0% found this document useful (0 votes)
16 views17 pages

Measurement Sheet

Uploaded by

m.rashard
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views17 pages

Measurement Sheet

Uploaded by

m.rashard
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 17

Measurement Sheet

Proposed Four Seasons Resort

No Description Nos Length Width Hight / Depth Sub Total Total Unit

1.0 top soil removing 416.26 416.26 m2

2.0 excavation
2.1 column excavation
F1 35 1.90 1.90 1.50 189.52
F2 1 3.45 3.40 1.50 17.60
F3 1 3.80 4.50 1.50 25.65
F4 1 6.15 7.98 1.50 73.62
1 7.40 1.83 1.50 20.31
F5 1 3.37 1.90 1.50 9.60 336.29 m3

2.2 plinth beam 1 173.00 0.25 0.25 10.81 10.81


Total Quantity 347.11 m3

3.0 Backfilling 1 282.10 0.50 141.05


1 26.00 0.35 9.10

column excvated qnty 336.29


f1 blinding -35 1.90 1.90 0.10 (12.64)
foooting -35 1.70 1.70 0.30 (30.34)
column shaft c1 -11 0.25 0.25 0.90 (0.62)
c2 -4 0.30 0.30 0.90 (0.32)
c3 -19 0.40 0.40 0.90 (2.74)
c4 -5 0.30 0.25 0.90 (0.34)
c5 -4 0.40 0.25 0.90 (0.36)
c6 -4 0.73 0.25 0.90 (0.65)
f2 -1 3.50 3.20 0.35 (3.92)
f3 -1 3.60 4.30 0.40 (6.19)
f4 -1 5.95 7.78 0.30 (13.89)
-1 7.20 1.63 0.30 (3.52)
f5 -1 3.17 1.70 0.30 (1.62) (77.15)

Total Quantity 409.30 m3

4.0 soil treatment


columns 35 4 1.70 0.90 214.20
2 3.45 0.90 6.21
2 3.40 0.90 6.12
2 3.80 0.90 6.84
2 4.50 0.90 8.10
1 23.90 1.60 38.24
2 3.37 0.90 6.07
2 1.90 0.90 3.42
floor area 254.98
Retaining Wall 28.83 1.50 43.25
28.83 1.53 44.11
beam 2 191.40 0.60 229.68
1 191.40 0.25 47.85
Steps 6 1.20 0.15 1.08 910.14

water Proofing
Substructure
G-1000 polythene
footings 173.00
Ground Beam 173.00 0.25 43.25
ground slab 247.90
retaining wall 28.83 1.50 43.25
Stepping Stone 40.00

Sub Structure RBE-1000


Footings 292.45 0.33 96.51 96.51
Columns
C1 11 1.00 1.40 15.40
C2 4 1.20 1.40 6.72
C3 21 1.60 1.40 47.04
C4 5 1.10 1.40 7.70
C5 4 1.30 1.40 7.28
C6 4 1.95 1.40 10.92 95.06
Ground Slab 247.90 247.90
Beeams 2 173.00 0.60 207.60
1 173.00 0.25 43.25 250.85
Retaining Wall 1 28.83 4.80 138.38 138.38 828.70

Swimming Pool
Base 6.95 3.75 26.06
Wall 1 12.82 4.59 58.86
Wall 2 11.87 3.98 47.25 132.18

Overflow Drain Pain 12.82 1.70 21.79


11.87 2.88 34.19 55.98

Super Structure
Bathroom
Vertical 26.63 2.00 53.26
Outdoor Shower Area 2.95 2.00 5.90
Planter Box Wall 1 3.60 1.00 3.60
Planter Box Wall 2 1.50 1.60 2.40 65.16

Bathroom
Horizontal 19.80
Drop-off Area Slab 21.00
MEP Room Slab 5.45
Top of Boundry Wall 6.24 52.49

