0% found this document useful (0 votes)
9 views4 pages

Testplan Sample

Uploaded by

dennisxtjohn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views4 pages

Testplan Sample

Uploaded by

dennisxtjohn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 4

**Technical Expertise:**

1. **Selenium and Java:**


- Can you explain the concept of Page Object Model (POM) and its benefits in
Selenium test automation?
- How do you handle dynamic elements or AJAX calls while automating tests with
Selenium and Java?
- What are the different types of waits available in Selenium, and when should
each be used?
2. **Robot Framework:**
- Describe the structure of a Robot Framework test case and the significance of
different sections like "Settings," "Test Cases," and "Keywords."
- How do you create custom keywords in Robot Framework, and what are the
advantages of using them?
- Can you explain the concept of data-driven testing in Robot Framework and how
it can be implemented?
3. **Python:**
- What are the benefits of using Python for test automation, and how does it
compare to other programming languages in this context?
- How do you handle exceptions and errors while writing test scripts in Python?
- Can you demonstrate your understanding of object-oriented programming concepts
in Python, such as classes, objects, and inheritance?
**Leadership and Management Skills:**
1. **Team Leadership:**
- How do you motivate and inspire your team members to achieve their best
performance?
- What strategies do you employ to effectively manage and allocate tasks within
your team?
- Can you describe a situation where you successfully resolved a conflict or
disagreement within your team?
2. **Communication and Collaboration:**
- How do you ensure effective communication and collaboration with stakeholders,
including developers, product owners, and business analysts?
- Can you provide an example of a situation where you successfully managed
stakeholder expectations and delivered high-quality test results?
- How do you handle situations where you need to provide constructive feedback
to team members or address performance issues?
**Software Testing Methodologies:**
1. **Test Planning and Strategy:**
- How do you approach test planning for a new

**Page Object Model (POM) in Selenium with Java:**


The Page Object Model (POM) is a design pattern used in Selenium test automation to
improve code maintainability, readability, and reusability. It involves creating a
separate class for each web page in the application under test. Each page object
class encapsulates all the elements and actions specific to that particular page.
**Benefits of POM:**
- **Modularity:** POM promotes modularity by separating the test logic from the
page-specific details. This makes it easier to maintain and update the tests as the
application evolves.
- **Reusability:** Page objects can be reused across multiple test cases,
eliminating the need to duplicate code. This saves time and effort, especially when
testing complex applications with many pages.
- **Readability:** POM improves the readability of test scripts by organizing the
code into logical units. Each page object class represents a single page, making it
easier to understand and follow the test flow.
**Handling Dynamic Elements and AJAX Calls:**
- **Explicit Waits:** Explicit waits are used to wait for a specific condition to
occur before proceeding with the test execution. For example, you can use an
explicit wait to wait until an element is visible or clickable before interacting
with it.
- **Implicit Waits:** Implicit waits set a default waiting time for all elements on
the page. If an element is not found within the specified time, the test fails.
Implicit waits are useful when you expect elements to load slowly or
intermittently.
- **Fluent Waits:** Fluent waits are similar to explicit waits, but they provide
more control over the waiting conditions. You can specify the maximum wait time,
the polling interval, and the condition to be checked.
**Types of Waits in Selenium:**
- **Implicit Wait:** Sets a default waiting time for all elements on the page.
- **Explicit Wait:** Waits for a specific condition to occur before proceeding with
the test execution.
- **Fluent Wait:** Provides more control over the waiting conditions compared to
explicit waits.
- **Polling Wait:** Continuously checks for a condition until it becomes true or
the maximum wait time is reached.
- **Sleep Wait:** Suspends the test execution for a specified amount of time.
**When to Use Different Waits:**
- **Implicit Wait:** Use implicit waits when you expect elements to load slowly or
intermittently, but you don't need precise control over the waiting time.
- **Explicit Wait:** Use explicit waits when you need to wait for a specific
condition to

**Handling Dynamic Elements and AJAX Calls in Selenium:**


Selenium provides several techniques to handle dynamic elements and AJAX calls
effectively. These techniques include explicit waits, implicit waits, fluent waits,
and polling waits. Each of these waits serves a specific purpose and can be used
depending on the situation.
**Explicit Waits:**
Explicit waits are used to wait for a specific condition to occur before proceeding
with the test execution. For example, you can use an explicit wait to wait until an
element is visible or clickable before interacting with it. Explicit waits are
useful when you need precise control over the waiting time and want to avoid
unnecessary delays.
Here's an example of using an explicit wait in Selenium:

