WPF 4 SV A1 2008
WPF 4 SV A1 2008
WPF 4 SV A1 2008
025
030
035 020
040
015
005
045
4x3
C1
1" A1
010
065
050
070 055
060
075
080 45˚H
090 085
095
Blast and Paint
100
105
Line No: 4"-SV-A1-2008 Corrosion Circuit No.: WPF-CC-002-080 Report No.: TAK -WPF- UT - THK - 11170
P & ID No: D-CAB-TAK- WPF-10-105 -Rev 6 Circuit Description: Test Sep. & Inst. Gas Filter Sep. Sheet No.: 4 of 7
Description: FROM TEST SEPERATOR TO OVERBOARD Iso No: Not Applicable Date: 16 June 2015
Location: Takula Fox Inspector: Gamma Technician: Colin MacLean
This report signifies acceptance or otherwise with regard only to the acceptance criteria of the applicable standard. Such compliance, or otherwise, does not infer or imply suitability and/or fitness for any particular use or purpose. No other communication by Oceaneering, whether oral or written, shall be construed
as an option as to whether the weld or other work inspected should be accepted or rejected.
A B C D E F G H I J K
V -160 Y F-170
T EST SEPA RA T O R INST RUM ENT G A S FILT ER SEPA RA T O R
SIZE: 3'- 10" OD X 12'- 4" T/T SIZE: 6 5/8" OD X 4'- 6 3/4" 0/A LENGTH
DESIGN TEMP: 150°F DESIGN: 250 PSIG @ 150°F
(OUT OF SERVICE)
45 SKID LIMIT 45 1
4"
44 4"- P- C1- 1022 44
10- 102
TO PROD. MANIFOLD
VN- 50
VN- 50
43 (M- 100N)
3/4"
3/4"
43
42 42
1 1/2"
41 1 1/2"-GI-A1-4500
41
3/4"-GI-A1-4501
39 4"- SV- A1- 2008 39
DISCHARGE OVERBOARD
TO TO
RTU
37 SDP- 160 SDP- 160 37 2
FR FR FIT
1"
160 160 160
36 3/4"- P- C1- 1047 BY- PASS
4"
CSO
36
PAH PAH
2"x3"
160 160
35 SET @ 1175 PSIG 35
PIC PR FR
2"x1"
PILOT
160 160 160 TO
(SEE NOTE: 1)
34 3/4"x1" 34
SDP- 160
SET @
PSV PSH PI PI PSL 1"
4"- P- C1- 1020 250 PSIG
33 33
1"
160 160 160 XXX 160
10- 102
1"
2"- V- A1- 2012
C1 A1 PAH TO
FROM WELL MANIFOLD TO PSV
3/4" SDP- 160
32 TEST HEADER LV- 160 170 170 32
1"
PV 1"
3/4"
3/4"
3/4"
3/4"
160 PAL
A1
1"
1/2"
1/2"
31 4"x3" SET @ CSO 31
170
LC PSH
120
1"x3/4"
C1
3/4" 160 T1 170
PSIG
3/4"
30 4" 4" 30
1 1/2"
1 1/2"
FROM
1 1/2"
1 1/2"
FO PV 1"
VN- 50 TI 1 1/2"x3/4"
SDP- 160
3/4"
FE 170 3
29 (TYP.) C1 A1
3/4"
161 29
C1
1/2"
A1
4"x3"
2" BF 160 CSO
6"x4"
C1 A1
2"VB- 75
(FUTURE)
4"x2"
VB-75N
CSC
SENIOR
C5
4"
C1
LSHL- 160 (TYP.)
SDV
1" 1" 2"x1" CSC
160 2" 2" 2" 2" 2" 1 1/2"
27 3/4" PI PIC PSL 27
FC
C1
1/2"
INLET 170
26
3/4"
26
15" 3/4"
3/4"
3/4"
2x1 1/2"
LEG
1" 1"
VN- 50
25 HLL
3/4"
25
TI
1/2"
1 1/2" 1"- GI- A1- 5002
3/4"
2" DRIP
160 1 1/2"
6" 2"x1"
T1
NLL
3/4"
24 18" MW 24
LG
3/4"
1"
1/2"
13" STILLING WELL
23 2" 160 23
LLL
VB 1" CSC 3/4"
V- 160 TO
22 TRIM- C1 SDP- 160 22
TO 1 1/2"
TUBE
FQI 3/4"
2"x1"
161
FE TO INST.
1/2"
1/2"
19 170 1 1/2" 19
1/2" SS
161 1" GAS USERS
18
3/4"
18
3" 3" 1" CSC
4"- DH- A1- 2025
1"
17
C1 A1
17
FROM
FE
10- 102
LC- 160
16 162 16
4"x3"
1 1/2"-GI-A1-4500
3/4"
LV 1" 3/4"
15 1"- DH- A1- 2023 15
160 10- 102A
VC- TO GLCC
3" 3" 3" 4"x3" 3/4"
14 14
3/4"
TO OPEN 3"
3/4"
13 DRAIN SYSTEM 13 5
FC
3/4"
FQI
4"x3"
11 11
9 9
8 8
u-gds.chevr
7 7
6 SKID LIMIT 6
5 5 6
4 NOTES: 4
2 2
1 1
SO UR PLA T FO RM
11 KA MOC 17- TAK- 398154 24 MAY 19 SB ST 5 MJS A S- BUILT F- 170 OUT OF SERVICE 07JULY11 C A BIND A G ULF O IL C O M PA NY LT D
10 JBKZ AS PER ALARM SET POINT REMOVAL PROJECT 1N O V18 TGJU MUON 4 BPJ ISSUED FOR CONSTRUCTION ADDED FIT- 162 (AFE 303603) 2AUG04 JNK
PIPING AND INSTRUMENT DIAGRAM
9 SMS AS BUILT GLCC MOC 15- TAK- 116780 11 NOV 16 3 DRD ADDED GAS VENT & DEMOLISHED GAS SKID AFE 303218 19 MAY 03 MPH W E LL PLA T FO RM "FO X"
TEST SEPARATOR AND INTRUMENT
8 NSA ADDED FIT- 160 (MOC 14- TAK- 006) 02/05/14 NSA 2 MPH AS BUILT INSTRUMENTATION ONLY 23APR03 DRD
GAS FILTER SEPARATOR
7A DvdM GLCC PROJECT- ISSUED FOR DESIGN 26/12/2011 1 JCP AS BUILT 9 SEPT 98 SMS
TAKULA FIELD CABINDA, ANGOLA
DATE 04 MAY 98 CHK'D JCM
DW G. NO. TITLE N O. BY DESCRIPTION DATE APP. N O. BY DESCRIPTION DATE APP.
FOR FOR
CHK'D CHK'D BID CONST
DRAW N J.Chocolate P APP'D DRAW ING NO. REV.
REFERENCES REVISIONS REVISIONS AFE SCALE: NONE D- CAB- TAK- W PF- 10- 105 11