Total Quantity 861.21 m2


5.0 dewatering
item Allow 1.00 I. Allow

6.0 plain/screed concrete


column
f1 35 1.90 1.90 0.10 12.64
f2 1 3.45 3.40 0.10 1.17
f3 1 3.80 4.50 0.10 1.71
f4 1 6.15 7.98 0.10 4.91
1 7.40 1.83 0.10 1.35
f5. 1 3.37 1.90 0.10 0.64
Total Quantity
Ground Beam 191.40 0.25 0.10 4.79
27.20 m3
7.0 Reinforced Concrete
column footings
c1 11 1.70 1.70 0.30 9.54
c2 2 1.70 1.70 0.30 1.73
1 3.17 1.70 0.30 1.62
c3 13 1.70 1.70 0.30 11.27
1 4.30 3.60 0.40 6.19
c4 5 1.70 1.70 0.30 4.34
c5 1 3.25 3.20 0.35 3.64
c6 4 1.70 1.70 0.30 3.47 41.79

Ground beam 1 191.40 0.25 0.60 28.71 28.71

colomn shaft
c1 11 0.25 0.25 1.40 0.96
c2 2 0.30 0.30 1.40 0.25
2 0.30 0.30 1.40 0.25
c3 6 0.40 0.40 1.40 1.34
15 0.40 0.40 1.40 3.36
c4 5 0.30 0.25 1.40 0.52
c5 4 0.40 0.25 1.40 0.56
c6 4 0.73 0.25 1.40 1.02 8.27

Ground Slab 169.10 0.10 16.91 16.91

Pool
deck 9.58 6.36 0.30 18.28
side walls 23.05 0.25 1.31 7.55
9.02 0.25 1.31 2.95
19.12 0.25 0.87 4.16 32.94
Total Quantity 128.62
Measurement Sheet
Proposed Four Seasons Resort
No Description Nos Length Width Hight / Depth Sub Total Total Unit
8.0 Reinforcement
footings
c1 13 2 9 1.60 374.40
c2 2 2 9 1.60 57.60
1 2 9 3.07 55.21
1 2 16 1.60 51.20
c3 13 2 9 1.60 374.40
1 2 19 4.20 159.60
1 2 22 3.50 154.00
c4 5 4 9 1.60 288.00
c5 4 4 17 3.10 843.20
4 4 17 3.15 856.80
c6 4 4 9 1.60 230.40 3,444.81 3,058.99

pool deck 1 1 49 6.31 309.19


1 1 33 9.53 314.49
pool wall1 -
vertical 2 2 116 1.80 835.20
horizontal 2 2 9 23.60 849.60
pool wall 2 -
vertical 2 2 46 1.80 331.20
horizontal 2 2 9 9.00 324.00
2 2 96 1.43 547.20
2 2 8 19.20 614.40 4,125.28 3,663.25
column shaft -
c1 1 11 8 2.40 211.20
c2 1 4 8 2.40 76.80
c3 1 15 8 2.40 288.00
1 6 8 2.40 115.20
c4 1 5 8 2.40 96.00
c5 1 4 8 2.40 76.80
c6 1 4 10 2.40 96.00 960.00 852.48
stirepps -
c1 1 11 9 0.85 84.15
c2 1 4 9 1.05 37.80
c3 1 15 8 1.45 174.00
1 6 8 1.45 69.60
c4 1 5 9 0.95 42.75
c5 1 4 9 1.90 68.40
c6 1 4 9 3.26 117.36 594.06 234.65
1,087.13

ground beam 2 191.40 382.80 339.93


6 191.40 1,148.40 1,814.47
958 1.55 1,484.90 586.54
2,740.93
ground slab 28 3.90 109.20
20 5.40 108.00
16 10.75 172.00
55 3.00 165.00
15 8.55 128.25
44 2.75 121.00
Measurement Sheet
Proposed Four Seasons Resort
No Description Nos Length Width Hight / Depth Sub Total Total Unit
803.45
64 4.88 312.00
22 12.60 277.20
9 4.80 43.20
25 1.60 40.00
15 2.65 39.75
14 2.75 38.50
19 3.10 58.90
16 3.60 57.60
12 4.48 53.70
23 2.20 50.60
11 2.70 29.70
15 2.10 31.50
13 1.15 14.95
6 2.45 14.70 1,865.75 1,656.79

