTROLLED IF PRINTED Page 61 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Testing of conduits
After installation and backfilling of a bank of conduits, Ausgrid’s Representative is to be notified to
witness conduit testing.
All new conduits shall be thoroughly cleaned and an approved solid mandrel of diameter 12mm
less than the internal diameter of the conduit and minimum 230mm in total length and minimum
130mm in flat length, shall be pulled by hand or with winch/machine (with suitable sized fuse)
through every conduit in both directions to ensure their integrity.

Figure 23

After passage through each conduit, the mandrel shall be thoroughly inspected for cuts or damage.
If in the opinion of Ausgrid’s Representative, there is any doubt as to the freedom from foreign
material or any object or defect that may cause damage to the cable in the conduit, the Constructor
shall repeat pass the mandrel through the conduit(s) until the Ausgrid Representative is satisfied.
Ausgrid reserves the right to request that a waste length of the cable to be installed be passed
through the conduits, or video cameras be used to inspect the conduits where reasonable concern
exists as to the condition of the conduits or if they have been backfilled without Ausgrid's
Representative being present.
Conduits found to have defects which, in the opinion of Ausgrid’s Representative, may cause
damage to cables shall be repaired by the Client / Constructor at no cost to Ausgrid and at a time
nominated by Ausgrid’s Representative. Several commercial conduit repair systems are available.

NW000-S0088 UNCONTROLLED IF PRINTED Page 62 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

REINSTATEMENT OF PAVEMENTS AND PATHWAYS


Temporary reinstatement
Reinstatement requirements
Unless final reinstatement is intended to be carried out immediately after completion of backfilling,
temporary reinstatement of pavements and pathways shall be carried out.
All temporary restorations in carriageways and pathways must be of sufficient quality and must be
maintained as such to ensure the safety of the site for pedestrians and vehicular traffic.
The Contractor shall be responsible for temporary line marking that is damaged or removed by the
cable laying project. Line and road marking that is required for the safety of vehicles and the public
must be installed temporarily as a minimum before the opening of the road for the carriage of
traffic. The Contractor must ensure that temporary road marking is maintained and is suitable for its
purpose until replaced by permanent line and road marking's.
Surfaced driveways and footpaths - Temporary reinstatement must be carried out by the
Constructor in accordance with 1152.3.11 Temporary footpaths and driveways.
Surfaced roadways controlled by Local Councils (except those carrying heavy traffic) -
Temporary reinstatement must be carried out by the Constructor in accordance 1152.3.11
Temporary carriageways.
Surfaced roadways controlled by the Roads & Maritime Services (RMS) of NSW - Temporary
reinstatement must be carried out by the persons carrying out the works in accordance RMS
Specification M209.

Temporary steel road plates


All steel road plates shall comply with RMS Specification M209 or the Australian Standard as
applicable.

Road furniture
The Contractor is responsible for installation of road furniture that is damaged or removed by the
cable laying project. Road furniture that is required for the safety of vehicles and the public must be
installed temporarily as a minimum before the opening of the road for the carriage of traffic. All road
furniture must be replaced like for like using current industry practice and approved materials and
techniques and in accordance with the manufacturer’s instructions. The Contractor must ensure
that temporary road furniture is maintained and is suitable for its purpose until replaced by
permanent road furniture.

Final reinstatement
Other than for State Roads, the Client shall arrange for permanent reinstatement which complies
with 1152.3.12 – 3.14.
For State Roads, the Client shall arrange for permanent reinstatement which complies with RMS
Specification M209.

NW000-S0088 UNCONTROLLED IF PRINTED Page 63 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

FREQUENCY OF TESTING OF BACKFILL AND TEMPORARY


RESTORATIONS
The frequency of testing of backfilling and temporary restorations shall be as specified in Table 11,
unless directed otherwise by Ausgrid. Refer to Annexure J and Section 25 for definitions of the
various layers.
Test reports shall be supplied to Ausgrid's Representative for approval as part of the project sign-
off process.
Ausgrid may also conduct random audits on the quality of backfill and compaction. Should these
audits indicate improper backfilling and compaction, Ausgrid may impose a higher level of testing.
Where final compaction tests indicate that the required percentage of maximum density has not
been met, the Constructor must perform further compaction tests at one metre intervals either side
of the failed test until two consecutive compaction tests pass on either side of the failed test. The
Constructor must re-compact the area of the failed tests and perform the compaction tests again.
This process must be repeated until the required compaction level is achieved over the entire
length of failed tests.
Where there has been more than one test that has not met the required percentage of maximum
density at the same Site, then the Constructor is to carry out such other number of tests that
Ausgrid’s Representative deems necessary, at no cost to Ausgrid.
Any defects in the quality of backfill or compaction shall be rectified by the person doing the work at
no cost to Ausgrid.
Table 11: Frequency of Testing of Backfill and Temporary Restorations

Activity to be Tested Key Quality Maximum Lot Minimum Test Test Method
Verification Size Frequency
Requirements (see note 5)

Materials supplied for trench Material properties 1 contract 1 per contract or source As specified
backfill under carriageways, as specified of supply for each type
footpaths, and all joint holes of material used or
suppliers test
certificates

Materials supplied for sub- Material properties 1 contract 1 per contract or source As specified
base and base layers as specified of supply for each type
of material used or
suppliers test
certificates

Trench and joint bay backfill Compaction 1 continuous 1 per layer, per 30 AS 1289.5.1.1
and sub-base and base under trench or 1 metre length per trench AS 1289.5.2.1
carriageways, heavy duty joint bay or (see note 6) AS 1289.5.6.1
vehicular crossings and car one road
parks crossing

Trench backfill and sub-base Compaction 1 project (see 1 per layer, per 100 AS 1289.5.1.1
and base under footpaths, note 1) metre length of trench AS 1289.5.2.1
light/medium duty driveways or part thereof (see AS 1289.5.6.1
and turfed areas notes 2 and 3)

Backfilling of individual joint Compaction 1joint bay (see 1 per layer AS 1289.5.1.1
bays in footways (see note 3) note 4) AS 1289.5.2.1
AS 1289.5.6.1

Backfill of trial holes Compaction 1 trial hole 1 per layer AS 1289.5.1.1


(Including location of conduit AS 1289.5.2.1
ends) (see note 3) AS 1289.5.6.1

NW000-S0088 UNCONTROLLED IF PRINTED Page 64 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Activity to be Tested Key Quality Maximum Lot Minimum Test Test Method
Verification Size Frequency
Requirements (see note 5)

Materials supplied for Material properties 1 contract Supplier test certificates As specified
temporary road surface (or as specified
sealing material

Temporary road surface Compaction 1 project Check evenness and As specified in


placement (see note 1) camber of all restored Section 15
surfaces

Notes:
1. ‘Project’ refers to the works executed within a reasonable timeframe by the same contractor
as part of a single Certified design/Design plan. Where a Certified design/Design plan
involves two or more well-defined stages, and each stage is executed separately, each stage
shall be regarded as a separate project for the purpose of testing frequency.
2. The length of trench backfilled shall be taken to be the total of all discrete excavations
backfilled together by the same Constructor.
3. Joint bays and trial holes backfilled and compacted concurrently with cable trenches shall be
regarded as cable trenches for the purpose of testing frequency.
4. Individual joint bays shall be taken as those which were part of a cable trench but were
backfilled separately from this trench, or any discrete joint bays which were not associated
with any other cable trenches.
5. A layer is defined in 1152 or RMS Specification M209 depending on the location.
6. Every separate trench in a roadway or carriageway must have at least one compaction test.
For example; if there is a requirement for two road crossings of 10m each, a compaction test
is required for each road crossing.

CABLE JOINTING
Jointing work on the electrical distribution system and details of the joints and terminations
required, are referenced in NS127 LV Cable Joints and Terminations, NS129 11kV Joints and
Terminations - Paper Insulated Lead Covered Cables and NS177 11kV Joints (including Transition
Joints) and Terminations - Polymeric Insulated Cables.

CABLE TESTING REQUIREMENTS


On completion of the works and immediately before the transfer of works to Ausgrid, all cabling
involved in the project must be tested in accordance with Ausgrid’s publication NS161 Testing of
Underground Cables after installation.
Any defects identified by the tests must be rectified at the Constructor’s cost, and the cables must
be re-tested.
The Constructor must coordinate the works and tests to allow transfer and/or commissioning
immediately after passing final testing.
The provisions of Section 19 of this Network Standard concerning protection of exposed
underground construction shall be observed at all times.

NW000-S0088 UNCONTROLLED IF PRINTED Page 65 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

PROTECTION OF EXPOSED UNDERGROUND


CONSTRUCTION
Access permits* for work on 5kV or 11kV underground cables shall not be signed off and
withdrawn, whether for testing, commissioning or re-energisation of the cables, unless:

 All new or repaired cable joints are backfilled or sand-bagged, and

 Excavations in the immediate proximity of substations are backfilled, and

 All other excavations are safely barricaded and protected, and arrangements are put in place
for regular checking to ensure that they remain safely barricaded and protected.
(*Ausgrid's Electrical Safety Rules cover access permit procedures and requirements).

CABLE TUNNELS
For dedicated Ausgrid cable tunnels, specific fire engineering solutions shall be provided that deal
with cable type, cable joints, fire detection, fire suppression, ventilation, emergency response and
other aspects. Installed cables within dedicated Ausgrid cable tunnels will generally include an
additional layer of low smoke zero halogen (LSOH) material over the normal HDPE over-sheath, to
retard the spread of fire and smoke.
The design of cable installations in cable tunnels shall be approved by Ausgrid prior to proceeding
with construction works.

Shared Cable Tunnels


This clause outlines the requirements for Ausgrid cables used in shared services tunnels. These
are locations where other authorities (eg water, sewer, gas, communications), or other parties, use
the tunnel void to carry their services, and have shared access arrangements for the tunnel.
The preferred approach for Ausgrid cables in shared services tunnels is to implement the
requirements of Annexure K for the installation of network ductlines through buildings. This will
ensure that adequate security and protection measures are provided for Ausgrid’s assets, and that
any potential Ausgrid impacts on other services will be minimised.
Where this approach is not reasonably practicable, it will be necessary to address the risk of fire
propagation in the tunnel initiated by a joint or cable failure. In this case, the following requirements
are to be met:
1. Cable Type:

 Fire retardant (low smoke, zero halogen or LSOH), HDPE sheaths shall be used on all
power cables in tunnels. Where this is not feasible, a fire retardant cable wrap or cable
coating shall be used to protect a conventional power cable.

