SBS Scope TL
SBS Scope TL
1
fi
Project Scope:
1. User Authentication:
• Implement a robust user authentication system to verify the
identity of users.
• Support different user roles such as students, faculty, staff, and
administrators.
2. Role-Based Access Control (RBAC):
• De ne and enforce role-based access control to restrict system
access based on user roles.
• Assign appropriate permissions to each role to ensure data
security and privacy.
3. Student Module:
• Enable students to access their academic records, grades, and
schedules.
• Implement a feature for students to update personal information
securely.
4. Faculty Module:
• Provide faculty members with access to course-related
information, student records, and class schedules.
• Allow faculty to submit grades and manage course materials.
5. Security:
• Ensure data security through encryption protocols for sensitive
information.
• Implement measures to prevent unauthorised access and
protect against common security threats.
6. User Interface (UI):
• Design an intuitive and user-friendly interface for easy
navigation.
• Ensure accessibility and responsiveness across various
devices.
2
fi
Project Timeline:
Phase 1: Planning and Analysis (Weeks 1-2)
• De ne project objectives, requirements, and deliverables.
• Conduct a detailed analysis of the existing system and user
needs.
• Create a project plan, including milestones and resource
allocation.
Phase 2: Design and Prototyping (Weeks 3-6)
• Develop system architecture and database design.
• Create wireframes and prototypes for user interface testing.
• Obtain feedback from stakeholders and make necessary
adjustments.
Phase 3: Development (Weeks 7-10)
• Implement the ERP login system based on the approved
design.
• Build authentication and authorisation mechanisms.
• Develop individual modules based on user roles.
Phase 4: Testing (Weeks 11-12)
• Conduct thorough testing, including unit testing, integration
testing, and user acceptance testing.
• Identify and address any issues or bugs discovered during
testing.
Phase 5: Deployment (Week 12)
• Prepare for system deployment, including data migration and
user training.
• Roll out the ERP login system in a controlled environment.
Phase 6: Maintenance and Support (Ongoing)
• Provide ongoing maintenance and support to address any
issues post-deployment.
•