9.0 steps 38.10 0.18 6.67


0.80 1.20 0.96
7.63 4.71
1,661.49
10.0 form work
footings
c1 74.70 0.30 22.41
c2 23.30 0.30 6.99
c3 89.20 0.30 26.76
15.80 0.40 6.32
c4 34.00 0.30 10.20
c5 12.90 0.35 4.52
c6 27.30 0.30 8.19 85.38

Pool
base 1 32.20 0.30 9.66
wall 1 2 23.00 1.30 59.80
wall 2 2 9.00 1.30 23.40
wall 3 2 19.20 0.88 33.79 126.65

column shaft
c1 11 4 0.25 1.40 15.40
c2 4 4 0.30 1.40 6.72
c3 15 4 0.40 1.40 33.60
c4 5 2 0.25 1.40 3.50
5 2 0.30 1.40 4.20
c5 4 2 0.25 1.40 2.80
4 2 0.40 1.40 4.48
c6 4 2 0.25 1.40 2.80
4 2 0.73 1.40 8.12 81.62

ground beam 2 174.00 0.60 208.80 208.80


Measurement Sheet
Proposed Four Seasons Resort
No Description Nos Length Width Hight / Depth Sub Total Total Unit
steps 12 1.20 0.15 2.16
2 1.50 1.00 3.00
ground slab 154.43 0.20 30.89

11.0 column
C1 11 0.25 0.25 2.20 1.51
c2 4 0.30 0.30 3.00 1.08
c3 15 0.40 0.40 0.65 1.56
c4 5 0.25 0.30 3.00 1.13
c5 4 0.25 0.40 3.00 1.20
c6 4 0.25 0.73 3.00 2.18 8.65

mep room slab 5.40 0.10 0.54


beams 51.20 0.25 0.60 7.68 7.68
beam on boundry wall & 40.20 0.25 0.25 2.51
drop area 17.70 0.40 0.20 1.42
boundy wall 40.20 0.55 22.11
ddt -134 0.03 0.10 (0.40)
drop area 45 0.06 0.05 0.13 25.77
retaining wall1 23.80 0.25 1.20 7.14
15.10 0.25 2.00 7.55 14.69
slab 21.00 0.20 4.20 4.20
LINTOL BEAMS 54.80 55.34

40.00 0.40 0.25 4.00

12.0 block work 1 39.50 3.87 152.87


1 12.50 3.55 44.38
ddt openings -1 4.20 2.60 (10.92)
-2 1.30 2.30 (5.98)
-1 1.40 2.60 (3.64)
-1 2.20 2.60 (5.72)
-1 1.42 2.68 (3.79) 167.19
in boundry wall 1 40.20 2.21 88.84 88.84
dropoffwall 8.70 2.40 20.88
-1 5.36 (5.36) 15.52
13.0 plastering
external
Bedroom/Bathroom 34.95 3.74 130.67
Entrence 5.74 2.73 15.63 146.30
Drop-off area 2 8.50 3.10 52.69
2 2.44 4.88
4 4.97 19.89
2 1.60 3.10 9.92
3 2.70 0.40 3.24 90.62
Boundry Wall 2 25.86 3.06 158.42
MEP Room 1 13.10 2.85 37.33
Column 5 4 0.40 0.73 5.80
6 4 0.40 0.33 3.12
4 4 0.40 0.63 4.00 12.92
Retaining Wall 28.83 1.90 54.77

Pool wall 1 10.97 1.82 19.97


Pool wall2 16.93 1.20 20.32
Pool wall3 10.72 1.55 16.62 56.90
pool
base 24.00
pool drain base1 13.60 0.40 5.44
pool drain base2 11.70 0.40 4.68 34.12
pool drain wall1 13.60 2.48 33.73
pool drain wall2 11.70 1.30 15.21 48.94