 The LSOH cable shall extend into the next underground joint bay, or into the
substation, up to the terminations, as applicable.
2. Cable Support, Protection and Signage:

 Ausgrid’s HV cables should be separated as much as possible from Ausgrid’s LV


cables.

 Ausgrid’s HV and LV cables shall be carried on dedicated cables trays (or equivalent),
in an elevated location if possible, and separated as much as possible from any
existing LV cables, communications cables, services etc that are owned by others.

NW000-S0088 UNCONTROLLED IF PRINTED Page 66 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

 Where additional security/mechanical protection is required, a fixed lightweight wire


cage or barrier around the cable tray that can be removed in sections should be
provided. This approach is comparable to that used on accessible bridge crossings to
protect major HV cables.

 Clear signage shall be provided indicating that the cables are HV and are owned by
Ausgrid.
3. Cable Joints:

 Cable joints within the tunnel should be minimised.

 Where joints are essential, encapsulation and/or local protective shields shall be used
in consultation with Ausgrid to minimise the risk of a joint failure damaging adjacent
cables or initiating a fire in the tunnel.

 Consideration shall be given to modified joint kits for any cables using LSOH sheaths,
as the standard joint kits may not be suitable.

 Localised fire retardant cable blankets or "wraps" shall be used around Ausgrid HV
cables at locations that are exposed (1m -1.5m) to joints in major LV cables. Any
derating of Ausgrid cables will need to be assessed and submitted to Ausgrid for
approval.
Other issues that are to be considered in the design of shared services tunnels include, but are not
limited to, the following:

 Control of shared access in the tunnel

 The FRL requirements of any supporting structure

 Corrosion protection of any supporting structure

 Fire rating of any spray-on fire protective coating used (eg Fendolite)

 Future access to conduits/cables

 Responsibility for maintenance of the supporting structure

 Maintenance and ownership of the tunnel.

STORES AND MATERIALS


Only approved materials and equipment may be used in the construction of infrastructure which
ultimately forms part of Ausgrid’s electrical network. The approved materials and equipment
contained in this Network Standard are detailed in Ausgrid's Approved Material List (AML) with
manufacturer and supplier information and Ausgrid stockcodes where appropriate. Ausgrid will
consider adding alternative materials and equipment to the AML in accordance with NS181 -
Approval of Materials & Equipment and Network Standard Variations.
ASPs may obtain approved materials and equipment items as listed in the AML from any source.
Where an ASP wishes to use alternative materials and equipment, application to have the
materials or equipment considered for approval is to be made in accordance with NS181.
Alternatively, where approved materials and equipment are held as stock in Ausgrid’s stores
system, ASPs may purchase them from Ausgrid. All enquiries and requests for quotations should
be directed by email to [email protected].
All materials used on Ausgrid’s network must be new.

NW000-S0088 UNCONTROLLED IF PRINTED Page 67 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

AUTHORITIES AND RESPONSIBILITIES


For this Network Standard the authorities and responsibilities of Ausgrid employees and managers
in relation to content, management and document control of this Network Standard can be obtained
from the Company Procedure (Network) – Production / Review of Engineering Technical
Documents within the document repository. The responsibilities of persons for the design or
construction work detailed in this Network Standard are identified throughout this Standard in the
context of the requirements to which they apply.

COMPLIANCE FRAMEWORK
The requirements of this standard should always be adhered to.
As specified in NS261 Compliance Framework for Network Standards, designers shall develop and
maintain a compliance framework, related to the compliance with Ausgrid Network Standards and
other technical documents in accordance with AS ISO 19600:2015.
Where variations to this Network Standard are proposed or non-compliance is the result of specific
site conditions or design decisions this needs to be identified and approval sought as per NS181
prior to their implementation.

RELATED DOCUMENTS
All work covered in this document shall conform to all relevant Legislation, Standards, Codes of
Practice and Network Standards. Current Network Standards are available on Ausgrid’s Internet
site at www.ausgrid.com.au.
ASPs and other persons external to Ausgrid are responsible for sourcing the manufacturer’s
instructions and manuals.

Ausgrid documents
 ASP Level 1 Authorisation Agreement

 Company Procedure (Network) – Network Standards Compliance

 Connection Policy

 Contract for Design Related Services

 Electrical Safety Rules

 Electricity Network Safety Management System Manual

 ES1 Premises Connection Requirements

 ES4 Service Provider Authorisation

 Model Standing Offer (MSO) – Standard Connection Services for Contestable ASP/1 Premises
Connection no greater than 11kV

 NEG OH14 – Guide to the Assessment of Waterway Crossing Risk

 NS100 Field Recording of Network Assets

 NS104 Specification for Electrical Network Project Design Plans

 NS113 Site Selection and Construction Design Requirements for Chamber Substations

 NS117 Design and Construction Standards for Kiosk Type Substations

 NS119 Public Lighting Design and Construction

 NS127 Low Voltage Cable Joints and Terminations

NW000-S0088 UNCONTROLLED IF PRINTED Page 68 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

 NS129 11kV Joints and Terminations - Paper Insulated Lead Covered Cables

 NS141 Site Selection and Site Preparation Standards for Kiosk Type Substations

 NS143 Easements, Leases and Rights of Way

 NS156 Working Near or Around Underground Cables

 NS159 Installation of Cables and conduits using Trenchless Techniques

 NS161 Testing of Underground Cables

 NS165 Safety Requirements for Non-Electrical Work in and Around Live Substations

 NS171 Fire Stopping in Substations

 NS172 Design Requirements for Cable Jointing Pits and Vaults

 NS174 Environmental Procedures

 NS177 11kV Joints (including Transition Joints) and Terminations – Polymeric Insulated
Cables

 NS181 Approval of Materials and Equipment and Network Standard Variations

 NS181 Approved Material List (AML)

 NS203 Telecommunications Network: Master Policy Document

 NS204 Communications Pits – Specifications and Installation Guidelines

 NS205 Telecommunications: Route Markers

 NS211 Working with Asbestos Products

 NS212 Integrated Support Requirements for Ausgrid Network Assets

 NS224 Low Voltage Suburban Commercial and Industrial Underground Distribution Utilising
Pillars

 NS234 Telecommunications Underground Physical Plant Installation

 NS235 Telecommunications Underground to Overhead (UGOH) Transition

 NS261 Requirement for Design Compliance Framework for Network Standards

 NS272 Underground Cable Rating

 Policy for ASP/1 Premises Connections

 Public Electrical Safety Awareness Plan

Other standards and documents


 AS1012 Methods of Testing Concrete

 AS1141 Methods for sampling and testing aggregates

 AS1289.5.1.1 Method of testing soils for engineering purposes - Soil compaction and density
tests - Determination of the dry density/moisture content relation of a soil using standard
compactive effort

 AS1289.5.2.1 Method of testing soils for engineering purposes - Soil compaction and density
tests - Determination of the dry density/moisture content relation of a soil using modified
compactive effort

 AS1289.5.6.1 Method of testing soils for engineering purposes - Soil compaction and density
tests - Compaction control test - Density Index method for a cohesionless material.

NW000-S0088 UNCONTROLLED IF PRINTED Page 69 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

 AS1379 Specification and Supply of Concrete

 AS1742 Manual of Uniform Traffic Control Devices

 AS2053.2 Conduits and fittings for electrical installations - Rigid Plain Conduits and Fittings of
Insulating Material

 AS2758.1 Aggregates and Rock for Engineering Purposes – Concrete Aggregates

 AS3600 Concrete Structures

 AS3610 Formwork for Concrete

 AS3972 General purpose and Blended Cements

 AS4130 Polyethylene (PE) Pipes for Pressure Applications

 AS4671 Steel for the Reinforcment of Concrete

 AS6947 Crossing of Waterways by Electricity Infrastructure

 ENA Doc 001-2008 National Electricity Network Safety Code

 Memorandum of Understanding Between Ausgrid & Roads And Maritime Services & Transport
For NSW

 NATSPEC1152 – Road Openings and Restorations (Utilities)

 New South Wales Specification (AUS-SPEC#2, 306U) – Road Openings and Restorations

 NSW Streets Opening Coordination Council (SOCC) Guide to Codes and Practices for Streets
Opening

 Specification M209 Road Openings and Restoration

 Specification 3051 – Granular Base and Subbase Materials for Surfaced Road Pavements

 Underground Services in a Shared Trench (NSW 1998) agreement between AGL,


EnergyAustralia, Optus and Telstra

 SafeWork NSW Excavation Work Code of Practice 2020

 SafeWork NSW Work Near Underground Assets - Guide

Acts and regulations


 Electricity Supply (General) Regulation 2014 (NSW)

 Electricity Supply (Safety and Network Management) Regulation 2014 (NSW)

 Protection of the Environment Operations Act 1997

 Protection of the Environment Operations (Waste) Regulation 2014 (NSW)

 Roads Act 1993

 The Coal Ash Order 2014

 The Coal Ash Exemption 2014

 Work Health and Safety Act 2011 (NSW)

 Work Health and Safety Regulation 2017 (NSW)

NW000-S0088 UNCONTROLLED IF PRINTED Page 70 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

DEFINITIONS
Accredited Service An individual or entity accredited by the NSW Department of Planning,
Provider (ASP) Industry and Environment, in accordance with the Electricity Supply
(Safety and Network Management) Regulation 2014 (NSW).
Authorised Person An authorised person can be either the ASP, as a sole trader or company
and an ASP’s employee or sub-contractor, who has personally been
granted permission in writing by Ausgrid to carry out contestable work in
Ausgrid’s network area.
Authorised Work Work requiring specific permission in writing from Ausgrid to undertake
contestable design or work on or near its network. Refer to ES4 for further
information.
Backfill Material placed to refill an excavated area above the conduits or cables
Base course The layer of the pavement immediately below the wearing surface.
(Base)
Bedding Material placed around conduits carrying cables to obtain good thermal
ratings and mechanical strength.
Carriageway That portion of a road or bridge devoted particularly to the use of vehicles,
inclusive of shoulders and auxiliary lanes and heavy duty vehicular
crossings.
Certified A CAD drawing in either hardcopy or electronic format prepared by an
Design/Design authorised designer working for a Level 3 Accredited Service Provider
Plan (ASP/3) and certified by Ausgrid, detailing proposed alterations to
Ausgrid’s Network. The proposed alterations may be components of
contestable services or of Ausgrid approved asset augmentation or
relocation works.
Classified road All classified roads under the Roads Act are designated as either State
Road or Regional Road under agreements with councils.
Clearing The removal of vegetation or other obstacles at or above ground.
Client A Client is an individual or an entity who has responsibility for the design
and construction of the network addition, and who enters into an
agreement/contractual arrangement with accredited parties, who may be
internal or external to Ausgrid, for developing the installation. A Client
could be a developer, an accredited service provider, Ausgrid or a
customer. Accredited parties include designers and service providers.
Contestable Work Contestable work is work such as the design, construction and installation
of electricity works which are required to connect a Client’s installation to
an electricity distributor’s network. Customers are required to fund the cost
of contestable work and they have the choice of selecting the ASP to carry
out the work.
Constructor The company or persons responsible for carrying out the construction
work.
Customer A Customer is an individual or an entity that is an end-user of electricity.
Depth of cover Vertical distance from the top of conduit/direct buried cable to the ground
surface level.

