C-Arm Refurbishing Process

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

♦ ♦ ♦ ♦

Each system is tested and report is generated to record the status of the system
components
System is dismantled and disinfected
Subassemblies are dismantled and disinfected
Corroded fasteners are replaced
System structural components are sanded with nicks, old labels, and dents
removed
Components are prepped and a primer coat is applied
Two coats of high quality polyurethane paint are applied. The paint is cured for
24 hours
A new rubber bumper, and chrome trim is applied
Components (switches, connectors, breakers, and fuses) are tested and
replaced as necessary
The imaging system is reassembled, adjusted, calibrated and burned in for 24
hours
The x-ray system is calibrated and the dose rate is set
The c-arms and monitor cart power supplies are checked and adjusted to OEM
specifications
The vertical column is checked, regreased, limit switches adjusted
Collimator: brushes checked and replaced as necessary. The bearings are
lubricated or replaced, and shutters are adjusted
C-arm bearings (cradle, flip flop, & horizontal slide) are lubricated and adjusted to
mate properly with the c-arm rail.
L-arm rotation bearings are adjusted and replaced as necessary
♦ ♦ ♦ ♦

New labels are applied as necessary


New batteries are installed and tested
Battery charger voltage is adjusted to specifications
The steering systems is adjusted and aligned. The steering wheel is replaced on
an “as needed” basis.
The c-arm rail is polished or rechromed, as necessary
Footswitch is rebuilt and readjusted
The x-ray tube is checked for excessive bearing noise and tungsten build upon
the outlet port if necessary, the tube is replaced and the x-ray system is
recalibrated
The x-ray beam is aligned
The video camera system is focused and adjusted to the highest achievable
resolution
The image intensifier is checked for artifacts and will be replaced as necessary
The image intensifier mode sizes are checked and adjusted, as necessary
The video monitor geometry is set up and adjusted
Locks, handles, and brakes are adjusted or replaced
New high voltage cable hangers are installed
Each reassembled system is tested and all functions checked
Each system is burned in for 24 hours
The high voltage cables are cleaned, and new grease applied
C-arm and cart wheels and casters are checked cleaned, and replaced as
necessary.