83.06
floore plastering
Verandah 30.80
Pool Deck 28.58
Cabana 27.06
Drop-off 7.42
Porch 4.44
Outdoor Shower Area 10.06
foot path 39.00
151.94 0.20 30.39
steps area 7.92
6 1.20 0.15 1.08 78.39
tree box 2 5.40 1.70 18.36
5.40 0.10 0.54
3.30 1.50 4.95
45 1.20 0.10 5.40
Ground Beam1 27.24 0.55 14.98
Ground Beam2 10.29 1.35 13.89
Ground Beam3 7.90 0.35 2.77
Steps to verandah 4.23 0.70 2.96 34.60

internel plastering
living room 1 41.90 4.55 190.77
bath room 1 26.50 3.00 79.50
mep room' 1 6.15 2.85 17.51 287.78
1 5.67 2.55 14.46
floore plastering 62.30

14.0 reinforcement super


c1 1 11 8 2.95 259.60
c2 1 4 8 2.95 94.40
c3 1 15 8 0.60 72.00
1 6 8 0.60 28.80
c4 1 5 8 2.95 118.00
c5 1 4 8 2.95 94.40
c6 1 4 10 2.95 118.00 785.20 697.26
stirepps
c1 1 11 16 0.85 149.60
c2 1 4 16 1.05 67.20
c3 1 15 4 1.45 87.00
1 6 4 1.45 34.80
c4 1 5 16 0.95 76.00
c5 1 4 16 1.90 121.60
c6 1 4 16 3.26 208.64 744.84 294.21
991.47
Measurement Sheet
Proposed Four Seasons Resort
No Description Nos Length Width Hight / Depth Sub Total Total Unit
Beam 2 57.60 115.20 102.30
6 57.60 345.60 546.05
stirups 285 1.55 441.75 392.27 1,040.62

Slab 2 30 3.60 216.00


2 19 5.80 220.40 436.40 269.26
2 10 2.35 47.00
2 13 1.85 48.10 95.10 58.68
15.0 formwork 327.94
column 2 11 0.25 2.20 12.10
2 4 0.30 2.95 7.08
2 15 0.40 0.60 7.20
2 5 0.28 2.95 8.11
2 4 0.33 2.95 7.67
2 4 0.49 2.95 11.51 53.67

Beam 2 27.60 0.60 33.12 33.12


Slab 21.00
23.86 0.20 4.77 31.17
Boundry Wall 2 31.38 0.55 34.52 34.52
Retaining Wall 2 23.80 1.20 57.12
2 15.10 2.00 60.40 117.52
mep room
5.40

15.0 Roofing 11.40 2.60


15.00 7.34
13.20 4.97
4.26 1.12
2.00 2.00
112.46 11.13 123.60 123.60

Metal Roof

light weight metal canopy 90.50 90.50

16.0 Wood Work


Timber Column 15 2.50 37.50
Timber Beams 66.40

18.0 thermal and moisture protection


column 52.20
ground beam 174.00 0.25 43.50
ground slab 216.30
Measurement Sheet
Proposed Four Seasons Resort
No Description Nos Length Width Hight / Depth Sub Total Total Unit
19.0 water proofing
56.70
pool 7.40 30.00 222.00 278.70

20.0 water proofing super structure

roof 123.60
canopy 90.50
on wall 6.00
220.10

21.0 ceiling 72.00

plastering 44.20 3.92 173.26


-1 4.20 2.60 (10.92)
-2 1.30 2.30 (5.98)
-1 1.40 2.60 (3.64)
-1 2.20 2.60 (5.72)
-1 1.42 2.68 (3.79)
143.22
Boundry Wall 53.00 2.85 151.05
2 -81 0.03 (4.86)
1 81 0.90 0.10 7.29
23.3 0.20 4.66
23.3 0.25 5.83
163.96
Dropoff wall 2 24.50 49.00
9.40 0.75 7.05
7.80 2.83 22.07
22.20 0.55 12.21
1.00 4.80 4.80
7.10 0.20 1.42
2 45 0.06 5.40
45 0.91 0.10 40.95
142.90