Designer An Ausgrid employee, contractor to Ausgrid or authorised ASP/3 who is


duly qualified to produce design plans.

NW000-S0088 UNCONTROLLED IF PRINTED Page 71 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Design The certification of a design in accordance with Clause 10 of Ausgrid


Certification document Contract for Design Related Services.
Design Information provided by Ausgrid to enable Designers to prepare electricity
Information reticulation designs to meet Ausgrid’s requirements.
Direct Buried Cables installed underground whose outer surface is in direct contact with
Cables the general mass of the earth.

Document control Ausgrid employees who work with printed copies of document must check
the document repository regularly to monitor version control. Documents
are considered “UNCONTROLLED IF PRINTED”, as indicated in the
footer.
Duct/ductline Has the same meaning as “conduit”.
Electricity Electricity Distributor means an electricity distributor constituted as a body
Distributor corporate under the Electricity Act 1945 (as amended). It is the party
setting conditions under which assets shall be constructed, and will
eventually take over title and maintenance responsibility for these assets.
Footpath The paved section of a pathway.
Joint bay An enlarged section of excavated trench in which cable joints are installed
and which is backfilled on completion of jointing works
Joint pit Underground enclosure constructed of brick or concrete in which cable
joints are installed. Typically used in heavily congested areas such as a
Central Business District.
Local Council The Local Government Authority responsible for the area where the work
is being performed.
Local Roads Those roads controlled by Local Council.
Lot Boundary The dividing boundary line between adjoining lots and road reserve.
Network Addition The network addition (the installation) shall mean the electricity cables,
wires, substations and associated equipment involved in a project. The
project could be Client driven (eg to extend or augment the existing
electricity network to supply the Client's premises or development) or
Ausgrid driven (eg to augment or refurbish the existing electricity network).

Network Standard A document, including Network Planning Standards, that describes the
Company's minimum requirements for planning, design, construction,
maintenance, technical specification, environmental, property and
metering activities on the distribution and transmission network. These
documents are stored in the Network Category of the document repository
and available externally on Ausgrid’s website.
Pathway That portion of a road or bridge reserved for the movement of pedestrians
and manually propelled vehicles.
Pavement That portion of a carriageway placed above the sub-grade for the support
of, and to form a running surface for, vehicular traffic including the sub-
base and base course.
Property (See definition for 'Street Alignment').
Alignment
Regional Roads The roads owned by the Roads and Maritime Services (RMS), but under
the management of the local council.
Representative of Contestable Project Coordinator (CPC) – Responsible for ensuring the
Ausgrid Ausgrid component of each contestable project is delivered in a
satisfactory manner ie contractually & provision of services such as design

NW000-S0088 UNCONTROLLED IF PRINTED Page 72 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

information, design certification &/or amendments or approved changes to


the certified design etc.

Ausgrid Compliance Officer (CO) - Responsible for inspecting ASP1


construction works to ensure they meet Ausgrid’s network standards,
policies and safety requirements and electrification of works.

Ausgrid Project Contracts Officer – Responsible for Ausgrid's Contract


Cable Laying Projects.
Review date The review date displayed in the header of the document is the future date
for review of a document. The default period is three years from the date of
approval however a review may be mandated at any time where a need is
identified. Potential needs for a review include changes in legislation,
organisational changes, restructures, occurrence of an incident or changes
in technology or work practice and/or identification of efficiency
improvements.
Roads and Any references to Roads and Maritime Services (RMS) will be legally
Maritime Services taken to mean Transport for NSW (TfNSW).
Shoulder The portion of the carriageway beyond the traffic lanes and contiguous and
flush with the surface of the pavement.
State Roads Those roads controlled by the Roads and Maritime Services (RMS).
Street Alignment The Street Alignment (also referred to as the Property Alignment) is the
boundary line between the dedicated roadway and the adjoining
subdivision lots.
Sub-base (Sub- The lowest layer of the pavement immediately above the sub-grade (often
base Course) a different quality material to the base course).
Sub-grade Sub-grade level is the level immediately below the pavement.
Thermal A measure of the resistance of a material to the flow of heat through it.
Resistivity Unit of measure used in this standard is K.m/W.
TSB Thermally Stable Bedding material
Unclassified road Those Roads that are not classified under the Roads Act.
Underground Low The electricity cable laid in public roadways and easements which
Voltage Distributor originates at the low voltage switchboard of a distribution substation, and
serves to supply electricity to end users at low voltage.
Verge That part of the road reserve between the carriageway and the road
reserve boundary.
Wearing Surface Bitumen, Asphaltic Concrete or Concrete Surface of the carriageway (with
concrete pavements the concrete often forms the base and wearing
surface).

NW000-S0088 UNCONTROLLED IF PRINTED Page 73 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

RECORDKEEPING
The table below identifies the types of records relating to the process, their storage location and
retention period.
Table 12 – Recordkeeping

Type of Record Storage Location Retention Period*

Approved copy of the Network Document repository Network sub Unlimited


Standard process Standard – Company

Draft Copies of the Network Standard Work Folder for Network Standards Unlimited
during amendment/creation (HPRM ref. 2014/21250/292)

Working documents (emails, memos, Records management system Work Unlimited


impact assessment reports, etc.) Folder for Network Standards (HPRM
ref. 2014/21250/292)

* The following retention periods are subject to change eg if the records are required for legal
matters or legislative changes. Before disposal, retention periods should be checked and approved
by the Records Manager.

DOCUMENT CONTROL
Content Coordinator : Head of Asset Engineering Policy & Standards

Distribution Coordinator : Manager Asset Engineering Standards

NW000-S0088 UNCONTROLLED IF PRINTED Page 74 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure A – List of Drawings


IMPORTANT: Users must ensure that the drawings they are using are the current versions with all
amendments.
Table A1- Drawings List

Number Title
212386_1 Telecommunications External Plant Optical Fibre Construction Drawing Index

212386_2 Telecommunications External Plant Optical Fibre Construction OPGW with Subtransmission
UGOH

212386_3 Telecommunications External Plant Optical Fibre Construction ADSS UGOH

212386_4 Telecommunications External Plant Optical Fibre Construction OPGW UGOH

212386_5 Telecommunications External Plant Optical Fibre Construction ADSS Termination with 11kV
UGOH

212393_1 Ausgrid Fibre Network Fibre & Duct Arrangement Index Page

212393_2 Ausgrid Fibre Network Fibre Duct Arrangement Typical Size 8 Communications Jointing Pit

212393_3 Ausgrid Fibre Network Fibre Duct Arrangement Typical Pit Construction Load Classification
Class C & Class D

212393_4 Ausgrid Fibre Network Fibre & Duct Arrangement Typical Communications Conduit Breakout
Detail For Each Side of Route for Dual Circuit

212393_5 Ausgrid Fibre Network Fibre & Duct Arrangement Breakout Detail on Same Side of Route for
Dual Circuit Arrangement A

212393_6 Ausgrid Fibre Network Fibre & Duct Arrangement Breakout Detail on Same Side of Route for
Dual Circuit Arrangement B

212393_7 Ausgrid Fibre Network Fibre & Duct Arrangement Distributed Temperature Sensing (DTS)
Typical Breakout Arrangement A

212393_8 Ausgrid Fibre Network Fibre & Duct Arrangement Distributed Temperature Sensing (DTS)
Typical Breakout Arrangement B

212393_9 Ausgrid Fibre Network Fibre & Duct Arrangement Combined DTS & Comms Typical Breakout
Arrangement A

212393_10 Ausgrid Fibre Network Fibre & Duct Arrangement Combined DTS & Comms Typical Breakout
Arrangement B

212393_11 Ausgrid Fibre Network Fibre & Duct Arrangement Combined DTS & Comms Typical Lay Flat
Arrangement Breakout Details

212393_12 Ausgrid Fibre Network Fibre & Duct Arrangement Combined DTS & Comms Typical Breakout
To Bypass HV Jointing Pit (Single Circuit)

212393_13 Ausgrid Fibre Network Fibre & Duct Arrangement Combined DTS & Comms Typical Breakout
- DTS Entering HV Jointing Pit (Single Circuit)

212393_14 Ausgrid Fibre Network Fibre & Duct Arrangement Combined DTS & Comms Typical Breakout
To Bypass HV Jointing Pit (Double Circuit)

212393_15 Ausgrid Fibre Network Fibre & Duct Arrangement Combined DTS & Comms Typical Breakout
- DTS Entering HV Jointing Pit (Double Circuit)

212393_16 Ausgrid Fibre Network Fibre & Duct Arrangement Fibre Cable Flow Through Typical
Communications Pit

212393_17 Ausgrid Fibre Network Fibre & Duct Arrangement Combined DTS & Comms Typical Breakout
2 x 2 HV Conduit Arrangement

NW000-S0088 UNCONTROLLED IF PRINTED Page 75 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Number Title
212393_18 Ausgrid Fibre Network Fibre & Duct Arrangement Inline Fibre Hauling Pit Typical
Arrangement

212393_19 Ausgrid Fibre Network Fibre & Duct Arrangement In Road Comms Pit

514020 Lighting Column Concrete Plinth Steel Mould (For Use With Ragbolt Assembly)

514087 Standard Construction Street Lighting Column Pile Footing Details

49070 Cable Installations Polythene Warning Strip Details

249060 Cable Pit (Precast) Typical Indicative Details

NW000-S0088 UNCONTROLLED IF PRINTED Page 76 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure B – Typical Trench Dimensions


Refer to Clause 10.11 for standard depth of cover.
Table B1: Conduit Trench Dimensions (125mm)

Number of Unclassified Regional and Local


Conduits Classified Roadway Trench Roadway Trench

(125mm PVC) Width(mm) Depth(mm) Width(mm) Depth(mm)

Conduits Conduits
protected unprotected

1 or 2 430 1190 1390 430 940

3 620 1190 1390 620 940

4 (2 on 2) 430 1380 1580 430 1130

6 (3 on 3) 620 1380 1580 620 1130

OD of 125mm PVC conduit is approx. 140mm

Table B2: Conduit Trench Dimensions (150mm)

Number of Unclassified Regional and Local


Conduits Classified Roadway Trench Roadway Trench

(150mm PVC) Width(mm) Depth(mm) Width(mm) Depth(mm)

Conduits Conduits
protected unprotected

1 or 2 530 1230 1430 530 980

3 760 1230 1430 760 980

4 (2 on 2) 530 1460 1660 530 1210

6 (3 on 3) 760 1460 1660 760 1210

OD of 150mm PVC conduit is approx. 160mm.


