Nisnisan Week 4 Assignment
Nisnisan Week 4 Assignment
Project Control
Introduction
The construction of a multi-storey condominium building is a complex and multifaceted
endeavor, involving a wide array of activities that need to be meticulously planned, monitored, and
controlled. Effective project control techniques are essential to ensure the successful completion of
such projects. For example in the context of particularly relevant to the construction of a 12-storey
condominium which was my current project assigned right now. Project control is a critical aspect of
project management in construction. It involves a systematic process to monitor, evaluate, and
influence the time, cost, quality, and scope of a project. The primary objective of project control is to
keep the project on track by ensuring it adheres to the planned schedule, budget, and quality
standards while mitigating risks and efficiently utilizing resources. In the context of a 12-storey
condominium, project control becomes even more significant due to the increased complexity,
higher stakes, and more stringent regulatory requirements. The construction of such buildings
involves coordinating various trades and activities, managing a large workforce, and ensuring the
timely delivery of materials and equipment. Any delays or cost overruns can have substantial
financial implications and potentially impact the project's viability.
The real-life experiences of industry professionals underscore the importance of adopting
robust project control techniques. Lessons learned from previous projects highlight common
challenges, such as unforeseen site conditions, design changes, labor shortages, and supply chain
disruptions. By leveraging proven project control methods, these challenges can be effectively
managed, leading to successful project outcomes.
Project Crashing
Project crashing is a project management technique used to shorten the duration of a project by
reducing the time of one or more of its critical path activities. This often involves the allocation of
additional resources, such as labor, equipment, or materials, to critical tasks. The main goal of
project crashing is to achieve the shortest possible project duration at the least incremental cost,
without compromising project quality. Project crashing is a valuable technique in the project
manager's toolkit, offering a way to meet tight deadlines and manage unexpected delays
effectively. However, it requires careful consideration of cost implications and potential risks to
ensure that the benefits outweigh the additional costs.
Cost and Time Trade-offs: The economic principles behind cost and time trade-offs in project
crashing involve understanding the relationship between project duration and project costs. Key
considerations include:
Direct Costs: Costs that are directly associated with project activities, such as labor, materials,
and equipment. Adding resources or working overtime typically increases direct costs.
Indirect Costs: Ongoing costs that are not directly tied to specific activities, such as overhead,
supervision, and administrative expenses. Reducing project duration can lower these costs by
shortening the time these expenses are incurred.
Total Project Costs: The sum of direct and indirect costs. The aim of project crashing is to
minimize total project costs by finding an optimal balance between increased direct costs and
decreased indirect costs.
Meeting Tight Deadlines: When projects have strict deadlines, such as product launches,
regulatory compliance dates, or contractual obligations, crashing can help ensure timely
completion.
Recovering from Delays: If a project falls behind schedule due to unforeseen circumstances
(e.g., bad weather, equipment failure, or resource shortages), crashing can help get it back on
track.
Maximizing Competitive Advantage: In highly competitive industries, completing a project
ahead of competitors can provide a significant market advantage, justifying the additional costs
of crashing.
Avoiding Penalties: Some projects may have contractual penalties for late completion. The
cost of crashing may be lower than the potential penalties, making it a viable option.
The most relevant example for the application of project crashing is a construction company working
on a high-rise building since it may face delays due to unexpected weather conditions. To meet the
contractual deadline and avoid penalties, the company may decide to crash the project by adding
more workers and equipment to critical path tasks etc.
Critical Chain Project Management (CCPM) is a project management approach developed by Dr.
Eliyahu M. Goldratt based on the Theory of Constraints (TOC). It focuses on the identification and
management of the critical chain, which is the longest sequence of dependent tasks considering both
task dependencies and resource constraints. CCPM aims to improve project delivery by addressing
uncertainties and efficiently managing resources to avoid delays and ensure timely completion.
CCPM is applied to manage project schedules and resources effectively through the following steps:
Project Planning: Identify all tasks, dependencies, and required resources. Determine the
critical chain by considering both task dependencies and resource constraints.
Buffer Insertion: Insert project, feeding, and resource buffers based on identified uncertainties
and dependencies.
Resource Allocation: Level resources to ensure they are dedicated to critical chain tasks
without interruptions. Avoid multitasking to improve focus and efficiency.
Monitoring and Control: Continuously monitor the progress of the critical chain and the
consumption of buffers. Use buffer management to identify potential delays and take corrective
actions promptly.
Adjustments and Improvements: Make necessary adjustments to resource allocation and task
priorities based on ongoing monitoring. Focus on continuous improvement to enhance
processes and reduce future uncertainties.
The advantages of using CCPM over traditional project management methods include:
Improved Project Delivery: CCPM often results in faster project completion times by effectively
managing resources and protecting the project schedule with buffers.
Increased Focus on Constraints: By identifying and addressing constraints, CCPM ensures
that bottlenecks are managed proactively, leading to smoother project execution.