In this example, the explicit wait is used to wait until the search box is visible
before typing "Selenium" into it. This ensures that the test doesn't fail if the
search box takes some time to load.
**Implicit Waits:**
Implicit waits set a default waiting time for all elements on the page. If an
element is not found within the specified time, the test fails. Implicit waits are
useful when you expect elements to load slowly or intermittently, but you don't
need precise control over the waiting time.
Here's an example of using an implicit wait in Selenium:

from selenium import webdriver


from selenium.webdriver.common.by import By
from selenium.webdriver.support.ui import WebDriverWait
from selenium.webdriver.support import expected_conditions as EC
driver = webdriver.Chrome()
driver.get("https://www.google.com")
# Wait for the search box to be visible
wait = WebDriverWait(driver, 10)
element = wait.until(EC.visibility_of_element_located((By.NAME, "q")))
# Type "Selenium" into the search box
element.send_keys("Selenium")
# Click the search button
driver.find_element(By.NAME, "btnK").click()

from selenium import webdriver


from selenium.webdriver.common.by import By
driver = webdriver.Chrome()
driver.implicitly_wait(10) # Set an implicit wait of 10 seconds
driver.get("https://www.google.com")
# Find the search box
element = driver.find_element(By.NAME, "q")
# Type "Selenium" into the search box
element.send_keys("Selenium

Certainly! As a Software QA Automation Lead, your role is crucial in ensuring the


quality and reliability of the cloud-based banking application. Let’s create a
comprehensive Test Plan Document that covers both functional and non-functional
testing aspects. Below, I’ve outlined the key sections you should include in your
test plan:

Test Plan for Cloud-Based Banking Application


1. Introduction
Scope:
Define the features, functional, and non-functional requirements of the software
that will be tested.
Specify what’s in scope (features to be tested) and what’s out of scope (features
not to be tested).
Quality Objective:
State the overall objectives of your testing project:
Ensure the application under test conforms to functional and non-functional
requirements.
Validate that the application meets quality specifications defined by the client.
Identify and fix any bugs or issues before the application goes live.
Roles and Responsibilities:
Detail the responsibilities of team members:
QA Analyst: Responsible for test planning, execution, and reporting.
Test Manager: Oversees the entire testing process.
Configuration Manager: Manages test environments and configurations.
Developers: Collaborate on defect resolution.
Installation Team: Responsible for deploying the application.
2. Test Methodology
Overview:
Explain the reason for adopting a particular test methodology for the project.
Common methodologies include:
Waterfall
Iterative
Agile
Extreme Programming
Choose the methodology based on project-specific factors.
Test Levels:
Define the types of testing to be executed on the Application Under Test (AUT).
Consider the scope, time, and budget constraints.
Bug Triage:
The goal of bug triage is to:
Define the type of resolution for each bug.
Prioritize bugs and determine a schedule for fixing them.
3. Test Deliverables
Specify the documents and artifacts to be produced during testing:
Test cases
Test scripts
Test data
Test reports
4. Resource & Environment Needs
Testing Tools:
List the automation and performance testing tools you’ll use (e.g., Selenium,
JMeter, etc.).
Test Environment:
Describe the environment where testing will take place (e.g., cloud-based servers,
databases, etc.).
5. Test Approach and Strategies
Functional Testing:
UI Testing:
Verify the user interface components (forms, buttons, navigation, etc.).
Validate user interactions and workflows.
API Testing:
Test API endpoints for correctness, security, and performance.
Use tools like Postman or REST-assured.
Desktop Application Testing:
Validate desktop-specific features.
Ensure compatibility with different operating systems.
Non-Functional Testing:
Performance Testing:
Conduct load, stress, and scalability testing.
Measure response times, throughput, and resource utilization.
Security Testing:
Assess application security (authentication, authorization, encryption, etc.).
Use tools like OWASP ZAP or Burp Suite.
Usability Testing:
Evaluate user-friendliness and accessibility.
Involve real users in testing.
6. Schedule and Milestones
Create a timeline for testing activities.
Define milestones for each testing phase.
Remember, a well-structured test plan ensures the success of your software testing
project. Feel free to adapt and customize this template to suit your specific
context. 🚀🔍

You might also like