Note: “Protected” refers to concrete or TSB to achieve a compressive strength of 3 to 5 MPa.
“Unprotected” refers to 20:1 sand/cement dry mix.
.

NW000-S0088 UNCONTROLLED IF PRINTED Page 77 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure C – Typical Cable Arrangements in Footways


HV and LV Cables Laid Direct

Figure C1

Cover* 500mm (minimum) over LV cables


600mm (minimum) over HV cables
600mm (minimum) over protection fibre conduits installed alongside a HV
feeder cable / conduit
900mm (minimum) over protection fibre conduits straying away from a HV
feeder conduit / cable to enter a communications pit.
** Width of Ausgrid allocation depends on the date of roadway dedication.
Refer to Annexure D for further details.
Note: Refer to Clause 10.10 for standard spacings.

NW000-S0088 UNCONTROLLED IF PRINTED Page 78 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

HV and LV cables laid direct (with spare conduits)

Figure C2

** Width of Ausgrid allocation depends on the date of roadway dedication.


Refer to Annexure D for further details.
Note: Refer to Clause 10.10 for standard spacings.

NW000-S0088 UNCONTROLLED IF PRINTED Page 79 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

HV and LV cables laid in conduits

Cover* 500mm (minimum) over LV cables


600mm (minimum) over HV cables

** Width of Ausgrid allocation depends on the date of roadway dedication.


Refer to Annexure D for further details.

Figure C3

NW000-S0088 UNCONTROLLED IF PRINTED Page 80 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

** Width of Ausgrid allocation depends on the date of roadway dedication. Refer to Annexure D for
further details.
Figure C4

NW000-S0088 UNCONTROLLED IF PRINTED Page 81 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Trenches shared with Telecommunications Carriers (default shared trench agreement)

Figure C5

* Width of Ausgrid allocation depends on the date of roadway dedication. Refer to Annexure D for
further details.
All trenches shall be 750mm deep. Refer to Clause 10.10 for standard spacings.
Minimum vertical separation between communications carrier and cable protection covers:

 150mm above cable protection covers over low voltage cables or conduits

 300mm above cable protection covers over high voltage cables or conduits

NW000-S0088 UNCONTROLLED IF PRINTED Page 82 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure D – Footway Allocations


For footway allocations, refer to NSW Streets Opening Coordination Council (SOCC) - Guide to Codes and
Practices for Streets Opening 2018 edition.

For Regional footway allocations prior to 2018, refer to NSW Streets Opening Conference - Guide to Codes
and Practices for Streets Opening 2009 edition.

For footway allocations in Sydney Region prior to 1991, refer to Figure D1.

NW000-S0088 UNCONTROLLED IF PRINTED Page 83 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Figure D1 - Existing Footway Areas before 1.1.91 - Sydney Region

NW000-S0088 UNCONTROLLED IF PRINTED Page 84 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure E – Guide to Maximum Pulling Tensions


E1 Using stocking grips
For the conventional methods of installation using a stocking grip and pulling on the “nose” of the
cable only, the maximum allowable pulling tension is mainly a function of cable diameter. The
limiting factors are related to compressibility of the sheath, bedding and insulation, and to the
friction between these, rather than to the tensile strength of conductors or the cable as a whole.
The table below provides a guide only to maximum pulling tensions.
The contractor shall obtain the manufacturer’s recommended maximum pulling tension before
applying any mechanical load to the cables. Annexure F is guide to calculating the winching
tension required to pull a cable through a trench or conduit bank route of predetermined geometry.
Table E1: Maximum Pulling Tensions for Stocking Grips

Approximate
Type of Cable** *Max. Pull Tension (kN**)
Cable Mass (kg/m)
11kV Unarmoured Power Cables
500 CU3 TRXQ 35 CU(WS) Z YQ 11.1 17.9
500 AL3 TRXQ 35 CU(WS) Z YQ 11.0 8.5
500 AL3 P H L YQ 19.2 13.2
400 AL3 TRXQ 35 CU(WS) Z YQ 10.5 7.3
300 AL3 TRXQ 35 CU(WS) Z YQ 9.5 6.2
300 CU3 P H L YQ 13.6 15.0
300 AL3 P H L YQ 13.6 9.3
240 AL3 P H L YQ 11.6 8.1
185 AL3 TRXQ 35 CU(WS) Z YQ 8.2 4.6
185 CU1 TRXQ 70 CU(WS) Z YQ 3.8 2.9
150 CU3 TRXQ 35 CU(WS) Z YQ 7.7 6.8
95 AL3 TRXQ 16 CU(WS) Z YQ 6.6 2.8
630 CU1 TRXQ 120 CU(WS) Z YQ 6.0 7.8
300 CU1 TRXQ 150 CU(WS) Z YQ 4.8 4.8
300 CU1 P H L Z 4.4 5.2
300 CU1 TRXQ 70 CU(WS) Z YQ 4.6 4.1
300 CU1 TRXQ 70 CU(WS) Z 13.8 (for total cable, 1 stocking required) 12.4
YQ/Triplex 4.6 (for each core, 3 stockings required)
185 CU1 P H L Z 3.2 3.5
185 CU1 TRXQ CU(WS) Z YQ / Triplex 12.6 (for total cable, 1 stocking required) 8.9
4.2 (for each core, 3 stockings required)
70 CU1 G TRXQ G 16 CU(WS) YQ 2.2 1.1
35 AL1 G TRXQ G 16 CU(WS) YQ 1.7 0.5
LV Unarmoured Power Cables
240 CU4 XQ Z 6.8 9.81
240 AL4 XQ Z / SAC 6.1 3.9
120 AL4 XQ Z/SAC 4.5 1.8
500 CU1 XQ Z 4.5 4.93
300 CU1 XQ Z 3.1 3.1
185 CU1 XQ Z 1.8 1.9
LV Service and Street Lighting Cables
16 CU2 XQ Z N/A 0.47
16 CU4 XQ Z N/A 0.9
25 CU4 XQ Z N/A 1.3
50 CU4 XQ Z N/A 2.2

NW000-S0088 UNCONTROLLED IF PRINTED Page 85 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

* Using stocking grips.


** 1 tonne = 10kN (approx.)
N/A Not applicable, cable to be installed by hand.
*** When pulling multiple single core cables together, the maximum pulling tension is the
maximum pulling tension of one single core cable multiplied by the number of cables.

E2 Using pulling eyes


Pulling eyes allow for much larger pulling tensions than stocking grips. A guide to the maximum
pulling tension that can be applied to a cable while using pulling eyes is provided in the table
below.
Table E2: Maximum Safe Tensile Stress for Pulling Eyes

Conductor Material Maximum Tension kN/mm2

Copper 0.07

Stranded aluminium 0.05

Solid aluminium 0.03

Note: Maximum pulling tension is limited to 20kN. Please consult the cable manufacturer for
advice if higher pulling tensions are required.
Where a pulling eye is considered necessary, the cable supplier shall be contacted for either fitting
the pulling eye to the cable or providing details of approved pulling eyes.
Before pulling a cable with a pulling eye, the installer shall ascertain from the cable supplier what
maximum sidewall pressure can be applied to the cable and shall ensure that this sidewall
pressure is not exceeded during cable installation.
Cable ends fitted with pulling eyes shall be waterproofed to ensure water does not enter the cables
during installation, regardless of the type of pulling eyes fitted. Waterproofing can be achieved by
shrinking a length of mastic lined heatshrink sleeve, covering the full length of the pulling eye and
overlapping the cable sheath by at least 150mm. Before installing heatshrink sleeves, the pulling
eyes and associated cable ends shall be thoroughly degreased and cleaned. The heatshrink
sleeves used shall be abrasion resistant and shall have a minimum wall thickness of 3mm after
recovery over the pulling eye.
Particular care must be exercised when pulling at the relatively high tensions allowed by the use of
pulling eyes. Large bending radii and adequate support using rollers must be provided to avoid
causing flattening, distortion or other damage to the cables.
Pulling cables into conduits
Prior to pulling cables through Asbestos Cement conduits refer to the appropriate Safe Work
Method Statement.
The pulling tension on cables being pulled into conduits shall not exceed 20kN, including cables
fitted with pulling eyes. Please consult the cable manufacturer for advice if higher pulling tensions
are required.
In addition, the maximum sidewall pressure exerted onto a cable must not exceed the following
values when the conduit is installed in compacted standard bedding or 20:1 sand cement bedding:
 3kN/m for a ‘rough bore’ conduit, eg fibre reinforced cement
 5kN/m for a ‘smooth bore’ conduit, eg plastic conduits.
For UPVC conduits installed in TSB, dry mix or concrete encased the maximum sidewall bearing
pressure exerted on the cable must not exceed the value specified by the cable manufacturer. At
least 7 days is required for sufficient strength gain of the encasement around the conduits.

NW000-S0088 UNCONTROLLED IF PRINTED Page 86 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure F – Guide to Calculating Cable Pulling Tension


The following guide is extracted from Annexure A of publication C(b)2 – 1989 ESAA Guide to the
Installation of Cables Underground.