Reduced Multitasking: CCPM minimizes multitasking, which improves resource productivity
and reduces the risk of delays caused by task switching.
Enhanced Resource Utilization: Resource leveling ensures that resources are used efficiently,
preventing overallocation and reducing idle time.
Better Risk Management: Buffer management provides a structured approach to handle
uncertainties and variations, improving the project's resilience to unforeseen events.
Higher Stakeholder Confidence: By delivering projects more reliably and predictably, CCPM
can increase stakeholder confidence and satisfaction.
In conclusion, CCPM offers a robust approach to managing complex projects by focusing on resource
optimization, buffer management, and constraint identification, providing significant benefits over
traditional project management techniques.
Project Termination
Project termination refers to the formal conclusion of a project. It involves the systematic closing of all
project activities, ensuring that project objectives have been met or addressing why the project was
terminated prematurely. The goal of project termination is to formally close the project, complete all
remaining deliverables, release resources, and document the outcomes and lessons learned.
Successful Completion: This occurs when the project has met its objectives, deliverables are
completed as planned, and the project is officially closed.
Premature Termination: A project is terminated before its planned conclusion due to various
reasons such as changes in business strategy, budget cuts, or unforeseen risks making
continuation unfeasible.
Termination by Integration: The project's work and deliverables are integrated into other
existing projects or operations. This often happens in organizational changes where project
deliverables become part of regular business operations.
Termination by Addition: The project evolves into a permanent function or department within
the organization, meaning its activities continue but are no longer considered a separate
project.
Termination by Starvation: This happens when a project is slowly deprived of resources and
support until it cannot continue. This can be a less direct way to terminate a project that is no
longer seen as viable or necessary.
Effective project termination processes are crucial for organizational learning and future project
success. They ensure that resources are used efficiently, stakeholders are satisfied, and lessons
learned are applied to improve project management practices.
Project termination can have significant economic implications, depending on the type of
termination and the stage at which it occurs:
Cost Implications: Terminating a project prematurely can lead to sunk costs, including
investments already made in resources, materials, and equipment that cannot be recovered.
These costs can impact the organization's financial performance and budget planning.
Opportunity Costs: Redirecting resources from terminated projects to other endeavors may
involve opportunity costs, where potential benefits from the original project are forgone.
Reputation and Market Impact: Failing to complete a project as planned can affect the
organization's reputation and credibility in the market, potentially leading to loss of future
business opportunities.
Legal and Contractual Obligations: Terminating contracts prematurely may result in legal
implications, including penalties, contractual disputes, or obligations to compensate
stakeholders.
Risk Management: Implement robust risk management practices to identify potential risks that
could lead to project termination. Develop contingency plans and mitigation strategies to
minimize economic losses.
Legal and Contractual Compliance: Ensure compliance with legal and contractual obligations
when terminating projects. Seek legal advice to mitigate risks and negotiate settlements with
stakeholders if termination becomes unavoidable.
Supply and Demand: Understanding supply and demand dynamics helps in determining
resource requirements and procurement strategies to optimize project costs.
Cost-Benefit Analysis: Evaluating costs and benefits helps prioritize project investments and
determine the feasibility of project alternatives.
Opportunity Cost: Assessing opportunity costs assists in making trade-offs between competing
project objectives and resource allocations.
Time Value of Money: Considering the time value of money helps in assessing the financial
implications of project investments, including discounting future cash flows and determining
project profitability.
Balancing short-term costs with long-term value is crucial for sustainable engineering projects:
1. Short-term Costs: Immediate expenses incurred during project execution, such as labor,
materials, and operational costs.
2. Long-term Value: Benefits and returns generated over the project's lifecycle, including
enhanced efficiency, increased revenue, reduced maintenance costs, and improved
sustainability.
Fit for Purpose: Select tools that align with project objectives, requirements, and constraints.
Usability and Integration: Choose tools that integrate well with existing systems and workflows
to ensure seamless project management.
Scalability: Consider scalability to accommodate project growth and complexity over time.
Data Accuracy and Reliability: Use tools that provide accurate and reliable data for informed
decision-making and performance evaluation.
1. Project Management Software: Tools like Microsoft Project, Primavera P6, and JIRA for
scheduling, resource allocation, and progress tracking.
2. CAD Software: Computer-aided design tools such as AutoCAD and SolidWorks for 2D and 3D
modeling, drafting, and visualization.
3. Simulation and Modeling Software: Tools like MATLAB, Simulink, and ANSYS for simulating
complex systems, optimizing designs, and predicting performance.
4. Data Analysis Tools: Statistical software such as R, Python (with libraries like NumPy and
Pandas), and MATLAB for analyzing data, conducting experiments, and making data-driven
decisions.
These tools enhance efficiency, accuracy, and collaboration in engineering projects, ultimately
contributing to successful project outcomes and stakeholder satisfaction.