Column 8 4 1.62 0.60 31.10


5 4 1.62 0.30 9.72
9.40 0.75 7.05
16.77
Measurement Sheet
Proposed Four Seasons Resort
No Description Nos Length Width Hight / Depth Sub Total Total Unit
Retaining wall
excavation 28.83 1.50 1.05 45.40

blinding 28.83 1.60 0.10 4.61

reinforced concrete 28.83 1.50 0.35 15.13


28.83 0.30 2.20 19.02 34.16

formwork 2 28.83 0.35 20.18


2 28.83 2.20 126.83 147.01

reinforcement 1 20 33.83 676.60


2 168 2.05 688.80
1 30 33.83 1,014.90
2 168 3.03 1,016.40
3,396.70
3,016.27

Back filling 1 25.00 0.60 0.70 10.50


1 25.00 0.60 2.20 33.00
43.50

Roof 2 11.49 2.07 47.57


2 13.29 2.17 57.63
2 5.03 2.66 26.77
131.97
13.20
145.16

Pool Tile
Wall 21.45 1.04 22.31
11.23 0.50 5.61 27.92
Measurement Sheet

Proposed Four Seasons Resort


Hight /
No Description Nos Length Width Sub Total Total Unit
Depth
1.0 top soil removing 416.26 416.26 m2

2.0 excavation
2.1 column excavation
F1 35 1.90 1.90 1.50 189.52
F2 1 3.45 3.40 1.50 17.60
F3 1 3.80 4.50 1.50 25.65
F4 1 6.15 7.98 1.50 73.62
1 7.40 1.83 1.50 20.31
F5 1 3.37 1.90 1.50 9.60 336.29 m3

2.2 plinth beam 1 310.42 0.25 0.25 19.40 19.40


Total Quantity 355.70 m3

3.0 Backfilling 1 282.10 0.50 141.05


1 26.00 0.35 9.10

column excvated qnty 336.29


f1 blinding -35 1.90 1.90 0.10 (12.64)
foooting -35 1.70 1.70 0.30 (30.34)
column shaft c1 -11 0.25 0.25 0.90 (0.62)
c2 -4 0.30 0.30 0.90 (0.32)
c3 -19 0.40 0.40 0.90 (2.74)
c4 -5 0.30 0.25 0.90 (0.34)
c5 -4 0.40 0.25 0.90 (0.36)
c6 -4 0.73 0.25 0.90 (0.65)
f2 -1 3.50 3.20 0.35 (3.92)
f3 -1 3.60 4.30 0.40 (6.19)
f4 -1 5.95 7.78 0.30 (13.89)
-1 7.20 1.63 0.30 (3.52)
f5 -1 3.17 1.70 0.30 (1.62)

Total Quantity 409.30 m3

4.0 soil treatment


columns 35 4 1.70 0.90 214.20
2 3.45 0.90 6.21
2 3.40 0.90 6.12
2 3.80 0.90 6.84
2 4.50 0.90 8.10
1 23.90 1.60 38.24
2 3.37 0.90 6.07
2 1.90 0.90 3.42
floor area 308.10
15.40
beam 3 310.42 0.25 232.82
Total Quantity 845.51 m2
Measurement Sheet
Proposed Four Seasons Resort
Hight /
No Description Nos Length Width Sub Total Total Unit
Depth
5.0 dewatering
item Allow 1.00 I. Allow

6.0 plain/screed concrete


column
f1 35 1.90 1.90 0.10 12.64
f2 1 3.45 3.40 0.10 1.17
f3 1 3.80 4.50 0.10 1.71
f4 1 6.15 7.98 0.10 4.91
1 7.40 1.83 0.10 1.35
f5. 1 3.37 1.90 0.10 0.64
Total Quantity 22.42 m3

7.0 Reinforced Concrete


column footings
c1 11 1.70 1.70 0.30 9.54
c2 2 1.70 1.70 0.30 1.73
1 3.17 1.70 0.30 1.62
c3 13 1.70 1.70 0.30 11.27
1 4.30 3.60 0.40 6.19
c4 5 1.70 1.70 0.30 4.34
c5 1 3.25 3.20 0.35 3.64
c6 4 1.70 1.70 0.30 3.47 41.79