NW000-S0088 UNCONTROLLED IF PRINTED Page 87 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

NW000-S0088 UNCONTROLLED IF PRINTED Page 88 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

NW000-S0088 UNCONTROLLED IF PRINTED Page 89 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

NW000-S0088 UNCONTROLLED IF PRINTED Page 90 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

The following coefficients of friction are extracted from EPRI Report EL-3333.
Table F1: Coefficients of Friction

Conduit Material Cable Outer Covering Coefficient of Friction


UPVC XLPE 0.40
PE (Polythene) 0.40
PVC 0.50
HDPE 0.50
Neoprene 0.90
Lead 0.25
PE XLPE 0.30
PE 0.25
PVC 0.40
Neoprene 0.40
Lead 0.25
Fibre (German Duct) XLPE 0.30
PE 0.25
PVC 0.40
Neoprene 0.40
Concrete XLPE 0.30
PE (Polythene) 0.35
PVC 0.55
Neoprene 0.50
Lead 0.55
Fibre Cement XLPE 0.70
PE 0.70
PVC 0.70
Neoprene 1.00
Steel XLPE 0.60
PE 0.50
PVC 0.65
Neoprene 1.05

NW000-S0088 UNCONTROLLED IF PRINTED Page 91 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure G – Stockcodes of Approved Items


Table G1: Approved Item Stockcodes

Item Stockcode
Cables:
11kV 500 AL3 TRXQ 35 CU(WS) Z YQ 178947
11kV 500 CU3 TRXQ 35 CU(WS) Z YQ 178813
11kV 300 CU1 TRXQ 70 CU(WS) Z YQ 177995
11kV 300 CU1 TRXQ 70 CU(WS) Z YQ/Triplex 179122
11kV 400 AL3 TRXQ 35 CU(WS) Z YQ 177562
11kV 300 AL3 TRXQ 35 CU(WS) Z YQ 177561
11kV 185 AL3 TRXQ 35 CU(WS) Z YQ 177566
11kV 150 CU3 TRXQ 35 CU(WS) Z YQ 177565
11kV 95 AL3 TRXQ 16 CU(WS) Z YQ 177564
11kV 630 CU1 TRXQ 120 CU(WS) Z YQ 90050
11kV 1000 CU1 TRXQ 120 CU(WS) Z YQ 177203
11kV 185 CU1 TRXQ 70 CU(WS) Z YQ/Triplex 181758
11kV 70 CU1 TRXQ 16 CU(WS) YQ 177568
11kV 35 AL1 TRXQ 16 CU(WS) YQ 67140
11kV 185 CU1 TRXQ 70 CU(WS) Z YQ 182311
11kV 300 CU1 TRXQ 150 CU(WS) Z YQ 177304
11kV 300 CU3 P H L YQ 1396
11kV 300 CU1 TRXQ 70 CU(WS) YQ LSZH/Triplex 182474
Pilot cable 4-core Nylon Translay 1.5CU4QQZNY/TR WHITE 78683
Pilot cable 4-core Nylon Translay 1.5CU4QQZNY/TR BLACK 78717
Pilot cable 4-core Nylon Translay 1.5CU4QQZNY/TR BLUE 78766
Pilot cable 4-core Nylon Translay 1.5CU4QQZNY/TR RED 78782
415V 240 AL4 XQ Z/SAC 141739
415V 240 CU4 XQ Z H108589**
415 500 CU1 XQ Z 14258
415V 300 CU1 XQ Z 14266
415V 185 CU1 XQ Z / COM / 4 CABLES (Parrot cable) 151183
415V 185 CU1 XQ Z 61432
240V 16 CU2 XQ Z 174565
415V 16 CU4 XQ Z 148668
415V 50 CU4 XQ Z 149112
** To be used only when the design specifies
UPVC Conduits to AS/NZS 2053.2:
50mm nominal diameter, 4m long, heavy duty rigid UPVC orange conduit 78022
63mm nominal diameter, 4m long, heavy duty rigid UPVC orange conduit 181361
100mm nominal diameter, 3m long, light duty rigid UPVC orange conduit 78154
125mm nominal diameter, 3m long, light duty rigid UPVC orange conduit 78188
125mm nominal diameter, 6m long, light duty rigid UPVC orange conduit 78162
150mm nominal diameter, 6m long, light duty rigid UPVC orange conduit 78147

NW000-S0088 UNCONTROLLED IF PRINTED Page 92 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Item Stockcode
UPVC Conduits to AS/NZS 2053.2 and AS/NZS 1477:
200mm nominal diameter, 6m long, light duty rigid UPVC orange conduit 178771
Heavy Duty Rigid UPVC Orange Bends to AS/NZS 2053.2
Conduit Dia Radius ‘R’ Angle Nominal Bend Length Stockcode
(mm) (m) (degrees) from coupling to coupling ‘L’ (mm)
50 1.2 45 1120 179832
50 1.2 90 2060 179941
50 0.3 22.5 255 181756
50 0.3 45 350 181755
50 0.3 11.25 205 181757
63 6 30 3400 181388
63 6 15 1800 181389
63 1.2 45 1050 182446
63 1.2 90 2000 182448
63 1.2 22.5 580 182445
Light Duty Rigid UPVC Orange Bends to AS/NZS 2053.2:
Conduit Dia Radius ‘R’ Angle Nominal Bend Length Stockcode
(mm) (m) (degrees) from coupling to coupling ‘L’ (mm)
100 0.6 90 1300 77602
100 1 11.25 450 77461
100 1 22.5 700 77487
100 1 90 1950 H8503
125 1 11.25 550 77503
125 1 22.5 800 77529
125 1 90 2000 77610
125 1.8 6 550 77578
125 1.8 11.25 750 77586
125 1.8 22.5 1100 77545
125 1.8 45 1850 77552
125 1.8 90 3400 177101
125 2.3 6 600 177856
125 2.3 11.25 900 177857
125 2.3 22.5 1300 177858
125 2.3 45 2200 177859
125 2.3 90 4050 177860
150 2.5 6 650 179064
150 2.5 22.5 1400 179065
150 2.5 45 2420 179066
150 6 15 2100 178791
150 6 30 3600 181387
150 10 11.25 2100 77560

NW000-S0088 UNCONTROLLED IF PRINTED Page 93 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Item Stockcode
Light Duty Rigid UPVC Orange Bends to AS/NZS 2053.2 and AS/NZS 1477:
Conduit Dia Radius ‘R’ Angle Nominal Bend Length Stockcode
(mm) (m) (degrees) from coupling to coupling ‘L’
(mm)
200 6 15 2100 178772
200 6 22.5 3100 181754
UPVC Couplings to AS/NZS 2053.2:
50mm, light duty rigid UPVC orange coupling 179831
63mm, heavy duty rigid UPVC orange coupling 185461
100mm, light duty rigid UPVC orange coupling H9703
125mm, light duty rigid UPVC orange coupling 179192
150mm, light duty rigid UPVC orange coupling 179191
UPVC Couplings to AS/NZS 2053.2 and AS/NZS 1477:
200mm, light duty rigid UPVC orange coupling 179194
Conduit Reducers:
150mm to 125mm conduit reducer, medium duty PVC white 176823
180mm to 150mm Conduit reducer, UPVC Orange 180482
Heavy Duty Bellmouths:
50mm 180004
100mm 180003
125mm 180002
150mm 180001
63mm 182449
Miscellaneous:
Plug for 50mm heavy duty rigid conduit 179754
Plug for 125mm and 150mm light duty rigid conduit (flower pot) 77750
Plug for 150mm light duty rigid conduit H85126
Plug for 63mm heavy duty rigid conduit 182450
Spacer for 125mm conduit in accordance with Annexure I of this document 65706
Spacer for 150mm conduit in accordance with Annexure I of this document 180486
PVC solvent cement 38463
Conduit sealing putty 75481
Conduit Sealing foam kit 180112
Lubricant:
Aqualift 20L drum 179705
Polymeric Cable Protection Covers, Steel Plates and Warning Tape:
150mm x 1.2m slabs polymeric cable cover 151100
300mm x 1.2m slabs polymeric cable cover 151076
150mm x 20 m rolls polymeric cable cover 151084
300mm x 10 m rolls polymeric cable cover 151092
200mm x 25 m rolls polymeric cable cover H74930
750 x 200 x 6mm Galv. mild steel plate 71464
150mm x 100 m roll orange polythene warning tape to drawing no. 49070 71233
Ragbolt Assembly:
Ragbolt assembly H5880

NW000-S0088 UNCONTROLLED IF PRINTED Page 94 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Item Stockcode
Heatshrink End Caps:
Heatshrink end caps (lined) for cable diameters in the range 3mm to 8mm 62232
Heatshrink end caps (lined) for cable diameters in the range 4mm to 8mm 62166
Heatshrink end caps (lined) for cable diameters in the range 8mm to 17mm 176801
Heatshrink end caps (lined) for cable diameters in the range 13mm to 22mm 62117
Heatshrink end caps (lined) for cable diameters in the range 17mm to 30mm 180005
Heatshrink end caps (lined) for cable diameters in the range 28mm to 50mm 62067
Heatshrink end caps (lined) for cable diameters in the range 38mm to 70mm 62042
Heatshrink end caps (lined) for cable diameters in the range 65mm to 95mm 62026
Heatshrink end caps (lined) for cable diameters in the range 95mm to 115mm 178062
Heatshrink end caps (unlined) for cable diameters in the range 95mm to 115mm 62208
Heatshrink Tubing:
Heatshrink tubing `for cable diameters in the range 14mm to 31mm 60186
Heatshrink tubing for cable diameters in the range 20mm to 45mm 143776
Heatshrink tubing for cable diameters in the range 27mm to 55mm 141721
Heatshrink tubing for cable diameters in the range 50mm to 100mm 169565
Triple End Seals:
Triple End Seal Kit for 95mm2 to 240mm2 Multicore Cables 178442
Triple End Seal Kit for 300mm2 to 500mm2 Multicore Cables 178441
Triple End Seal Kit for 185mm2 to 300mm2 High Voltage Single Core 178443
Polymeric Cables
Triple End Seal kit for 185 to 300 mm2 LV Single Core Polymeric Cables 182467
Cable Clamps for Polymeric Cables:
Nitrile Rubber Liner to be used with all Cable Clamps for Polymeric Cables 179201
Single Core Cable for attachment to Unistrut – 70mm2 179212
Single Core Cable for attachment to Unistrut – 300mm2 179211
Single Core Cable Held in Flat Arrangement – 300mm2 180350
Single Core Cable Held in Flat Arrangement – 185mm2 180291
Single Core Cable Held in Quad Arrangement – 185mm2 LV Parrot Cable 179213
Single Core Cable Held in Trefoil Arrangement – 70mm2 179491
Single Core Cable Held in Trefoil Arrangement – 185mm2 178988
Single Core Cable Held in Flat Arrangement – 630mm2 to 1000mm2 182114
Single Core Cable Held in Trefoil Arrangement – 300mm2 to 630mm2 178987
Single Core Cable Held in Trefoil Arrangement – 1000mm2 182134
Stainless Steel Band Type – Part No ABB:EA-UKR100 177651

NW000-S0088 UNCONTROLLED IF PRINTED Page 95 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure H – CBD 16 Way Conduit Line

Figure H1
Details
Cable: 300mm2 Cu Triplex
Ducts: 125mm UPVC
Backfill: 20:1 sand/cement dry mix
Bedding: thermally stable bedding slurry (TR = 0.9K.m/W or less, fully dry).
* Required cover may vary to suit Council or RMS requirements. Cover could be as high as 1.0m for RMS
roads.

