Me 821
Me 821
htt
Roll No. : ………………………………………………………...
Invigilator's Signature : ……………………………………….
CS/B.Tech/(ME-PE)/SEM-8/ME-821/2013
p:/
2013
TOTAL QUALITY MANAGEMENT
Time Allotted : 3 Hours Full Marks : 70
/q
The figures in the margin indicate full marks.
Candidates are required to give their answers in their own words
pap
as far as practicable.
GROUP – A
( Multiple Choice Type Questions )
1. Choose the correct alternatives for any ten of the following :
er.
10 1 = 10
a) Juran b) Crosby
c) Deming d) Taguchi.
ut .
a) cost of prevention
a c.
b) cost of appraisal
a) P b) R
p:/
c) X d) C.
a) P-chart b) R-chart
pap
c) C-chart d) OC curve.
d) None of these.
in
8375 2
CS/B.Tech/(ME-PE)/SEM-8/ME-821/2013
b) after LTPD
p:/
c) between AQL and LTPD
/q
d) after LTPD.
d) none of these.
wb
a) R chart b) P chart
ut .
has 12 elements ?
a c.
a) CIS b) BIS
/q
c) GIS d) DIS.
pap
GROUP – B
( Short Answer Type Questions )
Answer any three of the following. 3 5 = 15
quality ?
example.
them.
a c.
8375 4
CS/B.Tech/(ME-PE)/SEM-8/ME-821/2013
GROUP – C
( Long Answer Type Questions )
htt
Answer any three of the following. 3 15 = 45
Batch 1 2 3 4 5 6 7 8 9 10
pap
Mean 500 499 500 504 500 500 498 501 503 497
gm. of
5 bags
Range 3 4 2 4 3 5 4 2 6 4
er.
–
Establish control chart limits for x and R charts.
specifications ? 5 + 10
ut .
9. a) Define quality ?
a c.
8375 6
CS/B.Tech/(ME-PE)/SEM-8/ME-821/2013
10. a) Draw O.C. curve for single sampling plan and describe
htt
each region in detail. Use the following data for
n = 50, c = 2
Probability of
acceptance = 0.98, 0.92, 0.81, 0.54, 0.31,
0.11, 0.02, 0.001, 0.0001
/q
b) What do you mean by appraisal cost, internal failure
cost and external failure cost ? Give suitable examples
pap
for them. 10 + 5
a) Kaizen
er.
b) Six sigma
c) Acceptance sampling
d) Quality circle
wb
e) Poke-Yoke.
ut .