Ground beam 1 310.42 0.25 0.60 46.56 46.56

colomn shaft
c1 11 0.25 0.25 1.40 0.96
c2 2 0.30 0.30 1.40 0.25
2 0.30 0.30 1.40 0.25
c3 6 0.40 0.40 1.40 1.34
15 0.40 0.40 1.40 3.36
c4 5 0.30 0.25 1.40 0.52
c5 4 0.40 0.25 1.40 0.56
c6 4 0.73 0.25 1.40 1.02 8.27

Ground Slab 169.10 0.15 25.37 25.37

Pool
deck 9.58 6.36 0.30 18.28
side walls 23.05 0.25 1.31 7.55
9.02 0.25 1.31 2.95
19.12 0.25 0.87 4.16 32.94
Total Quantity 154.93
Measurement Sheet
Proposed Four Seasons Resort
Hight /
No Description Nos Length Width Sub Total Total Unit
Depth
8.0 Reinforcement
footings
c1 13 2 9 1.60 374.40
c2 2 2 9 1.60 57.60
1 2 9 3.07 55.21
1 2 16 1.60 51.20
c3 13 2 9 1.60 374.40
1 2 19 4.20 159.60
1 2 22 3.50 154.00
c4 5 2 9 1.60 144.00
c5 4 2 17 3.10 421.60
4 2 17 3.15 428.40
c6 4 2 9 1.60 115.20 2,335.61 2,074.02
pool deck 1 1 49 6.31 309.19
1 1 33 9.53 314.49
pool wall1 -
vertical 1 2 116 1.80 417.60
horizontal 1 2 9 23.60 424.80
pool wall 2 -
vertical 1 2 46 1.80 165.60
horizontal 1 2 9 9.00 162.00
1 2 96 1.43 273.60
1 2 8 19.20 307.20 2,374.48 2,108.54
column shaft -
c1 1 11 8 2.25 198.00
c2 1 4 8 2.25 72.00
c3 1 15 8 2.25 270.00
1 6 8 2.25 108.00
c4 1 5 8 2.25 90.00
c5 1 4 8 2.25 72.00
c6 1 4 10 2.25 90.00 900.00 799.20
stirepps -
c1 1 11 9 0.85 84.15
c2 1 4 9 1.05 37.80
c3 1 15 8 1.45 174.00
1 6 8 1.45 69.60
c4 1 5 9 0.95 42.75
c5 1 4 9 1.90 68.40
c6 1 4 9 3.26 117.36 594.06 234.65
ground beam 8 191.40 1,531.20 1,359.71
958 1.55 1,484.90 586.54
ground slab 28 3.90 109.20 1,946.24
20 5.40 108.00
16 10.75 172.00
55 3.00 165.00
15 8.55 128.25
44 2.75 121.00
Measurement Sheet
Proposed Four Seasons Resort
Hight /
No Description Nos Length Width Sub Total Total Unit
Depth
803.45
64 4.88 312.00
22 12.60 277.20
9 4.80 43.20
25 1.60 40.00
15 2.65 39.75
14 2.75 38.50
19 3.10 58.90
16 3.60 57.60
12 4.48 53.70
23 2.20 50.60
11 2.70 29.70
15 2.10 31.50
13 1.15 14.95
6 2.45 14.70 1,865.75 1,656.79

9.0 steps 38.10 0.18 6.67


0.80 1.20 0.96
7.63

10.0 form work


footings
c1 74.70 0.30 22.41
c2 23.30 0.30 6.99
c3 89.20 0.30 26.76
15.80 0.40 6.32
c4 34.00 0.30 10.20
c5 12.90 0.35 4.52
c6 27.30 0.30 8.19 85.38

