NTPL PP End User Manual
NTPL PP End User Manual
NTPL PP End User Manual
Implementation
Project by
GENERAL INFORMATION
DOCUMENT APPROVAL
Prepared by Approved by
RAMESH KUMAR
Bill of Material
Work center
Routing
Production versions
Demand Management
Material Requirements Planning (MRP)
Collective conversion to Production Order
Manual Production Order Creation
Production Confirmation
Cancel Production Confirmation
Goods Receipt and Reversal
Technical Completion of Production Order&
Revoking
Closing of Production Order
Reports
1. Bill of Material
Procedure
3. Click button or press ENTER key and go to next screen – Create Material BOM:
General Item Overview and make the following entries
If you have only one BOM for a Material (No alternate), then this field should have
the value of “1”
A. Save the entries and view the message “BOM for Material Created” (Bottom of the
screen)
Note:
If an alternate Bill of Material is required for this material, repeat the whole cycle, message will
pop up in create BOM: Initial screen would say alternate 2 added to BOM, Press ENTER and
continue.
PP User Manual Version 1.0
2. Work Center
1. Access the activity using one of the following navigation options
After filling in all the fields, click or press Enter to go to the next screen.
3. In this Screen, Work Center basic data would be entered as given below.
After filling in all the fields, click to go back to the Work Center capacity overview.
Then click on the tab "Scheduling" tab from the menu, the system will show the following screen:
6. In Scheduling Tab
Enter Capacity category as "001" which represents machine category and hence machine
time would be the basis for calculating schedule time in production order
7. In Costing Tab
Enter Start and Finish date which represents validity date of the cost center.
Input cost center to which operational costs would be booked.
Input all activity types along with the formulae, which would be used for calculating the
activity costs.
Click button to save the new Work Center. The system will show message
3.ROUTING
1. Access the activity using one of the following navigation options
After filling in all the fields, click or press Enter to go to the next screen. "Header Details"
Enter Usage as "1" which is meant for Production routing and will be used in Production
Order. There are other task list usages which are meant for Plant maintenance and
inspection plan.
Enter Status as "4" which is a released status. It indicates that routing is valid for material
requirement planning and costing.
Enter Lot Size as "99999999" which means that routing is valid for order quantity between 0
and 99999999.
Press Operation button to add the sequence of operation and follow next step .
Some information such as Description, Group Counter and Basic Unit Measure will be populated by
system automatically.
4.PRODUCTION VERSION
Access the activity using one of the following navigation options
5.MRP RUN
Access the activity using one of the following navigation options
System will show planed order against each materialwhich are not available.
After saving
Enter plant
Sale order and item line
Press enter
Execute
In create Manual Production Order : Initial Screen, Make the following entries
To cancel a Production Order confirmation : Initial Screen, Make the following entries
Select Cancellation
Select Material Document
Fill the material document number
Press Enter
Post the document.
Save
Press entre
Select function
Save
In Technical completion for mass level : Initial Screen, Make the following entries
Execute
14. Reports
Access the activity using one of the following navigation options
Enter plant
Enter storage location
Execute