NW000-S0088 UNCONTROLLED IF PRINTED Page 96 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure I – 125mm and 150mm Spacers for Conduits


125mm conduit spacer

Figure I1 - 125mm conduit spacer

NW000-S0088 UNCONTROLLED IF PRINTED Page 97 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Figure I2 - 150mm conduit spacer

NW000-S0088 UNCONTROLLED IF PRINTED Page 98 of 113


Unclassified
Unclassified
NW000-S0088
Reinstatement
width in Backfill Zone Backfill Zone Backfill Material Compaction
accordance with Thickness Requirement
specification
.
Finished Surface Levelw
Final wear Match existing Match existing
surface
Base course Match existing Base as 98% MMDD or
specified 102% MSDD
Sub-base Level
Sub-base course Match existing Sub-base as
NS130 Laying Underground Cables up to and Including 11kV

specified
Sub-grade Level
Below sub-grade Varies As specified in 98% MSDD or
Clause 0 95% MMDD

UNCONTROLLED IF PRINTED
Density Index
80%

Bedding zone As per As per As per this


Notification Notification Plan Network
Plan and this and this Network Standard
Network Standard
Table J1: Carriageway or Heavy Duty Vehicular Crossing
Annexure J – Typical Final Restorations

Standard

Page 99 of 113
Amendment No 5
Unclassified
NW000-S0088
Reinstatement Zone Zone Thickness Material Compaction
width in Requirement
accordance
with
specification .
Finished Surface Levelw

Final wear surface 25 MPa concrete – 75 mm MIN or match


existing AC5 Asphalt – match existing
Segmental paving units – match existing
NS130 Laying Underground Cables up to and Including 11kV

Footpath pavement Match existing thickness Fine crushed 92% MMDD or


sub-base (minimum 50 mm) rock 95% MSDD
Sub-grade Level

Below sub-grade Varies As specified in 90% MMDD or


Clause 0 Density Index

UNCONTROLLED IF PRINTED
70%

Bedding zone As per Notification Plan As per As per this


Table J2: Typical Restorations in Footpaths

and this Network Standard Notification Network Standard


Plan and this
Network
Standard

Page 100 of 113


Amendment No 5
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure K – Installation of Network Conduit Lines through


Buildings
Introduction
This section deals with Ausgrid’s requirements where a bank of conduits is intended to carry
distribution Network Cables through a building. It is anticipated that this situation would arise mainly
in Central Business Districts where street congestion begins to limit the ability to effectively provide
supply to all customers.

Definitions
Network Cables 415V and 11kV cables required to supply parts of Ausgrid's network
other than just the building through which they are passing.
Ductline A group or bank of conduits suitably spaced for required cable ratings
and installed so that heat generated by the cables may be effectively
dissipated. The cables are required to be protected from the effects of
a fire in the building through which they pass, either by encasement in
suitable materials or shielding and separation from sources of fire.

Property requirements
Where a bank of conduits are to be run through a privately owned building, an easement covering
the route and a right of way to permit access must first be negotiated as per NS143 and applicable
Property Branch documents. The easement would normally be a stratum easement, confined to the
boundaries of the materials encasing and supporting the conduits.

Policy
Wherever possible, Network Cables shall be routed through public roads or reserves in accordance
with NS143 Easements and Leases and NS130 Laying Underground Cables up to and including
11kV.
However, where situations arise such that it is difficult to provide supply to all customers in this
manner, Ausgrid may determine that space is required through new or existing buildings for the
construction of a Ductline. This new Ductline would not be intended to exclusively supply the
customers in that building.
In such cases, other network customers are exposed to an additional risk of wider spread loss of
supply in the uncommon event of a fire or catastrophic incident occurring within the building and
impacting on the availability of the Network Cables passing through the Ductline.
It is therefore necessary that a policy be developed and requirements specified to ensure that
Network Cables running through buildings are installed in such a manner that they are protected as
far as possible from accidental damage and the impact of a catastrophic incident. If damaged, the
Network Cables should be installed so that they are capable of being quickly restored to a
serviceable condition.
Functional Requirements
The installation conditions should be such that the performance of the cables is not compromised
by the additional measures required to protect them. The cable protection shall be such that the
cables are capable of being quickly removed or replaced in the event of a major building failure.
Ausgrid’s policy in this regard is as follows:

 Where Network Cables are to be run through a Ductline located inside a building, the Ductline
shall be designed to provide at least a 3 hour fire rating (FRL 180/180/180) for the Network
Cables unless special circumstances mitigate the risk of the Ductline being exposed to the fire.

NW000-S0088 UNCONTROLLED IF PRINTED Page 101 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

 At the end of 3 hours fire exposure, it shall be possible to withdraw existing cables installed in
the Ductline and to install new Network cables without difficulty.

 The Ductline and supporting structures shall be protected against a 2 kPa overpressure
generated from within the building area.

 Any proposed reduction in the fire protection or overpressure requirements shall be subject to
the written approval of Ausgrid.

 Where the above requirements are not fully achievable, or where there is considered a more
significant potential consequence to the cables or conduits being severely damaged, the
relevant section of Ductline shall be readily accessible. The conduit encasement shall be
designed for ease of demolition so that it can be replaced or repaired in order to facilitate the
speedy replacement of Network Cables contained in the Ductline. Alternative solutions such as
the provision of an alternative back up route may also be considered acceptable.

 While adequate fire and overpressure protection is to be established for the Ductline, the form
of protection proposed shall not adversely impact on the design cable ratings of the Network
Cables passing through the building. In particular, the thermal resistivity (TR) of the conduit
encasement shall not be greater than that specified for the project.

 Any Ductline design that may adversely impact on the designed cable ratings, shall have a
rating assessment completed by the Designer as per NS 272 and the rating assessment shall
be submitted to Ausgrid for review and written approval.

Minimum technical requirements


A. Internal Building Areas with LV and HV Conduits Above Ground and Exposed to Air
The following technical requirements are based on a concrete encased Ductline design. Alternative
arrangements which provide the necessary protection and do not reduce cable ratings to
unacceptable levels may also be submitted for consideration by Ausgrid.
1. The conduits shall be 150mm (160mm OD) heavy duty UPVC Orange and shall meet the
minimum requirements of NS130 and AS 2053
2. Minimum conduit centre to centre spacing shall be 230mm
3. The conduits shall be encased in concrete with all exposed faces suitably reinforced. A high
concrete density is required and lightweight aggregate and air entraining agents shall not be
used.
4. A minimum three (3) hour (FRL 180/180/180) fire rating shall be achieved for the concrete
encasement to the conduits and for any supporting structures. This requirement may be
reduced in fire isolated areas such as fire stairs subject to approval from Ausgrid.
5. The conduit ductline and supporting structures shall be designed to sustain a minimum
superimposed live load of 2 kPa overpressure, generated from within the internal building area.
6. A minimum concrete cover of 180mm to the conduits shall be provided at all exposed concrete
encasement faces. This concrete cover shall be suitably reinforced and incorporate the
required 3 hour fire rating. Reinforcement detailing shall be arranged to reduce the potential for
induced currents in accordance with the requirements of Ausgrid.
7. A minimum concrete cover of 100mm to the conduits shall be provided at non-exposed faces of
the Ductline, for example, along external basement walls. This cover may be reduced in
confined locations subject to approval from Ausgrid.
8. Suitable allowance shall be made for conduit installation and support along the Ductline route.
9. The use of core filled blockwork to form the exposed faces of the ductline is not acceptable due
to its higher thermal resistivity. Blockwork may be used below the Ductline for support provided
a 3 hour fire rating and 2 kPa overpressure resistance is achieved by the support structure.

NW000-S0088 UNCONTROLLED IF PRINTED Page 102 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

10. All exposed faces along the route of the internal Ductline shall have suitable marking to the
requirements for reduced cover specified in NS130, and approved by Ausgrid.
11. Internal building areas through which the ductline passes shall be suitably ventilated or air
conditioned to allow for effective circulation of air to all exposed faces and to remove heat
generated by the cables. Design information to be provided by Ausgrid shall include the
estimated heat load per metre for the Ductline being designed.
B. Internal Building Areas with LV and HV Conduits Below Ground in Trenches
1. The conduits shall be 150mm (160mm OD) heavy duty UPVC Orange and shall meet the
minimum requirements of NS130 and AS 2053
2. Minimum conduit centre to centre spacing shall be 230mm
3. The conduits shall be encased in Thermally Stable Bedding (TSB) or concrete. Where concrete
is used a high concrete density is required and lightweight aggregate and air entraining agents
shall not be used.
4. A minimum cover of 100mm for the conduits shall be provided to the trench walls and floor.
This cover may be reduced in confined locations subject to approval from Ausgrid. Minimum
cover below the internal floor surface shall all be in accordance with NS130 requirements
including those for reduced cover.
5. Within the building area all conduit trenches shall be provided with a reinforced concrete slab
at the surface with a minimum thickness of 125mm.
6. Marking of the route of the Ductline on the floor surface shall be required as shown in NS130
and approved by Ausgrid for all internal Ductlines.
7. Internal building areas above the conduit trenches shall be suitably ventilated or air conditioned
to allow for effective circulation of air and remove heat generated by the cables.
C. Concrete Requirements
Concrete used for encasement of ductlines shall be specified to ensure that it provides the required
mechanical strength and fire rating, while not adversely impacting the thermal ratings of the cables.
In particular, the following requirements must be adopted in designing the concrete mix:
1. The specific concrete specifications required for the concrete encasement of the Ductline are to
be indicated on the drawings. Ausgrid's requirements, including those indicated below, shall be
referenced.
2. The minimum concrete strength for the encasement shall be 20MPa at fire exposed locations
and shall be indicated on the drawings. To limit the heat of hydration, the cement content
should be minimised to the extent possible given the other design requirements.
3. A low heat of hydration cement (Type LH) and appropriate concrete mix design shall be used
to reduce the risk of the UPVC conduits softening during curing. Other measures to further limit
the temperature rise in the concrete encasement during curing may be acceptable subject to
approval by Ausgrid.
4. Admixtures in the concrete mix shall be subject to the approval of Ausgrid following the
submission of a product specific data sheet. The use of accelerators to speed concrete curing
or admixtures that entrain air will not be approved.
5. The total flyash in the concrete mix (by weight) shall not exceed 5% unless separately
approved by Ausgrid. Flyash reduces the thermal performance of the installed Ductline.
6. Lightweight aggregate and air entraining agents shall not be used.
7. The concrete cover to reinforcement shall comply with AS 3600 to achieve a minimum three (3)
hour (180/180/180) fire rating. Ausgrid requires a minimum concrete cover of 45mm to
reinforcement at any fire exposed face.

