Septic Tank, Storm Water, Invert Level Calculation
Septic Tank, Storm Water, Invert Level Calculation
Septic Tank, Storm Water, Invert Level Calculation
MANHOLE SCHEDU
SLOPE (1:100) 0.01
MH NO COVER LEVEL INVERT LEVEL DEPTH (M)
MH-01 0.0 -0.45 0.45
MH-02 0.0 -0.7246 0.72
MH-03 0.0 -0.45 0.45
MH-04 0.0 -0.49465 0.49
MH-05 0.0 -0.917 2.00
MH-06 1.8 0.8 1.00
MH-07 0.0 -0.6 0.60
MANHOLE SCHEDU
SLOPE (1:100) 0.01
MH NO COVER LEVEL INVERT LEVEL DEPTH
MH-01 0.0 -0.45 0.45
MH-02 0.0 -0.7246 0.74
MH-03 0.0 -0.45 0.45
MH-04 0.0 -0.49465 0.51
MH-05 0.0 -0.93 0.95
MH-06 0.0 -1.0475 1.06
MH-07 0.0 1.14 1.16
MANHOLE SC
SLOPE (1:100) 0.01
MH NO COVER LEVEL INVERT LEVEL(IN) INVERT LEVEL(OUT)
MH-01 0.0 -0.43 -0.45
MH-02 0.0 -0.7246 -0.74
MH-03 0.0 -0.43 -0.45
MH-04 0.0 -0.49465 -0.51
MH-05 0.0 -0.937 -0.96
MH-06 0.0 -1.0545 -1.07
MH-07 0.0 -1.1636 -1.18
MANHOLE SCHEDULE
MANHOLE SCHEDULE
MANHOLE SCHEDULE
MANHOLE SCHEDULE
TANK
IPC
Kitchen sink
BS EN 12056-2
WC
WB
KS
URINAL
STORAGE
TANK VOLUME
qty dfu total dfu
5 2 10
gpm 5 18.5
0.308333
BS EN 12056-2
K 0.7
WASTE WATER FLOW 1.106797 LPS
66.40783 LPM
30 MINUTE
1992.23492590608 LTR
WIDTH 8 MTR
LENGTH 20 MTR
FLOOR AREA 160 M2
H 2.003314953
J 1.001657476
PIPE 1
INSULATION 1
L 5.004972429
PA
M
MM
INCH
INCH
INCH
INCH
INCH
INCH
Q Rainwater flow,m3/sec
C Runoff coeff
I intensity of rain fall, mm/hr
A Catchment area, m2
Q= C*I*A /(3600*1000)
FLAT ROOF
CATCHMENT AREA 608 M2
C 0.9
I 60 MM/HR
OFFICE
MH NO 5
HOLDING TANK ( PEAK DEMAND)
PEAK WATER DEMAND ( 1 HOUR ) 20 LTR
NO OF PEOPLE 450 NOS
PEAK WATER FLOW ( DRAINAGE) 9000 LTR
MH-05
3M X 3M X 2 M
NOTE
DENSITY - 721 KG/M3
IPC 2 DFU = 1 GPM
DFU 46
TOTAL DFU 230
115 GPM
434.7 LPM
7.245 LPS
STORAGE 30 MINUTE
TANK VOLUME 13041 LTR
BS EN 12056-2
K 0.5
WASTE WATER FLOW 2.54951 LPS
152.9706 LPM
STORAGE 60 MINUTE
TANK VOLUME 9178.23512446701 LTR
PUMP FLOW 2.54950975679639 LPS
DRAINAGE SUMP PUMP & PIT
Depth 1
Free board 0.15
Effective depth 0.85
Sump Pit area 0.806824
Sump Pit dia 1.013805
Vehicle washing
WSFU of one Tap x 2 (consider 2 Tap ) (hose bib) 6
10.7
mtr
mtr Total water flowrate 74.920634921
mtr 283.2
m2 0.2832
MTR
One pump cycle time (T) 15
(Optimum - 15 min)
Total water flowrate (Q) 0.2832
LPS Effective volume of Sump pit (V) 1.062
Effectiva volumeAdding 20% more to overcome pump surface 1.2744
(V= T x Q/4) - For 15 min pump cycle
Depth 1
Free board 0.15
Effective depth 0.85
Pit area 1.4992941176
Pit dia 1.3820017411
M2
MM/HR
M3/SEC
LPS
GPS
GPM
gpm
gpm
lpm
m3/min
min
m3/min
m3
m3
mtr
mtr
mtr
m2
MTR
LPS
HOSPITAL - LESS THAN 100 BED SPACE
NUMBER OF BED SPACE 25 Nos
WATER REQUIREMENT PER BED 370 LTR/DAY/BED
LAUNDRY REQUIREMENT PER BED 60 LTR/DAY/BED
CANTEEN REQUREMENT 25 LTR/DAY/BED
RESIDENTIAL BUILDING
Septic tank volume = 2000 ltr + 180 ltr per person
No of people 4
Septic tank volume (ltr) 2720
m3 2.72
SEWAGE GENERATION 80% OF WATER CONSUMPTION
11375 LTR/DAY
DETENTION PERIOD 24 HOURS
CLEANING PERIOD 1 YEAR