Adaptability is crucial in project control because it allows project teams to respond effectively to
changing circumstances, uncertainties, and unexpected challenges throughout the project lifecycle.
Here are key reasons why adaptability is important:
Risk Management: Being adaptable allows teams to anticipate and mitigate risks proactively.
They can quickly pivot and implement contingency plans to minimize disruptions and maintain
project progress.
Enhanced Problem-Solving: Adaptive teams are better equipped to tackle complex problems
and find innovative solutions. They can capitalize on opportunities that arise and overcome
obstacles efficiently.
To foster adaptability within project teams, consider implementing the following techniques:
Continuous Learning: Encourage team members to stay updated with industry trends, new
technologies, and best practices. Provide opportunities for training, workshops, and knowledge
sharing sessions.
Flexibility in Planning: Develop agile project management methodologies that allow for iterative
planning and adjustments based on feedback and changing requirements.
Effective Communication: Establish open channels of communication within the team and with
stakeholders. Regularly update everyone on project progress, changes in scope, and potential
challenges.
Empowerment and Autonomy: Empower team members to make decisions and take
ownership of their tasks. Provide a supportive environment where creativity and initiative are
encouraged.
Adaptive Leadership: Leadership plays a crucial role in promoting adaptability. Leaders should
set clear goals, provide guidance, and support team members in overcoming obstacles.
2. Material Supply Shortages: Sometimes, delays in material deliveries can occur due to supplier
issues or unforeseen transportation challenges. A project team adapted by sourcing alternative
suppliers, adjusting construction sequences to use available materials more efficiently, or
temporarily reallocating resources to other aspects of the project.
3. Design Changes and Client Feedback: Clients may request design changes or additional
features during the construction process. A flexible project team adapted by incorporating
these changes into the project plan, revising timelines and budgets accordingly, and
maintaining clear communication with the client to ensure satisfaction.
4. Regulatory Changes: Changes in local building codes or regulations can impact construction
projects. An adaptable team proactively monitored regulatory updates, adjusted plans and
designs to comply with new requirements, and communicated changes to stakeholders to
avoid delays or legal issues.
5. Labor Shortages or Skills Gaps: If skilled labor shortages occur or team members leave
unexpectedly, an adaptable project team can quickly recruit new talent, provide training where
needed, and reorganize tasks to minimize productivity disruptions.
These examples illustrate how adaptability in project control enables teams to navigate challenges
effectively, maintain project momentum, and achieve successful outcomes despite changing
circumstances.
In conclusion, effective project control techniques are indispensable for managing the complexities
and challenges inherent in constructing a 12-storey condominium building. Techniques such as
project crashing provide valuable tools for meeting tight deadlines and overcoming unexpected
setbacks, albeit with careful consideration of cost implications. Critical Chain Project Management
(CCPM) offers a structured approach to optimize resource allocation and mitigate risks, enhancing
project efficiency and delivery. Project termination, whether successful or premature, requires
meticulous planning and execution to minimize economic impacts and ensure stakeholder
satisfaction. Lastly, adaptability emerges as a cornerstone for success, enabling project teams to
respond agilely to evolving conditions and thereby ensuring the timely and cost-effective completion
of construction projects. Adopting these strategies will not only streamline project management
processes but also foster a culture of continuous improvement and resilience in facing future
challenges.
Reference:
Association for Project Management. (2000). Project Management Body of Knowledge,
APMBoK. UK: Association for Project Management.
Bauch G. T., & Chung C. A. (2001). A statistical project control tool for engineering
managers. Project Management Journal 32(2), 37–44.
ote M. J., & Daugherty C. R. (2000). Using project management to improve month end
reporting in a hospital. Production and Inventory Management Journal 41(4), 17–22.
Flyvbjerg B. (2021). Top ten behavioral biases in project management: An overview.
Project Management Journal, 52(6), 531–46.
https://doi.org/10.1177/8756972821104904
Arditi D., Tokdemir O. B., & Suh K. (2001). Effect of learning on line-of-balance
scheduling. International Journal of Project Management 19(5), 265–277.
Chapman P., Quang C. (2021). Major project risk management: Reconciling complexity
during delivery with the inside view in planning. Engineering Project Organization
Journal, 10(2). https://doi.org/10.25219/epoj.2021.00104
Kwok K. Y., & Rao V. M. (1998). A quality control and improvement system based on
the total control methodology (TCM). International Journal of Quality and Reliability
Management 15(1), 13–48.
Meredith J. R., & Mantel S. Jr. (2003). Project Management - A Managerial Approach.
New York: John Wiley & Sons, Inc.
Floricel S., Michela J., Piperca S. (2016). Complexity, uncertainty-reduction strategies,
and project performance. International Journal of Project Management, 34(7), 1360–
1383.
Drechsler A., Breth S. (2019). How to go global: A transformative process model for the
transition towards globally distributed software development projects. International
Journal of Project Management, 37(8), 941–955.