NW000-S0088 UNCONTROLLED IF PRINTED Page 103 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

8. Reinforcement detailing shall be arranged to reduce the potential for induced currents. In
particular, transverse reinforcement around the Ductline shall not form a closed loop at any
location.
ASPs or contractors wishing to vary concrete mix from approved requirements shall provide
documentation demonstrating that their proposal achieves the specified functional requirements
including Ductline integrity and thermal resistivity (TR) value without increasing the in-situ concrete
curing temperature to a level where conduits are likely to be damaged.
D. Electric and Magnetic Fields (EMFs) and Electromagnetic Interference (EMI)
The selection of the route for network ductlines through buildings should take into account the
possible effects of Electric and Magnetic Fields (EMF) and Electromagnetic Interference (EMI). The
adjacent, current and expected building and land uses and locations of Ductlines and cables
should be evaluated for EMI.
Evaluation by an approved Electrical Engineer is to be undertaken to ensure EMI does not disrupt
sensitive electronic equipment or pose a health risk to persons who continuously occupy adjacent
areas for long periods of time.
An EMI report must be provided as part of the design submission for the proposed Ductline.
Areas of particular relevance include hospitals, particularly operating theatres (Refer to AS/NZS
3003), computer rooms, laboratories, general offices and apartments.
Refer to NS114 for additional requirements and guidance.
Note: Installation of EMI screening is not permitted inside any Chamber Substation, at any HVC
connection, or associated chambers and cable risers. The addition of EMI screening at
other locations must not interfere with access to, maintenance of, air circulation around or
the efficient operation of the Ductline and related equipment.

NW000-S0088 UNCONTROLLED IF PRINTED Page 104 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure L – Testing of Backfills: Thermal Resistivity


Background
Ausgrid has a high capital investment in underground cables.
The ratings of these buried cables are greatly affected by the thermal properties of the surrounding
soils and imported thermal bedding materials.
Thermal resistivity (TR) is a major input parameter into cable rating calculations and a thorough
understanding of the resulting values during construction is vital to ensure the specified cable
ratings are achievable over the lifetime of installed assets.
Ausgrid wishes to ensure that the TR testing services being offered by external service providers
are accurate and consistent, providing test results that can be relied on for it’s determination of
cable ratings.
This document has been developed with the intent that the quality of TR testing being offered by
external service providers is of a standard compatible with Ausgrid's requirements. Information is
included to assist Testing Laboratories experienced in soil analysis but no thermal studies to
understand the basis for the requirements and procedures specified.

Thermal resistivity (TR)


Thermal resistivity (TR) is the reciprocal of thermal conductivity.
Thermal resistivity (TR) is a property of the material being tested.
Thermal resistance depends upon the TR of the material AND the geometry of the installation
TR is often measured in either Km/W or oC.m/W, the units depicting temperature rise across a
given distance due to an amount of heat(power) passing through the medium.
Regardless of whether K or oC are used, the magnitude of the TR will be the same.
For a given geometry: the higher the TR the greater the resistance to the flow of heat and, for a
given amount of heat the greater the temperature rise.
The formula used to calculate TR for a line heat source of infinite length within an infinite medium
is:
4 *  * (T 2  T 1)

2.303 * q * log(t 2 t1)

Where:
ρ = TR in K.m/W (or oC.m/W)
T1 and T2 = Temperatures at the beginning and end of the test period respectively
q = Heat dissipated by the line heat source in watts/m
t1 and t2 = Times at the beginning and end of the test period in minutes

The qualifying factors that apply to the above expression should be noted as:
Thermal probes are not line heat sources and have physical diameters and wall thickness. The
resulting mass and specific volumetric heat of the probes causes non linear relationships between
temperature and log (time differences) at the initialisation of tests.

NW000-S0088 UNCONTROLLED IF PRINTED Page 105 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Scope
The scope of this document covers information relating to the necessary processes for ensuring
that testing of thermally stable materials or soil samples is conducted in a manner that provides
accurate and consistent results regardless of the Testing Laboratory undertaking the tests. In
particular, the document includes information on:

 Tests to be Undertaken on Samples


 Quality of Test Procedures
 Sample Preparation
 Storage of Samples
 The development of thermal bedding materials
 General equipment needed

Tests to be undertaken on samples


Tests to determine the thermal characteristics and performance of bedding materials for use in
Ausgrid projects shall be generally in accordance with:
ASTM D5334-08 Standard Test Method for Determining the Thermal Conductivity of Soil and Soft
Rock by Thermal Needle Probe Procedure.
Note that results from this method are for thermal conductivity, and it will be necessary to take the
reciprocal of this value to calculate the thermal resistivity, which is the value generally used in
Australia for cable installations.
Ausgrid require the following tests to be undertaken and results provided for samples for which
thermal resistivity is being determined.
For native soil samples:-

 Thermal resistivity – as found


 Moisture content – as found
 Thermal resistivity – in the fully dried out state
 Thermal dryout curves – Thermal resistivity vs Moisture content.
 Soil density – as found
The density of native soils may not always be required. When commencing work on projects the
Testing Laboratory should confirm that Ausgrid requires native soil density results.
For compacted granular thermal bedding materials (including graded sands) submitted for approval
or routine testing:

 Thermal resistivity at a specified compaction density


 Moisture content – when compacted
 Proctor density of the compacted sample
 Thermal resistivity in the fully dried out state
 Dry Density
For flowable thermal bedding materials submitted for approval or routine testing:

 Thermal resistivity at commencement of testing


 Moisture content at commencement of testing
 Thermal resistivity in the fully dried out state
 Dry Density
Where the material is being submitted for approval (type testing), a dry out curve may also be
required, recording moisture content and thermal resistivity at; zero moisture content, initial
moisture content and at least two points in between. The initial moisture content shall be not less
than 8%.

NW000-S0088 UNCONTROLLED IF PRINTED Page 106 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

For compacted granular materials, the minimum Proctor density of samples shall be specified by
Ausgrid. If not specified, the value shall be 98% Standard Proctor density. For material submitted
for approval (type testing) the fully dried out TR shall also be determined at 95% and 90% standard
Proctor density.
Sieve analysis may also be required when instigating projects the Testing Laboratory should
confirm that Ausgrid requires sieve analysis results.

Provision of test reports


Results are to be provided to Ausgrid in an uneditable electronic format (eg pdf file) for storage and
access by Ausgrid staff in Ausgrid’s ThermalRes database.

Quality of test procedures


Notwithstanding any standard, process or equipment used the Testing Laboratory must at all times
be able to demonstrate to the satisfaction of Ausgrid that the methodologies and equipment used
for the determination of the thermal resistivity of soils will provide accurate and repeatable test
results.
The following references shall be used in place of the comparable US standards where referenced
in ASTM D5334-08:

 AS 1289 5.1.1-2003: Method of Testing Soils for Engineering Purposes – Soil compaction and
dry density Tests.
 AS 1289 2.1.1-1992: Method of Testing Soils for Engineering Purposes – Soil moisture content
tests
 AS 1289 1.1.1-2001: Method of Testing Soils for Engineering Purposes – Sampling and
preparation of soils.
 AS 1012.3.1 – 1993: Methods of Testing Concrete. Determination of properties related to the
consistency of concrete – Slump test
 AS 1379 – 1997 Specification and supply of concrete

Factors that influence test results


Test samples are also not infinite mediums (often being as small as 50mm in diameter). Boundary
effects occur during tests as the heat flux reaches the outer surface of the sample where it often
interfaces with air.
There are many factors that can influence test results such as:

 Moisture migration within the sample under test due to the heat from thermal needles can affect
the rates of temperature rise
 Non stable sample temperatures affect the flow of heat generated by the probe
 Poor probe surface contact resistance with the surrounding aggregates can influence results
due to situations such as: aggregate size, compaction, cracked samples or incorrectly installed
thermal needles
 Poorly prepared samples where in the case of compacted granular materials the density of the
material is inconsistent with the expected density
For these reasons when assessing the resulting values (or more fundamentally, the time periods
over which analysis is to occur) a visual representation of the temperature/log time output must be
referred to, to ensure initial and transient boundary effects have been considered and their effect
on the TR result minimized.

NW000-S0088 UNCONTROLLED IF PRINTED Page 107 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Equipment
Thermal Resistivity Test Instruments.
Refer to part 5 of IEEE 442-1981 Guide for Soil Thermal Resistivity Measurements for general
information on test equipment for use on TR testing.
Whilst the determination and analysis of TR can be achieved using relatively simple equipment,
modern instrumentation usually incorporates constant current power sources and data logging
facilities together with computer assistance to output a TR quantum.
Due to the effects of initial transients and edge effects, only those instruments that can
demonstrate to the satisfaction of Ausgrid that these effects have been considered and eliminated
in the determination of TR shall be approved for carrying out TR measurements.
Thermal needle length to diameter ratio shall be no less than: 30:1.
The contractor may be required to perform a practical demonstration of the instrumentation offered
and shall be required to provide specifications for the equipment to be used for testing samples for
Ausgrid.
A list of the key equipment expected to be required by Testing Laboratory in carrying out TR
measurements for Ausgrid is provided in Table L1.

Sample preparation
The preparation and handling of samples has a great influence on the resulting TR.
Due to the relatively small size of commonly prepared samples the scaling effects on mix
tolerances can lead to inaccuracies when specifying delivered quantities.
The measuring tolerances of equipment and methodologies used to prepare samples shall be
suitably controlled to minimize scaling errors.