Pool
base 1 32.20 0.30 9.66
wall 1 2 23.00 1.30 59.80
wall 2 2 9.00 1.30 23.40
wall 3 2 19.20 0.88 33.79 126.65

column shaft
c1 11 4 0.25 1.40 15.40
c2 4 4 0.30 1.40 6.72
c3 15 4 0.40 1.40 33.60
c4 5 2 0.25 1.40 3.50
5 2 0.30 1.40 4.20
c5 4 2 0.25 1.40 2.80
4 2 0.40 1.40 4.48
c6 4 2 0.25 1.40 2.80
4 2 0.73 1.40 8.12 81.62

ground beam 2 174.00 0.60 208.80 208.80


Measurement Sheet
Proposed Four Seasons Resort
Hight /
No Description Nos Length Width Sub Total Total Unit
Depth
steps 12 1.20 0.15 2.16
2 1.50 1.00 3.00

11.0 column
C1 11 0.25 0.25 2.20 1.51
c2 4 0.30 0.30 2.95 1.06
c3 15 0.40 0.40 0.60 1.44
c4 5 0.25 0.30 2.95 1.11
c5 4 0.25 0.40 2.95 1.18
c6 4 0.25 0.73 2.95 2.14

beams 51.20 0.25 0.60 7.68


beam on boundry wall & 40.20 0.25 0.25 2.51
drop area 17.70 0.40 0.20 1.42
boundy wall 40.20 0.55 22.11
ddt -134 0.03 0.10 (0.40)
drop area 45 0.06 0.05 0.13
retaining wall1 23.80 0.25 1.20 7.14
15.10 0.25 2.00 7.55
slab 21.00 0.20 4.20

12.0 block work 1 39.50 3.87 152.87


1 12.50 3.55 44.38
ddt openings -1 4.20 2.60 (10.92)
-2 1.30 2.30 (5.98)
-1 1.40 2.60 (3.64)
-1 2.20 2.60 (5.72)
-1 1.42 2.68 (3.79) 167.19
in boundry wall 1 40.20 2.21 88.84 88.84

13.0 plastering
external 40.50 3.87 156.74
on boundry wall 2 73.60 2.21 325.31
on columns c3 15 4 0.30 0.60 10.80
15 4 0.30 0.05 0.90
retaining wall 1 23.80 1.20 28.56
23.80 0.25 5.95
retaining wall 2 15.10 2.00 30.20
15.10 0.25 3.78
15.10 1.00 15.10
dropoff area 1 24.50 1.00 24.50
45 0.06 1.00 2.70
10.50 2.84 29.82
Measurement Sheet
Proposed Four Seasons Resort
Hight /
No Description Nos Length Width Sub Total Total Unit
Depth
pool
base 25.90
wall 1 2 23.00 1.30 59.80
wall2 2 9.00 1.30 23.40
wall3 2 19.20 0.90 34.56
1 23.00 0.25 5.75
1 9.00 0.15 1.35
1 19.20 0.15 2.88
1 25.00 0.20 5.00
floore plastering 107.40
19.40 0.13 2.52
foot path 38.10
154.43 0.20 30.89
steps area 7.90
6 1.20 0.15 1.08
tree box 2 5.40 1.70 18.36
5.40 0.10 0.54
3.30 1.50 4.95
45 1.20 0.10 5.40

internel plastering
living room 1 26.60 3.87 102.94
bath room 1 28.50 3.87 110.30
mep room' 1 12.40 2.21 27.40
floore plastering 62.30

reinforcement super
c1 1 11 8 2.95 259.60
c2 1 4 8 2.95 94.40
c3 1 15 8 0.60 72.00
1 6 8 0.60 28.80
c4 1 5 8 2.95 118.00
c5 1 4 8 2.95 94.40
c6 1 4 10 2.95 118.00 785.20 697.26
stirepps
c1 1 11 16 0.85 149.60
c2 1 4 16 1.05 67.20
c3 1 15 4 1.45 87.00
1 6 4 1.45 34.80
c4 1 5 16 0.95 76.00
c5 1 4 16 1.90 121.60
c6 1 4 16 3.26 208.64 744.84 294.21
Measurement Sheet
Proposed Four Seasons Resort
Hight /
No Description Nos Length Width Sub Total Total Unit
Depth
Beam 8 57.60 460.80
stirups 285 1.55 441.75 902.55

Slab 30 3.60 108.00


19 5.80 110.20 218.20