0% found this document useful (0 votes)
24 views7 pages

Me 821

Mechanical engineering
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views7 pages

Me 821

Mechanical engineering
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Name : ……………………………………………………………

htt
Roll No. : ………………………………………………………...
Invigilator's Signature : ……………………………………….
CS/B.Tech/(ME-PE)/SEM-8/ME-821/2013
p:/
2013
TOTAL QUALITY MANAGEMENT
Time Allotted : 3 Hours Full Marks : 70
/q
The figures in the margin indicate full marks.
Candidates are required to give their answers in their own words
pap
as far as practicable.

GROUP – A
( Multiple Choice Type Questions )
1. Choose the correct alternatives for any ten of the following :
er.

10 1 = 10

i) 'Quality is conformance to requirement'. This definition


was provided by
wb

a) Juran b) Crosby

c) Deming d) Taguchi.
ut .

ii) The cost associated with rework of purchased material


under

a) cost of prevention
a c.

b) cost of appraisal

c) cost of internal failure

d) cost of external failure.


in

8375 [ Turn over


CS/B.Tech/(ME-PE)/SEM-8/ME-821/2013

iii) Which one of the following is the chart for defective


htt
items ?

a) P b) R
p:/
c) X d) C.

iv) Poisson distribution is assumed in


/q

a) P-chart b) R-chart
pap

c) C-chart d) OC curve.

v) Risk of rejecting the lot of quality better than or equal to


er.

the specified AQL is called

a) consumer risk b) producer risk


wb

c) OC curve d) reliably factor.

vi) How to reduce the cost of quality ?


ut .

a) By increasing the degree of conformance

b) By decreasing the cost of failure


a c.

c) Both (a) and (b)

d) None of these.
in

8375 2
CS/B.Tech/(ME-PE)/SEM-8/ME-821/2013

vii) The region of indifference in the OC curve is found


htt
a) before AQL

b) after LTPD
p:/
c) between AQL and LTPD
/q
d) after LTPD.

viii) The range between difference quality zone is


pap

a) AQL & LTPD

b) type I error & type II error


er.

c) producers' risk and consumers' risk

d) none of these.
wb

ix) Size of sample is one in

a) R chart b) P chart
ut .

c) C chart d) none of these.

x) Which internationalized organization for standardization

has 12 elements ?
a c.

a) ISO 9000 b) ISO 9001

c) ISO 9002 d) ISO 9003.


in

8375 3 [ Turn over


CS/B.Tech/(ME-PE)/SEM-8/ME-821/2013

xi) Which of the following means mistake proofing ?


htt
a) Kaizen b) Poka yoke

c) Six sigma d) None of these.


p:/
xii) The Indian representation to ISO is

a) CIS b) BIS
/q
c) GIS d) DIS.
pap
GROUP – B
( Short Answer Type Questions )
Answer any three of the following. 3 5 = 15

2. Define quality. What are the various dimensions of


er.

quality ?

3. What do you understand by process capability ratio ? What


wb

is the physical signification of it ? Show with suitable

example.

4. Explain producers' and consumers' risk in single sampling.


ut .

5. What are the seven QC tools ? Briefly describe any two of

them.
a c.

6. Enumerate the major benefits of ISO 9000 certification. Do

all companies prefer it ?


in

8375 4
CS/B.Tech/(ME-PE)/SEM-8/ME-821/2013

GROUP – C
( Long Answer Type Questions )
htt
Answer any three of the following. 3 15 = 45

7. National Power Corp. has commissioned a new power plant

at Vellore. During the initial run of the plant, the following


p:/
observations were made by drawing 10 samples (of size 4)

drawn at an equal interval of 1 hrs.


/q
Voltage of power generated (volts)
pap
Sample Observation 1 Observation 1 Observation 1 Observation 1
No.

1 211 223 217 215

2 215 218 215 214


er.

3 228 224 221 222

4 241 218 221 212

5 220 225 216 223


wb

6 216 222 235 213

7 223 233 223 230

8 214 218 230 220


ut .

9 205 214 224 211

10 212 218 225 221


a c.

Create stable mean and sample range charts by using above

data. Also create warning control levels.

( use d 2 = 2·059, d 3 = 0·0880 and =4)


in

8375 5 [ Turn over


CS/B.Tech/(ME-PE)/SEM-8/ME-821/2013

8. a) Write down about control chart.


htt
b) In an automatic bottle filling plant 500 gm of liquid was

to be filled in bags. The permissible variation is ± 5 gm.

To investigate the process capability five bags were


p:/
taken at random from each batch for 10 successive

batches and result are shown in table-1 below.


/q
Table - 1

Batch 1 2 3 4 5 6 7 8 9 10
pap

Mean 500 499 500 504 500 500 498 501 503 497
gm. of
5 bags

Range 3 4 2 4 3 5 4 2 6 4
er.


Establish control chart limits for x and R charts.

Calculate the process capability and interpret the


wb

meaning of control chart. Take A 2 = 0.58, D 2 = 0 and

D 4 = 2.11. Will the process be able to meet the

specifications ? 5 + 10
ut .

9. a) Define quality ?
a c.

b) What are the different costs involved in quality ?

c) With the help of an example explain operating

characteristic curve. 3+6+6


in

8375 6
CS/B.Tech/(ME-PE)/SEM-8/ME-821/2013

10. a) Draw O.C. curve for single sampling plan and describe
htt
each region in detail. Use the following data for
n = 50, c = 2

Fraction defective = 0.01, 0.02, 0.03, 0.05, 0.07,


p:/
0.10, 0.15, 0.20, 0.25

Probability of
acceptance = 0.98, 0.92, 0.81, 0.54, 0.31,
0.11, 0.02, 0.001, 0.0001
/q
b) What do you mean by appraisal cost, internal failure
cost and external failure cost ? Give suitable examples
pap

for them. 10 + 5

11. Write short notes on any three of the following : 3 5

a) Kaizen
er.

b) Six sigma

c) Acceptance sampling

d) Quality circle
wb

e) Poke-Yoke.
ut .
a c.
in

8375 7 [ Turn over