 The measurement accuracy of Thermal Resistivity shall be: < +/- 5%


 Routine daily calibration checks of balances shall be carried out using known test weights.
 The measurement accuracy of balances shall be: < +/- 1%
 The minimum diameter of samples to be tested shall be: 50mm
 The minimum length of sample to be tested shall be: 150mm
 Larger samples are preferred

Compacted Granular Samples


For a given material type the TR of compacted granular materials is usually quite sensitive to both
compaction density and moisture content.
For results to be accurate and repeatable the compaction of samples must be well controlled.
Testing Laboratories must have systems in place to ensure:

 The positioning of test probes within the samples being prepared is controlled to prevent
movement of the probes during compaction
 The density of the compacted material within the sample is consistent throughout the sample
volume.
 Sample compaction is carried out at known moisture contents (as a percentage of dry weight)
For these reasons samples must be prepared in controlled layers where the mass of the material
being compacted within each successive layer volume is known. Quality balances must be used to
accurately measure the mass of material used within the layered samples.
Samples shall be taken from site or prepared from ingredients in accordance with AS 1289.1.1.1.
When placed in the test cylinder, compaction shall be tested in accordance with AS1289.5.1.1.

NW000-S0088 UNCONTROLLED IF PRINTED Page 108 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Compaction rates and the densities must be referenced to standards to ensure repeatability in the
field ie Standard Proctor Test.
Where a dryout curve is being prepared, moisture content shall be tested at the beginning and end
of tests, as well as at additional points in between. Testing for moisture content shall be in
accordance with the requirements of AS1289.2.1.1.
Flowable Samples
The collection and treatment of fluidised samples before solidifying can have marked effect on the
TR of the sample under test. The aggregates within these high slump materials (designed such that
they should flow without mechanical vibration) can easily segregate under vibration. The
consistency of the collected sample under test must be representative of the material installed
within the cable trench and for this reason, further movement/vibration caused by influences such
as but not limited to:

 Rodding
 Transport
 Tapping the sample tube
should be avoided until the material has solidified to prevent aggregate segregation. Collected
samples are usually best left on site until solidified before transporting to a test laboratory for
further testing.
Probe Installation and Collection of Undisturbed Soil Samples
The installation of thermal needles/probes must be done with a view to ensuring good contact
between the needle and the surrounding material without disturbing the soil.
Poor contact between the thermal needle and surrounding material will greatly affect the TR
measurement.
If the sample material is so hard as to require the drilling of a hole to permit installation of the
needle without damage to the needle or disturbance to the sample, the hole shall be of slightly
smaller diameter than the needle to ensure that the needle maintains a good contact with the
sample throughout its length.
The most common method used for collecting undisturbed samples is via driven tubes. These
tubes must comply with the minimum dimensions specified above.
The tubes used must be thin walled (nominally 1.0mm) and driving operations undertaken with
processes that prevent inadvertent compaction of the collected sample.
Note: Driving thermal needles and sample tubes into native soil within the field environment
bring with it the risk of damaging other services. The Contractor’s attention is brought to
the necessity to locate services before driving probes, collection tubes or drilling holes for
needles. The cost of rectification of any damage caused by the contractor in carrying out
probe installation or the collection of samples shall be borne by the contractor.

Storage of samples
The Test Laboratory shall have in place suitable storage facilities for the preservation and storage
of test samples.
Following final tests, samples are usually discarded, however there may be a requirement for
samples to be stored for a period of time for records and/ or retest either by the Test Laboratory or
by others.
The maximum time samples are required to be stored is: 6 weeks.
For samples to be stored by the Test Laboratory, Ausgrid must issue notice to the Test Laboratory
no less than 2 weeks prior the commencement of testing that samples are to be stored. At the
completion of the storage time the Test Laboratory may discard the samples unless within the 6
week storage period notice has been given by Ausgrid that prolonged storage of samples would be
required.

NW000-S0088 UNCONTROLLED IF PRINTED Page 109 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

 The maximum prolonged period of storage (including the initial 6 weeks) shall be 12 weeks.
 The minimum volume to be allocated for the storage of samples shall be 24m3
The storage facility shall be in a cool dry place with security and appropriate filing to prevent the
loss and ensure proper identification of samples for the storage period.
At the end of the storage period the Test Laboratory may discard the samples and/or hand them
over to Ausgrid at Ausgrid’s discretion.

Development of thermal bedding materials


Once a mix design for thermal bedding or backfill material has been determined within the
laboratory, and constituent components specified to a level such that variation in the delivered
material prevents the resulting TR from exceeding Ausgrid’s specified maximum TR for the project
in hand, before it can be used on Ausgrid’s network it must be type tested in the following manner.
Samples for type testing shall be collected from a batched mix of no less than 1m3 with no less
than 3 samples for TR testing being taken from the beginning, middle and end of the batched
product (a total of 9 samples for thermal testing plus additional samples for compressive strength
tests).
Test reports for these materials shall include:

 Detail description of the constituent components


 Sieve analysis
 Identification of the source quarries and batching plants
 Mix design (in kg/m3 – dry weight)
 Water content in litres/m3 or % dry weight
 Compressive strength at 7, 28 and 120 days (with strength values to be within the ranges
required by Clause0) at the minimum and maximum site acceptable slump (moisture content)
values.
 Thermal Resistivity in the fully dried out state in Km/W (for materials mixed at the minimum and
maximum site acceptable slump (moisture content) values.
 Methods used for the sample preparation and installation to ensure the type test results are
representative of the “in field installed” materials.
For compacted granular mixes only:-

 Compaction density to be used on site as a % of the Standard Proctor Density (used to achieve
the type test results for compacted granular materials)
For flowable type mixes only:-

 Nominated slump (in the case of fluid type product) to be used on site
 Forecast Compressive strength @ 6, 12 and 24 months at the minimum and maximum site
acceptable slump (moisture content) values.
Six cylindrical samples nominally 100mmD * 150mm long shall also be provided for inspection by
Ausgrid.
The type test results (including the 28 day compressive strength results) together with work method
statements (WMS) for their installation for controlled thermal bedding together with samples, shall
be provided no less than 6 weeks prior to first installation.
Quality Management Plans
Testing Laboratories undertaking TR testing must have in place, accredited or approved quality
systems documenting the:

 Work method statements for each of the individual processes being undertaken
 Test report formats
 Equipment list that positively identifies the equipment used and the accuracy of the
instrumentation provided

NW000-S0088 UNCONTROLLED IF PRINTED Page 110 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

 List of key personnel undertaking TR testing and sample preparation


 Methods used to calibrate instrumentation, including calibration frequency

Ownership and treatment of samples


Samples provided by Ausgrid shall remain the property of Ausgrid until testing is completed and
samples are discarded.
Samples collected by the Test Laboratory or contactor for testing shall remain the property of the
Test Laboratory until full payment of the testing services is received.
From the time of receipt of samples the Test Laboratory shall ensure that the samples are
maintained within a controlled environment and treated such that the variation in TR results due to
storage are minimized. For this reason bulk samples shall be stored in sealed enclosures to
prevent moisture loss and or migration of moisture within the sample itself.

Right of access
Ausgrid reserves the right to witness any testing being carried out on its behalf, whether this testing
is on site or within laboratories.
Ausgrid reserves the right to audit any testing or equipment that may be used for testing samples
on its behalf. The cost of auditing will be to Ausgrid who will provide reasonable notice to the Test
Laboratory for the audit.

Confidentiality
The Test Laboratory must have in place quality systems to guarantee the confidentiality of tests
carried out on Ausgrid’s behalf.
Table L1: Typical Equipment

Item Equipment Description / Use

1 TR test instrumentation Suitable constant power sources (adjustable) with temperature/log


time data logging facilities.
Output results to be able to be confirmed by graphical output.

2 Thermal needles Thermal probes/needles with a length to diameter ratio of > 30:1
probes capable of withstanding oven temperatures  105oC.
Sized to suit field and laboratory situations.

3 Forced air oven Used for drying out and stage drying samples (at up to 105oC ± 2.5%)
as well as treating soil samples at elevated temperatures prior
disposal in accordance with the NSW department of agriculture
specifications.

4 Balance and calibration ± 0.01% for accurately weighing component materials and mixtures.
test weights

5 Sieve / shaker - Multistage vibrating sieve up to 25mm sieve sizes.

6 Standard proctor These standardized items (to AS 1289 – Methods For Testing Soils
compaction hammer For Engineering Purposes) are used for the laboratory compaction
and test cell and density measurement of samples.

7 Field sample tubes with 50mmd * 150mm long Stainless steel tubes for the collection of
sealing caps undisturbed field samples with “in-situ/natural” density or allowing
uncontrolled drying out of test samples.

8 Laboratory sample For accurately preparing compacted granular samples with consistent
tubes and compaction density throughout the sample.
equipment

NW000-S0088 UNCONTROLLED IF PRINTED Page 111 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Item Equipment Description / Use

9 Slump cone and Used for determining the standard slump of “fluid” materials.
tamping rod

10 Measuring cylinder 0-500ml ± 0.5ml measuring cylinder for accurately measuring the
required moisture component of samples under manufacture.

11 Manuals and work Quality assurance for equipment calibration and work procedures.
instructions

NW000-S0088 UNCONTROLLED IF PRINTED Page 112 of 113


Unclassified
NS130 Laying Underground Cables up to and Including 11kV Amendment No 5

Annexure M – Typical TSB Recipes


The following are typical examples of slurry mix designs that may satisfy the performance
requirements of Clause 0:
Table M1: Regular Mix Recipes - Compressive Strength: 1 to 3MPa

Component Wt.(kg/m3) SSD*

Cement 20

Fly Ash 160

Coarse Aggregate - Round River Gravel 925

Fine Aggregate 985

Water 200

Table M2: Regular Mix Recipes - Compressive Strength: 3 to 5MPa

Component Wt.(kg/m3) SSD*

Cement 70

Flyash 100

10mm crushed river gravel 970

Coarse Sand 930

Water 190

Table M3: Dry Mix Recipe

Component Wt.(kg/m3) SSD*

Cement 25

Fly Ash 140

Coarse Aggregate - 10mm aggregate 725

Fine Aggregate 1095

Water 105

* SSD = Saturated Surface Dry - the condition of the aggregate in which the pores in each particle
of the aggregate are filled with water but no excess water is on the particle surface.

NW000-S0088 UNCONTROLLED IF PRINTED Page 113 of 113


Unclassified

You might also like