Airtable-Spm-Software Project Management
Airtable-Spm-Software Project Management
BILAL MASOOD
1
1.2.2 Opportunity
The company provides best services to customer for the paint and company is introducing new
unit of protective gloves used in paint and process industry. The PPE and paint section have very
good business opportunities.
1.10 Management team
The company is using cross function teams
• Sales team
• Procurement team
• Engineers
o Chemical engineer
o Electrical engineer
o Mechanical engineer
o Civil engineer
• Material department
• Production department team/operations
• Management advisors
2 PRODUCT DESCRIPTION
2.3 Target product description
Types of PPE and uses
It can include items such as safety helmets, gloves, eye protection, high-visibility clothing, safety
footwear and safety harnesses. It also includes respiratory protective equipment (RPE).
High frequency used PPE
2
Figure 2: rubber gloves process making plant/unit to be installed
Description = The paint industrial safety is at worst condition; one can notice the hazards easily
at many points. The complete hazard study of the industry is conducted and it is recommended in
the hazard study to reduce the hazards and risks for the safety of the industry and employees. The
safety of industrial unit and its work force is very important factor in any process industry. The
work force and employees are considered to be the potential assert of the industry. For the safety
of work force and employees it is very important to introduce the PPE project. The PPE project
will not only improve the safety of industrial unit but also the improve the work performance of
employees. This project will improve the moral of the employees. The overall the production of
industrial unit will be increased. Moreover, it is requirement of HSE to adhere to industrial PPE
program. So, it is very important to initiate the PPE program and this PPE project. The buying of
gloves for the employees costs a huge amount. It is high frequency used item.so it is recommended
to install the safety rubber gloves unit. This will ensure the continuous supply o gloves to the
employees and sales of these gloves to external market will generate revenue for the industry.
5 Project sequencing and scheduling
5.2 Project Sequencing of process
3
Figure 3: process sequencing
5.3 Installation of gloves manufacturing unit procedure sequencing
Figure 5: WBS
4
Project WBS of the tasks
5
Gantt chart of the scheduling of the project
6
AIRTABLE Gallery view of the WBS