4.39 2116120 Mens Brief

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

FLAMINGO FASHIONS LIMITED (LINGERIE)

Operation Bulletin (Production Guide Line)


Buyer: C&A Total SMV: 4.39 Total Manpower: 29 Target @60% 237.81 CM Tk.
Item: Mens Brief Machine SMV: 3.51 Total Machine: 24 Target @50% 198.18
Order No: Manual SMV: 0.88 Target @100% 396 Cycle Time 0.15 Target
STYLE No: 2116120 Total Operator: 24.00 Target @80% 317 Prepared on: 28-Nov-19
Fabrication: Total Helper: 5.00 Target @70% 277 Prepared By: Aminur

Seam
Needle Thread Trims( Req. Req. Target Target Total Shortage
OP NO. M/C Type Operation Description Work-Aid
Type
SPI allowance
Type mm)
SMV
M/C Man @100% @80% Target
TML
(mm) / Excess

1 1N/3T/OL Make pouch dirt(Upper & lower) Back Latch M/c 14.00 0.40 pp/ny n/a 0.28 2 2 214 171 343 26 1

2 1N/2T/SN Security tack and Basting to pouch 10 0.20 pp/pp n/a 0.47 3 3 128 102 306 -11 1

3 4N/7T/FD Join pouch with front part 14.00 0.50 pp/ny n/a 0.30 2 2 200 160 320 3 1

4 4N/7T/FD Join inseam panel 14.00 0.50 pp/ny n/a 0.20 2 2 300 240 480 163 1

5 2N/4T/OL Join side seam(L&R) 14.00 0.50 pp/ny n/a 0.30 2 2 200 160 320 3 1

6 1N/3T/OL Attach elastic to leg(L&R) 14.00 0.50 pp/ny 3 0.35 2 2 171 137 274 -43 1

7 2N/3T/FL Top stitch to leg(L&R) 12.00 n/a pp/ny n/a 0.30 2 2 200 160 320 3 1

8 HP Cut waist elastic n/a n/a n/a 3.00 0.12 1 500 400 400 83 1

9 1N/2T/1ZZ Make waist elastic (as per sample) n/a n/a n/a n/a 0.14 1 1 429 343 343 26 1

10 HP Mark waist elastic n/a n/a n/a n/a 0.16 1 375 300 300 -17 1

11 1N/3T/OL Attach elastic to waist 14.00 0.50 pp/ny 3.00 0.30 2 2 200 160 320 3 1

12 1N/2T/SN Make and Attach label to waist 12.00 0.50 pp/pp 4.50 0.24 2 2 250 200 400 83 1

13 2N/3T/FL Top stitch to waist 12.00 n/a pp/ny n/a 0.32 2 2 188 150 300 -17 1

14 1N/2T/SN Mark & Attach patch label 12.00 0.10 pp/pp 2.40 0.31 2 2 194 155 310 -7 1

15 HP Remove size sticker & Final trimming 0.60 3 100 80 240 -77 1
Total 4.39 24.00 29.00 14 11 317 0 15

Machine Summary
M/C 1N/3T/OL 1N/2T/SN 4N/7T/FD 2N/4T/OL 2N/3T/FL 1N/2T/1ZZ TTL M/C TTL HP TTL

SMV 0.93 1.02 0.50 0.30 0.62 0.14 3.51 0.88 4.39

QTY 6 7 4 2 4 1 24 5 29

Work-Study Sample Quality MPD Technician Production

03:43:0007/28/2024
FLAMINGO FASHIONS LIMITED (LINGERIE) TTL M/C OPERATOR HELPER MANPOWER M/C SMV: MN SMV TTL SMV

SEWING MACHINE LAYOUT 24 24 5 29 3.51 0.88 4.39

BUYER ORDER NO ITEM SEWING INPUT DATE SEWING START SEWING FINISH PITCH TIME 100% SMV TGT: 80% SMV TARGET

C&A 2116120.00 Mens Brief 0.18 396 317

1N/3T/OL 1N/2T/SN 4N/7T/FD 2N/4T/OL 2N/3T/FL 1N/2T/1ZZ TOTAL


6 7 4 2 4 1 24

LINE NO. 21 DATE: July 28, 2024


END TABLE

Operation SMV Target M/C M/C Target SMV Operation

#N/A #N/A #N/A #N/A


14 1N/2T/SN 193.5484 0.31 Mark & Attach patch label

Operation SMV Target M/C M/C Target SMV Operation

Top stitch to waist 0.32 187.5 2N/3T/FL


13 13 2N/3T/FL 187.5 0.32 Top stitch to waist

Operation SMV Target M/C M/C Target SMV Operation

Make and Attach label to waist 0.24 250 1N/2T/SN


12 12 1N/2T/SN 250 0.24 Make and Attach label to waist

C
Operation SMV Target M/C e M/C Target SMV Operation

Attach elastic to waist 0.3 200 1N/3T/OL


11 n 11 1N/3T/OL 200 0.3 Attach elastic to waist
t
r
Operation SMV Target M/C e M/C Target SMV Operation
9 7
Make waist elastic (as per sample) 0.14 428.571 1N/2T/1ZZ T 2N/3T/FL 200 0.3 Top stitch to leg(L&R)
a
b
Operation SMV Target M/C Target SMV Operation
l
Attach elastic to leg(L&R) 0.35 171.429 1N/3T/OL
6 e 7 2N/3T/FL 200 0.3 Top stitch to leg(L&R)

Operation SMV Target M/C C M/C Target SMV Operation

Attach elastic to leg(L&R) 0.35 171.429 1N/3T/OL


6 e 5 2N/4T/OL 200 0.3 Join side seam(L&R)
n
t
r
Operation SMV Target M/C M/C Target SMV Operation
e
Join inseam panel 0.2 300 4N/7T/FD
4 5 2N/4T/OL 200 0.3 Join side seam(L&R)
T
a
Operation SMV Target M/C b M/C Target SMV Operation

Join inseam panel 0.2 300 4N/7T/FD


4 l 3 4N/7T/FD 200 0.3 Join pouch with front part
e

Operation SMV Target M/C M/C Target SMV Operation

Security tack and Basting to pouch 0.47 127.66 1N/2T/SN


2 3 4N/7T/FD 200 0.3 Join pouch with front part

Operation SMV Target M/C M/C Target SMV Operation

Security tack and Basting to pouch 0.47 127.66 1N/2T/SN


2 2 1N/2T/SN 127.6596 0.47 Security tack and Basting to pouch

Operation SMV Target M/C M/C Target SMV Operation

Make pouch dirt(Upper & lower) 0.28 214.286 1N/3T/OL


1 1 1N/3T/OL 214.2857 0.28 Make pouch dirt(Upper & lower)

INPUT TABLE

Work-Study MPD Production


Photo Sample

You might also like